CN106436926A - Square steel tube column-H-shaped steel beam end-plate connecting node - Google Patents
Square steel tube column-H-shaped steel beam end-plate connecting node Download PDFInfo
- Publication number
- CN106436926A CN106436926A CN201610973006.6A CN201610973006A CN106436926A CN 106436926 A CN106436926 A CN 106436926A CN 201610973006 A CN201610973006 A CN 201610973006A CN 106436926 A CN106436926 A CN 106436926A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- end plate
- plate
- square steel
- pipe column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 118
- 239000010959 steel Substances 0.000 title claims abstract description 118
- 239000003351 stiffener Substances 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 12
- 238000003466 welding Methods 0.000 abstract description 8
- 238000005192 partition Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开一种方钢管柱‑H形钢梁的端板连接节点,包括方钢管柱、H形钢梁,节点端板、梁端板、侧钢板;梁端板与H形钢梁端部焊缝连接,梁端板上开有螺栓孔;两侧钢板与方钢管柱两侧壁板焊缝连接,节点端板与侧钢板焊缝连接,节点端板上开有与梁端板相对应的螺孔;方钢管柱、H形钢梁借助节点端板、梁端板通过摩擦型高强螺栓连接成整体。本发明构造简单,解决了在方钢管内焊接内隔板所造成的施工问题,同时不影响混凝土在钢管中的浇筑;易于实现“强节点、弱构件”的抗震设计原则,具有较好的抗震性能;具有较高的施工效率,适用于多层或高层建筑钢结构中的方钢管柱‑钢梁的连接节点构建。
The invention discloses an end plate connection node of a square steel pipe column-H-shaped steel beam, comprising a square steel pipe column, an H-shaped steel beam, a node end plate, a beam end plate, and a side steel plate; the beam end plate and the end of the H-shaped steel beam Weld seam connection, there are bolt holes on the beam end plate; the steel plates on both sides are welded to the wall plates on both sides of the square steel pipe column, the node end plate is connected to the side steel plate by weld seam, and the node end plate is opened with holes corresponding to the beam end plate screw holes; square steel pipe columns and H-shaped steel beams are connected into a whole by means of node end plates and beam end plates through friction-type high-strength bolts. The invention has a simple structure, solves the construction problem caused by welding the inner partition in the square steel pipe, and does not affect the pouring of concrete in the steel pipe; it is easy to realize the anti-seismic design principle of "strong nodes, weak components", and has better anti-seismic Performance; with high construction efficiency, it is suitable for the connection node construction of square steel pipe column-steel beam in the steel structure of multi-storey or high-rise buildings.
Description
技术领域technical field
本发明涉及建筑领域的钢结构梁与柱的连接节点,特别是涉及一种适用于多层或高层建筑钢结构中的方钢管柱-H形钢梁的连接节点。The invention relates to a connection node between a steel structure beam and a column in the construction field, in particular to a connection node suitable for a square steel pipe column-H-shaped steel beam in a multi-storey or high-rise building steel structure.
背景技术Background technique
目前,方钢管柱与钢梁的连接节点方式主要有三种:内隔板式、隔板贯通式和外隔板式。对于内隔板式节点,内隔板最后一条焊缝是在封闭的柱内焊接,需要利用电渣焊结束,施工复杂,造价较高,同时,若在隔板上开孔以便浇筑混凝土,开孔大小受到截面尺寸的影响,钢管内混凝土的浇筑带来困难。隔板贯通式节点需要将钢管柱在节点处断开,构造复杂,焊接工作量较大,与内隔板式节点一样存在混凝土浇筑问题。外隔板式节点施工简单、不受钢管截面尺寸的限制,但用钢量较大,且外隔板使得节点角部突出,影响建筑美观。At present, there are three main ways to connect square steel pipe columns and steel beams: inner diaphragm type, diaphragm through type and outer diaphragm type. For inner diaphragm joints, the last weld of the inner diaphragm is welded in a closed column, which needs to be completed by electroslag welding. The construction is complicated and the cost is high. The size of the hole is affected by the size of the section, and the pouring of concrete in the steel pipe brings difficulties. The clapboard through joint needs to disconnect the steel pipe column at the joint, the structure is complex, the welding workload is large, and there are concrete pouring problems like the inner clapboard joint. The construction of the outer diaphragm joint is simple and is not limited by the cross-sectional size of the steel pipe, but the amount of steel used is relatively large, and the outer diaphragm makes the corner of the joint protrude, which affects the appearance of the building.
发明内容Contents of the invention
针对上述存在问题,本发明旨在提供一种构造简单的方钢管柱-H形钢梁的连接节点,既能满足承载力和刚度的要求,又方便节点的施工。In view of the above existing problems, the present invention aims to provide a square steel pipe column-H-shaped steel beam connection node with a simple structure, which can not only meet the requirements of bearing capacity and stiffness, but also facilitate the construction of the node.
本发明的目的通过下述技术方案来实现:一种方钢管柱-H形钢梁的端板连接节点,包括方钢管柱、H形钢梁、节点端板、梁端板、侧钢板,梁端板与H形钢梁端部焊接连接,梁端板上开有螺栓孔,两侧钢板与方钢管柱两侧壁板焊缝连接,节点端板与侧钢板焊缝连接,节点端板上开有与梁端板相对应的螺孔,方钢管柱、H形钢梁借助节点端板、梁端板通过摩擦型高强螺栓连接成整体。The purpose of the present invention is achieved through the following technical solutions: a square steel pipe column-H-shaped steel beam end plate connection node, including square steel pipe column, H-shaped steel beam, node end plate, beam end plate, side steel plate, beam The end plate is welded to the end of the H-shaped steel beam. There are bolt holes on the end plate of the beam. The steel plates on both sides are welded to the side wall plates of the square steel pipe column. There are screw holes corresponding to the beam end plates, and square steel pipe columns and H-shaped steel beams are connected into a whole by means of joint end plates and beam end plates through friction-type high-strength bolts.
本发明的侧钢板的宽度与H形钢梁的安装相关联,当方钢管柱一侧安装H形钢梁,侧钢板置方钢管柱侧壁板宽度中间;当方钢管柱两侧均安装H形钢梁,侧钢板与方钢管柱侧壁板整宽搭接。The width of the side steel plate of the present invention is associated with the installation of the H-shaped steel beam. When the H-shaped steel beam is installed on one side of the square steel pipe column, the side steel plate is placed in the middle of the width of the side wall plate of the square steel pipe column; when the H-shaped steel beam is installed on both sides of the square steel pipe column The beam, the side steel plate and the side wall plate of the square steel pipe column overlap the entire width.
本发明的H形钢梁与方钢管柱的连接或采用平端板节点或采用伸臂端板节点,当采用伸臂端板节点时,梁端板伸臂部分焊有加劲肋。The connection between the H-shaped steel beam and the square steel pipe column of the present invention either adopts a flat end plate node or an outrigger end plate node. When the outrigger end plate node is used, the outrigger part of the beam end plate is welded with stiffeners.
本发明的有益效果如下:The beneficial effects of the present invention are as follows:
1、本发明中方钢管柱与H形钢梁的连接采用钢管侧壁板焊接钢板,利用端板通过高强螺栓连接,避免了设置横隔板,一方面使钢构件的制作更加方便,另一方面,避免了方钢管内部设置加劲肋,同时不影响混凝土在钢管中的浇筑。1. In the present invention, the connection between the square steel pipe column and the H-shaped steel beam adopts the steel pipe side wall plate welded steel plate, and the end plate is connected by high-strength bolts, which avoids the setting of a diaphragm. On the one hand, the production of the steel member is more convenient, on the other hand , avoiding the setting of stiffeners inside the square steel pipe, while not affecting the pouring of concrete in the steel pipe.
2、本发明采用侧钢板与方钢管柱焊接,增加了节点域的厚度,具有较高的节点域刚度,而H形钢梁通过端板连接与方钢管柱连接成整体,具有半刚性的特性,易于实现“强节点、弱构件”的抗震设计原则,具有较好的抗震性能。2. The invention adopts the welding of side steel plates and square steel pipe columns, which increases the thickness of the joint domain and has higher joint domain stiffness, while the H-shaped steel beam is connected with the square steel pipe column through the end plate connection to form a whole, which has semi-rigid characteristics , it is easy to realize the anti-seismic design principle of "strong nodes, weak components", and has good anti-seismic performance.
3、本发明方钢管柱与H形钢梁的端板式连接节点中,构件与构件间的焊接以及端板的螺孔加工均可在工厂内完成;施工现场只需将方钢管柱安装定位后,再将H形钢梁吊装到相应的位置用高强螺栓连接,即可完成节点。现场工作量少,提高了施工效率。3. In the end-plate connection node between the square steel pipe column and the H-shaped steel beam of the present invention, the welding between components and the screw hole processing of the end plate can be completed in the factory; the construction site only needs to install and position the square steel pipe column , and then hoist the H-shaped steel beam to the corresponding position and connect it with high-strength bolts to complete the node. The on-site workload is less, and the construction efficiency is improved.
附图说明Description of drawings
图1为本发明的平端板连接节点主视图。Fig. 1 is the front view of the connection node of the flat end plate of the present invention.
图2为本发明的平端板连接节点右视图。Fig. 2 is the right side view of the connection node of the flat end plate of the present invention.
图3为本发明的平端板连接节点俯视图。Fig. 3 is a top view of the connection node of the flat end plate of the present invention.
图4为本发明的伸臂端板连接节点主视图。Fig. 4 is a front view of the connection node of the outrigger end plate of the present invention.
图5为本发明的伸臂端板连接节点右视图。Fig. 5 is a right side view of the connection node of the outrigger end plate of the present invention.
图6为本发明的伸臂端板连接节点俯视图。Fig. 6 is a top view of the connection node of the outrigger end plate of the present invention.
图中:1-方钢管柱;2-侧钢板;3-节点端板;4-H形钢梁;5-梁端板;6-摩擦型高强螺栓;7-加劲肋。In the figure: 1-square steel pipe column; 2-side steel plate; 3-joint end plate; 4-H-shaped steel beam; 5-beam end plate; 6-friction type high-strength bolt; 7-stiffening rib.
具体实施方式detailed description
下面结合附图及实施例对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
实施例1:Example 1:
本发明一种方钢管柱与H形钢梁的端板式连接节点—平端板连接节点,如图1~3所示,包括方钢管柱1、侧钢板2、节点端板3、H形钢梁4、梁端板5,以及摩擦型高强螺栓6。侧钢板2与方钢管柱1焊接连接;节点端板3与侧钢板3伸出端焊接连接,梁端板5与H形钢梁4端部焊接连接,方钢管柱1、H形钢梁4借助节点端板3、梁端板5通过摩擦型高强螺栓6连接成整体。侧钢板与方钢管侧壁的焊接方式、板厚和焊缝尺寸根据《钢结构设计规范》(GB50017-2003)计算确定。侧钢板与方钢管柱和节点端板的焊接、H形钢梁与梁端板的焊接,以及节点端板和梁端板的螺孔加工均可在工厂内完成;施工现场只需将方钢管柱安装定位后,再将H形钢梁吊装到相应的位置用高强螺栓连接,即可完成连接节点的构建。The present invention is an end-plate connection node between a square steel pipe column and an H-shaped steel beam—a flat end-plate connection node, as shown in Figures 1 to 3, including a square steel pipe column 1, a side steel plate 2, a node end plate 3, and an H-shaped steel beam 4. Beam end plate 5, and friction type high-strength bolt 6. The side steel plate 2 is welded to the square steel pipe column 1; the node end plate 3 is welded to the extended end of the side steel plate 3; the beam end plate 5 is welded to the end of the H-shaped steel beam 4; the square steel pipe column 1 and the H-shaped steel beam 4 The node end plate 3 and the beam end plate 5 are connected as a whole through friction type high-strength bolts 6 . The welding method, plate thickness and weld size of the side steel plate and the side wall of the square steel pipe are calculated and determined according to the "Code for Design of Steel Structures" (GB50017-2003). The welding of side steel plates and square steel pipe columns and joint end plates, the welding of H-shaped steel beams and beam end plates, and the screw hole processing of joint end plates and beam end plates can all be completed in the factory; the construction site only needs to place square steel pipes After the column is installed and positioned, the H-shaped steel beam is hoisted to the corresponding position and connected with high-strength bolts to complete the construction of the connection node.
实施例2:Example 2:
如图4~6所示,本发明一种方钢管柱与H形钢梁的端板连接节点—伸臂端板连接节点,其构件组成、加工制作及安装与平端板连接节点类似,不同的是在梁端板5与H形钢梁4腿对应的上、下翼缘处分别焊有加劲肋7。As shown in Figures 4 to 6, an end-plate connection node between a square steel pipe column and an H-shaped steel beam in the present invention—the outrigger end-plate connection node, its component composition, processing and installation are similar to those of the flat end-plate connection node, and the difference Stiffeners 7 are respectively welded at the upper and lower flanges corresponding to the beam end plate 5 and the H-shaped steel beam 4 legs.
本发明构造简单,解决了设置隔板后的技术问题,容易实现“强节点,弱构件”的抗震设计原则,具有较好的抗震性能,具有较高的施工效率以及经济效益和社会效益。The invention has a simple structure, solves the technical problem after installing partitions, easily realizes the anti-seismic design principle of "strong nodes, weak components", has better anti-seismic performance, and has higher construction efficiency and economic and social benefits.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610973006.6A CN106436926A (en) | 2016-11-07 | 2016-11-07 | Square steel tube column-H-shaped steel beam end-plate connecting node |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610973006.6A CN106436926A (en) | 2016-11-07 | 2016-11-07 | Square steel tube column-H-shaped steel beam end-plate connecting node |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106436926A true CN106436926A (en) | 2017-02-22 |
Family
ID=58180919
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610973006.6A Pending CN106436926A (en) | 2016-11-07 | 2016-11-07 | Square steel tube column-H-shaped steel beam end-plate connecting node |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106436926A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106703193A (en) * | 2017-03-08 | 2017-05-24 | 燕山大学 | Channel steel end plate joint for square steel string |
| CN107642198A (en) * | 2017-10-12 | 2018-01-30 | 广西广厦环保科技有限公司 | Prefabricated beams of concrete and its preparation technology |
| CN107724602A (en) * | 2017-10-12 | 2018-02-23 | 广西广厦环保科技有限公司 | Prefabricated concrete column and its preparation technology |
| CN113737964A (en) * | 2021-09-02 | 2021-12-03 | 上海电力设计院有限公司 | Box-type beam full-bolting rigid connection node and design and manufacturing method thereof |
| CN114562036A (en) * | 2021-11-21 | 2022-05-31 | 中冶建筑研究总院(深圳)有限公司 | Self-resetting connection node between steel frame and composite wallboard and assembly type building thereof |
| CN117702929A (en) * | 2024-01-17 | 2024-03-15 | 中国五冶集团有限公司 | Square steel tube concrete beam column end plate type connecting node |
| CN118110265A (en) * | 2024-03-04 | 2024-05-31 | 同济大学建筑设计研究院(集团)有限公司 | A replaceable external plate type semi-rigid energy-absorbing beam-column node |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04343935A (en) * | 1991-05-17 | 1992-11-30 | Sekisui House Ltd | Column/beam joining device |
| JPH10252148A (en) * | 1997-03-17 | 1998-09-22 | Housing Tamura:Kk | Beam-column joint construction |
| KR20020026895A (en) * | 2002-02-02 | 2002-04-12 | 이연희 | Joining method of high strength steel structure |
| CN1884751A (en) * | 2006-06-16 | 2006-12-27 | 清华大学 | End plate type steel pipe concrete column-steel beam connection node |
| CN101285323A (en) * | 2008-05-30 | 2008-10-15 | 同济大学 | H-shaped column weak axis direction end plate connecting beam column node and manufacturing method thereof |
| CN201535015U (en) * | 2009-07-31 | 2010-07-28 | 宝山钢铁股份有限公司 | The connection node between the outer casing type square rectangular steel pipe column and the H-shaped steel beam |
| CN104100007A (en) * | 2014-07-16 | 2014-10-15 | 天元建设集团有限公司 | Double-lug-plate type square tube column and H-shaped steel frame variable-beam-depth assembly joint and construction method thereof |
| WO2016060349A1 (en) * | 2014-10-13 | 2016-04-21 | (주)센벡스 | Octagonal concrete-filled steel tube column |
| CN205604471U (en) * | 2016-05-12 | 2016-09-28 | 中国矿业大学 | Novel assembly node of steel -pipe column and shaped steel roof beam |
-
2016
- 2016-11-07 CN CN201610973006.6A patent/CN106436926A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04343935A (en) * | 1991-05-17 | 1992-11-30 | Sekisui House Ltd | Column/beam joining device |
| JPH10252148A (en) * | 1997-03-17 | 1998-09-22 | Housing Tamura:Kk | Beam-column joint construction |
| KR20020026895A (en) * | 2002-02-02 | 2002-04-12 | 이연희 | Joining method of high strength steel structure |
| CN1884751A (en) * | 2006-06-16 | 2006-12-27 | 清华大学 | End plate type steel pipe concrete column-steel beam connection node |
| CN101285323A (en) * | 2008-05-30 | 2008-10-15 | 同济大学 | H-shaped column weak axis direction end plate connecting beam column node and manufacturing method thereof |
| CN201535015U (en) * | 2009-07-31 | 2010-07-28 | 宝山钢铁股份有限公司 | The connection node between the outer casing type square rectangular steel pipe column and the H-shaped steel beam |
| CN104100007A (en) * | 2014-07-16 | 2014-10-15 | 天元建设集团有限公司 | Double-lug-plate type square tube column and H-shaped steel frame variable-beam-depth assembly joint and construction method thereof |
| WO2016060349A1 (en) * | 2014-10-13 | 2016-04-21 | (주)센벡스 | Octagonal concrete-filled steel tube column |
| CN205604471U (en) * | 2016-05-12 | 2016-09-28 | 中国矿业大学 | Novel assembly node of steel -pipe column and shaped steel roof beam |
Non-Patent Citations (2)
| Title |
|---|
| H. ALHENDI 等: ""Behavior of reverse-channel and double-reverse-channel connections to tubular columns with HSS"", 《JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH》 * |
| HOANG VAN-LONG 等: ""Extended end-plate to concrete- fi lled rectangular column joint using", 《JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH》 * |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106703193A (en) * | 2017-03-08 | 2017-05-24 | 燕山大学 | Channel steel end plate joint for square steel string |
| CN107642198A (en) * | 2017-10-12 | 2018-01-30 | 广西广厦环保科技有限公司 | Prefabricated beams of concrete and its preparation technology |
| CN107724602A (en) * | 2017-10-12 | 2018-02-23 | 广西广厦环保科技有限公司 | Prefabricated concrete column and its preparation technology |
| CN107642198B (en) * | 2017-10-12 | 2020-09-29 | 广西贺州市矿投广厦环保科技有限公司 | Prefabricated concrete beam and preparation process thereof |
| CN113737964A (en) * | 2021-09-02 | 2021-12-03 | 上海电力设计院有限公司 | Box-type beam full-bolting rigid connection node and design and manufacturing method thereof |
| CN113737964B (en) * | 2021-09-02 | 2023-03-14 | 上海电力设计院有限公司 | Box-type beam full-bolting rigid connection node and design and manufacturing method thereof |
| CN114562036A (en) * | 2021-11-21 | 2022-05-31 | 中冶建筑研究总院(深圳)有限公司 | Self-resetting connection node between steel frame and composite wallboard and assembly type building thereof |
| CN117702929A (en) * | 2024-01-17 | 2024-03-15 | 中国五冶集团有限公司 | Square steel tube concrete beam column end plate type connecting node |
| CN118110265A (en) * | 2024-03-04 | 2024-05-31 | 同济大学建筑设计研究院(集团)有限公司 | A replaceable external plate type semi-rigid energy-absorbing beam-column node |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106436926A (en) | Square steel tube column-H-shaped steel beam end-plate connecting node | |
| CN204510482U (en) | A kind of through concrete-filled steel square tubular column of stiffener and H profile steel beam structures with semi-rigid joints | |
| CN204551758U (en) | For the sticking board type mental node that girder steel, bracing members are connected with Flat steel pipe concrete column | |
| CN204199440U (en) | The node structure that a kind of concrete column is connected with girder steel | |
| CN102251587A (en) | Inner lining pipe type rectangular steel pipe column-H-shaped steel beam connecting node and manufacturing method thereof | |
| CN103510625A (en) | Top-bottom T-shaped steel type node for connecting H-shaped steel beam with rectangular tubular column through unilateral bolts | |
| WO2022057642A1 (en) | Steel special-shaped column with corrugated plates for connection | |
| CN204608999U (en) | A kind of abutment node be connected with Flat steel pipe concrete column for girder steel | |
| CN107476446B (en) | Banded enhancement mode node that H shaped steel roof beam and wide steel core concrete column minor face are connected | |
| CN203238783U (en) | Rectangular concrete filled steel tubular column and steel beam semi-rigid node structure | |
| CN102635166A (en) | Connecting node of square steel pipe column and H-shaped steel beams | |
| CN107299683A (en) | Compound concrete-filled tubular column assembled docks node and connection method | |
| CN106836492A (en) | A kind of group frame-embedded faced wall Lateral Resistant System | |
| CN104912197A (en) | Connecting node for steel pipe concrete post and outside U-shaped steel and concrete composite beam | |
| CN204609003U (en) | A kind of box node be connected with Flat steel pipe concrete column for girder steel | |
| CN104196128A (en) | Insertion plate type node for connection of steel beam and flat concrete-filled steel tube column | |
| CN103469902B (en) | Full rigid steel pipes concrete column connected node | |
| CN207048045U (en) | A kind of endplate connections node | |
| CN105863056B (en) | A kind of dual-sided board bolt joint and assembly method for beam column | |
| CN106121043A (en) | A kind of two-tube coupled column with energy-dissipating and shock-absorbing effect and construction method | |
| CN204059608U (en) | A kind of sticking board type mental node be connected with Flat steel pipe concrete column for girder steel | |
| CN104264792B (en) | A kind of bean column node of layered assembling type steel structure | |
| CN106168055A (en) | The edge of a wing, rectangular steel-tube concrete column H profile steel Liangping external rib circular board node | |
| CN211621962U (en) | Node connection structure of multicavity L shape steel pipe concrete special-shaped column | |
| CN105863081B (en) | Multi-cavity steel tube concrete coupled column and girder steel bolt connection node and assembly method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170222 |