CN207297311U - Test device and testboard bay - Google Patents

Test device and testboard bay Download PDF

Info

Publication number
CN207297311U
CN207297311U CN201721140714.8U CN201721140714U CN207297311U CN 207297311 U CN207297311 U CN 207297311U CN 201721140714 U CN201721140714 U CN 201721140714U CN 207297311 U CN207297311 U CN 207297311U
Authority
CN
China
Prior art keywords
pipeline
section
main
water
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721140714.8U
Other languages
Chinese (zh)
Inventor
陆群
孙艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changcheng Huaguan Automotive Technology Suzhou Co ltd
Original Assignee
Beijing Changcheng Huaguan Automobile Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Changcheng Huaguan Automobile Technology Development Co Ltd filed Critical Beijing Changcheng Huaguan Automobile Technology Development Co Ltd
Priority to CN201721140714.8U priority Critical patent/CN207297311U/en
Application granted granted Critical
Publication of CN207297311U publication Critical patent/CN207297311U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本实用新型公开了一种测试装置和测试台架,涉及水泵和水阀测试技术领域,主要目的是降低水泵性能以及水泵和水阀耐久性的测试成本。本实用新型的主要技术方案为:该测试装置中,第一管路包括第一主管路和与其一端连通的多个第一支管路,第一主管路的另一端与水箱入口连通;第二管路包括第二主管路和与其一端连通的多个第二支管路,每个第一支管路和每个第二支管路之间用于连接一被测水阀;第三管路的一端与出口连通,第三管路的另一端和第二主管路的另一端用于连接被测水泵;第一压力传感器和第二压力传感器分别设置于第三管路和第二主管路上,流量传感器设置于第一主管路。本实用新型主要用于水泵的性能测试及水泵和水阀的耐久性测试。

The utility model discloses a test device and a test stand, which relate to the technical field of testing water pumps and water valves. The main purpose is to reduce the performance of the water pump and the test cost of the durability of the water pump and the water valve. The main technical solution of the utility model is: in the test device, the first pipeline includes the first main pipeline and a plurality of first branch pipelines connected with one end thereof, and the other end of the first main pipeline is connected with the inlet of the water tank; the second pipeline The pipeline includes a second main pipeline and a plurality of second branch pipelines connected to one end thereof, each first branch pipeline and each second branch pipeline are used to connect a measured water valve; one end of the third pipeline is connected to the outlet The other end of the third pipeline and the other end of the second main pipeline are used to connect the tested water pump; the first pressure sensor and the second pressure sensor are respectively set on the third pipeline and the second main pipeline, and the flow sensor is set on the The first main road. The utility model is mainly used for the performance test of the water pump and the durability test of the water pump and the water valve.

Description

测试装置和测试台架Test fixtures and test benches

技术领域technical field

本实用新型涉及水泵和水阀测试技术领域,尤其涉及一种测试装置和测试台架。The utility model relates to the technical field of water pump and water valve testing, in particular to a testing device and a testing stand.

背景技术Background technique

水泵和水阀是水冷热管理系统中必不可少的部件,水泵的性能以及水泵和水阀的耐久性是影响热管理系统使用寿命的重要因素。Water pumps and water valves are essential components in water-cooled thermal management systems. The performance of water pumps and the durability of water pumps and water valves are important factors that affect the service life of thermal management systems.

为了保证水冷热管理系统的使用寿命,在实际选定部件之前,通常对水泵的性能以及水泵和水阀的耐久性能否满足要求进行测试。现有技术中,对水泵性能的测试以及对水泵和水阀的耐久性测试单独分开进行,也就是搭建出相应不同的验台架,并在一个试验台架进行水泵的性能和耐久性测试,在另一个试验台架进行水阀的耐久性测试,成本较高。In order to ensure the service life of the water-cooling thermal management system, before the actual selection of components, the performance of the water pump and whether the durability of the water pump and water valve can meet the requirements are usually tested. In the prior art, the performance test of the water pump and the durability test of the water pump and the water valve are carried out separately, that is, corresponding different test benches are built, and the performance and durability test of the water pump is carried out on one test bench. The durability test of the water valve is carried out on another test bench, and the cost is relatively high.

实用新型内容Utility model content

有鉴于此,本实用新型实施例提供一种测试装置和测试台架,主要目的是降低水泵性能以及水泵和水阀耐久性的测试成本。In view of this, the embodiment of the utility model provides a test device and a test bench, the main purpose of which is to reduce the test cost of the performance of the water pump and the durability of the water pump and the water valve.

为达到上述目的,本实用新型主要提供如下技术方案:In order to achieve the above object, the utility model mainly provides the following technical solutions:

一方面,本实用新型实施例提供了一种测试装置,包括:On the one hand, the embodiment of the utility model provides a test device, including:

水箱、第一管路、第二管路、第三管路、第一压力传感器、第二压力传感器、流量传感器;Water tank, first pipeline, second pipeline, third pipeline, first pressure sensor, second pressure sensor, flow sensor;

所述水箱具有出口和入口;The water tank has an outlet and an inlet;

所述第一管路包括第一主管路和与所述第一主管路一端连通的多个第一支管路,所述第一主管路的另一端与所述入口连通;The first pipeline includes a first main pipeline and a plurality of first branch pipelines communicated with one end of the first main pipeline, and the other end of the first main pipeline communicates with the inlet;

所述第二管路包括第二主管路和与所述第二主管路一端连通的多个第二支管路,每个所述第一支管路和每个所述第二支管路之间用于连接一被测水阀,使多个所述被测水阀并联;The second pipeline includes a second main pipeline and a plurality of second branch pipelines communicating with one end of the second main pipeline, each of the first branch pipelines and each of the second branch pipelines is used for Connecting a water valve to be tested so that a plurality of water valves to be tested are connected in parallel;

所述第三管路的一端与所述出口连通,所述第三管路的另一端和所述第二主管路的另一端用于连接被测水泵;One end of the third pipeline communicates with the outlet, and the other end of the third pipeline and the other end of the second main pipeline are used to connect the tested water pump;

所述第一压力传感器设置于所述第三管路上,所述第二压力传感器设置于所述第二主管路上,所述流量传感器设置于所述第一主管路上。The first pressure sensor is arranged on the third pipeline, the second pressure sensor is arranged on the second main pipeline, and the flow sensor is arranged on the first main pipeline.

具体地,所述第二主管路的另一端连通有多个第三支管路;Specifically, the other end of the second main pipeline is communicated with a plurality of third branch pipelines;

所述第三管路包括第三主管路和与所述第三主管路一端连通的多个第四支管路,所述第三主管路的另一端与所述出口连通;The third pipeline includes a third main pipeline and a plurality of fourth branch pipelines communicated with one end of the third main pipeline, and the other end of the third main pipeline communicates with the outlet;

每个所述第三支管路和每个所述第四支管路之间用于连接一所述被测水泵,使多个所述被测水泵并联;Each of the third branch pipelines and each of the fourth branch pipelines is used to connect a tested water pump, so that a plurality of the tested water pumps are connected in parallel;

所述第一压力传感器设置于所述第三主管路上。The first pressure sensor is arranged on the third main pipe.

具体地,所述第三主管路具有第一段,所述第一段的长度值等于15倍的所述第一段的内径值,所述第一段为所述第三主管路靠近所述第四支管路的一端与所述第一压力传感器之间的一段;Specifically, the third main pipeline has a first section, the length of the first section is equal to 15 times the inner diameter of the first section, and the first section is that the third main pipeline is close to the A section between one end of the fourth branch pipeline and the first pressure sensor;

所述第二主管路具有第二段和第三段,所述第二段的长度值等于10倍的所述第二段的内径值,所述第三段的长度值大于或等于10倍的所述第三段的内径值,所述第二段为所述第二主管路靠近所述第三支管路的一端与所述第二压力传感器之间的一段,所述第三段为所述第二主管路上除了所述第二段以外的一段;The second main pipeline has a second section and a third section, the length of the second section is equal to 10 times the inner diameter of the second section, and the length of the third section is greater than or equal to 10 times the The inner diameter value of the third section, the second section is a section between the second main pipeline end close to the third branch pipeline and the second pressure sensor, the third section is the a section of the Second Main Main Road other than said second section;

所述第一主管路具有第四段,所述第四段的长度值等于20倍的所述第四段的内径值,所述第四段为所述第一主管路靠近所述第一支管路的一端与所述流量传感器之间的一段;The first main pipe has a fourth section, the length of the fourth section is equal to 20 times the inner diameter of the fourth section, and the fourth section is that the first main pipe is close to the first branch pipe A section between one end of the road and the flow sensor;

其中,所述第一段、所述第二段、所述第三段和所述第四段的内径值均相等。Wherein, the inner diameters of the first segment, the second segment, the third segment and the fourth segment are all equal.

具体地,所述第三主管路由刚性材料制成。Specifically, the third main pipe is made of rigid material.

具体地,所述水箱内设置有第一温度传感器;Specifically, a first temperature sensor is provided in the water tank;

所述第三主管路上设置有第二温度传感器。A second temperature sensor is arranged on the third main pipe.

具体地,所述第一主管路上设置有第三压力传感器。Specifically, a third pressure sensor is arranged on the first main pipe.

具体地,所述第一主管路上设置有泄压阀。Specifically, a pressure relief valve is provided on the first main pipe.

具体地,所述水箱为开放式水箱。Specifically, the water tank is an open water tank.

另一方面,本实用新型实施例还提供一种测试台架,包括测试装置,所述测试装置采用上述的测试装置。On the other hand, the embodiment of the utility model also provides a test bench, which includes a test device, and the test device adopts the above test device.

借由上述技术方案,本实用新型测试装置和测试台架至少具有以下有益效果:By means of the above technical solution, the utility model test device and test bench have at least the following beneficial effects:

本实用新型实施例提供的测试装置,通过水箱、第一管路、第二管路和第三管路、以及各个传感器的设置,实现了当需要测试水泵的性能以及水泵和水阀的耐久性时,只需将被测水泵连接在第三管路的另一端和第二主管路的另一端,将多个被测水阀分别连接在相应的每个第一支管路和每个第二支管路之间,开启所有被测水阀或其中一个水阀,保证管路中的水流畅通,即可进行被测水阀的性能测试;而且,通过控制多个被测水阀开启或关闭的时间,使得多个被测水阀不会同时关闭,以保证管路中的水流畅通,即可实现被测水泵和多个被测水阀耐久性测试的同时进行。与现有技术相比,本实用新型实施例提供的技术方案,实现了利用一个测试装置来完成水泵的性能测试以及水泵和水阀的耐久性测试的目的,降低了成本;同时,还实现了被测水泵和被测水阀的耐久性测试能够同时进行的目的,而且,还可以一次完成多个被测水阀的耐久性测试,有效提高了工作效率。The test device provided by the embodiment of the utility model, through the setting of the water tank, the first pipeline, the second pipeline and the third pipeline, and various sensors, realizes when it is necessary to test the performance of the water pump and the durability of the water pump and the water valve. When, only need to connect the water pump under test to the other end of the third pipeline and the other end of the second main pipeline, and connect multiple water valves under test to each corresponding first branch pipeline and each second branch pipeline respectively. Between the pipelines, open all the tested water valves or one of the water valves to ensure the smooth flow of water in the pipeline, and then perform the performance test of the tested water valves; moreover, by controlling the opening or closing time of multiple tested water valves , so that multiple tested water valves will not be closed at the same time, so as to ensure the smooth flow of water in the pipeline, and the durability test of the tested water pump and multiple tested water valves can be carried out at the same time. Compared with the prior art, the technical solution provided by the embodiment of the utility model realizes the performance test of the water pump and the durability test of the water pump and the water valve by using one test device, and reduces the cost; at the same time, it also realizes The durability test of the tested water pump and the tested water valve can be carried out at the same time, and the durability test of a plurality of tested water valves can also be completed at one time, which effectively improves the work efficiency.

附图说明Description of drawings

图1为本实用新型实施例提供的一种测试装置的结构示意图。Fig. 1 is a schematic structural diagram of a test device provided by an embodiment of the present invention.

具体实施方式Detailed ways

为更进一步阐述本实用新型为达成预定实用新型目的所采取的技术手段及功效,以下结合附图及较佳实施例,对本实用新型申请的测试装置和测试台架的具体实施方式、结构、特征及其功效进行详细说明。在下述说明中,不同的“一实施例”或“实施例”指的不一定是同一实施例。此外,一或多个实施例中的特定特征、结构、或特点可由任何合适形式组合。In order to further explain the technical means and effects that the utility model takes to achieve the predetermined utility model purpose, the specific implementation, structure and characteristics of the test device and test bench for the utility model application are described below in conjunction with the accompanying drawings and preferred embodiments. and its effects are described in detail. In the following description, different "one embodiment" or "embodiment" do not necessarily refer to the same embodiment. Furthermore, the particular features, structures, or characteristics of one or more embodiments may be combined in any suitable manner.

如图1所示,本实用新型实施例提供了一种测试装置,包括水箱1、第一管路、第二管路、第三管路、第一压力传感器2、第二压力传感器3、流量传感器4;其中,水箱1具有出口11和入口12,且与大气想通;第一管路包括第一主管路5和与第一主管路5一端连通的多个第一支管路6,第一主管路5的另一端与入口12连通;第二管路包括第二主管路7和与第二主管路7一端连通的多个第二支管路8,每个第一支管路6和每个第二支管路8之间用于连接一被测水阀10,使多个被测水阀10并联;第三管路的一端与出口11连通,第三管路的另一端和第二主管路7的另一端用于连接被测水泵20;第一压力传感器2设置于第三管路上,第二压力传感器3设置于所述第二主管路7上,流量传感器4设置于第一主管路5上。As shown in Figure 1, the utility model embodiment provides a test device, including a water tank 1, a first pipeline, a second pipeline, a third pipeline, a first pressure sensor 2, a second pressure sensor 3, a flow rate Sensor 4; wherein, the water tank 1 has an outlet 11 and an inlet 12, and is connected with the atmosphere; the first pipeline includes a first main pipeline 5 and a plurality of first branch pipelines 6 communicated with one end of the first main pipeline 5, the first The other end of the main pipeline 5 communicates with the inlet 12; the second pipeline includes a second main pipeline 7 and a plurality of second branch pipelines 8 communicated with one end of the second main pipeline 7, each first branch pipeline 6 and each second branch pipeline 8 The two branch pipelines 8 are used to connect a measured water valve 10 so that multiple measured water valves 10 are connected in parallel; one end of the third pipeline communicates with the outlet 11, and the other end of the third pipeline communicates with the second main pipeline 7 The other end is used to connect the tested water pump 20; the first pressure sensor 2 is set on the third pipeline, the second pressure sensor 3 is set on the second main pipeline 7, and the flow sensor 4 is set on the first main pipeline 5 .

该测试装置,通过将第一管路和第二管路设计为包括主管路和支管路的结构形式,使得多个被测水阀10可以相互并联后再与被测水泵20串联在回路中,图1中箭头方向表示水流方向,而且,在第三管路和第二主管路7上分别设置有用于测量被测水泵20两端压力值的第一压力传感器2和第二传感器,以及在第一管路上设置有用于测量回路中流量值的流量传感器4,实现了利用该测试装置既可以进行被测水泵20的性能测试,又可以进行被测水泵20和被测水阀10的耐久性测试。其中,第一压力传感器2和第二压力传感器3亦可以由压差计来代替。In this test device, by designing the first pipeline and the second pipeline to include a main pipeline and a branch pipeline, a plurality of tested water valves 10 can be connected in parallel with each other and then connected in series with the tested water pump 20 in the loop, Arrow direction represents water flow direction among Fig. 1, and, be respectively provided with the first pressure sensor 2 and the second sensor that are used to measure the pressure value at both ends of tested water pump 20 on the 3rd pipeline and the 2nd main pipeline 7, and A flow sensor 4 for measuring the flow value in the circuit is arranged on a pipeline, so that the performance test of the tested water pump 20 and the durability test of the tested water pump 20 and the tested water valve 10 can be carried out by using the test device . Wherein, the first pressure sensor 2 and the second pressure sensor 3 can also be replaced by differential pressure gauges.

具体地,在应用该测试装置对被测水泵20进行性能测试时,首先,可以使得所有被测水阀10均处于开启状态,以确保管路中的水流畅通,然后,通过调节水箱1入口12和出口11处的调压阀,并通过流量传感器4得到回路中一定数量的不同流量值,以及通过第一压力传感器2和第二压力传感器3得到相应流量值下被测水泵20两端的压力差,最后,做出被测水泵20的Q-ΔP性能曲线,并通过该Q-ΔP性能曲线得出该被测水泵20的性能是否满足要求的判断结果,试验完毕。Specifically, when using the test device to test the performance of the tested water pump 20, first, all the tested water valves 10 can be opened to ensure the smooth flow of water in the pipeline, and then, by adjusting the water tank 1 inlet 12 And the pressure regulating valve at the outlet 11, and a certain number of different flow values in the circuit are obtained through the flow sensor 4, and the pressure difference at both ends of the measured water pump 20 is obtained under the corresponding flow values through the first pressure sensor 2 and the second pressure sensor 3 Finally, the Q-ΔP performance curve of the tested water pump 20 is made, and the judgment result of whether the performance of the tested water pump 20 meets the requirements is obtained through the Q-ΔP performance curve, and the test is completed.

在应用该测试装置对被测水泵20和被测水阀10同时进行耐久性测试时,可以使被测水泵20以60秒为周期运转,其中,可以包括先以额定转速运转45秒,再暂停15秒,直至运转总时间达到500小时,同时,多个被测水阀10分别连续开启100秒,再关闭50秒,并交替进行,直至每个被测水阀10的开关次数达到预设次数(不低于10000次),而且,对于相邻两个被测水阀10来说,可以先开启其中一个被测水阀10,另一个被测水阀10延迟75秒后再启动,以保证多个被测水阀10不会同时关闭,从而保证管路中的水流畅通,进而实现被测水泵20和被测水阀10耐久性测试的同时进行,测试结束后,通过判断被测水泵20的轴承能否轻松平稳地转动,以及水封是否出现损坏或泄露,来判断被测水泵20的耐久性是否满足要求,以及通过被测水阀10是否能够满足机械行业标准中关于气密性与内泄漏的要求来判断被测水阀10的耐久性是否满足要求,试验完毕。需要说明的是,也可以采用一个普通阀门来代替多个并联的被测水阀10中的一个,并通过保持该普通阀门在耐久性测试试验中始终保持开启状态,来保证管路中的水流畅通,从而允许多个被测水阀10同时关闭的情形发生,也能实现被测水阀10和被测水泵20耐久性测试能够同时完成的目的。在具体实施时,被测水阀10和被测水泵20的开启和关闭时间可以视具体试验需要而定。When applying the test device to the durability test of the tested water pump 20 and the tested water valve 10 at the same time, the tested water pump 20 can be operated in a cycle of 60 seconds, which can include first running at a rated speed for 45 seconds, and then pausing 15 seconds, until the total running time reaches 500 hours. At the same time, multiple tested water valves 10 are opened continuously for 100 seconds, and then closed for 50 seconds, and alternately, until the number of times each tested water valve 10 is opened and closed reaches the preset number of times. (not less than 10,000 times), and, for two adjacent tested water valves 10, one of the tested water valves 10 can be opened first, and the other tested water valve 10 can be started after a delay of 75 seconds to ensure A plurality of tested water valves 10 will not be closed at the same time, so as to ensure the smooth flow of water in the pipeline, and then realize the simultaneous durability test of the tested water pump 20 and the tested water valve 10. After the test is over, by judging the tested water pump 20 Whether the bearing can rotate easily and smoothly, and whether the water seal is damaged or leaks, to judge whether the durability of the water pump 20 under test meets the requirements, and whether the water valve 10 under test can meet the air tightness and To judge whether the durability of the tested water valve 10 meets the requirements according to the requirements of internal leakage, the test is completed. It should be noted that an ordinary valve can also be used to replace one of the multiple parallel-connected water valves 10 to be tested, and by keeping the ordinary valve always open during the durability test, the water flow in the pipeline can be guaranteed. Unimpeded, thereby allowing a plurality of tested water valves 10 to be closed at the same time, it can also achieve the purpose of completing the durability test of the tested water valve 10 and the tested water pump 20 at the same time. In a specific implementation, the opening and closing time of the tested water valve 10 and the tested water pump 20 may be determined according to specific test requirements.

本实用新型实施例提供的测试装置,通过水箱、第一管路、第二管路和第三管路、以及各个传感器的设置,实现了当需要测试水泵的性能以及水泵和水阀的耐久性时,只需将被测水泵连接在第三管路的另一端和第二主管路的另一端,将多个被测水阀分别连接在相应的每个第一支管路和每个第二支管路之间,开启所有被测水阀或其中一个水阀,以保证管路中的水流畅通,即可进行被测水阀的性能测试;而且,通过控制多个被测水阀开启或关闭的时间,使得多个被测水阀不会同时关闭,以保证管路中的水流畅通,即可实现被测水泵和多个被测水阀耐久性测试的同时进行。与现有技术相比,本实用新型实施例提供的技术方案,实现了利用一个测试装置来完成水泵的性能测试以及水泵和水阀的耐久性测试的目的,降低了成本;同时,还实现了被测水泵和被测水阀的耐久性测试能够同时进行的目的,而且,还可以一次完成多个被测水阀的耐久性测试,有效提高了工作效率。The test device provided by the embodiment of the utility model, through the setting of the water tank, the first pipeline, the second pipeline and the third pipeline, and various sensors, realizes when it is necessary to test the performance of the water pump and the durability of the water pump and the water valve. When, only need to connect the water pump under test to the other end of the third pipeline and the other end of the second main pipeline, and connect multiple water valves under test to each corresponding first branch pipeline and each second branch pipeline respectively. Between the pipelines, open all the water valves under test or one of the water valves to ensure the smooth flow of water in the pipeline, and the performance test of the water valves under test can be carried out; moreover, by controlling the opening or closing of multiple water valves under test Time, so that multiple tested water valves will not be closed at the same time, so as to ensure the smooth flow of water in the pipeline, and the durability test of the tested water pump and multiple tested water valves can be carried out at the same time. Compared with the prior art, the technical solution provided by the embodiment of the utility model realizes the performance test of the water pump and the durability test of the water pump and the water valve by using one test device, and reduces the cost; at the same time, it also realizes The durability test of the tested water pump and the tested water valve can be carried out at the same time, and the durability test of a plurality of tested water valves can also be completed at one time, which effectively improves the work efficiency.

为了进一步提高工作效率,参见图1,第二主管路7的另一端连通的多个第三支管路9;第三管路包括第三主管路13和与第三主管路13一端连通的多个第四支管路14,第三主管路13的另一端与出口11连通;每个第三支管路9和每个第四支管路14之间用于连接一被测水泵20,使多个被测水泵20并联;第一压力传感器2设置于第三主管路13上。通过在第二主管路7的另一端设置多个与其连通的第三支管路9,以及在第三主管路13的一端设置多个与其连通的第四支管路14,实现了多个被测水泵20可以并联在管路中,从而实现了在一次试验中,即可完成多个被测水泵20的测试试验,进一步提高了工作效率。需要说明的是,在应用该测试装置对多个被测水泵20进行性能测试时,回路中应保证只有一个被测水泵20处于工作状态,以避免多个被测水泵20同时处于工作状态时易导致每个被测水泵20的流量值和压差值不准确的弊端,从而能够准确地得到相应被测水泵20的性能曲线,进而准确地判断出被测水泵20的性能是否满足要求。In order to further improve work efficiency, referring to Fig. 1, a plurality of third branch pipelines 9 communicated with the other end of the second main pipeline 7; The fourth branch pipeline 14, the other end of the third main pipeline 13 communicates with the outlet 11; each third branch pipeline 9 and each fourth branch pipeline 14 are used to connect a tested water pump 20, so that multiple measured The water pumps 20 are connected in parallel; the first pressure sensor 2 is arranged on the third main pipeline 13 . By setting a plurality of third branch pipelines 9 communicating with it at the other end of the second main pipeline 7, and setting a plurality of fourth branch pipelines 14 communicating with it at one end of the third main pipeline 13, a plurality of water pumps under test are realized. 20 can be connected in parallel in the pipeline, so that the test test of multiple tested water pumps 20 can be completed in one test, which further improves the work efficiency. It should be noted that when using the test device to perform performance tests on multiple tested water pumps 20, it should be ensured that only one tested water pump 20 is in the working state in the circuit, so as to avoid easy The disadvantage of inaccurate flow and differential pressure values of each tested water pump 20 is that the performance curve of the corresponding tested water pump 20 can be accurately obtained, thereby accurately judging whether the performance of the tested water pump 20 meets the requirements.

为了进一步准确测试被测水泵20的性能是否满足要求,参见图1,第三主管路13具有第一段,该第一段的长度值等于15倍的第一段的内径值,第一段为第三主管路13靠近第四支管路14的一端与第一压力传感器2之间的一段;第二主管路7具有第二段和第三段,第二段的长度值等于10倍的第二段的内径值,第三段的长度值大于或等于10倍的第三段的内径值,第二段为第二主管路7靠近第三支管路9的一端与第二压力传感器3之间的一段,第三段为第二主管路7上除了第二段以外的一段;第一主管路5具有第四段,该第四段的长度值等于20倍的第四段的内径值,第四段为第一主管路5靠近第一支管路6的一端与流量传感器4之间的一段;其中,第一段、第二段、第三段和第四段的内径值均相等。通过将第一压力传感器2、第二压力传感器3和流量传感器4与被测水阀10和被测水泵20之间的距离设定为上述的距离,降低了测试回路中水流的脉冲对传感器精度的影响,从而提高了测试数据的准确性,进而进一步保证了被测水泵20性能测试的准确性。In order to further accurately test whether the performance of the tested water pump 20 meets the requirements, referring to Fig. 1, the third main pipeline 13 has a first section, the length value of this first section is equal to the inner diameter value of the first section of 15 times, and the first section is The third main pipeline 13 is close to a section between an end of the fourth branch pipeline 14 and the first pressure sensor 2; the second main pipeline 7 has a second section and a third section, and the length value of the second section is equal to the second section of 10 times. The inner diameter value of the section, the length value of the third section is greater than or equal to the inner diameter value of the third section of 10 times, the second section is the distance between the second main pipeline 7 and the second pressure sensor 3 near one end of the third branch pipeline 9 One section, the third section is a section other than the second section on the second main pipe 7; the first main pipe 5 has a fourth section, the length value of the fourth section is equal to the internal diameter value of the fourth section of 20 times, the fourth section The section is a section between the end of the first main pipeline 5 close to the first branch pipeline 6 and the flow sensor 4; wherein, the inner diameters of the first section, the second section, the third section and the fourth section are all equal. By setting the distances between the first pressure sensor 2, the second pressure sensor 3 and the flow sensor 4 and the tested water valve 10 and the tested water pump 20 to the above-mentioned distance, the pulse-to-sensor accuracy of the water flow in the test circuit is reduced , thereby improving the accuracy of the test data, and further ensuring the accuracy of the performance test of the water pump 20 under test.

为了保证被测水泵20工作在大流量工况时,其流量能够保持稳定,可以将第三主管路13采用具有一定刚度的材料制成,从而使得被测水泵20的进口测压段流量稳定,而且,第三主管路13还应具有足够的掩埋深度,从而保证了被测水泵20工作在大流量工况时,被测水泵20的流量能够保持稳定。In order to ensure that the flow rate of the water pump 20 under test can be kept stable when it works in a large flow condition, the third main pipeline 13 can be made of a material with a certain rigidity, so that the flow rate of the inlet pressure measuring section of the water pump 20 under test can be stabilized. Moreover, the third main pipe 13 should also have sufficient burial depth, so as to ensure that the flow rate of the tested water pump 20 can be kept stable when the tested water pump 20 works in a large flow condition.

具体地,参见图1,在水箱1内还可以设置第一温度传感器;第三主管路13上设置有第二温度传感器15,从而实现了当对水箱1中的水进行加热时,可以通过第一温度传感器监测其温度,并通过第二温度传感器15监测流入被测水泵20的流量温度,从而实现对被测水泵20进行热冲击特性的测试。Specifically, referring to Fig. 1, a first temperature sensor can also be arranged in the water tank 1; a second temperature sensor 15 is arranged on the third main pipeline 13, thereby realizing that when the water in the water tank 1 is heated, the first temperature sensor can be passed A temperature sensor monitors its temperature, and the temperature of the flow flowing into the tested water pump 20 is monitored by the second temperature sensor 15 , so as to test the thermal shock characteristics of the tested water pump 20 .

具体地,参见图1,还可以在第一主管路5上设置第三压力传感器16,用以监测回路中的压力损失,若发现压力损失较大,应及时作出调整,以避免被测水泵20的性能测试结果造成影响,进一步保证了被测水泵20性能测试的准确性。其中,第三压力传感器16与第一管路靠近第一支管路6的一端的距离可以为10倍的该段管路的内径值,以确保第三压力传感器16的精度,从而保证其测量数据的准确性。Specifically, referring to Fig. 1, a third pressure sensor 16 can also be installed on the first main pipeline 5 to monitor the pressure loss in the circuit. The performance test results have an impact, further ensuring the accuracy of the performance test of the water pump 20 under test. Wherein, the distance between the third pressure sensor 16 and the end of the first pipeline near the first branch pipeline 6 can be 10 times the inner diameter value of this section of pipeline, so as to ensure the accuracy of the third pressure sensor 16, thereby ensuring its measurement data accuracy.

为了保证该测试装置的使用安全性,参见图1,还可以在第一主管路5上设置泄压阀17,实现了当管路中的压力较大时,可以自动泄压。In order to ensure the use safety of the test device, referring to FIG. 1 , a pressure relief valve 17 can also be provided on the first main pipeline 5 to realize automatic pressure relief when the pressure in the pipeline is high.

具体地,所述水箱1可以为开放式水箱。Specifically, the water tank 1 may be an open water tank.

本实用新型实施例还提供了一种测试台架,包括测试装置,该测试装置采用上述的测试装置。The embodiment of the utility model also provides a test bench, including a test device, and the test device adopts the above-mentioned test device.

本实用新型实施例提供的测试台架,包括测试装置,该测试装置通过水箱、第一管路、第二管路和第三管路、以及各个传感器的设置,实现了当需要测试水泵的性能以及水泵和水阀的耐久性时,只需将被测水泵连接在第三管路的另一端和第二主管路的另一端,将多个被测水阀分别连接在相应的每个第一支管路和每个第二支管路之间,开启所有被测水阀或其中一个水阀,以保证管路中的水流畅通,即可进行被测水阀的性能测试;而且,通过控制多个被测水阀开启或关闭的时间,使得多个被测水阀不会同时关闭,以保证管路中的水流畅通,即可实现被测水泵和多个被测水阀耐久性测试的同时进行。与现有技术相比,本实用新型实施例提供的技术方案,实现了利用一个测试装置来完成水泵的性能测试以及水泵和水阀的耐久性测试的目的,降低了成本;同时,还实现了被测水泵和被测水阀的耐久性测试能够同时进行的目的,而且,还可以一次完成多个被测水阀的耐久性测试,有效提高了工作效率。The test stand provided by the embodiment of the utility model includes a test device, and the test device realizes when the performance of the water pump needs to be tested through the setting of the water tank, the first pipeline, the second pipeline and the third pipeline, and various sensors. As well as the durability of water pumps and water valves, it is only necessary to connect the tested water pump to the other end of the third pipeline and the other end of the second main pipeline, and connect multiple tested water valves to each corresponding first Between the branch pipeline and each second branch pipeline, open all or one of the water valves under test to ensure the smooth flow of water in the pipeline, and the performance test of the water valve under test can be carried out; and, by controlling multiple The time for the water valve under test to open or close, so that multiple water valves under test will not be closed at the same time, so as to ensure the smooth flow of water in the pipeline, which can realize the durability test of the water pump under test and multiple water valves under test at the same time . Compared with the prior art, the technical solution provided by the embodiment of the utility model realizes the performance test of the water pump and the durability test of the water pump and the water valve by using one test device, and reduces the cost; at the same time, it also realizes The durability test of the tested water pump and the tested water valve can be carried out at the same time, and the durability test of a plurality of tested water valves can also be completed at one time, which effectively improves the work efficiency.

以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应以所述权利要求的保护范围为准。The above is only a specific embodiment of the present utility model, but the scope of protection of the present utility model is not limited thereto. Anyone familiar with the technical field can easily think of changes or changes within the technical scope disclosed by the utility model Replacement should be covered within the protection scope of the present utility model. Therefore, the protection scope of the present utility model should be based on the protection scope of the claims.

Claims (8)

1.一种测试装置,其特征在于,包括:1. A testing device, characterized in that, comprising: 水箱、第一管路、第二管路、第三管路、第一压力传感器、第二压力传感器、流量传感器;Water tank, first pipeline, second pipeline, third pipeline, first pressure sensor, second pressure sensor, flow sensor; 所述水箱具有出口和入口;The water tank has an outlet and an inlet; 所述第一管路包括第一主管路和与所述第一主管路一端连通的多个第一支管路,所述第一主管路的另一端与所述入口连通;The first pipeline includes a first main pipeline and a plurality of first branch pipelines communicated with one end of the first main pipeline, and the other end of the first main pipeline communicates with the inlet; 所述第二管路包括第二主管路和与所述第二主管路一端连通的多个第二支管路,每个所述第一支管路和每个所述第二支管路之间用于连接一被测水阀,使多个所述被测水阀并联;The second pipeline includes a second main pipeline and a plurality of second branch pipelines communicating with one end of the second main pipeline, each of the first branch pipelines and each of the second branch pipelines is used for Connecting a water valve to be tested so that a plurality of water valves to be tested are connected in parallel; 所述第三管路的一端与所述出口连通,所述第三管路的另一端和所述第二主管路的另一端用于连接被测水泵;One end of the third pipeline communicates with the outlet, and the other end of the third pipeline and the other end of the second main pipeline are used to connect the tested water pump; 所述第一压力传感器设置于所述第三管路上,所述第二压力传感器设置于所述第二主管路上,所述流量传感器设置于所述第一主管路上。The first pressure sensor is arranged on the third pipeline, the second pressure sensor is arranged on the second main pipeline, and the flow sensor is arranged on the first main pipeline. 2.根据权利要求1所述的测试装置,其特征在于,2. The test device according to claim 1, characterized in that, 所述第二主管路的另一端连通有多个第三支管路;The other end of the second main pipeline is connected with a plurality of third branch pipelines; 所述第三管路包括第三主管路和与所述第三主管路一端连通的多个第四支管路,所述第三主管路的另一端与所述出口连通;The third pipeline includes a third main pipeline and a plurality of fourth branch pipelines communicated with one end of the third main pipeline, and the other end of the third main pipeline communicates with the outlet; 每个所述第三支管路和每个所述第四支管路之间用于连接一所述被测水泵,使多个所述被测水泵并联;Each of the third branch pipelines and each of the fourth branch pipelines is used to connect a tested water pump, so that a plurality of the tested water pumps are connected in parallel; 所述第一压力传感器设置于所述第三主管路上。The first pressure sensor is arranged on the third main pipe. 3.根据权利要求2所述的测试装置,其特征在于,3. The test device according to claim 2, characterized in that, 所述第三主管路具有第一段,所述第一段的长度值等于15倍的所述第一段的内径值,所述第一段为所述第三主管路靠近所述第四支管路的一端与所述第一压力传感器之间的一段;The third main pipeline has a first section, the length of the first section is equal to 15 times the inner diameter of the first section, and the first section is that the third main pipeline is close to the fourth branch pipe a section between one end of the road and the first pressure sensor; 所述第二主管路具有第二段和第三段,所述第二段的长度值等于10倍的所述第二段的内径值,所述第三段的长度值大于或等于10倍的所述第三段的内径值,所述第二段为所述第二主管路靠近所述第三支管路的一端与所述第二压力传感器之间的一段,所述第三段为所述第二主管路上除了所述第二段以外的一段;The second main pipeline has a second section and a third section, the length of the second section is equal to 10 times the inner diameter of the second section, and the length of the third section is greater than or equal to 10 times the The inner diameter value of the third section, the second section is a section between the second main pipeline end close to the third branch pipeline and the second pressure sensor, the third section is the a section of the Second Main Main Road other than said second section; 所述第一主管路具有第四段,所述第四段的长度值等于20倍的所述第四段的内径值,所述第四段为所述第一主管路靠近所述第一支管路的一端与所述流量传感器之间的一段;The first main pipe has a fourth section, the length of the fourth section is equal to 20 times the inner diameter of the fourth section, and the fourth section is that the first main pipe is close to the first branch pipe A section between one end of the road and the flow sensor; 其中,所述第一段、所述第二段、所述第三段和所述第四段的内径值均相等。Wherein, the inner diameters of the first segment, the second segment, the third segment and the fourth segment are all equal. 4.根据权利要求2或3所述的测试装置,其特征在于,4. The testing device according to claim 2 or 3, characterized in that, 所述水箱内设置有第一温度传感器;The water tank is provided with a first temperature sensor; 所述第三主管路上设置有第二温度传感器。A second temperature sensor is arranged on the third main pipe. 5.根据权利要求1至3中任一项所述的测试装置,其特征在于,5. The test device according to any one of claims 1 to 3, characterized in that, 所述第一主管路上设置有第三压力传感器。A third pressure sensor is arranged on the first main pipe. 6.根据权利要求1至3中任一项所述的测试装置,其特征在于,6. The test device according to any one of claims 1 to 3, characterized in that, 所述第一主管路上设置有泄压阀。A pressure relief valve is arranged on the first main pipe. 7.根据权利要求1至3中任一项所述的测试装置,其特征在于,7. The test device according to any one of claims 1 to 3, characterized in that, 所述水箱为开放式水箱。The water tank is an open water tank. 8.一种测试台架,包括测试装置,其特征在于,8. A test bench, comprising a test device, characterized in that, 所述测试装置采用如权利要求1至7中任一项所述的测试装置。The test device is the test device according to any one of claims 1-7.
CN201721140714.8U 2017-09-07 2017-09-07 Test device and testboard bay Expired - Fee Related CN207297311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721140714.8U CN207297311U (en) 2017-09-07 2017-09-07 Test device and testboard bay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721140714.8U CN207297311U (en) 2017-09-07 2017-09-07 Test device and testboard bay

Publications (1)

Publication Number Publication Date
CN207297311U true CN207297311U (en) 2018-05-01

Family

ID=62446176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721140714.8U Expired - Fee Related CN207297311U (en) 2017-09-07 2017-09-07 Test device and testboard bay

Country Status (1)

Country Link
CN (1) CN207297311U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108679448A (en) * 2018-06-02 2018-10-19 哈尔滨工业大学 Microfluid flow on-line control device and detection method
CN109632286A (en) * 2018-12-20 2019-04-16 中国海洋石油集团有限公司 A kind of water control valve test fixture
CN110646192A (en) * 2019-10-30 2020-01-03 上海三一重机股份有限公司 Hydraulic oil tank testing system and durability testing method
CN112816197A (en) * 2021-01-12 2021-05-18 上海亚大汽车塑料制品有限公司 Normal-temperature electronic water pump durability testing machine
CN115876456A (en) * 2023-03-03 2023-03-31 博鼎精工智能科技(山东)有限公司 Poppet valve testing arrangement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108679448A (en) * 2018-06-02 2018-10-19 哈尔滨工业大学 Microfluid flow on-line control device and detection method
CN109632286A (en) * 2018-12-20 2019-04-16 中国海洋石油集团有限公司 A kind of water control valve test fixture
CN110646192A (en) * 2019-10-30 2020-01-03 上海三一重机股份有限公司 Hydraulic oil tank testing system and durability testing method
CN112816197A (en) * 2021-01-12 2021-05-18 上海亚大汽车塑料制品有限公司 Normal-temperature electronic water pump durability testing machine
CN115876456A (en) * 2023-03-03 2023-03-31 博鼎精工智能科技(山东)有限公司 Poppet valve testing arrangement

Similar Documents

Publication Publication Date Title
CN207297311U (en) Test device and testboard bay
CN104359661B (en) universal valve performance test device
CN103307057B (en) Pollution and abrasion test system for electro-hydraulic servo valve
CN205352677U (en) Valve flow flow resistance test device
CN104048805B (en) Use the assay method of the device of experimental determination feedwater piping leakage
CN107781155A (en) Test system, durability test method and performance test methods
JP2011099850A5 (en)
CN202075022U (en) Natural gas small flow meter online real flow verification device
CN103557992A (en) Method for detecting inner leakage of steam hydrophobic valve based on valve front pipe wall temperature detection
CN107131119A (en) High-temperature melting salt pump compbined test detection means under a kind of long-shaft liquid
CN105156403A (en) Automatic power recycling testing platform for hydraulic pump and hydraulic motor
CN105424264A (en) Valve flow and flow resistance coefficient detection device
CN103616405B (en) A kind of pick-up unit to ground buried pipe of ground source heat pump system
CN103792082B (en) Safety return-flow valve detection device and method
CN207570774U (en) One-way valve pressure test device for construction machinery
CN205157337U (en) Polylinker pipeline pressure testing device
CN106643993B (en) Device for low-temperature test of water supply vertical pipe and water meter
CN204177548U (en) A kind of pipeline liquid discharge characteristic proving installation
CN204461979U (en) A kind of recirculating cooling water system on-line corrosion monitoring system
CN102749180B (en) Stop valve leak rate online test method
CN107883056A (en) Safety valve real time on-line monitoring system and safety valve escape monitoring method
CN203979895U (en) A test device for the sealing effect of pipeline under pressure
CN205445993U (en) Compressor test bench
CN114526276B (en) Special hydraulic station for testing functions of hydraulic reversing valve and testing method thereof
CN216210669U (en) Gas flow controller system of leaking hunting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190313

Address after: 215011 No. 150 Keats Road, Suzhou High-tech Zone, Jiangsu Province

Patentee after: CHANGCHENG HUAGUAN AUTOMOTIVE TECHNOLOGY (SUZHOU) Co.,Ltd.

Address before: 101300 the 4 Building (1) of Beijing science and Technology Innovation Zone, Renjun North Street, Renhe Town, Shunyi District.

Patentee before: CH-AUTO TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501