CN207296862U - A kind of house hydropower installation folding device - Google Patents
A kind of house hydropower installation folding device Download PDFInfo
- Publication number
- CN207296862U CN207296862U CN201721243593.XU CN201721243593U CN207296862U CN 207296862 U CN207296862 U CN 207296862U CN 201721243593 U CN201721243593 U CN 201721243593U CN 207296862 U CN207296862 U CN 207296862U
- Authority
- CN
- China
- Prior art keywords
- folding device
- main body
- folding
- device main
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a kind of house hydropower installation folding device, including folding device main body and support baseboard, vertical chute is installed on the left of the folding device main body, the side of the folding device main body away from vertical chute is welded with the left vertical bar of folding ladder, side away from the left vertical bar of folding ladder on the right side of the folding device main body is welded with the right vertical bar of folding ladder, some cross bars are installed between the left vertical bar of the folding ladder and the right vertical bar of folding ladder, the folding device body top is provided with socket, hinge is installed on the left of the folding device body surfaces, the side of the folding device body surfaces away from hinge is welded with control handle, side of the support baseboard away from folding device main body is provided with universal wheel.The house hydropower installation folding device, ensure that by components such as the left and right vertical bar of folding ladder, folding device main body and its internal batteries and house water power is installed, the use of person easy to operation.
Description
Technical field
The utility model belongs to hydroelectric facility auxiliary device technical field, and in particular to a kind of house hydropower installation folds dress
Put.
Background technology
It is exactly first the family of oneself to be fitted up first in living in house, wherein critically important one is exactly to occupying
Family's water power is installed, must not in the thing that house hydropower installation carries out before being fine fitment indoors, and whole fitment process
The link that can lack.If there is mistake in whole link, very big trouble will be brought to later finishing work.Water
The finishing of this electric block is the most important thing, hydropower installation Exact Design scheme complete be finishing go into operation the primary condition that must possess it
One.There is no detailed hydropower installation cabling scheme hastily to go into operation often blindness, while perturbed on one side carrying out Hydroelectric Project Construction
It is uneasy to spend measured step back and forth which place is kept in mind and do something, as a result arrived just found when finishing finishes use it is ready-made
Thing is not used, and the thing also much wanted is not done.House water power peace would generally be used in Hydroelectric Project Construction is carried out at the same time
Fill folding device.
At present house hydropower installation folding device on the market be there are problems that, can not be moved freely, can be carried out
Hydropower installation operation less and can not install eminence water power, be unfavorable for the use of operator, for it is above-mentioned the problem of, I
A kind of be badly in need of house hydropower installation folding device to solve to move freely, can carry out hydropower installation operation less and nothing
The problem of method installs eminence water power, the use of person easy to operation.
Utility model content
The purpose of this utility model is to provide a kind of house hydropower installation folding device, to solve in above-mentioned background technology
The problem of proposition.
To achieve the above object, the utility model provides following technical solution:A kind of house hydropower installation folding device, bag
Folding device main body and support baseboard are included, vertical chute, the folding device main body are installed on the left of the folding device main body
Side away from vertical chute is welded with the left vertical bar of folding ladder, and the folding device main body right side is away from the left vertical bar of folding ladder
Side be welded with the right vertical bar of folding ladder, some horizontal strokes are installed between the left vertical bar of the folding ladder and the right vertical bar of folding ladder
Bar, the folding device body top are provided with socket, hinge, the folding are provided with the left of the folding device body surfaces
Side of the stacking device body surfaces away from hinge is welded with control handle, side of the support baseboard away from folding device main body
Universal wheel is installed.
Preferably, the folding device body interior bottom is provided with tool shelving rack one, on the tool shelving rack one
Portion is provided with tool shelving rack two, and insulated column, the work are welded with inside the tool shelving rack one and tool shelving rack two
Support isolation board two is welded between tool storage rack one and tool shelving rack two, two upper weld of tool shelving rack has support
Isolation board one, one top of the support isolation board are provided with storage battery.
Preferably, left-handed shaft is installed in the middle part of the left vertical bar of the folding ladder, is pacified in the middle part of the right vertical bar of folding ladder
Equipped with dextral shaft, the support baseboard upper right is provided with fixed Ingathering board.
Preferably, side of the vertical chute away from folding device main body is welded with connecting rod, the connecting rod lower part installation
There is shaft, side of the connecting rod away from vertical chute is welded with clamp port.
Preferably, Three-hole socket is installed on the left of the socket plate surface, the socket plate surface is away from Three-hole socket
Side is provided with Double-hole socket.
Preferably, universal wheel connecting rod is installed, the universal wheel connecting rod is right between the universal wheel and support baseboard
Side is provided with brake fixed link.
The technique effect and advantage of the utility model:The house hydropower installation folding device, by installed in folding device
The left vertical bar of folding ladder, the right vertical bar of folding ladder and cross bar on the right side of main body ensure that the installation to eminence house water power, described
Left-handed shaft, dextral shaft and fixed Ingathering board ensure that the folding storage to folding ladder, ensure that by clamp port to water power
The clamping of instrument in installation process, ensure that by shaft, connecting rod and vertical chute and clamp port is folded and ensure that
Clamp port can be moved freely up and down, by hinge and control handle ensure that maintenance to folding device body interior component and
Replace, the electricity to the instrument of electricity consumption during hydropower installation ensure that by storage battery, socket, Double-hole socket and Three-hole socket
Power is supplied, by supporting isolation board one and supporting isolation board two to ensure that the isolation to folding device body interior component supports,
Storage to hydropower installation instrument ensure that by tool shelving rack one and tool shelving rack two, ensure that by insulated column to work
Isolation during tool storage, ensure that folding device can move freely by universal wheel, universal wheel connecting rod and brake fixed link,
The house hydropower installation folding device, passes through the components such as the left and right vertical bar of folding ladder, folding device main body and its internal battery
It ensure that and house water power is installed, the use of person easy to operation.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of the utility model;
Fig. 2 is the internal structure schematic diagram of the utility model.
In figure:1 folding device main body, 2 support baseboards, 3 vertical chutes, the left vertical bar of 4 folding ladders, 5 folding ladders are right vertical
Bar, 6 cross bars, 7 universal wheels, 8 hinges, 9 control handles, 10 left-handed shafts, 11 dextral shafts, 12 fix Ingathering boards, 13 sockets,
14 shafts, 15 connecting rods, 16 clamp ports, 17 universal wheel connecting rods, 18 brake fixed links, 19 Double-hole sockets, 20 Three-hole sockets, 21
Support isolation board one, 22 and support isolation board two, 23 storage batteries, 24 tool shelving racks one, 25 tool shelving racks two, 26 insulated columns.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained, shall fall within the protection scope of the present invention.
Referring to Fig. 1, Fig. 1 is the dimensional structure diagram of the utility model;A kind of house hydropower installation folding device, bag
Folding device main body 1 and support baseboard 2 are included, the left side of folding device main body 1 is provided with vertical chute 3, the folding device
Side of the main body 1 away from vertical chute 3 is welded with the left vertical bar 4 of folding ladder, and the right side of folding device main body 1 is away from folding ladder
The side of left vertical bar 4 is welded with the right vertical bar 5 of folding ladder, between the left vertical bar 4 of the folding ladder and the right vertical bar 5 of folding ladder
Some cross bars 6 are installed, the top of folding device main body 1 is provided with socket 13,1 surface of the folding device main body left side
Hinge 8 is installed, side of 1 surface of folding device main body away from hinge 8 is welded with control handle 9, the support baseboard 2
Side away from folding device main body 1 is provided with universal wheel 7, and 1 inner bottom of folding device main body is provided with tool storage
Frame 1, one 24 top of tool shelving rack are provided with tool shelving rack 2 25, and the tool shelving rack 1 and instrument are deposited
Put and insulated column 26 is welded with inside frame 2 25, support is welded between the tool shelving rack 1 and tool shelving rack 2 25
Isolation board 2 22,2 25 upper weld of tool shelving rack have support isolation board 1, one 21 top of the support isolation board
Storage battery 23 is installed, the left middle part of vertical bar 4 of folding ladder is provided with left-handed shaft 10, in the right vertical bar 5 of folding ladder
Portion is provided with dextral shaft 11, and 2 upper right of support baseboard is provided with fixed Ingathering board 12, and the vertical chute 3 is remote
The side of folding device main body 1 is welded with connecting rod 15, and 15 lower part of connecting rod is provided with shaft 14, and the connecting rod 15 is away from vertical
The side of sliding slot 3 is welded with clamp port 16, and Three-hole socket 20,13 table of socket are provided with the left of 13 surface of socket
Side of the face away from Three-hole socket 20 is provided with Double-hole socket 19, and universal wheel is provided between the universal wheel 7 and support baseboard 2
Connecting rod 17, the right side of universal wheel connecting rod 17 are provided with brake fixed link 18.
To house water power when folding ladder left vertical bar 4, the right vertical bar 5 of folding ladder and the cross bar 6 ensure that aloft
Installation, the left-handed shaft 10, dextral shaft 11 and fixed Ingathering board 12 ensure that right to the left vertical bar of folding ladder 4, folding ladder
The folding and storage of vertical bar 5 and cross bar 6, the hinge 8 and control handle 19 ensure that to 1 internal part of folding device main body
Maintenance and replacement, the shaft 14, connecting rod 15, clamp port 16 and vertical chute 3 ensure that to instrument during hydropower installation
Clamping and instrument be freely lifted, the universal wheel 7, universal wheel connecting rod 17 and brake fixed link 18 ensure that folding device
It can move freely.
Referring to Fig. 2, Fig. 2 is the internal structure schematic diagram of the utility model.The socket 13, Double-hole socket 19, three
Spring hole scoket 20 and storage battery 23 ensure that the supply of electric power to hydropower installation instrument, the insulated column 26, support isolation board 1
The isolation support to 1 internal part of folding device main body, one 25 He of tool shelving rack are ensure that with support isolation board 2 22
Tool shelving rack 2 26 ensure that the storage to hydropower installation instrument.
Operation principle:During using the house hydropower installation folding device, pass through the left vertical bar 4 of folding ladder, folding
Installation when folded terraced right vertical bar 5 and cross bar 6 ensure that aloft to house water power, passes through left-handed shaft 10, dextral shaft 11
The folding and storage to the left vertical bar of folding ladder 4, the right vertical bar 5 of folding ladder and cross bar 6 are ensure that with fixed Ingathering board 12, at the same time
Clamping to instrument during hydropower installation and instrument ensure that by shaft 14, connecting rod 15, clamp port 16 and vertical chute 3
It is freely lifted, the maintenance and replacement to 1 internal part of folding device main body ensure that by hinge 8 and control handle 19, pass through
Socket 13, Double-hole socket 19, Three-hole socket 20 and storage battery 23 ensure that the supply of electric power to hydropower installation instrument, pass through work
Tool storage rack 1 and tool shelving rack 2 26 ensure that the storage to hydropower installation instrument, while pass through insulated column 26, support
Isolation board 1 and support isolation board 2 22 ensure that the isolation support to 1 internal part of folding device main body, pass through universal wheel
7th, universal wheel connecting rod 17 and brake fixed link 18 ensure that folding device can move freely.
Finally it should be noted that:The above descriptions are merely preferred embodiments of the present invention, is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it can still modify the technical solution described in foregoing embodiments, or to which part technical characteristic
Equivalent substitution is carried out, where within the spirit and principles of the present invention, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (6)
1. a kind of house hydropower installation folding device, including folding device main body (1) and support baseboard (2), it is characterised in that:Institute
State and vertical chute (3) is installed on the left of folding device main body (1), the one of the remote vertical chute (3) of the folding device main body (1)
Side is welded with the left vertical bar of folding ladder (4), side of folding device main body (1) right side away from the left vertical bar of folding ladder (4)
Be welded with the right vertical bar of folding ladder (5), the left vertical bar of folding ladder (4) and the right vertical bar of folding ladder (5) if between be provided with
Dry cross bar (6), folding device main body (1) top are provided with socket (13), folding device main body (1) the surface left side
Hinge (8) is installed, the side of folding device main body (1) surface away from hinge (8) is welded with control handle (9), described
Side of the support baseboard (2) away from folding device main body (1) is provided with universal wheel (7).
A kind of 2. house hydropower installation folding device according to claim 1, it is characterised in that:The folding device main body
(1) inner bottom is provided with tool shelving rack one (24), and described one (24) top of tool shelving rack is provided with tool shelving rack two
(25), insulated column (26) is welded with inside the tool shelving rack one (24) and tool shelving rack two (25), the instrument is deposited
Put and support isolation board two (22) is welded between frame one (24) and tool shelving rack two (25), on the tool shelving rack two (25)
Portion is welded with support isolation board one (21), and described support isolation board one (21) top is provided with storage battery (23).
A kind of 3. house hydropower installation folding device according to claim 1, it is characterised in that:The folding ladder is left vertical
Left-handed shaft (10) is installed in the middle part of bar (4), dextral shaft (11) is installed in the middle part of the right vertical bar of folding ladder (5), it is described
Support baseboard (2) upper right is provided with fixed Ingathering board (12).
A kind of 4. house hydropower installation folding device according to claim 1, it is characterised in that:The vertical chute (3)
Side away from folding device main body (1) is welded with connecting rod (15), and connecting rod (15) lower part is provided with shaft (14), the company
Side of the bar (15) away from vertical chute (3) is welded with clamp port (16).
A kind of 5. house hydropower installation folding device according to claim 1, it is characterised in that:Socket (13) table
Left side of face is provided with Three-hole socket (20), and the side of socket (13) surface away from Three-hole socket (20) is provided with diplopore and inserts
Seat (19).
A kind of 6. house hydropower installation folding device according to claim 1, it is characterised in that:The universal wheel (7) and
Universal wheel connecting rod (17) is installed between support baseboard (2), brake is installed on the right side of the universal wheel connecting rod (17) and is fixed
Bar (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721243593.XU CN207296862U (en) | 2017-09-26 | 2017-09-26 | A kind of house hydropower installation folding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721243593.XU CN207296862U (en) | 2017-09-26 | 2017-09-26 | A kind of house hydropower installation folding device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207296862U true CN207296862U (en) | 2018-05-01 |
Family
ID=62439579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721243593.XU Expired - Fee Related CN207296862U (en) | 2017-09-26 | 2017-09-26 | A kind of house hydropower installation folding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207296862U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112405474A (en) * | 2020-11-27 | 2021-02-26 | 广东电网有限责任公司 | Smart power grids operation toolbox |
-
2017
- 2017-09-26 CN CN201721243593.XU patent/CN207296862U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112405474A (en) * | 2020-11-27 | 2021-02-26 | 广东电网有限责任公司 | Smart power grids operation toolbox |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207296862U (en) | A kind of house hydropower installation folding device | |
CN207116967U (en) | A kind of modularization distribution box | |
CN204838680U (en) | Portable drawing frame for machine tooling | |
CN204349307U (en) | Middle circuit breaker moves apparatus for examination and repair | |
CN207285324U (en) | A kind of tailoring equipment cut suitable for straight line and curve | |
CN205493042U (en) | Art design multifunctional workbench | |
CN209319752U (en) | A kind of Moveable foldable tool rack | |
CN204800162U (en) | Be used for circuit board welded weld holder | |
CN204719260U (en) | A kind of operating means for optical fiber welding welding machine | |
CN203650468U (en) | Portable working table | |
CN210878304U (en) | Cable hook processing locater | |
CN205849094U (en) | A kind of independent assortment cabinet | |
CN204392708U (en) | A kind of combined cabinet | |
CN106695190B (en) | A kind of safety-type welding machine | |
CN207156046U (en) | A kind of making wood twig process equipment for being easy to regulation to use | |
CN213658943U (en) | Safe grounding detection device | |
CN204273781U (en) | Maintenance and production labor station | |
CN207083305U (en) | A kind of electric appliance combined cabinet | |
CN205439797U (en) | Formula fine arts drawing board is inhaled to wind | |
CN104473468A (en) | Workbench for maintenance and production | |
CN215920366U (en) | Workstation is used in warm logical installation of multi-use architecture | |
CN205882074U (en) | Full -automatic battery kludge | |
CN216293472U (en) | Locker for life management | |
CN207028683U (en) | A kind of Multifunction fine arts drawing board | |
CN205125513U (en) | Combined hall cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180501 Termination date: 20180926 |