CN207312978U CN201720890513.3U CN201720890513U CN207312978U CN 207312978 U CN207312978 U CN 207312978U CN 201720890513 U CN201720890513 U CN 201720890513U CN 207312978 U CN207312978 U CN 207312978U
Authority
CN
China
Prior art keywords
tower crane
standard knot
shaped
plate
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720890513.3U
Other languages
Chinese (zh)
Inventor
董森
牛化宪
赵忠杨
乔元亮
于科
陈前钟
王良超
赵海峰
刘宗敬
魏书圣
刘化锡
明宪永
徐斌
邓秀丽
汪洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201720890513.3U priority Critical patent/CN207312978U/en
Application granted granted Critical
Publication of CN207312978U publication Critical patent/CN207312978U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of Super High boom-type tower crane hand-held C-type beam and climb band device,Including the second standard knot of the first standard knot of tower crane and tower crane,First standard knot of tower crane and the second standard knot of tower crane are closed-in construction,The upper end of first standard knot of tower crane is arranged with two I-shaped plates,The lower end of I-shaped plate and the upper end of the first standard knot of tower crane are fitted and connected,The upper end of the I-shaped plate is fixedly connected with the lower end of platelet by full weld,The upper end of platelet is fixedly connected with the lower end of installing plate also by full weld,Support platform of two I-shaped plates as electrical hoist is set on the first standard knot of tower crane,And firmly install,Both requirement of the high altitude environment to safety had been met,Also the technology operating mode of independent operating is met,The fixed seat and L-shaped limiting plate of setting fully meet safety,Standard,The technical conditions of specification,So that the position of electrical hoist is fixed,Will not because of vibrations the bonding strength of electrical hoist.

Description

A kind of Super High boom-type tower crane hand-held C-type beam and climb band device
Technical field
Boom-type tower crane correlative technology field is the utility model is related to, is specially a kind of Super High boom-type tower crane hand-held C-type beam and climb band device.
Background technology
With the fast development of urban construction, large quantities of Gongjian's projects are constantly filled with, wherein being no lack of high-rise building project, root According to the requirement of building height and structure type, Super High project lifts up into the lifting operation of row engineering using movable arm tower, to meet it Huge Lifting Capacity and lifting characteristic.
Super High swing arm tower crane tradition climbing technique is to lift up into the lifting installation of row C-type beam just by second movable arm tower Position, then carry out climbing the lifting of band, in the process, second swing arm tower crane needs full name coordinating operation, until complete C-type beam and Climb the lifting operation of band.
In current existing technology, employ the devices such as channel steel, steel wire rope, pulley blocks and only climbing for swing arm tower crane is brought into Design is gone, without accomplishing, by the automatic lifting function of swing arm tower crane C-type beam, at the scene during practice of construction, to lack one Fixed operability, its operating efficiency is not high, in the actual lifting process of swing arm tower crane C-type beam, it is still necessary to second tower crane into The lifting of row mate-assist is accomplished, and rocks or shake the bonding strength that can influence equipment during single unit system operation.
Utility model content
The purpose of this utility model is to provide a kind of Super High boom-type tower crane hand-held C-type beam and band device is climbed, with Solve the problems, such as proposed in the above background technology.
To achieve the above object, the utility model provides following technical solution:A kind of Super High boom-type tower crane hand-held C Type beam and band device is climbed, including the second standard knot of the first standard knot of tower crane and tower crane, first standard knot of tower crane and tower crane the Two standard knots are closed-in construction, and the upper end of first standard knot of tower crane is arranged with two I-shaped plates, the lower end of I-shaped plate It is fitted and connected with the upper end of the first standard knot of tower crane, the upper end of the I-shaped plate is fixedly connected with the lower end of platelet by full weld, small The upper end of plate is fixedly connected with the lower end of installing plate also by full weld, and the upper end of the installing plate is fitted and connected under electrical hoist End, and the upper end of installing plate is equipped with fixed seat, is equipped with directed cavity in the fixed seat, the bottom of directed cavity is equipped with lead, institute The one end for stating lead is plugged in the opening of L-shaped limiting plate one end, and fixed block is fixedly connected with the downside of the L-shaped limiting plate other end One end, the other end of fixed block is fitted and connected by the upper end of damping mat and electrical hoist, described L-shaped limiting plate one end Side arrangement is equipped with two protrusions, and the side of the fixed seat is equipped with spacing tongue, and spacing tongue is connected with directed cavity, the limit One end of position tongue connects one end of gag lever post by Damping rotation shaft, and the other end of gag lever post is described between two protrusions The side of gag lever post one end is fixedly connected with one end of L-shaped bearing rod, and the other end of L-shaped bearing rod is hinged one end of force bearing plate, institute Force bearing plate is stated to be located in spacing tongue, and the other end of force bearing plate is fixedly connected with one end of motion bar, the other end of motion bar passes through Wear the side wall of spacing tongue and extend to the outside of spacing tongue, the outside of the spacing tongue is equipped with the other end of motion bar Socket, the other end of motion bar are located in socket, and the outside of the socket is connected limited cap by internal and external threads.
Preferably, it is equipped with L-shaped fixed plate on the inside of first standard knot of tower crane, one end of the L-shaped fixed plate passes through tight Fixing bolt is connected with the first standard knot of tower crane, and the other end of L-shaped fixed plate is connected also by fastening bolt with the lower end of I-shaped plate, The quantity of the fixed seat is four, and four fixed seats are symmetricly set on the both sides of electrical hoist.
Preferably, the upper end four corners of first standard knot of tower crane are fixedly connected with one end of supporting rod, supporting rod The other end is fixedly connected with the lower end of the second standard knot of tower crane, and the lower end of second standard knot of tower crane is transversely provided with cruciform girder, The end of cruciform girder is fixedly connected with supporting rod.
Preferably, the upper and lower side of the cruciform girder is respectively fixedly connected with two first pulleys and second pulley, and described The quantity of two pulleys is two, another second pulley is fixedly connected with the lower end of C-shaped mounting rail, and the C-shaped mounting rail is located at tower Hang the outside of the second standard knot.
Compared with prior art, the beneficial effects of the utility model are:The utility model is rational in infrastructure, highly practical, tool Have the advantage that:
1. setting support platform of two I-shaped plates as electrical hoist on the first standard knot of tower crane, and jail is installed Gu both having met requirement of the high altitude environment to safety, also meet the technology operating mode of independent operating;
2. since any component and accessory of swing arm tower crane are forbidden directly to be chemically treated, so the branch of electrical hoist Support platform(Namely two I-shaped plates)Connection mode between the first standard knot of tower crane is physical connection, the fixed seat of setting The technical conditions of safety, standard, specification are fully met with L-shaped limiting plate so that the position of electrical hoist is fixed, will not be because of Shake and the bonding strength of electrical hoist;
3. single unit system greatly reduces the Job readiness time before movable arm tower furred ceiling rises, it is no longer necessary to extra power aids in, Largely shorten due to each swing arm tower crane C-type beam and climb band lifting and caused by duration pressure influence.Solution well Determine shortcoming of the prior art.
Brief description of the drawings
Fig. 1 is the utility model structure main view diagrammatic cross-section;
Fig. 2 regards diagrammatic cross-section figure for the utility model structure side;
Fig. 3 is structure enlargement diagram at A in Fig. 1;
Fig. 4 is the first standard knot of the utility model and I-shaped board connecting structure schematic diagram;
Fig. 5 is the utility model L-shaped fixed plate attachment structure schematic diagram.
In figure:The first standard knot of tower crane 1, I-shaped plate 2, L-shaped fixed plate 21, installing plate 3, electrical hoist 4, fixed seat 5, Directed cavity 6, L-shaped limiting plate 7, spacing tongue 8, gag lever post 9, motion bar 10, the second standard knot of tower crane 11, fixed block 12, cross Crossbeam 13, C-shaped mounting rail 14, first pulley 15, second pulley 16.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained, shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of Super High boom-type tower crane hand-held c-type Beam and climb band device, including the first standard knot of tower crane 1 and the second standard knot of tower crane 11, the first standard knot of tower crane 1 and tower crane second Standard knot 11 is closed-in construction, and the upper end of the first standard knot of tower crane 1 is arranged with two I-shaped plates 2, the lower end of I-shaped plate 2 with The upper end of the first standard knot of tower crane 1 is fitted and connected, and the inner side of the first standard knot of tower crane 1 is equipped with L-shaped fixed plate 21, L-shaped fixed plate 21 One end be connected by fastening bolt with the first standard knot of tower crane 1, the other end of L-shaped fixed plate 21 is also by fastening bolt and work The lower end connection of letter stencil 2;
Support platform of two I-shaped plates 2 as electrical hoist 4 is set on the first standard knot of tower crane 1, and jail is installed Gu both having met requirement of the high altitude environment to safety, also meet the technology operating mode of independent operating;
The upper end of I-shaped plate 2 is fixedly connected with the lower end of platelet by full weld, and the upper end of platelet is fixedly connected also by full weld The lower end of installing plate 3, the upper end of installing plate 3 is fitted and connected the lower end of electrical hoist 4, and the upper end of installing plate 3 is equipped with and fixes Seat 5, the quantity of fixed seat 5 is four, and four fixed seats 5 are symmetricly set on the both sides of electrical hoist 4;
Directed cavity 6 is equipped with fixed seat 5, the bottom of directed cavity 6 is equipped with lead, and one end of lead is plugged on L-shaped limit In the opening of position plate 7 one end, be fixedly connected with one end of fixed block 12 on the downside of 7 other end of L-shaped limiting plate, fixed block 12 it is another End is fitted and connected by the upper end of damping mat and electrical hoist 4, and the side arrangement of 7 one end of L-shaped limiting plate is equipped with two protrusions, The side of fixed seat 5 is equipped with spacing tongue 8, and spacing tongue 8 is connected with directed cavity 6, and one end of spacing tongue 8 passes through Damping rotation shaft One end of gag lever post 9 is connected, for the other end of gag lever post 9 between two protrusions, the side of 9 one end of gag lever post is fixedly connected with L One end of shape bearing rod, the other end of L-shaped bearing rod are hinged one end of force bearing plate, and force bearing plate is located in spacing tongue 8, and load The other end of plate is fixedly connected with one end of motion bar 10, and the other end of motion bar 10 runs through the side wall of spacing tongue 8 and extends to The outside of spacing tongue 8, the outside of spacing tongue 8 are equipped with socket, the other end position of motion bar 10 to the other end of motion bar 10 In in socket, the outside of socket is connected limited cap by internal and external threads;
The fixed seat 5 and L-shaped limiting plate 7 of setting fully meet the technical conditions of safety, standard, specification so that electric rolling The position for raising machine 4 is fixed, will not because of vibrations the bonding strength of electrical hoist 4;
The upper end four corners of the first standard knot of tower crane 1 are fixedly connected with one end of supporting rod, and the other end of supporting rod is fixed The lower end of the second standard knot of tower crane 11 is connected, the lower end of the second standard knot of tower crane 11 is transversely provided with cruciform girder 13, cruciform girder 13 end is fixedly connected with supporting rod;
The upper and lower side of cruciform girder 13 is respectively fixedly connected with two first pulleys 15 and second pulley 16, second pulley 16 Quantity is two, another second pulley 16 is fixedly connected with the lower end of C-shaped mounting rail 14, and C-shaped mounting rail 14 is located at tower crane second The outside of standard knot 11, first pulley 15 and second pulley 16 are connected by steel wire rope (not shown) with electrical hoist 4, Two first pulleys 15 carry out swing arm tower crane by steel wire rope and climb the lifting with (not shown).Two second pulleys 16 pass through steel wire Rope carries out the lifting of swing arm tower crane C-type beam (not shown).
Operation principle:When the utility model is used, electrical hoist 4 first is placed into 2 upper end of I-shaped plate, then it is pulled outwardly Dynamic motion bar 10, between gag lever post 9 departs from two protrusions, at this time, moves down L-shaped limiting plate 7 so that damping mat is to moving down It is dynamic, electrical hoist 4 is firmly fixed on I-shaped plate 2, then motion bar 10 is moved inward, gag lever post 9 is to a raised position Put and be defined, under the action of Damping rotation shaft, the position of gag lever post 9 is fixed, then turns limited cap, and limited cap is fastened with socket Connection so that the position of motion bar 10 is fixed, and gag lever post 9 will not be subjected to displacement phenomenon because of vibrations.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from the principle of the utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of Super High boom-type tower crane hand-held C-type beam and climb band device, including the first standard knot of tower crane(1)With tower crane Two standard knots(11), first standard knot of tower crane(1)With the second standard knot of tower crane(11)It is closed-in construction, its feature exists In:First standard knot of tower crane(1)Upper end be arranged with two I-shaped plates(2), I-shaped plate(2)Lower end and tower crane first Standard knot(1)Upper end be fitted and connected, the I-shaped plate(2)Upper end the lower end of platelet is fixedly connected with by full weld, platelet Upper end is fixedly connected with installing plate also by full weld(3)Lower end, the installing plate(3)Upper end be fitted and connected electrical hoist (4)Lower end, and installing plate(3)Upper end be equipped with fixed seat(5), the fixed seat(5)It is interior to be equipped with directed cavity(6), directed cavity (6)Bottom be equipped with lead, one end of the lead is plugged on L-shaped limiting plate(7)In the opening of one end, L-shaped limiting plate (7)Fixed block is fixedly connected with the downside of the other end(12)One end, fixed block(12)The other end pass through damping mat and electric rolling Raise machine(4)Upper end be fitted and connected, the L-shaped limiting plate(7)The side arrangement of one end is equipped with two protrusions, the fixed seat (5)Side be equipped with spacing tongue(8), spacing tongue(8)With directed cavity(6)Connection, the spacing tongue(8)One end pass through Damping rotation shaft connects gag lever post(9)One end, gag lever post(9)The other end between two protrusions, the gag lever post(9)One The side at end is fixedly connected with one end of L-shaped bearing rod, and the other end of L-shaped bearing rod is hinged one end of force bearing plate, the force bearing plate Positioned at spacing tongue(8)It is interior, and the other end of force bearing plate is fixedly connected with motion bar(10)One end, motion bar(10)The other end Through spacing tongue(8)Side wall and extend to spacing tongue(8)Outside, the spacing tongue(8)Outside to motion bar (10)The other end be equipped with socket, motion bar(10)The other end be located in socket, pass through internal and external threads on the outside of the socket Mating connection limited cap.
2. a kind of Super High boom-type tower crane hand-held C-type beam according to claim 1 exists with band device, its feature is climbed In:First standard knot of tower crane(1)Inner side is equipped with L-shaped fixed plate(21), the L-shaped fixed plate(21)One end pass through fastening Bolt and the first standard knot of tower crane(1)Connection, L-shaped fixed plate(21)The other end also by fastening bolt and I-shaped plate(2)'s Lower end connects, the fixed seat(5)Quantity be four, and four fixed seats(5)It is symmetricly set on electrical hoist(4)Two Side.
3. a kind of Super High boom-type tower crane hand-held C-type beam according to claim 1 exists with band device, its feature is climbed In:First standard knot of tower crane(1)Upper end four corners be fixedly connected with one end of supporting rod, the other end of supporting rod is fixed Connect the second standard knot of tower crane(11)Lower end, second standard knot of tower crane(11)Lower end be transversely provided with cruciform girder (13), cruciform girder(13)End be fixedly connected with supporting rod.
4. a kind of Super High boom-type tower crane hand-held C-type beam according to claim 3 exists with band device, its feature is climbed In:The cruciform girder(13)Upper and lower side be respectively fixedly connected with two first pulleys(15)And second pulley(16), described Two pulleys(16)Quantity be two, another second pulley(16)It is fixedly connected with C-shaped mounting rail(14)Lower end, the C-shaped Mounting rail(14)Positioned at the second standard knot of tower crane(11)Outside.
CN201720890513.3U 2017-07-21 2017-07-21 A kind of Super High boom-type tower crane hand-held C-type beam and climb band device Active CN207312978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720890513.3U CN207312978U (en) 2017-07-21 2017-07-21 A kind of Super High boom-type tower crane hand-held C-type beam and climb band device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720890513.3U CN207312978U (en) 2017-07-21 2017-07-21 A kind of Super High boom-type tower crane hand-held C-type beam and climb band device

Publications (1)

Publication Number Publication Date
CN207312978U true CN207312978U (en) 2018-05-04

Family

ID=62433721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720890513.3U Active CN207312978U (en) 2017-07-21 2017-07-21 A kind of Super High boom-type tower crane hand-held C-type beam and climb band device

Country Status (1)

Country Link
CN (1) CN207312978U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108853933A (en) * 2018-06-15 2018-11-23 乐陵市五环体育器材有限公司 One kind climbing band training slideway special

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108853933A (en) * 2018-06-15 2018-11-23 乐陵市五环体育器材有限公司 One kind climbing band training slideway special

Similar Documents

Publication Publication Date Title
CN201901539U (en) Internal climbing type and external climbing type tower crane with luffing jib
CN206580442U (en) A kind of hanging apparatus suitable for Assembled Building gangboard prefabricated components
CN205387439U (en) Mast hoisting accessory
CN109502480A (en) The hoisting that high building turns over
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN201068371Y (en) Self-hoisting tower crane
CN207312978U (en) A kind of Super High boom-type tower crane hand-held C-type beam and climb band device
CN215717106U (en) Hanging basket with protective structure
CN107130517B (en) It is a kind of fine-tuning from promotion closure mould bases base apparatus and its operating method
CN204702437U (en) A kind of build-up type power pontoon combination mast crane device
CN209194364U (en) A kind of Continuous Beam-arch Bridge sunpender bridge floor tensioning equipment
CN109797964A (en) A kind of lifting platform system of integrated tower crane
CN201762053U (en) Simple automatic derrick
CN210393401U (en) Hoisting and positioning device for stand column
CN103225390B (en) Hollow facade pulley guide attached-type lifting scaffold
CN208636051U (en) Multifunctional motor-driven cucurbit testing stand
CN211034970U (en) Down-the-hole drill jack-up hoist and mount auxiliary device
CN210176323U (en) Simple and easy installation device of fog dispersal tower heat exchanger
CN209523453U (en) A kind of climbing frame automatic climbing device
CN110185250A (en) A kind of nacelle construction device
CN205346600U (en) Big plate -girder hoist and mount specialized tool
CN206580444U (en) A kind of urban construction building prefabricated components hanging apparatus
CN111943054A (en) Assembled hoisting equipment for building
CN106869508B (en) A kind of rotation lifting of assembled architecture steel box column is welded and fixed mounting process in place
CN110359756A (en) 750kV booster stations framework installation method

Legal Events

Date Code Title Description
GR01 Patent grant