CN207325888U - A kind of arbor connection structure - Google Patents

A kind of arbor connection structure Download PDF

Info

Publication number
CN207325888U
CN207325888U CN201721073594.4U CN201721073594U CN207325888U CN 207325888 U CN207325888 U CN 207325888U CN 201721073594 U CN201721073594 U CN 201721073594U CN 207325888 U CN207325888 U CN 207325888U
Authority
CN
China
Prior art keywords
arbor
hole
crab
contiguous block
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721073594.4U
Other languages
Chinese (zh)
Inventor
杨恒远
刘继波
李永刚
张聚辉
毕海香
于建忠
卢彬彬
王佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weichai Heavy Machinery Co Ltd
Original Assignee
Weichai Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weichai Heavy Machinery Co Ltd filed Critical Weichai Heavy Machinery Co Ltd
Priority to CN201721073594.4U priority Critical patent/CN207325888U/en
Application granted granted Critical
Publication of CN207325888U publication Critical patent/CN207325888U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casting Devices For Molds (AREA)

Abstract

The utility model discloses a kind of arbor connection structure, including contiguous block, crab is inserted into contiguous block, since the size of through hole is slightly larger than main core bone size, conveniently crab is inserted into through hole.Secondary arbor is threaded into screw hole again, the end of secondary arbor is withstood on the sidepiece of crab, preventing from shaking there are gap between crab and contiguous block causes sand core cracked, then puts the manufacturing process that sand completes sand core again.First revolute arbor is needed during cleaning, it is extracted crab out after exiting screw hole, contiguous block is taken out by the hole above casting structure, so as to complete the taking-up work of arbor.Contiguous block and crab, secondary arbor all in sand encirclement, may be reused.

Description

A kind of arbor connection structure
Technical field
It the utility model is related to a kind of arbor connection structure.
Background technology
Sand core is used for being formed the inner-cavity structure of casting, is largely surrounded in casting mold by the liquid metal of high temperature, and core Bone is a kind of made of metal skeleton, being placed in sand core to improve the strength and stiffness of sand core in casting.
Traditional arbor has two kinds of overall arbor or split arbor.Overall arbor is to use round steel or screw-thread steel integrally bending system Into, or be welded together to form round steel or screw-thread steel by the way of electric welding.Split arbor refers to arbor being divided into two parts Or several parts, the mode being then stitched together during coremaking.For the complex sand core of structure, integral core is used Bone can only often solve the strength and stiffness problems of sand core, but the limitation due to casting structure in scale removal process causes arbor It cannot take out.And use split arbor, although taken out during cleaning it is more convenient, in foundry production by Easily connect in sand core in transhipment, the stress during lower core and the buoyancy for bearing during cast iron liquid, sand core in arbor Socket part position is broken, the defects of causing disconnected core, core floatation.
Utility model content
The technical problems to be solved in the utility model is in view of the foregoing drawbacks, there is provided a kind of arbor connection structure, the arbor Connection structure ensure that the intensity of sand core, and take out sand core during being convenient to clean.
In order to solve the above-mentioned technical problem, the utility model includes contiguous block, and the middle part of the contiguous block is equipped with through hole, institute State and crab is fitted with through hole, the sidepiece of the contiguous block is equipped with the screw hole with perforation in the middle part of through hole, and pair is bolted with screw hole Arbor.
The opposite both ends of the surface of the through hole through connection block.
The through hole is vertically arranged with screw hole.
The diameter of the through hole is more than the diameter of crab.
The end of the pair arbor is equipped with external screw thread, and the externally threaded length is more than the depth of screw hole.
The end of the pair arbor is located at the sidepiece in through hole with crab and holds out against.
Using the above scheme after the advantages of effect be:Crab is inserted into contiguous block, since the size of through hole is slightly larger than master Arbor size, therefore conveniently crab is inserted into through hole.Secondary arbor is threaded into screw hole again, is made The end of secondary arbor withstands on the sidepiece of crab, and preventing from shaking there are gap between crab and contiguous block causes sand core to go out Existing crackle, then puts the manufacturing process that sand completes sand core again.
First revolute arbor is needed during cleaning, it is extracted crab out after exiting screw hole, contiguous block passes through casting The hole of structure is taken out, so as to complete the taking-up work of arbor.Contiguous block and crab, secondary arbor all in sand encirclement, It may be reused.
Brief description of the drawings
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the structure diagram of contiguous block;
Fig. 3 is the bottom view of Fig. 2.
Embodiment
As shown in Figure 1-Figure 3, which includes contiguous block 3, and the middle part of contiguous block 3 is equipped with through hole 31, through hole The opposite both ends of the surface of 31 through connection blocks 3, the center line of through hole 31 are overlapped with the center line between 3 both ends of contiguous block.This implementation Through hole 31 is circular hole in example.Crab 1 is fitted with through hole 31, the diameter of through hole 31 is more than the diameter of crab 1, easy to lead Arbor 1 is inserted into through hole 31.The sidepiece of contiguous block 3 is equipped with the screw hole 32 with the perforation of the middle part of through hole 31, and through hole 31 hangs down with screw hole 32 It is straight to set.Secondary arbor 2 is bolted with screw hole 32.32 inner wall of screw hole is equipped with internal thread in the present embodiment, and the end of secondary arbor 2 is set There is the external screw thread with screw-internal thread fit, externally threaded length is more than the depth of screw hole 32, is so conveniently adjusted what secondary arbor 2 screwed in Length.Screw that secondary arbor 2 can make the end of secondary arbor 2 and crab 1 is located at a sidepiece top in through hole 31 in the present embodiment Tightly.
During coremaking, certain thickness sand is laid with core box bottom first, ensures that contiguous block 3 is fully enclosed in sand core and works as In.Crab 1 is inserted into contiguous block 3, since the size of through hole 31 is slightly larger than 1 size of crab, is conveniently inserted crab 1 Enter in through hole 31.Secondary arbor 2 is threaded into screw hole 32 again, the end of secondary arbor 2 is withstood on main core The sidepiece of bone 1, preventing from shaking there are gap between crab 1 and contiguous block 3 causes sand core cracked, then puts sand again Complete the manufacturing process of sand core.
First revolute arbor 2 is needed during cleaning, it is extracted crab 1 out after exiting screw hole 32, contiguous block 3 passes through Hole above casting structure is taken out, so as to complete the taking-up work of arbor.Contiguous block 3 and crab 1, secondary arbor in the present embodiment 2 all in sand encirclement, may be reused.
The utility model is not limited to above-mentioned embodiment, and those skilled in the art, are not departing from the utility model On the premise of spirit and scope, some change and modification can be done.The scope of protection of the utility model should be with the utility model Subject to claim.

Claims (6)

1. a kind of arbor connection structure, it is characterized in that:Including contiguous block(3), the contiguous block(3)Middle part be equipped with through hole (31), the through hole(31)Inside it is fitted with crab(1), the contiguous block(3)Sidepiece be equipped with and through hole(31)Middle part penetrates through Screw hole(32), screw hole(32)Inside it is bolted with secondary arbor(2).
2. arbor connection structure according to claim 1, it is characterized in that:The through hole(31)Through connection block(3)Relatively Both ends of the surface.
3. arbor connection structure according to claim 2, it is characterized in that:The through hole(31)With screw hole(32)Vertically set Put.
4. arbor connection structure according to claim 1, it is characterized in that:The through hole(31)Diameter be more than crab (1)Diameter.
5. arbor connection structure according to claim 1, it is characterized in that:The pair arbor(2)End be equipped with external screw thread, The externally threaded length is more than screw hole(32)Depth.
6. arbor connection structure according to claim 5, it is characterized in that:The pair arbor(2)End and crab(1) Positioned at through hole(31)An interior sidepiece is held out against.
CN201721073594.4U 2017-08-25 2017-08-25 A kind of arbor connection structure Expired - Fee Related CN207325888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721073594.4U CN207325888U (en) 2017-08-25 2017-08-25 A kind of arbor connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721073594.4U CN207325888U (en) 2017-08-25 2017-08-25 A kind of arbor connection structure

Publications (1)

Publication Number Publication Date
CN207325888U true CN207325888U (en) 2018-05-08

Family

ID=62374455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721073594.4U Expired - Fee Related CN207325888U (en) 2017-08-25 2017-08-25 A kind of arbor connection structure

Country Status (1)

Country Link
CN (1) CN207325888U (en)

Similar Documents

Publication Publication Date Title
CN103624218B (en) A kind of casting method of hollow crankshaft of slurry pump
CN206779390U (en) A kind of fixation frock between sand mold and core
CN201588403U (en) Core mould used for concrete pore construction
CN104815965B (en) A kind of annulus sand core rod bridge-type connects anti-deformation method and structure
CN207193983U (en) A kind of cast-in-place pile concrete pours pipe guide
CN111659870A (en) Centrifugal roller die casting tool and casting process thereof
CN207325888U (en) A kind of arbor connection structure
CN104259406A (en) Sand core support for exhausting pipe
CN207119740U (en) Stop-off hanger
CN103567390B (en) A kind of method for designing for aluminium alloy sleeper beam sand cores of castings fabrication hole
CN205834183U (en) A kind of safe and reliable chill suspension ring
CN206765041U (en) A kind of mounting structure of the reserving hole in prefabricated concrete elements
CN205519511U (en) Injection molding machine accessory mode locking hydro -cylinder becomes core bar
CN212191123U (en) Pouring cup
CN203621396U (en) Combined sand core for miniature vehicle four-cylinder body
CN204700244U (en) A kind of endless belt sand core rod bridge-type connects anti-deforming structure
CN207255172U (en) A kind of anti-shrinkage cavity shrinkage porosity structure of oil cylinder class casting
CN203917805U (en) A kind of wax-pattern weld holder
CN205270758U (en) Exhaust stick structure of wheel centre bore psammitolite
CN204135308U (en) A kind of ductile iron pipe pipe die
CN204867300U (en) Psammitolite and make core box of this psammitolite
CN205394406U (en) Remove electrolytic aluminum series short circuit mouth insulation support specialized tool
CN203409188U (en) Cast wooden mold structure of bracket-supported riser sleeve
CN213162987U (en) Centrifugal roller die casting frock
CN204792399U (en) Transformer ware body positioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508

CF01 Termination of patent right due to non-payment of annual fee