CN207330087U - The construction platform of construction is replaced for shaft borehole cage conductor - Google Patents

The construction platform of construction is replaced for shaft borehole cage conductor Download PDF

Info

Publication number
CN207330087U
CN207330087U CN201721433724.0U CN201721433724U CN207330087U CN 207330087 U CN207330087 U CN 207330087U CN 201721433724 U CN201721433724 U CN 201721433724U CN 207330087 U CN207330087 U CN 207330087U
Authority
CN
China
Prior art keywords
construction
cage
support part
replaced
cage guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721433724.0U
Other languages
Chinese (zh)
Inventor
曹彬
操礼发
周兵谊
陈伟
高万斌
杨友来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201721433724.0U priority Critical patent/CN207330087U/en
Application granted granted Critical
Publication of CN207330087U publication Critical patent/CN207330087U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model belongs to mine Maintenance and Repair equipment, and in particular to a kind of construction platform that construction is replaced for shaft borehole cage conductor, including for carrying the support part of construction personnel, and the equipped section for old cage guide after carrying new cage guide to be installed and dismantling;The top that the construction platform is installed on vertical shaft hoisting container can move up and down with hoisting container, to realize personnel and the cage guide conveying between underground and well head;The hollow-out parts passed through for the main hoisting rope of hoisting container are equipped with the middle part of the construction platform.For a large amount of pit shafts for replacing cage guide, construct using with tank platform, effectively raise construction efficiency, ensure that construction safety;Shaft borehole cage conductor replaces the successful use with tank platform, not only solves the construction difficult problem for being difficult to replace cage guide in pit shaft, and ensure that the safety of construction personnel, improves the construction efficiency for replacing cage guide.

Description

The construction platform of construction is replaced for shaft borehole cage conductor
Technical field
The utility model belongs to mine Maintenance and Repair equipment, and in particular to a kind of to replace construction for shaft borehole cage conductor Construction platform.
Background technology
Cage guide is to provide a kind of spacing and guiding track in mine for the up and down motion of hoisting container, at present, with each Mine yield is continuously increased, and the requirement of higher is proposed to whole lifting system.Cage guide in pit shaft is due to being subject to high-frequency Collision, in abrasion and pit shaft the complex conditions such as water drenching influence, its service life gradually decreases, and replacement frequency gradually increases Add.Under normal circumstances, pit guide length is every 12 meters, and weight is in 1t or so.It is replaced among shaft of vertical well Difficulty of construction and security risk it is all very big.
Utility model content
The purpose of this utility model is to provide a kind of construction platform that can be improved shaft cage guide and replace construction efficiency.
To achieve the above object, the utility model provides following technical scheme:One kind is used for shaft borehole cage conductor and replaces The construction platform of construction, including for carrying the support part of construction personnel, and for after carrying new cage guide to be installed and dismantling The equipped section of old cage guide;The top that the construction platform is installed on vertical shaft hoisting container can move up and down with hoisting container, with Realize the personnel between underground and well head and cage guide conveying;The main hoisting rope being equipped with the middle part of the construction platform for hoisting container leads to The hollow-out parts crossed.
Preferably, the cage guide is vertically detachably mounted on the girder steel at support part edge, the girder steel, that is, structure Into the equipped section.
Preferably, the middle part of a construction platform at least girder steel is consolidated by the main hoisting rope of restrict card and hoisting container Connect.
Preferably, the support part is equipped with least two layers, spaced setting between each layer support part, adjacent two layers bracketing Be supported between portion by column, in the spacing and cage guide between adjacent two layers support part between adjacent two installation site between Away from suitable.
Preferably, each layer of support part includes two pieces of bracketing regions, and two pieces of bracketing regions pass through respectively at for main hoisting rope The both sides in region.
Preferably, other each layer support parts in addition to orlop support part are being respectively provided with one close to main hoisting rope position Crossbeam, the crossbeam are affixed with main hoisting rope by card of restricting.
Preferably, the cage guide is connected and fixed by U-shaped card and the channel steel at support part edge.
Preferably, the support part is equipped with three layers, is spaced 4m between adjacent two layers support part, is equipped between each layer support part Connect mutual cat ladder.
The utility model has technical effect that:In Construction in Preparatory Stage, processing and fabricating is with tank platform, the halt production of ore deposit side in advance Afterwards, using with tank platform replacement cage guide will be carried out, next time replaceable 4-8 on container with tank stage+module on hoisting container Root cage guide.For a large amount of pit shafts for replacing cage guide, construct using with tank platform, effectively raise construction efficiency, ensure Construction safety;Shaft borehole cage conductor replaces the successful use with tank platform, not only solves and is difficult to replace cage guide in pit shaft Construction difficult problem, and ensure that the safety of construction personnel, improve the construction efficiency for replacing cage guide.
Brief description of the drawings
Fig. 1 is the front view of the utility model;
Fig. 2 is the side view of the utility model;
Fig. 3 is the top view of the orlop support part of the utility model;
Fig. 4 is the top view of the utility model other each layer support parts in addition to orlop.
Embodiment
The utility model is described in detail below in conjunction with attached drawing.
As shown in Figs 1-4, a kind of construction platform that construction is replaced for shaft borehole cage conductor, including for carrying constructor The support part 11 of member, and the equipped section for old cage guide 16 after carrying new cage guide 16 to be installed and dismantling;The construction platform It can move up and down installed in the top of vertical shaft hoisting container 10 with hoisting container 10, to realize the personnel between underground and well head Conveyed with cage guide 16;The hollow-out parts passed through for the main hoisting rope 13 of hoisting container 10 are equipped with the middle part of the construction platform.Preferably, The cage guide 16 is vertically detachably mounted on the girder steel 14 at 11 edge of support part, is taken described in the girder steel 14 i.e. composition Load portion.The middle part of a construction platform at least crossbeam 17 is solid by the main hoisting rope 13 of restrict card 18 and hoisting container 10 Connect.The support part 11 is equipped with least two layers, spaced setting between each layer support part 11, between adjacent two layers support part 11 Be supported by column 12, in the spacing and cage guide 16 between adjacent two layers support part 11 between adjacent two installation site between Away from suitable.Each layer of support part 11 includes two pieces of bracketing regions, and two pieces of bracketing regions for main hoisting rope 13 respectively at passing through region Both sides.Other each layer support parts 11 in addition to orlop support part 11 are being respectively provided with a horizontal stroke close to main 13 position of hoisting rope Beam 17, the crossbeam 17 are affixed with main hoisting rope 13 by card 18 of restricting.The cage guide 16 passes through cage guide card 15 and construction platform side The channel steel that edge is set connects and fixes.The support part 11 is equipped with three layers, and 4m, each layer bracketing are spaced between adjacent two layers support part 11 It is equipped between portion 11 and connects mutual cat ladder.
In Construction in Preparatory Stage, processing and fabricating, will be with tank stage+module in lifting appearance after ore deposit side stops production with tank platform in advance On device 10, using carrying out replacing cage guide 16 with tank platform, next time replaceable 4-8 roots cage guide 16 on container.Replaced for a large amount of The pit shaft of cage guide 16, constructs using with tank platform, effectively raises construction efficiency, ensure that construction safety;Vertical well The successful use with tank platform is replaced in canister road 16, not only solves the construction difficult problem for being difficult to replace cage guide 16 in pit shaft, and It ensure that the safety of construction personnel, improve the construction efficiency for replacing cage guide 16.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (8)

  1. A kind of 1. construction platform that construction is replaced for shaft borehole cage conductor, it is characterised in that:Including for carrying construction personnel Support part (11), and for carry new cage guide to be installed and dismounting after old cage guide equipped section;The construction platform installation It can move up and down at the top of vertical shaft hoisting container (10) with hoisting container (10), to realize the personnel between underground and well head Conveyed with cage guide (16);The hollow-out parts passed through for the main hoisting rope of hoisting container (10) are equipped with the middle part of the construction platform.
  2. 2. the construction platform according to claim 1 that construction is replaced for shaft borehole cage conductor, it is characterised in that:The tank Road (16) is vertically detachably mounted on the girder steel (14) at support part (11) edge, described in which is formed Equipped section.
  3. 3. the construction platform according to claim 1 that construction is replaced for shaft borehole cage conductor, it is characterised in that:It is described to apply The middle part of a work platform at least crossbeam (17) is affixed by rope card (18) and the main hoisting rope (13) of hoisting container (10).
  4. 4. the construction platform according to claim 1 that construction is replaced for shaft borehole cage conductor, it is characterised in that:The support Support portion (11) is equipped with least two layers, and spaced setting between each layer support part (11), leads between adjacent two layers support part (11) Cross column (12) to be supported, between upper adjacent two installation site of spacing and cage guide (16) between adjacent two layers support part (11) Spacing it is suitable.
  5. 5. the construction platform according to claim 4 that construction is replaced for shaft borehole cage conductor, it is characterised in that:Each layer Support part (11) includes two pieces of bracketing regions, and two pieces of bracketing regions are respectively at the both sides for passing through region for main hoisting rope (13).
  6. 6. the construction platform according to claim 4 that construction is replaced for shaft borehole cage conductor, it is characterised in that:Except most lower Other each layer support parts (11) beyond layer support part (11) are being respectively provided with a crossbeam (17) close to main hoisting rope (13) position, The crossbeam (17) is affixed by rope card (18) and main hoisting rope (13).
  7. 7. the construction platform according to claim 2 that construction is replaced for shaft borehole cage conductor, it is characterised in that:The tank Road (16) is connected and fixed by the channel steel that cage guide card (15) is set with construction platform edge.
  8. 8. the construction platform according to claim 1 that construction is replaced for shaft borehole cage conductor, it is characterised in that:The support Support portion (11) is equipped with three layers, and 4m is spaced between adjacent two layers support part (11), connection is equipped with each other between each layer support part (11) Cat ladder.
CN201721433724.0U 2017-10-31 2017-10-31 The construction platform of construction is replaced for shaft borehole cage conductor Active CN207330087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721433724.0U CN207330087U (en) 2017-10-31 2017-10-31 The construction platform of construction is replaced for shaft borehole cage conductor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721433724.0U CN207330087U (en) 2017-10-31 2017-10-31 The construction platform of construction is replaced for shaft borehole cage conductor

Publications (1)

Publication Number Publication Date
CN207330087U true CN207330087U (en) 2018-05-08

Family

ID=62363762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721433724.0U Active CN207330087U (en) 2017-10-31 2017-10-31 The construction platform of construction is replaced for shaft borehole cage conductor

Country Status (1)

Country Link
CN (1) CN207330087U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107651545A (en) * 2017-10-31 2018-02-02 淮南矿业(集团)有限责任公司 The construction platform of construction is changed for shaft borehole cage conductor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107651545A (en) * 2017-10-31 2018-02-02 淮南矿业(集团)有限责任公司 The construction platform of construction is changed for shaft borehole cage conductor

Similar Documents

Publication Publication Date Title
CN102536289B (en) Two-column shielding large-center distance and ultrahigh-working resistance hydraulic support for medium-thickness coal seam
CN102900460A (en) Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN204703066U (en) The built-in cable channel in inter-city passenger rail T beam sidewalk
CN201650330U (en) Special advanced supporting support set for conveyor gateway on fully-mechanized coal mining faces
CN207330087U (en) The construction platform of construction is replaced for shaft borehole cage conductor
CN104500117B (en) Without repeatedly supporting continuous supporting advanced hydraulic support
CN107651545A (en) The construction platform of construction is changed for shaft borehole cage conductor
CN101798935B (en) Transverse self-moving combined suspension hydraulic bracket
CN108252218A (en) A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
CN204492830U (en) The supporting job platform of a kind of colliery driving suspension device
CN111022098A (en) Advanced support system and method for fully-mechanized roadway continuous construction
CN105822315B (en) The anti-battery truck car slipping crash device of shield machine and method
CN102352772B (en) Fully enclosed telescopic safety protection device of transloading machine
CN202370265U (en) Movable type safe and flat screen
CN104555837A (en) Boiler overhauling platform
CN204572054U (en) Drag conveyor handrail of eddied ladder device
CN209040868U (en) Coal working face branch bridge joint cash device
CN203820389U (en) Rail bound aisle stacking crane
CN100567059C (en) Movable flexible buffer stop
CN206008942U (en) A kind of mill of magnetic iron ore underground mill selects system
CN206346735U (en) Top-coal caving face elevating conveyor fluid pressure linkage whole closing appliance
CN203903745U (en) Protection door capable of being opened and closed automatically along with rising and falling of elevator
CN210882136U (en) Mining scraper rail clamping device and system thereof
CN202467878U (en) Medium-thick coal layer two-column-shield type large-center-distance ultrahigh working resistance hydraulic support
CN206727566U (en) A kind of upset cable trough for drag conveyor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant