CN207314326U - It is a kind of that there is the pile pile of crack detection - Google Patents
It is a kind of that there is the pile pile of crack detection Download PDFInfo
- Publication number
- CN207314326U CN207314326U CN201720983756.1U CN201720983756U CN207314326U CN 207314326 U CN207314326 U CN 207314326U CN 201720983756 U CN201720983756 U CN 201720983756U CN 207314326 U CN207314326 U CN 207314326U
- Authority
- CN
- China
- Prior art keywords
- pile
- metal bar
- carrier
- crack detection
- alarm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
It is a kind of that there is the pile pile of crack detection, it is characterized in that, including pile pile main body, the pile pile body interior is equipped with the metal bar of connection pile pile upper and lower ends, the metal bar both ends are welded on the reinforced frame at pile pile both ends, and sealed by concreting, a carrier is slidably connected on the metal bar, some wireropes are connected with the carrier, the detection device can freely up and down move under the collective effect with hawser tractive force of conducting oneself with dignity along metal bar, the pile pile is equipped with a maintenance room, in pile pile after construction machinery completes piling process, room is overhauled far from ground 1.2m, the utility model can be monitored except bad stake rate caused by the change reduction construction of pile pile itself at any time in the construction process, underground foundation situation is monitored at any time after can also being built up in building.
Description
Technical field
It the utility model is related to civil construction field, and in particular to a kind of that there is the pile pile of crack detection.
Background technology
Pile pile is as a kind of method for processing foundation and pile foundation form, easy for construction, industrial metaplasia short with the construction period
Production, economic benefits pollution-free to construction site, it is adaptable the advantages that.Pile pile used in ground usually mixes neck by reinforcing bar
Soil, which pours, to be formed, and since practical operation is improper or the limitation of soil layer during piling, pile pile is likely to occur fracture, if
Cracked pile pile cannot timely be found, significantly increase the risk of subsequent operation, existing patent is to pile pile
Research focus primarily on the sedimentation of pile pile in terms of, few to the fault analysis of pile pile, the utility model is not only in work progress
It is middle to monitor at any time except bad stake rate caused by the change reduction construction of pile pile itself, monitor ground at any time after can also being built up in building
Lower base case, if occurring whether earthquake can also be alarmed in advance by alarm mechanism, provides for the common people and more escapes
The raw time.
The content of the invention
To solve the deficiencies in the prior art, the purpose of this utility model is to provide a kind of pipe for having and detecting alarm at any time
Stake.
In order to realize above-mentioned target, the utility model adopts the following technical scheme:
A kind of to have the function of the pile pile of crack detection, including pile pile main body, the pile pile body interior is equipped with connection pile pile
The metal bar of upper and lower ends, the metal bar both ends are welded on the reinforced frame at pile pile both ends, and are sealed by concreting,
A carrier is slidably connected on the metal bar, some wireropes are connected with the carrier, the detection device is certainly
Can freely up and down being moved along metal bar under the collective effect of weight and hawser tractive force, the pile pile is equipped with a maintenance room,
Pile pile is after construction machinery completes piling process, and maintenance room is far from ground 1.2m.
As the further preferred of the utility model, the pile pile be internally provided with more it is evenly distributed along pile pile length direction
The thin rod of conductivity ceramics.
As the further preferred of the utility model, will symmetrically be bundled by the thin rod of conductivity ceramics of soft rubber set cladding
After steel reinforcement cage, it is put into drilling and is poured.
As the further preferred of the utility model, equipped with the sliding slot that three sizes are identical, carrier in the metal bar
Inner surface is equipped with limited block corresponding with the sliding slot, and the limited block is slidably connected with the sliding slot.
As the further preferred of the utility model, the maintenance indoor location has haulage gear and fracture alarm mechanism,
The haulage gear includes DC power supply, DC servo motor, singlechip computer system, and DC servo motor is connected with wirerope,
Pass through the control for controlling the operating of the singlechip computer system to realize to DC servo motor, fracture alarm mechanism bag
Include the tinkle of bells alarm, alarm display lamp, alarm control module, the thin rod both ends of conductivity ceramics set in pile pile pass through conducting wire and alarm
Control module is connected.
As the further preferred of the utility model, the maintenance room is equipped with artificial overhauls window, and maintenance chamber interior is equipped with
Multiple LED illumination lamps.
As the further preferred of the utility model, ultrasonic sensor or ultra high-definition shooting are installed on the carrier
The equipment such as machine, the equipment are connected with computer display terminal.
The beneficial effects of the utility model:It not only can at any time monitor and be applied except the change of pile pile itself is reduced in the construction process
Bad stake rate caused by work, underground foundation situation is monitored after can also being built up in building at any time, if earthquake is occurring whether also
It can in advance be alarmed by alarm mechanism, more escape times provided for the common people.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is carrier and metal bar 1 is slidably installed figure;
Fig. 3 is the end view drawing of metal bar;
Fig. 4 is the top view of carrier;
Fig. 5 is alarm station structure diagram;
Fig. 3 is the schematic diagram of second buffer layer;
The implication of reference numeral in figure:1- metal bars, 2- carriers, 3- maintenance room, 4- wireropes, the thin rod of 5- conductivity ceramics,
6- alarm stations, 7- alarm display lamps, 8- the tinkle of bells alarms.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is further introduced.
Embodiment 1
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of of the present embodiment has the function of the pile pile of crack detection, including pile pile
Main body, pile pile body interior are equipped with the metal bar 1 of connection pile pile upper and lower ends, and 1 both ends of metal bar are welded on the steel at pile pile both ends
In ledges, and sealed by concreting, a carrier 2 is slidably connected on metal bar 1, if being connected with carrier 2
Dry wirerope 4, carrier 2 can freely up and down move under the collective effect with 4 tractive force of wirerope of conducting oneself with dignity along metal bar 1, pile pile
Maintenance room 3 is equipped with, in pile pile after construction machinery completes piling process, maintenance room 3 is led away from ground 1.2m, this of the present embodiment
Thin 5 periphery of rod of electroceramics is coated with one layer of soft rubber set, will be thin by the conductivity ceramics of soft rubber set cladding when manufacturing pile pile
After rod 5 is symmetrically bundled in steel reinforcement cage, it is put into drilling and is poured, the thin rod 5 of the conductivity ceramics after pouring is along pile pile length
Direction is evenly distributed, as shown in Figure 2, Figure 3 and Figure 4, equipped with the sliding slot that three sizes are identical in metal bar 1,2 inner walls in carrier
Equipped with limited block corresponding with sliding slot, limited block is slidably connected with sliding slot, generally, in order to make carrier 2 under rising
Operation is more stablized when drop, multiple clump weights is equipped with carrier 2, and the clump weight can rationally change with being actually needed
Quantity.
Haulage gear and fracture alarm mechanism be installed in the maintenance room 3 of the present embodiment, haulage gear include DC power supply,
DC servo motor, singlechip computer system, DC servo motor are connected with wirerope, pass through the fortune of control single chip computer TT&C system
Go to realize the control to DC servo motor, and then to the control of carrier 2;Fracture alarm mechanism alarms including the tinkle of bells
Device 8, alarm display lamp 7, alarm control module, thin 5 both ends of rod of conductivity ceramics set in pile pile pass through conducting wire and controlling alarm mould
Block is connected, and the quantity of the quantity rod 5 thin with conductivity ceramics of alarm display lamp 7 is consistent, as shown in figure 5, the tinkle of bells alarm 8 and alarm
Display lamp 7 is installed on alarm station 6, and 7 arrangement position of alarm display lamp and the installation of the thin rod 5 of conductivity ceramics set in pile pile
Position corresponds, easy to be quickly found out fracture extent when pile pile is broken, to meet repairing or the operation of other necessity, this reality
The maintenance room for applying example is equipped with artificial overhauls window, and maintenance room 3 is internally provided with multiple LED illumination lamps.
When detecting pile pile crack conditions, in order to realize that 360 ° are detected without dead angle, the mode on carrier 2 circumferentially is equal
Even installation more than one piece ultrasonic sensor, by controlling the operating of direct current generator, makes carrier in 4 pulling force of wirerope and conducts oneself with dignity common
Pump under effect along metal bar 1, ultrasonic sensor carries out comprehensive sweep to pile pile inside during movement
Retouch, and be sent to signal is measured on the computer display terminal being connected with sensor.
Embodiment 2
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of of the present embodiment has the function of the pile pile of crack detection, including pile pile
Main body, pile pile body interior are equipped with the metal bar 1 of connection pile pile upper and lower ends, and 1 both ends of metal bar are welded on the steel at pile pile both ends
In ledges, and sealed by concreting, a carrier 2 is slidably connected on metal bar 1, if being connected with carrier 2
Dry wirerope 4, carrier 2 can freely up and down move under the collective effect with 4 tractive force of wirerope of conducting oneself with dignity along metal bar 1, pile pile
Maintenance room 3 is equipped with, in pile pile after construction machinery completes piling process, maintenance room 3 is led away from ground 1.2m, this of the present embodiment
Thin 5 periphery of rod of electroceramics is coated with one layer of soft rubber set, will be thin by the conductivity ceramics of soft rubber set cladding when manufacturing pile pile
After rod 5 is symmetrically bundled in steel reinforcement cage, it is put into drilling and is poured, the thin rod 5 of the conductivity ceramics after pouring is along pile pile length
Direction is evenly distributed, as shown in Figure 2, Figure 3 and Figure 4, equipped with the sliding slot that three sizes are identical in metal bar 1,2 inner walls in carrier
Equipped with limited block corresponding with sliding slot, limited block is slidably connected with sliding slot, generally, in order to make carrier 2 under rising
Operation is more stablized when drop, multiple clump weights is equipped with carrier 2, and the clump weight can rationally change with being actually needed
Quantity.
Haulage gear and fracture alarm mechanism be installed in the maintenance room 3 of the present embodiment, haulage gear include DC power supply,
DC servo motor, singlechip computer system, DC servo motor are connected with wirerope, pass through the fortune of control single chip computer TT&C system
Go to realize the control to DC servo motor, and then to the control of carrier 2;Fracture alarm mechanism alarms including the tinkle of bells
Device 8, alarm display lamp 7, alarm control module, thin 5 both ends of rod of conductivity ceramics set in pile pile pass through conducting wire and controlling alarm mould
Block is connected, and the quantity of the quantity rod 5 thin with conductivity ceramics of alarm display lamp 7 is consistent, as shown in figure 5, the tinkle of bells alarm 8 and alarm
Display lamp 7 is installed on alarm station 6, and 7 arrangement position of alarm display lamp and the installation of the thin rod 5 of conductivity ceramics set in pile pile
Position corresponds, easy to be quickly found out fracture extent when pile pile is broken, to meet repairing or the operation of other necessity, this reality
The maintenance room for applying example is equipped with artificial overhauls window, and maintenance room 3 is internally provided with multiple LED illumination lamps.
When detecting pile pile crack conditions, in order to realize that 360 ° are detected without dead angle, the mode on carrier 2 circumferentially is equal
Even installation more than one piece ultra high-definition camera, and a searchlight is installed by each camera, by the fortune for controlling direct current generator
Turn, carrier is pumped under 4 pulling force of wirerope and the collective effect of dead weight along metal bar 1, during movement
Ultra high-definition camera to pile pile inside carry out it is comprehensive photographs to record, and will measure signal be sent to camera even computer show
Show in terminal.
The above is only the preferred embodiment of the utility model patent, it is noted that for the general of the art
For logical technical staff, on the premise of the utility model patent principle is not departed from, some improvements and modifications can also be made, this
A little improvements and modifications also should be regarded as the protection domain of the utility model patent.
Claims (7)
1. a kind of have the function of the pile pile of crack detection, it is characterised in that including pile pile main body, the pile pile body interior is equipped with
The metal bar of pile pile upper and lower ends is connected, the metal bar both ends are welded on the reinforced frame at pile pile both ends, and pass through concrete
Sealing is poured, a carrier is slidably connected on the metal bar, some wireropes, detection device are connected with the carrier
Can freely up and down it be moved along metal bar under the collective effect with wirerope tractive force of conducting oneself with dignity, the pile pile is equipped with a maintenance
Room, in pile pile after construction machinery completes piling process, maintenance room is far from ground 1.2m.
A kind of there is the pile pile of crack detection 2. according to claim 1, it is characterised in that set inside the pile pile
There are more along the thin rod of the evenly distributed conductivity ceramics of pile pile length direction.
A kind of there is the pile pile of crack detection 3. according to claim 2, it is characterised in that will be by soft rubber set
After the thin rod of conductivity ceramics of cladding is symmetrically bundled in steel reinforcement cage, it is put into drilling and is poured.
A kind of there is the pile pile of crack detection 4. according to claim 1, it is characterised in that set in the metal bar
Have an identical sliding slot of three sizes, carrier inner surface is equipped with limited block corresponding with the sliding slot, the limited block with it is described
Sliding slot is slidably connected.
A kind of there is the pile pile of crack detection 5. according to claim 1, it is characterised in that the indoor peace of maintenance
Equipped with haulage gear and fracture alarm mechanism, the haulage gear includes DC power supply, DC servo motor, microcontroller observing and controlling system
System, DC servo motor are connected with wirerope, are realized by controlling the operating of the singlechip computer system to DC servo electricity
The control of machine, the fracture alarm mechanism include the tinkle of bells alarm, alarm display lamp, and alarm control module, what is set in pile pile leads
The thin rod both ends of electroceramics are connected by conducting wire with alarm control module.
A kind of there is the pile pile of crack detection 6. according to claim 1, it is characterised in that the maintenance room is equipped with
Artificial overhauls window, maintenance chamber interior are equipped with multiple LED illumination lamps.
A kind of there is the pile pile of crack detection 7. according to claim 1, it is characterised in that pacify on the carrier
Equipped with the equipment such as ultrasonic sensor or ultra high-definition camera, the equipment is connected with computer display terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720983756.1U CN207314326U (en) | 2017-08-08 | 2017-08-08 | It is a kind of that there is the pile pile of crack detection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720983756.1U CN207314326U (en) | 2017-08-08 | 2017-08-08 | It is a kind of that there is the pile pile of crack detection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207314326U true CN207314326U (en) | 2018-05-04 |
Family
ID=62434119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720983756.1U Active CN207314326U (en) | 2017-08-08 | 2017-08-08 | It is a kind of that there is the pile pile of crack detection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207314326U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138159A (en) * | 2018-09-04 | 2019-01-04 | 沈阳炳恒科技有限公司 | It is a kind of to fill the steel structure connecting member for prejudging alarm rod |
CN115094961A (en) * | 2022-07-13 | 2022-09-23 | 南京工业大学 | Long-term monitoring device and method for bearing performance of stiff composite pile |
-
2017
- 2017-08-08 CN CN201720983756.1U patent/CN207314326U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138159A (en) * | 2018-09-04 | 2019-01-04 | 沈阳炳恒科技有限公司 | It is a kind of to fill the steel structure connecting member for prejudging alarm rod |
CN115094961A (en) * | 2022-07-13 | 2022-09-23 | 南京工业大学 | Long-term monitoring device and method for bearing performance of stiff composite pile |
CN115094961B (en) * | 2022-07-13 | 2023-05-26 | 南京工业大学 | Long-term monitoring device and method for bearing performance of stiff composite pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104374649B (en) | A kind of experimental rig and method for being used to observe shear deformation breaks down feature between pile tube and the slip casting soil body | |
CN104330819B (en) | A kind of microseismic sensors recoverable erecting device and installation method | |
CN105241656B (en) | The physical simulation experiment system and method for deep tunnel high resistant Extendable anchor rod supporting | |
CN202125080U (en) | Heat dissipation device for concrete | |
CN207314326U (en) | It is a kind of that there is the pile pile of crack detection | |
CN106437178A (en) | Integral lifting construction method and integral lifting construction device of veranda of multi-layer steel structure | |
CN205421870U (en) | Pressure sensing safety type scaffold | |
CN104947663A (en) | Special drive type umbrella-shaped anchor for rushing to deal with emergency as well as application method of anchor | |
CN204040081U (en) | Cast-in-place pile concrete conduit buried depth monitoring device | |
CN206667880U (en) | A kind of electric power line pole tower Anti-inclining monitoring device | |
CN203961014U (en) | A kind of precast concrete building structure | |
CN113187247A (en) | Construction method of cast-in-situ cup-mouth foundation steel structure | |
CN212052561U (en) | Disconnection clearing device for inverted-hanging monitoring facility | |
CN206016230U (en) | It is based on assembled wall-connecting piece exterior wall scaffold system | |
CN203834355U (en) | Device for full-view detection of bridge | |
CN107476263A (en) | A kind of construction method of prestressed pier anchor cable | |
CN203247568U (en) | Slope section lifting monitoring device | |
CN206635780U (en) | A kind of soil nailed wall retaining structure | |
CN205242467U (en) | Foundation pit deformation monitoring device | |
CN212154862U (en) | Tunnel is suddenly mud gushing water inrush early warning blocking device | |
CN204982875U (en) | Special use of speedily carrying out rescue work is hit into formula umbellate form anchor | |
CN210036580U (en) | Real-time monitoring tool for displacement of surface mine side slope | |
CN203514836U (en) | Safety protection structure for horizontal openings of elevator shaft and pipe shaft | |
CN206735651U (en) | A kind of lifting suspension centre offset tool | |
CN203654789U (en) | Combined type shaping safety net on periphery of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |