CN207316945U - The mounting structure of rapping beam in membrane wall deashing device - Google Patents

The mounting structure of rapping beam in membrane wall deashing device Download PDF

Info

Publication number
CN207316945U
CN207316945U CN201721280257.2U CN201721280257U CN207316945U CN 207316945 U CN207316945 U CN 207316945U CN 201721280257 U CN201721280257 U CN 201721280257U CN 207316945 U CN207316945 U CN 207316945U
Authority
CN
China
Prior art keywords
rapping
membrane wall
rapping beam
locking
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721280257.2U
Other languages
Chinese (zh)
Inventor
朱建云
徐建新
顾君健
马志莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Hailu Heavy Industry Co Ltd
Original Assignee
Suzhou Hailu Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Hailu Heavy Industry Co Ltd filed Critical Suzhou Hailu Heavy Industry Co Ltd
Priority to CN201721280257.2U priority Critical patent/CN207316945U/en
Application granted granted Critical
Publication of CN207316945U publication Critical patent/CN207316945U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Using Semi-Permeable Membranes (AREA)

Abstract

The utility model discloses a kind of mounting structure of rapping beam in membrane wall deashing device, including:The rapping beam being arranged on outside membrane wall, the rapping beam at each rapping position are connected by elastic locking mechanism with membrane wall, and the structure of elastic locking mechanism includes:Tie down screw is threaded through in the locking through hole on rapping beam, the end of tie down screw on the inside of locking through hole is weldingly fixed on adjacent two water pipes of membrane wall by backing plate, spring base is set with tie down screw on the outside of locking through hole, compression spring is set with spring base, the both ends difference top pressure of spring is compressed on spring base and pressing plate, pressing plate is sleeved on the tie down screw of compression spring outwards, and locking nut is provided with the tie down screw outside pressing plate;Tightening locking nut all on a rapping beam can be fitted in rapping beam compression outside membrane wall.The utility model has the advantage of:Effectively membrane wall can be avoided to be damaged, so that the water pipe for preventing membrane wall is occurred by the situation of drawing crack.

Description

The mounting structure of rapping beam in membrane wall deashing device
Technical field
It the utility model is related to membrane wall waste heat boiler technical field, and in particular to the deashing device on membrane wall.
Background technology
Membrane wall is also referred to as fin panel casing.After membrane wall waste heat boiler operation a period of time, it can be saved bit by bit on boiler inner wall A certain amount of dust, this not only results in boiler heat exchange inefficiency, is also easy to cause boiler failure.In order to ensure boiler can pacify Efficiently run entirely, deashing device is installed outside boiler diaphragm type wall.As shown in Figure 1, the structure of deashing device includes:In boiler 1 Membrane wall outside short transverse be arranged at intervals with some rapping beams 2, rapping beam 2 is weldingly fixed on outside membrane wall, every rapping It is arranged at intervals with some rapping positions on beam 2, electronic hammer 3 is provided with the rack outside each rapping position.It is electronic to hit The impact rapping of hammer 3 beam 2 is beaten, the vibrations of rapping beam 2 drive boiler slightly to shake, so that the dust stratification on boiler inner wall drops and reaches To the purpose of deashing.
At present, the rapping beam in deashing device is to be fixedly mounted on by welding outside membrane wall.The defects of such It is:Under boiler thermal-state operating status, fin panel casing can produce expansion, this is easy to cause the weldering of rapping beam and fin panel casing Socket part position produces drawing crack, so as to easily trigger boiler tubes cracking accident, seriously affects safe operation of the boiler.
Utility model content
The utility model technical issues that need to address are:A kind of connection that can effectively avoid membrane wall and rapping beam is provided Position is by the mounting structure of rapping beam in the membrane wall deashing device of drawing crack.
To solve the above problems, the technical solution adopted in the utility model is:The peace of rapping beam in membrane wall deashing device Assembling structure, including:Fitting is arranged on the rapping beam outside membrane wall, and rapping beam is longitudinally spaced to be provided with some rapping positions, each The rapping beam at rapping position is connected by elastic locking mechanism with membrane wall, the structure bag of the elastic locking mechanism Include:The locking through hole being arranged on rapping beam, tie down screw are threaded through in locking through hole, the tie down screw on the inside of locking through hole End is weldingly fixed on adjacent two water pipes of membrane wall by backing plate, is locked and is set with bullet on the tie down screw on the outside of through hole Spring abutment, is set with compression spring on spring base, compresses the both ends difference top pressure of spring on spring base and pressing plate, the pressing plate It is sleeved on the tie down screw of compression spring outwards, locking nut is provided with the tie down screw outside pressing plate;Tighten a rapping Rapping beam can be compressed and is fitted in outside membrane wall by all locking nuts on beam.
Further, in foregoing membrane wall deashing device rapping beam mounting structure, wherein, rapping beam is i shaped steel Beam, i-shape steel beam include inner side flange plate, web, ala lateralis listrium, and the locking through hole is opened in i-shape steel beam On the flange plate of inner side, film can be fitted in by the inner side flange plate compression of rapping beam by tightening locking nut all on a rapping beam Outside formula wall.
Further, in foregoing membrane wall deashing device rapping beam mounting structure, wherein, at each rapping position A pair of of elastic locking mechanism is both provided with the rapping beam at place, a pair of of elastic locking mechanism is in the both sides up and down of the web of rapping beam It is arranged symmetrically.
Further, in foregoing membrane wall deashing device rapping beam mounting structure, wherein, two neighboring shake positioned at every Pad is equipped with some spacing deck plates between the rapping beam and membrane wall beaten between position, and the cross section of every piece of spacing deck plate is arc, often Block spacing deck plate is bonded on the outer wall for a water pipe for being welded on membrane wall.
Further, in foregoing membrane wall deashing device rapping beam mounting structure, wherein, the compression spring is Disc spring.
Further, in foregoing membrane wall deashing device rapping beam mounting structure, wherein, on every tie down screw It is provided with inside and outside two locking nuts.
Further, in foregoing membrane wall deashing device rapping beam mounting structure, wherein, at each rapping position Rapping beam on be both provided with reinforcing plate, reinforcing plate is arranged symmetrically in the both sides up and down of the web of rapping beam.
The utility model has the advantages that:Rapping beam is connected by elastic locking mechanism with membrane wall, rapping beam and membrane type Nothing is directly connected between wall, and when membrane wall expands with heat and contract with cold because of temperature change, the compression spring in elastic locking mechanism can The active force for expanding with heat and contract with cold and producing is absorbed, effectively avoids membrane wall from being damaged, so as to prevent feelings of the water pipe by drawing crack of membrane wall Condition occurs, this can greatly prolong the service life of membrane wall waste heat boiler, and greatly improves the use peace of membrane wall waste heat boiler Quan Xing.
Brief description of the drawings
Fig. 1 is the mounting structure schematic diagram of the deashing device on the membrane wall waste heat boiler described in background technology.
Fig. 2 is the mounting structure schematic diagram of rapping beam in membrane wall deashing device described in the utility model.
Fig. 3 is the structure diagram shown in the right apparent directions of Fig. 2.
Fig. 4 is the structure diagram shown in Fig. 2 overlook directions.
Embodiment
The utility model is described in further detail with preferred embodiment below in conjunction with the accompanying drawings.
As shown in Figure 2, Figure 3, Figure 4, in membrane wall deashing device rapping beam mounting structure, including:Fitting is arranged on film Rapping beam 2 outside formula wall 1, rapping beam 2 is longitudinally spaced to be provided with some rapping positions 6, the rapping beam 2 at each rapping position 6 It is connected by elastic locking mechanism with membrane wall 1.The structure of the elastic locking mechanism includes:It is arranged on rapping beam 2 On locking through hole 21, tie down screw 22 is threaded through in locking through hole 21, the end of the tie down screw 22 of locking through hole 21 inner side It is weldingly fixed on by two pieces of backing plates 3 on adjacent two water pipes 4 of membrane wall 1, on the tie down screw 22 in 21 outside of locking through hole Spring base 23 is set with, compression spring 24 is set with spring base 23, the compression spring 24 is disc spring.Compress spring 24 Top pressure is distinguished on spring base 23 and pressing plate 25 in both ends, and the pressing plate 25 is sleeved on the tie down screw 22 in 24 outside of compression spring On, it is provided with locking nut 26 on the tie down screw 22 outside pressing plate 25.Tighten 26 energy of locking nut all on a rapping beam 2 Rapping beam 2 is compressed and is fitted in outside membrane wall 1.In order to ensure the reliability of locking in the present embodiment, on every tie down screw 22 It is both provided with inside and outside two locking nuts 26.
In the present embodiment, in order to improve the stability of rapping beam 2 and intensity, rapping beam 2 is i-shape steel beam, i shaped steel Beam includes inner side flange plate 201, web 202, ala lateralis listrium 203.The locking through hole 21 is opened in i-shape steel beam On inner side flange plate 201, the inner side flange plate 201 of rapping beam 2 can be pressed by tightening locking nut 26 all on a rapping beam 2 Tightly it is fitted in outside membrane wall 1.In order to further improve the stability of rapping beam 2 and intensity, the rapping at each rapping position Reinforcing plate 27 is both provided with beam 2, reinforcing plate 27 is arranged symmetrically in the both sides up and down of the web 202 of rapping beam 2.Shake to improve The connection reliability between beam 2 and membrane wall 1 is beaten, a pair of of snap lock is both provided with the rapping beam 2 at each rapping position Tight mechanism, a pair of of elastic locking mechanism are arranged symmetrically in the both sides up and down of the web 202 of rapping beam 2.
In order to further improve the stability connected between rapping beam 2 and membrane wall 1, while in order to quickly transmit vibrations, Pad is equipped with some spacing deck plates 5, every piece of spacer between rapping beam 2 and membrane wall 1 between every two neighboring rapping position 6 The cross section of plate 5 is in arc-shaped, and every piece of spacing deck plate 5 is bonded and is welded on the outer wall of a water pipe 4 of membrane wall 1, actual In manufacturing process, spacing deck plate 5 can be cut by water pipe and be formed.
When membrane wall waste heat boiler needs deashing, the rapping position 6 of electronic hammer impact rapping beam 2, rapping beam 2 produces Raw vibrations, vibrations are transferred on membrane wall 1 by backing plate 3 and spacing deck plate 5, and such membrane wall 1 will produce vibrations, membrane wall 1, which produces vibrations, then can cause the dust stratification on boiler inner wall to drop.
The utility model has the advantage of:First, rapping beam 2 is connected by elastic locking mechanism with membrane wall 1, rapping beam Nothing is directly connected between membrane wall, when membrane wall 1 expands with heat and contract with cold because of temperature change, the compression bullet in elastic locking mechanism Spring 24 can absorb the active force for expanding with heat and contract with cold and producing, and effectively avoid membrane wall 1 impaired, so as to prevent the water pipe of membrane wall 1 Occurred by the situation of drawing crack, this can greatly prolong the service life of membrane wall waste heat boiler, and greatly improve membrane wall waste heat pot The safety in utilization of stove.2nd, after rapping beam 2 is tapped, the vibrations of rapping beam 2 can be passed rapidly by backing plate 3 and spacing deck plate 5 It is handed on membrane wall 1, which greatly enhances the effect of deashing.

Claims (7)

1. the mounting structure of rapping beam in membrane wall deashing device, including:Fitting is arranged on the rapping beam outside membrane wall, rapping beam It is longitudinally spaced to be provided with some rapping positions, it is characterised in that:The rapping beam at each rapping position passes through elastic locking machine Structure is connected with membrane wall, and the structure of the elastic locking mechanism includes:The locking through hole being arranged on rapping beam, locking screw Bar is threaded through in locking through hole, and the end for locking the tie down screw on the inside of through hole is weldingly fixed on the adjacent of membrane wall by backing plate On two water pipes, lock and be set with spring base on the tie down screw on the outside of through hole, compression spring is set with spring base, compress bullet The both ends difference top pressure of spring is on spring base and pressing plate, and the pressing plate is sleeved on the tie down screw of compression spring outwards, pressure Locking nut is provided with tie down screw outside plate;Patch can be compressed by rapping beam by tightening locking nut all on a rapping beam Close outside membrane wall.
2. the mounting structure of rapping beam in membrane wall deashing device according to claim 1, it is characterised in that:Rapping beam is I-shape steel beam, i-shape steel beam include inner side flange plate, web, ala lateralis listrium, and the locking through hole is opened in I-shaped On the inner side flange plate of section steel beam, the inner side flange plate of rapping beam can be compressed by tightening locking nut all on a rapping beam It is fitted in outside membrane wall.
3. the mounting structure of rapping beam in membrane wall deashing device according to claim 2, it is characterised in that:Shake each Beat on the rapping beam at position and be both provided with a pair of of elastic locking mechanism, a pair of of elastic locking mechanism rapping beam web it is upper Lower both sides are arranged symmetrically.
4. the mounting structure of rapping beam in membrane wall deashing device according to claim 1, it is characterised in that:Positioned at every phase Pad is equipped with some spacing deck plates between rapping beam and membrane wall between adjacent two rapping positions, and the cross section of every piece of spacing deck plate is Arc-shaped, every piece of spacing deck plate is bonded on the outer wall for a water pipe for being welded on membrane wall.
5. the mounting structure of rapping beam, its feature exist in the membrane wall deashing device according to claim 1 or 2 or 3 or 4 In:The compression spring is disc spring.
6. the mounting structure of rapping beam, its feature exist in the membrane wall deashing device according to claim 1 or 2 or 3 or 4 In:Inside and outside two locking nuts are both provided with every tie down screw.
7. the mounting structure of rapping beam in the membrane wall deashing device according to Claims 2 or 3, it is characterised in that:Every Reinforcing plate is both provided with the rapping beam at a rapping position, reinforcing plate is arranged symmetrically in the both sides up and down of the web of rapping beam.
CN201721280257.2U 2017-09-30 2017-09-30 The mounting structure of rapping beam in membrane wall deashing device Withdrawn - After Issue CN207316945U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721280257.2U CN207316945U (en) 2017-09-30 2017-09-30 The mounting structure of rapping beam in membrane wall deashing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721280257.2U CN207316945U (en) 2017-09-30 2017-09-30 The mounting structure of rapping beam in membrane wall deashing device

Publications (1)

Publication Number Publication Date
CN207316945U true CN207316945U (en) 2018-05-04

Family

ID=62428503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721280257.2U Withdrawn - After Issue CN207316945U (en) 2017-09-30 2017-09-30 The mounting structure of rapping beam in membrane wall deashing device

Country Status (1)

Country Link
CN (1) CN207316945U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107631312A (en) * 2017-09-30 2018-01-26 苏州海陆重工股份有限公司 The mounting structure of rapping beam in membrane wall deashing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107631312A (en) * 2017-09-30 2018-01-26 苏州海陆重工股份有限公司 The mounting structure of rapping beam in membrane wall deashing device
CN107631312B (en) * 2017-09-30 2023-08-01 苏州海陆重工股份有限公司 Mounting structure of vibrating beam in membrane wall ash removal device

Similar Documents

Publication Publication Date Title
CN207316945U (en) The mounting structure of rapping beam in membrane wall deashing device
CN107806736B (en) Independently detachable mechanism for installing refrigerator
CN107631312A (en) The mounting structure of rapping beam in membrane wall deashing device
KR200390456Y1 (en) Guide Structure of Bellows Expansion Joint for Pump
CN103940090A (en) Heat pump water heater and heat exchanger thereof
WO2012139437A1 (en) Two-point clamping device for high-power thyristor
CN201587524U (en) Asphalt tanker and heat insulating shell connecting device
CN107143043B (en) Flexible connection node
CN103590505A (en) Honeycomb-type steel plate damper
CN106401170A (en) Outer wall strengthening device for connection of aluminum alloy formwork and high plates
CN203364649U (en) Supporting structure for heat exchanger in nuclear power station containment vessel
CN205102164U (en) Water -cooling wall
CN210802194U (en) Fixing device of heat exchanger connecting pipe
CN209099597U (en) A kind of good easy assembled steel bar truss floor support plate of soundproof effect
CN204944279U (en) A kind of deflection plate used on corrugated tube heat exchanger
CN204530456U (en) A kind of Novel comb tooth plate stretching device anchor bolt
WO2010081272A1 (en) Link assembly between vertical rigid girder and horizontal rigid girder in boiler
CN202398950U (en) Safety fixing device for clips
CN219866638U (en) Cooling water pipeline device for copper foil production
CN206146294U (en) Online quick scale removal device of plate heat exchanger
CN203705009U (en) Boiler drum liquid level meter
CN219264631U (en) End cover structure and heat recovery condenser
CN103658190A (en) Split type hot continuous rolling cooling water retaining structure
CN212430844U (en) Sealing structure between heat insulation slag discharge pipe and air distribution plate
CN210394259U (en) Protective plate for coke oven

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180504

Effective date of abandoning: 20230801

AV01 Patent right actively abandoned

Granted publication date: 20180504

Effective date of abandoning: 20230801