CN207296020U - Wallboard and floor bridging arrangement - Google Patents
Wallboard and floor bridging arrangement Download PDFInfo
- Publication number
- CN207296020U CN207296020U CN201721232860.3U CN201721232860U CN207296020U CN 207296020 U CN207296020 U CN 207296020U CN 201721232860 U CN201721232860 U CN 201721232860U CN 207296020 U CN207296020 U CN 207296020U
- Authority
- CN
- China
- Prior art keywords
- notch part
- floor
- steel tie
- prefabricated panel
- lug boss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of wallboard and floor bridging arrangement are the utility model is related to, it includes the first prefabricated panel, the second prefabricated panel and floor.At least one side of first prefabricated panel has the first lug boss and the first notch part, the at least one side of second prefabricated panel has the second lug boss and the second notch part, second lug boss is arranged at the first notch part, second notch part corresponds to the first lug boss, second notch part is big compared to the first lug boss, second notch part and the first lug boss form recess, and at least one side of floor is embedded in corresponding recess.The utility model has the advantages of simple structure, and structurally waterproof is formed on structural level.In addition, the structure of the utility model is easy for installation, it can save the duration, advantageously reduce cost.
Description
Technical field
It the utility model is related to a kind of assembled architecture field, more particularly to a kind of wallboard and floor bridging arrangement.
Background technology
At present, the component part of known assembled arthitecutral structure uses concrete material or lightgage steel joist composite junction mostly
Structure, structurally waterproof poor performance, assembling degree is low, and cost is higher.
Utility model content
For the structurally waterproof poor performance of the prior art, the low and of high cost deficiency of assembling degree, and then propose a kind of
Structure-improved.The purpose of this utility model is to provide a kind of wallboard and floor bridging arrangement.
In order to solve the above-mentioned technical problem, it is pre- it includes first this application discloses a kind of wallboard and floor bridging arrangement
Wallboard, the second prefabricated panel and floor processed.At least one side of first prefabricated panel has the first lug boss and the first notch
Portion, at least one side of the second prefabricated panel has the second lug boss and the second notch part, wherein the second lug boss is arranged at
First notch part, the second notch part correspond to the first lug boss, and the second notch part is big compared to the first lug boss, the second notch
Portion forms recess with the first lug boss, and at least one side of floor is embedded in corresponding recess.
According to presently filed embodiment, all have inside the first above-mentioned prefabricated panel, the second prefabricated panel and floor
The through hole of multiple columns.
According to presently filed embodiment, the first above-mentioned prefabricated panel has the first wall and the first steel tie, the
One steel tie is arranged at the first wall, and the first steel tie and the first wall surround the first opening, and the second prefabricated panel has
Second wall and the second steel tie, the second steel tie are arranged at the second wall, and the second steel tie is surrounded with the second wall
Second opening, first is open is open in correspondence with each other and is formed first passage with second.
According to presently filed embodiment, the first above-mentioned steel tie is U-shaped with the second steel tie.
According to presently filed embodiment, at least one angle end of above-mentioned floor has notch part, and floor has body
With the 3rd steel tie, the both ends of the 3rd steel tie are individually fixed in two side walls of notch part, the 3rd steel tie both ends
Between there is bending section, and the 3rd steel tie surrounds second channel with notch part.
According to presently filed embodiment, multiple column reinforcing bars are further included, it wears the first channel and second channel.
Compared with prior art, the application can be obtained including following effect:
The wallboard of the application and floor bridging arrangement, it is simple in structure, structurally waterproof is formed on structural level.In addition, this
The structure of utility model is easy for installation, can save the duration, advantageously reduce cost.
Brief description of the drawings
Attached drawing described herein is used to provide a further understanding of the present invention, and forms one of the utility model
Point, the exemplary embodiment and its explanation of the utility model are used to explain the utility model, do not form to the utility model
Improper restriction.In the accompanying drawings:
Fig. 1 is the schematic perspective view of the wallboard with floor bridging arrangement of the utility model;
Fig. 2 is the A-A ' diagrammatic cross-sections of Fig. 1;
Fig. 3 is the A-A ' section combination diagrams of Fig. 1;
Fig. 4 is another combination diagram of A-A ' sections of Fig. 1;And
Fig. 5 is the B area enlarged drawing of Fig. 1.
Embodiment
Presently filed embodiment will be disclosed with schema below, as clearly stated, details in many practices will be
Illustrate in the lump in described below.It should be appreciated, however, that the details in these practices is not applied to limit the application.That is,
In some embodiments of the application, the details in these practices is non-essential.In addition, for the sake of simplifying schema, some
Known usual structure will illustrate it in a manner of simply illustrative in the drawings with component.
Please refer to Fig.1 and Fig. 2, it is the wallboard of the utility model and the schematic perspective view of floor bridging arrangement and Fig. 1
A-A ' diagrammatic cross-sections.As shown in the figure, the application provides a kind of wallboard and floor bridging arrangement 1, it is used for the wall of building structure
Plate is overlapped with floor, and wallboard includes the first prefabricated panel 11, the second prefabricated panel 13 and floor 15 with floor bridging arrangement 1.
The inside of first prefabricated panel 11, the second prefabricated panel 13 and floor 15 all has the through hole 135 of multiple columns respectively, multiple
Through hole can discharge the ponding (such as rainwater) in building, strengthen the water resistance of structure.
Fig. 3 to Fig. 4 is referred to, the A-A ' sections combination diagrams and another combination diagram of A-A ' sections that are Fig. 1.Such as figure
Shown, at least one side of the first prefabricated panel 11 has the first notch part 111 and the first lug boss 113, and second pre-
At least one side of wallboard 13 processed has the second lug boss 131 and the second notch part 133, wherein the second lug boss 131 is set
In the first notch part 111, at this time, the second lug boss 131 and the first notch part 113 just coincide, and the second notch part 133 corresponds to
First lug boss 113, especially, the second notch part 133 are big compared to the first lug boss 113, i.e., the first lug boss 113 is convex
The notch depth that height is less than the second notch part 133 is played, therefore, the second notch part 133 and the first lug boss 111 form recess
31, and the openings of sizes of recess 31 is then the height of projection and the difference of 133 notch depth of the second notch part of the first lug boss 113
Value.At least one side of floor 15 is embedded in recess 31 again, is composed so concaveconvex structure 17, its structure has the function of waterproof.Connect
Above-mentioned, through hole 135 and the concaveconvex structure 17 of multiple columns are wallboard and the waterproof construction of floor bridging arrangement.
Referring to Fig. 5, it is the B area enlarged drawing of Fig. 1;As shown in the figure, at least side of the first prefabricated panel 11 is equipped with
Multiple first steel ties 112, the both ends of the first steel tie 112 are fixed on the side wall of corresponding first prefabricated panel 11,
First steel tie 112 and the first prefabricated panel 11 surround the first opening 121, the shape of the first steel tie of each of which 112
Shape is U-shaped.At least side of second prefabricated panel 13 is equipped with multiple second steel ties 132, the both ends of the second steel tie 132
It is fixed on the side wall of corresponding second prefabricated panel 13, the second steel tie 132 surrounds second with the second prefabricated panel 13 and opens
Mouth 137, the shape of the second steel tie of each of which 132 is U-shaped.Hold above-mentioned, the first opening 121 is open 137 with second
Position in correspondence with each other and forms first passage 237.
Also, at least one angle end 151 of each floor 15 has notch part 153, each notch part 153 is equipped with the 3rd and draws
Reinforcing bar 155 is tied, the angle of the extending direction at the both ends of each the 3rd steel tie 155 is less than or equal to 90 degree, its both ends point
Orthogonal two side walls of corresponding notch part 153, each the 3rd steel tie 155 and corresponding notch are not fixed on
Portion 153 surrounds second channel 157, and each of which has bending section 161 between the 3rd 155 both ends of steel tie.Described in connecting,
Multiple column reinforcing bars 19 are arranged in the first channel 237 and second channel 157 again, i.e., multiple column reinforcing bars 19 are sequentially arranged in respectively
The opening 121 of first steel tie 112 of group, the opening 137 and second channel 157 of the second steel tie 132 of each group.
In embodiment, the quantity of the first prefabricated panel 11, the second prefabricated panel 13 and floor 15 is respectively two, its
In each second prefabricated panel 13 be arranged at corresponding first prefabricated panel 11, each floor 15 is embedded in corresponding recess
31, it is so two groups, wherein the angle formed between two adjacent the first prefabricated panels 1 is 180 degree, therebetween with installation space
123.Multiple first steel ties 112 and multiple second steel ties 132 are entirely located in installation space 123, and plurality of first
The both ends of first steel tie 112 in mutual group two-by-two, every group of steel tie 112 are connected to the first prefabricated panel of left side
11, and this first steel tie 112 can be limited be subject to the structure of multiple column reinforcing bars 19 on right side in first passage 237;
The both ends of another the first steel tie 112 are connected to the first prefabricated panel 11 of right side, and this first steel tie 112 can be subject to
The structure limitation of multiple column reinforcing bars 19 in left side in first passage 237.In other words, groups of two the first steel ties
112 are respectively arranged at corresponding first prefabricated panel 11, and 2 first steel ties 112 of each group are conversely set mutually for structure
Put.Also the both ends of second steel tie 132 in mutual group, every group are connected to left side to multiple second steel ties 132 two-by-two
Second prefabricated panel 13, and this second steel tie 132 can be subject to multiple column reinforcing bars 19 on the right side in first passage 237
Structure limitation;The both ends of another the second steel tie 132 are connected to the second prefabricated panel 13 of right side, and this second drawknot steel
Muscle 132 can be limited be subject to the structure of multiple column reinforcing bars 19 in left side in first passage 237.In other words, groups of two
Second steel tie 132 is respectively arranged at corresponding second prefabricated panel 11, and two second steel ties 132 of each group are knot
Structure is reversed mutually.The both ends of each the 3rd steel tie 155 are individually fixed in being mutually perpendicular to for corresponding notch part 153
Two side walls, and this 3rd steel tie 155 can be subject to the structure limit of multiple column reinforcing bars 19 in the second channel 157
System.In this way, every group of first steel tie 112 provides pulling force, every group of second steel tie 132 for the first prefabricated panel 11 of left and right
Pulling force is provided for the second prefabricated panel 13 of left and right, each the 3rd steel tie 155 provides pulling force, such pulling force for floor 15
Can average structure intensity enhancing.From the above, the both sides of multiple connecting plates 21 are respectively arranged at corresponding two the first dry walls
Plate 11, and the both sides of multiple connecting plates 21 are respectively arranged at two the second prefabricated panels 13, and multiple connecting plates 21 are located at
The both sides of multiple column reinforcing bars 19.After the completion of above-mentioned wallboard bridging arrangement overlap joint 1, with cast-in-place concrete to wallboard bridging arrangement into
Row pours, i.e., inserts concrete in installation space 123.
In conclusion in presently filed embodiment, the wallboard bridging arrangement of the application is simple, is formed on structural level
Structurally waterproof.In addition, the structure of the utility model is easy for installation, it can save the duration, advantageously reduce cost.
The upper only presently filed embodiment, is not limited to the application.For those skilled in the art
For, the application can have various modifications and variations.All any modifications made in spirit herein and principle, be equal
Replace, improve etc., it should all be included within the scope of claims hereof.
Claims (6)
1. a kind of wallboard and floor bridging arrangement, it is characterised in that it includes:
First prefabricated panel, at least one side has the first lug boss and the first notch part for it;
Second prefabricated panel, at least one side has the second lug boss and the second notch part for it, and second lug boss is set
In first notch part, second notch part corresponds to first lug boss, and second notch part is compared to described
Big, second notch part and first lug boss formation recess of first lug boss;And
Floor, at least one side is embedded in the corresponding recess for it.
2. wallboard and floor bridging arrangement according to claim 1, it is characterised in that wherein described first prefabricated panel, institute
Stating all has the through hole of multiple columns inside the second prefabricated panel and the floor.
3. wallboard and floor bridging arrangement according to claim 1, it is characterised in that wherein described first prefabricated panel has
First wall and the first steel tie, first steel tie are arranged at first wall, first steel tie with
First wall surrounds the first opening, and second prefabricated panel has the second wall and the second steel tie, and described second
Steel tie is arranged at second wall, and second steel tie and second wall surround the second opening, and described the
One is open is open in correspondence with each other and is formed first passage with described second.
4. wallboard and floor bridging arrangement according to claim 3, it is characterised in that wherein described first steel tie and institute
It is U-shaped to state the second steel tie.
5. wallboard and floor bridging arrangement according to claim 3, it is characterised in that at least one angle of wherein described floor
End has notch part, and the floor has body and the 3rd steel tie, and the both ends of the 3rd steel tie are individually fixed in
Two side walls of the notch part, have bending section between the 3rd steel tie both ends, and the 3rd steel tie with
The notch part surrounds second channel.
6. wallboard and floor bridging arrangement according to claim 5, further include multiple column reinforcing bars, it is logical that it wears described first
Road and the second channel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721232860.3U CN207296020U (en) | 2017-09-25 | 2017-09-25 | Wallboard and floor bridging arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721232860.3U CN207296020U (en) | 2017-09-25 | 2017-09-25 | Wallboard and floor bridging arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207296020U true CN207296020U (en) | 2018-05-01 |
Family
ID=62442457
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721232860.3U Active CN207296020U (en) | 2017-09-25 | 2017-09-25 | Wallboard and floor bridging arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207296020U (en) |
-
2017
- 2017-09-25 CN CN201721232860.3U patent/CN207296020U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102787681B (en) | Connecting structure of prefabricated concrete wall body | |
JP3116896U (en) | Assembly structure of spiral stirrup and steel frame | |
CN103572840B (en) | Notch-key type prefabricated member connection node and connection method | |
CN202866043U (en) | Connection structure of precast concrete walls | |
CN104358331A (en) | Laminated slab type shear wall steel bar pin joint connecting component and connecting method | |
WO2020253811A1 (en) | Local composite slab connection node, and construction method therefor | |
CN102797307B (en) | The syndeton of precast concrete wall | |
CN106567475A (en) | Steel and concrete composite shear wall and construction method thereof | |
CN207402953U (en) | For pouring sectional die, vertical die component and the prefabricated overlapping wall body structure of prefabricated overlapping wall | |
AU1738699A (en) | Block for retaining wall and method for the construction of retaining wall using the same | |
CN202672351U (en) | Sunk key type prefabricated component connected node | |
CN209163218U (en) | A kind of novel concrete-filled steel square tubular column reinforced using cross floor | |
CN207296020U (en) | Wallboard and floor bridging arrangement | |
CN106436926A (en) | Square steel tube column-H-shaped steel beam end-plate connecting node | |
CN105937280A (en) | Novel prefabricated building connecting joint | |
CN202831298U (en) | Connecting structure of prefabricated concrete wall body | |
CN204252327U (en) | Overlaid plate type shear force wall reinforcing steel bar pin joint connecting elements | |
CN104005494A (en) | Prefabricated shear wall dry-wet mixed vertical connecting joint structure | |
CN207959529U (en) | Overlap wall vertically with horizontal member roof connecting node | |
JP5394554B1 (en) | Precast concrete foundation and building foundation | |
CN207331425U (en) | A kind of Steel Pipe Concrete Tied-arch Bridge arch springing connecting structure | |
CN207003804U (en) | The prefabricated board assembly unit of quick-assembling | |
CN111764509B (en) | Reinforced concrete connecting joint with steel pipe core for prefabricated beam column and connecting method | |
CN103835402A (en) | L-shaped prefabricated concrete wall connection joint | |
CN204959967U (en) | Hoop reinforcing concrete filled steel tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |