CN207314233U - A kind of full section of tunnel cleaning device - Google Patents

A kind of full section of tunnel cleaning device Download PDF

Info

Publication number
CN207314233U
CN207314233U CN201721074167.8U CN201721074167U CN207314233U CN 207314233 U CN207314233 U CN 207314233U CN 201721074167 U CN201721074167 U CN 201721074167U CN 207314233 U CN207314233 U CN 207314233U
Authority
CN
China
Prior art keywords
main line
cleaning device
water
bye
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721074167.8U
Other languages
Chinese (zh)
Inventor
段晓
郭明果
杨小凡
徐照新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Shandong Co Ltd
Original Assignee
CRRC Shandong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Shandong Co Ltd filed Critical CRRC Shandong Co Ltd
Priority to CN201721074167.8U priority Critical patent/CN207314233U/en
Application granted granted Critical
Publication of CN207314233U publication Critical patent/CN207314233U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of full section of tunnel cleaning device, it solves the problems, such as to exist in the prior art and city tunnel can not be cleaned effectively, its spray angle can be adjusted according to field operation effect, it can be achieved that being to comprehensive fully cleaning, its technical solution of full section of tunnel:Including rail flat car, rail flat car both ends lower part sets track cleaning device, rail flat car both ends top sets tunnel cross-section cleaning device, the tunnel cross-section cleaning device includes main line, axially disposed multiple first bye-passes of main line side wall, first bye-pass includes the hose connected with main line, and hose is also connected by connector with steel pipe, and steel tube end part sets nozzle.

Description

A kind of full section of tunnel cleaning device
Technical field
City rail Line Flush technical field is the utility model is related to, cleans and fills more particularly to a kind of full section of tunnel Put.
Background technology
With the growth of urban rail transit in China, especially subway construction, which is presented, flourishes, and is protected for equipment in subway The demand of the depollution of environment highlights increasingly in foster cleaning, tunnel.
And since subway circulation is all increasing in whole city, its running length and the volume of the flow of passengers, for the clear of subway It is very high to wash difficulty, and with the accumulation of metro operation time, the pollution to tunnel is also increasingly severe.
At present, carrying out clean mode for subway has dust-collecting type and Water flush, and dust-collecting type is to tunnel using air-source Dust accumulation carries out dust suction in road, and this mode needs to expend mass energy, and dust-collecting type compares for some region of cleaning effect Substantially, but for whole tunnel area effective cleaning can not be realized, cleaning effect is poor, and cleaning efficiency is low;Water flush is by water It is sprayed in tunnel environment and is cleaned, this mode is more preferable relative to dust-collecting type cleaning effect, but existing Water flush device Set straight tube to be rinsed tunnel area mostly, water outlet sprinkling direction can not be adjusted, also can not just be liquidated according to tunnel environment Wash angle to adjust, simultaneously because subway tunnel environment is complicated, often there is electric device to be installed in tunnel wall, existing water rinses Mode can not avoid it, though complete cleaning also hence in so that electric device break down, can not work normally, on the contrary because It is small to lose greatly.
In conclusion the problem of can not effectively being cleaned for city tunnel in the prior art, still lack effective solution party Case.
Utility model content
In order to overcome the above-mentioned deficiencies of the prior art, the utility model provides a kind of full section of tunnel cleaning device, its Full section of tunnel equipment can be efficiently cleaned after one action operation, a large amount of manpowers is saved, reduces washing and cleaning operation cost;
Further, the utility model uses following technical proposals:
A kind of full section of tunnel cleaning device, including rail flat car, rail flat car both ends lower part set track to clean Device, rail flat car both ends top set tunnel cross-section cleaning device, and the tunnel cross-section cleaning device includes main line, are responsible for Axially disposed multiple first bye-passes of trackside wall, first bye-pass include the hose connected with main line, and hose is also logical Cross connector to connect with steel pipe, steel tube end part sets nozzle.
Further, the main line head end is connected with the second bye-pass, main line end by tunnel clean water route with First water pump connects.
Further, second bye-pass includes steel pipe, and steel tube end part sets nozzle, set between steel pipe and main line Valve.
Further, the main line is vertically arranged, and the first bye-pass is set with main line into setting angle.
Further, the angle of multiple first bye-passes and main line is different two-by-two.
Further, angle of multiple first bye-passes from top to bottom with main line gradually increases.
Further, the angle of first bye-pass and main line is 10~90 degree.
Further, high-pressure ball valve is set between the hose and main line, steel pipe is rotationally connected with rail flat car.
Preferably, the connector is adjustable spherojoint.
Further, the track cleaning device includes multiple water lines, and water lines clean water route by hose and track Connection, track cleaning water route are connected with the second water pump.
Further, the water lines set multiple nozzles, and high-pressure ball valve is set between nozzle and water lines.
Further, the nozzle is connected to water lines by adjustable spherojoint.
Further, the water lines are laterally set, and water lines are also connected with vertical pipeline, and vertical pipeline is also equipped with more A nozzle.
Further, the water lines set high-pressure solenoid valve, and high-pressure solenoid valve is connected with controller.
Further, water pot and power unit, water pot and track cleaning device, tunnel cross-section are set on the rail flat car Cleaning device is all connected with;Power unit is all connected with track cleaning device, tunnel cross-section cleaning device.
Compared with prior art, the beneficial effects of the utility model are:
The cleaning device of the utility model, multiple bye-passes are set on the main line side wall of tunnel cross-section cleaning device, And each bye-pass is made of hose and fastener for connection, this, which allows for spray angle, to be adjusted according to field operation effect, The sprinkling situation of cleaning device is enabled to be more in line with the work requirements at tunnel scene.
The cleaning device of the utility model, the first bye-pass are laid successively along the axial direction of main line side wall, and each first Pipeline is from top to bottom sequentially increased with the angle of main line, this to be sprayed in the whole short transverse of main line Spill, sufficiently cleaning can be realized comprehensively to the side wall in tunnel;The connector of hose and steel pipe is arranged to adjustable spherojoint, Ke Yitong Overregulate cleaning of the spherojoint satisfaction to tunnel wall different height.
The cleaning device of the utility model, track cleaning device set multiple horizontal water lines and vertical pipeline, can be right The sidepiece of track and top are effectively cleaned, and track cleaning device is arranged on tunnel cross-section cleaning device lower part, can be with Cleaning is realized to the whole section in tunnel, full section of tunnel equipment can be efficiently cleaned after one action operation, is saved a large amount of Manpower, reduce washing and cleaning operation cost, improves operating environment and safety in tunnel.
The cleaning device of the utility model, track cleaning device, tunnel cross-section cleaning device each pipeline on be respectively provided with High-pressure ball valve, it is possible to achieve, can so when running into the electric device of tunnel wall to the open and close controlling of each water pipe line spraying nozzle Portion nozzle is selectively turned on, to achieve the purpose that to bypass electric device, more ensure that the security of cleaning.
Brief description of the drawings
The accompanying drawings which form a part of this application are used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are used to explain the application, do not form the improper restriction to the application.
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the front view of track cleaning device;
Fig. 3 is the top view of track cleaning device;
Fig. 4 is the structure diagram of tunnel cross-section cleaning device;
Fig. 5 is the combination diagram of track cleaning device and tunnel cross-section cleaning device;
Fig. 6 is the water cleaning performance schematic diagram of the utility model;
In figure, 1 rail flat car, 2 first water pumps, 3 power units, 4 water pots, 5 second water pumps, 6 cleaning devices, 7 high pressures are soft Pipe, 8 stainless steel water pipelines, 9 nozzles, 10 high pressures are adjustable spherojoint, 11 high-pressure ball valves, 12 high-pressure solenoid valves, 13 vertical pipelines, 14 Nozzle, 15 high pressures are adjustable spherojoint, 16 high-pressure ball valves, 17 stainless-steel pipes, 18 high pressure rubber hoses, 19 high-pressure hose connectors, 20 stainless-steel pipes, 21 main lines, 22 first bye-passes, 23 second bye-passes, 24 valves.
Embodiment
It is noted that described further below is all illustrative, it is intended to provides further instruction to the application.It is unless another Indicate, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, exist in the prior art to city tunnel can not effectively clean deficiency, in order to Technical problem as above is solved, present applicant proposes a kind of safe efficient, labor-saving full section of tunnel cleaning device.
In a kind of typical embodiment of the application, as shown in figures 1 to 6, there is provided a kind of full section of tunnel cleaning dress Put, including rail flat car 1,1 both ends of rail flat car are respectively provided with cleaning device 6, water pot 4 and power unit set on rail flat car 1 3rd, the first water pump 2 and the second water pump 5, water pot 4 and power unit 3 are connected with cleaning device 6;
First water pump 2, power unit 3, water pot 4, the second water pump 5, cleaning device 6 are arranged on rail flat car 1.First Water pump 2,3 and second water pump 5 of power unit are bolted with base, convenient dismounting, base and the welding of rail flat car 1 one Rise.Water pot 4 is connected by high-strength bolts with car body, and water pot 4 is formed by stainless steel welded, equipped with manhole and manhole ladder, facilitates work Make personnel and pass in and out water pot work.Water pot 4 is equipped with liquid level sensor and visual liquid level gauge, is set when the water in water pot is below or above When determining height, liquid level sensor can send signal, remind staff.Water pot 4 is equipped with folding guard rail, there is provided staff pacifies Entirely.Water pot 4 is equipped with water inlet and water outlet, and water inlet can be connected with fire main, adds water for water pot;Water outlet and the first water pump 2 are connected with the second water pump 5, and water source is provided for operation.First water pump 2 and the second water pump 5 provide high pressure water for tunneling boring cleaning.
Cleaning device 6 includes track cleaning device and tunnel cross-section cleaning device, 1 both ends of track cleaning device rail flat car Lower part, tunnel cross-section cleaning device are arranged at 1 both ends top of rail flat car;Below 1.4m tunnels in track cleaning device cleaning tunnel Road side wall, railway roadbed, the flange of rail and pedestal etc. clean.The tunnel wall of more than 1.4m in tunnel cross-section cleaning device cleaning tunnel.
As Figure 2-3, including multiple water lines, (water lines use stainless steel to track cleaning device in the present embodiment Into being stainless steel water pipeline 8), stainless steel water pipeline 8 is connected by hose (be high-pressure hose 7) with track cleaning water route, Track cleaning water route is connected with the second water pump 5, and the second water pump 5 is connected with water pot 4, and the second water pump 5 is provided dynamic by power unit 3 Power.High-pressure hose 7 can bear 30MPa water pressures.Track ejected wash water route high-pressure solenoid valve, screw-in flange, minimum point row Water polo valve, high pressure stainless steel waterpipe composition.Second water pump 5 is capable of providing the hydraulic pressure of 15MPa.
Stainless steel water pipeline 8 sets multiple nozzles 9, and high-pressure ball valve 11 is set between nozzle 9 and stainless steel water pipeline 8.Spray Mouth 9 selects the nozzle of certain flow and certain angle, disclosure satisfy that the cleaning to tunnel wall.High-pressure ball valve 11 can control on the spot Nozzle 9 switchs.The nozzle of stainless steel water pipeline 8 can be arranged to multiple directions to lower part spray water by stainless steel water pipeline 8, It can strengthen spraying cleaning performance.
Nozzle 9 is connected to stainless steel water pipeline 8 by adjustable spherojoint (i.e. the adjustable spherojoint 10 of high pressure).High pressure is adjustable ball Connector 10 can be by adjusting cleaning of the spherojoint satisfaction to tunnel wall different height.
Stainless steel water pipeline 8 is laterally set, and stainless steel water pipeline 8 is also connected with vertical pipeline 13, and vertical pipeline 13 is also set It is equipped with multiple nozzles 9.Vertical pipeline 13 is to sidepiece spray water.
Stainless steel water pipeline 8 sets high-pressure solenoid valve 12, and high-pressure solenoid valve 12 is connected with controller.High-pressure solenoid valve is set 12 can be switched by remote control nozzle 9.
As shown in figure 4, tunnel cross-section cleaning device includes main line 21,21 side wall of main line axially disposed multiple first Bye-pass 22, the first bye-pass 22 include the hose (i.e. high pressure rubber hose 18) connected with main line 21, high pressure rubber hose 18 are also connected by connector with steel pipe (i.e. stainless-steel pipe 20), which uses the adjustable spherojoint 15 of high pressure.Stainless-steel pipe 20 end set nozzles 14.Nozzle 14 selects the nozzle of certain flow and certain angle, disclosure satisfy that full face to tunnel wall Cleaning.High pressure is adjustable, and spherojoint 15 can be by adjusting cleaning of the spherojoint satisfaction to tunnel wall diverse location.
21 head end of main line is connected with the second bye-pass 23, and 21 end of main line is connected with stainless-steel pipe 17, stainless steel Steel pipe 17 cleans water route by tunnel and is connected with the first water pump 2, and the first water pump 2 is connected with water pot 4, and the first water pump 2 is by power list Member 3 provides power.Tunnel cross-section ejected wash water route high-pressure solenoid valve, screw-in flange, minimum point drainage ball valve, stainless steel waterpipe Composition.First water pump 2 is capable of providing the hydraulic pressure of 7MPa.
Second bye-pass 23 includes steel pipe (being stainless-steel pipe 20), 20 end set nozzle 14 of stainless-steel pipe, no Become rusty and valve 24 is set between steel steel pipe 20 and main line 21.Second bye-pass 23 sprays upwards, thus the first bye-pass 22 and The cooperation of two bye-passes 23, can clean the sidepiece of whole tunnel wall and top.
Main line 21 is vertically arranged, and the first bye-pass 22 is set with main line 21 into setting angle.
The angle of multiple first bye-passes 22 and main line 21 is different two-by-two.
Multiple first bye-passes 22 from top to bottom gradually increase with the angle of main line 21.First bye-pass 22 and main line 21 angle is 10~90 degree.The angle major embodiment of first bye-pass 22 and main line 21 is in the inclination angle of stainless-steel pipe 20 Degree, the first bye-pass 22 that foot is connected with main line 21 are in 90 degree, from lower to upper the first bye-pass 22 and main line 21 Angle is gradually reduced, and multiple first bye-passes 22 are set up in the whole length side of main line 21, in the present embodiment, main line 5 the first bye-passes 22 are set respectively in both sides, and all the nozzle of the first bye-pass and the second bye-pass can surround great circle arc.
High-pressure ball valve 16 is set between high pressure rubber hose 18 and main line 21, and stainless-steel pipe 20 is rotationally connected with rail On road flatcar 1, by adjusting the adjustable spherojoint 15 of high pressure, it is possible to achieve the adjustment to spray angle, at any time according to field operation Effect adjusts, highly practical.High-pressure ball valve 16 can control nozzle 14 to switch on the spot.
High pressure rubber hose 18 is connected by high-pressure hose connector 19 with high-pressure ball valve 16 and stainless-steel pipe 20, high pressure rubber Glue hose 18 can bear the pressure of 20MPa, and the length by adjusting high pressure rubber hose 18 can adjust tunneling boring sprinkling Highly, different tunnel cross-sections are adapted to.
As shown in fig. 6, the sprinkling region of each nozzle has overlapping, tunnel cross-section cleaning device can be to the more of top and sidepiece A direction is sprayed, and the whole section of tunnel wall of more than 1.4m in tunnel fully can be cleaned;Track cleaning device It can be sprayed to sidepiece and bottom, can be abundant to the carry out such as below 1.4m tunnel-sides, railway roadbed, the flange of rail and pedestal in tunnel Cleaning.
The foregoing is merely the preferred embodiment of the application, the application is not limited to, for the skill of this area For art personnel, the application can have various modifications and variations.It is all within spirit herein and principle, made any repair Change, equivalent substitution, improvement etc., should be included within the protection domain of the application.

Claims (10)

1. a kind of full section of tunnel cleaning device, it is characterized in that, including rail flat car, rail flat car both ends lower part setting rail Road cleaning device, rail flat car both ends top set tunnel cross-section cleaning device, and the tunnel cross-section cleaning device includes supervisor Road, axially disposed multiple first bye-passes of main line side wall, first bye-pass includes the hose connected with main line, soft Pipe is also connected by connector with steel pipe, and steel tube end part sets nozzle.
2. device as claimed in claim 1, it is characterized in that, the main line head end is connected with the second bye-pass, main line end End is cleaned water route by tunnel and is connected with the first water pump;Second bye-pass includes steel pipe, and steel tube end part sets nozzle, steel pipe Valve is set between main line.
3. device as claimed in claim 1, it is characterized in that, the main line is vertically arranged, the first bye-pass and main line into Angle is set to set;The angle of multiple first bye-passes and main line is different two-by-two.
4. device as claimed in claim 3, it is characterized in that, multiple first bye-passes are gradual with the angle of main line from top to bottom Increase;The angle of first bye-pass and main line is 10~90 degree.
5. device as claimed in claim 1, it is characterized in that, high-pressure ball valve is set between the hose and main line, steel pipe can It is rotationally connected with rail flat car;The connector is adjustable spherojoint.
6. device as claimed in claim 1, it is characterized in that, the track cleaning device includes multiple water lines, and water lines are led to Cross hose to connect with track cleaning water route, track cleaning water route is connected with the second water pump.
7. device as claimed in claim 6, it is characterized in that, the water lines set multiple nozzles, between nozzle and water lines High-pressure ball valve is set;The nozzle is connected to water lines by adjustable spherojoint.
8. device as claimed in claim 6, it is characterized in that, the water lines are laterally set, and water lines also connect with vertical pipeline Connect, vertical pipeline is also equipped with multiple nozzles.
9. device as claimed in claims 6 or 7, it is characterized in that, the water lines set high-pressure solenoid valve, high-pressure solenoid valve with Controller connects.
10. device as claimed in claim 1, it is characterized in that, water pot and power unit be set on the rail flat car, water pot with Track cleaning device, tunnel cross-section cleaning device are all connected with;Power unit and track cleaning device, tunnel cross-section cleaning device are equal Connection.
CN201721074167.8U 2017-08-25 2017-08-25 A kind of full section of tunnel cleaning device Active CN207314233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721074167.8U CN207314233U (en) 2017-08-25 2017-08-25 A kind of full section of tunnel cleaning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721074167.8U CN207314233U (en) 2017-08-25 2017-08-25 A kind of full section of tunnel cleaning device

Publications (1)

Publication Number Publication Date
CN207314233U true CN207314233U (en) 2018-05-04

Family

ID=62432013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721074167.8U Active CN207314233U (en) 2017-08-25 2017-08-25 A kind of full section of tunnel cleaning device

Country Status (1)

Country Link
CN (1) CN207314233U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109633085A (en) * 2018-12-05 2019-04-16 中车山东机车车辆有限公司 A kind of high pressure water sprinkling cleaning system experimental rig and test method
CN110512557A (en) * 2018-10-26 2019-11-29 重庆陈氏清洁服务有限公司 The high-pressure washing of sweeper sweeps method and sweeps vehicle without brush high-pressure washing
CN110512557B (en) * 2018-10-26 2024-04-26 重庆陈氏清洁服务有限公司 High-pressure water washing and sweeping method of washing and sweeping vehicle and brushless disc high-pressure water washing and sweeping vehicle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512557A (en) * 2018-10-26 2019-11-29 重庆陈氏清洁服务有限公司 The high-pressure washing of sweeper sweeps method and sweeps vehicle without brush high-pressure washing
CN110512557B (en) * 2018-10-26 2024-04-26 重庆陈氏清洁服务有限公司 High-pressure water washing and sweeping method of washing and sweeping vehicle and brushless disc high-pressure water washing and sweeping vehicle
CN109633085A (en) * 2018-12-05 2019-04-16 中车山东机车车辆有限公司 A kind of high pressure water sprinkling cleaning system experimental rig and test method

Similar Documents

Publication Publication Date Title
CN203944254U (en) A kind of tower crane water injection system
CN205704645U (en) A kind of underground engineering high-efficiency water-saving automatic concrete spraying curing system
CN206090432U (en) Multi -functional dirt watering lorry that presses down
CN207314233U (en) A kind of full section of tunnel cleaning device
CN105648949A (en) Subway tunnel cleaning vehicle, cleaning integrated devices and cleaning method
CN207512680U (en) A kind of sprinkling truck high-efficiency water-spraying device
CN206090433U (en) Multifunctional spraying car
CN206577929U (en) Goods train anti-icing fluid spray equipment
CN218373617U (en) High-pressure water spraying device for track bed
CN207211044U (en) A kind of urban environmental protection operation sprinkling truck
CN207929628U (en) A kind of converter transformer cooling system cooling fin electrification flusher
CN109914326A (en) A kind of airborne spray equipment cleaned for rail
CN212153229U (en) Tunnel washing device
CN214972681U (en) Type spraying dust device prevents frostbite
CN210875869U (en) Roadside dust raising prevention device for building engineering
CN108221839A (en) A kind of airborne spray equipment cleaned for rail
CN203007889U (en) Tunnel whole fracture surface cleaning vehicle
CN207191003U (en) A kind of steam turbine
CN206653509U (en) A kind of precast beam intelligence curing means
CN208593373U (en) A kind of concrete tank cleaning device
CN207582399U (en) A kind of injection sprinkling pipeline control device for electrocar
CN214288848U (en) Sprinkler boom for watering lorry convenient to accomodate
CN206204857U (en) A kind of road sweeper sprays anti-water recovery apparatus
CN214288849U (en) Spray lance convenient to watering lorry lateral wall is accomodate
CN208501607U (en) A kind of airborne spray equipment cleaned for rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant