CN207295709U CN201720933849.3U CN201720933849U CN207295709U CN 207295709 U CN207295709 U CN 207295709U CN 201720933849 U CN201720933849 U CN 201720933849U CN 207295709 U CN207295709 U CN 207295709U
Authority
CN
China
Prior art keywords
fixed
plate
transmission shaft
support bar
connecting cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720933849.3U
Other languages
Chinese (zh)
Inventor
徐贵强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jiangchuan Water Conservancy And Hydropower Engineering Co ltd
Original Assignee
Xinchang County Qinzhen Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang County Qinzhen Machinery Manufacturing Co Ltd filed Critical Xinchang County Qinzhen Machinery Manufacturing Co Ltd
Priority to CN201720933849.3U priority Critical patent/CN207295709U/en
Application granted granted Critical
Publication of CN207295709U publication Critical patent/CN207295709U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of construction piling equipment, including support plate, the both sides of the support plate upper surface are installed with fixed plate, the both sides of the support plate lower surface are installed with universal wheel, the side of the fixed plate is installed with servomotor, and it is provided with transmission shaft between two fixed plates, the transmission shaft is hinged by the bearing block that its both ends is set and fixed plate, the shaft of the servomotor with transmission shaft driven is connected through fixed plate and by shaft coupling, the both sides of the transmission shaft are respectively welded first support bar and second support bar.The utility model is by setting first support bar, second support bar, the first fixed link, the second fixed link and servomotor to be used cooperatively, during construction, timber is placed in clamping plate, timber can be pounded into ground, using more time saving and energy saving, and the stabilization of timber need not be manually kept, can be to avoid dangerous generation.

Description

A kind of construction piling equipment
Technical field
Building machinery technical field is the utility model is related to, is specially a kind of construction piling equipment.
Background technology
Building machinery is the general name of mechanical equipment used in engineering construction and town and country construction, it includes excavating machinery, shovel soil fortune Defeated machinery, compacting machinary, crane tool, piling machinery, pavement construction machinery, concreting machinery, concrete product machinery, reinforcing bar A variety of mechanical compositions such as level prestressing force machinery, finishing machinery and aerial operation machine, during construction, it is necessary to Drive piles on the ground, be convenient for people to construct in specific position, tradition piling is all manually to pound timber into ground, using comparing Arduously, and easily cause danger.
Utility model content
The purpose of this utility model is to provide a kind of construction piling equipment, and strength can be saved and compare by possessing The advantages of safer, solve the problems, such as to use in the prior art than relatively hazardous.
To achieve the above object, the utility model provides following technical solution:A kind of construction piling equipment, including Support plate, the both sides of the support plate upper surface are installed with fixed plate, and the both sides of the support plate lower surface are fixed Universal wheel is installed, the side of the fixed plate is installed with servomotor, and is provided with transmission shaft between two fixed plates, The transmission shaft is hinged by the bearing block that its both ends is set and fixed plate, and the shaft of the servomotor through fixed plate and is led to Cross shaft coupling to be connected with transmission shaft driven, the both sides of the transmission shaft are respectively welded first support bar and second support bar, institute State the one end of first support bar away from transmission shaft and be welded with the first tup, one end welding of the second support bar away from transmission shaft Have the second tup, be provided with the first fixed link on the downside of the first support bar, first fixed link away from fixed plate one End is welded with first clamping plate, the second fixed link is provided with the downside of the second support bar, second fixed link is away from fixed One end of plate is welded with second clamping plate, and the downside of first fixed link and the second fixed link is installed with buffer unit, The both sides of the fixed plate are installed with storage box.
Preferably, first tup is located at the surface of first clamping plate, and second tup is being located at second clamping plate just Top, and first clamping plate and second clamping plate are in arc-shaped.
Preferably, electric pushrod is installed with the outside of the support plate lower surface, the bottom of the electric pushrod is consolidated Dingan County is equipped with sucker.
Preferably, the buffer unit includes the first connecting cylinder and the second connecting cylinder, and the first connecting cylinder and the second connection Buffer bar is provided between cylinder.
Preferably, the inside of the first connecting cylinder is extended at the top of the buffer bar and is installed with the first limited block, First connecting cylinder is internally provided with the first spring.
Preferably, the bottom of the buffer bar extends to the inside of the second connecting cylinder and is installed with the second limited block, Second connecting cylinder is internally provided with second spring.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is by setting first support bar, second support bar, the first fixed link, the second fixed link and servo Motor is used cooperatively, and during construction, timber is placed in clamping plate, then using servomotor drive first support bar and Second support bar reciprocating rotation, it is possible to pound timber into ground, use is more time saving and energy saving, and need not manually keep wood The stabilization of stake, can be to avoid dangerous generation.
2nd, the utility model is convenient to be moved equipment by setting roller and electric pushrod, so as to difference Position drive piles, use is more flexible, and can utilize electric pushrod keep equipment stabilization, avoid the mistake in piling It is moved in journey, it is ensured that the accuracy of piling, and by setting buffer unit, can be by the first fixed link and second The impact force that fixed link is subject to is into row buffering, so as to avoid the first fixed link and the second fixed link from being damaged.
Brief description of the drawings
Fig. 1 is the utility model front view;
Fig. 2 is the utility model buffer unit profile;
Fig. 3 is the utility model top view.
In figure:1 support plate, 2 storage boxes, 3 first clamping plates, 4 first tups, 5 first support bars, 6 first fixed links, 7 are watched Take motor, 8 second support bars, 9 second fixed links, 10 second tups, 11 second clamping plates, 12 buffer units, 121 first connections Cylinder, 122 first springs, 123 first limited blocks, 124 buffer bars, 125 second connecting cylinders, 126 second limited blocks, 127 second bullets Spring, 13 universal wheels, 14 suckers, 15 electric pushrods, 16 fixed plates, 17 bearing blocks, 18 transmission shafts.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained, shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, a kind of construction piling equipment, including support plate 1, the both sides of 1 upper surface of support plate are equal Be installed with fixed plate 16, the both sides of 1 lower surface of support plate are installed with universal wheel 13,1 lower surface of support plate it is outer Side is installed with electric pushrod 15, and the bottom of electric pushrod 15 is installed with sucker 14, by setting universal wheel 13 and electricity Dynamic push rod 15, convenient to be moved equipment, so as to drive piles to different positions, use is more flexible, Er Qieke With using electric pushrod 15 keep equipment stabilization, avoid being moved during piling, it is ensured that piling it is accurate Property, the side of fixed plate 16 is installed with servomotor 7, and is provided with transmission shaft 18 between two fixed plates 16, transmission shaft 18 is hinged with fixed plate 16 by the bearing block 17 that its both ends is set, and the shaft of servomotor 7 through fixed plate 16 and passes through connection Axis device is sequentially connected with transmission shaft 18, and the both sides of transmission shaft 18 are respectively welded first support bar 5 and second support bar 8, are applying During work, transmission shaft 18 is driven to rotate using servomotor 7, then transmission shaft 18 drives first support bar 5 and second Strut 8 rotates, it is not necessary to which manual control tup pounds timber into ground, and use is more time saving and energy saving, is conducive to improve work effect Rate, the one end of first support bar 5 away from transmission shaft 18 are welded with the first tup 4, the one end of second support bar 8 away from transmission shaft 18 The second tup 10 is welded with, the downside of first support bar 5 is provided with the first fixed link 6, and the first fixed link 6 is away from fixed plate 16 One end is welded with first clamping plate 3, and timber is individually placed in first clamping plate 3 and second clamping plate 11, and then servomotor 7 drives the 8 reciprocating rotation of one supporting rod 5 and second support bar, the first tup 4 and the second tup 10 will pound the timber in clamping plate into ground, And work can be carried out at the same time in both sides, the time can be saved, the first tup 4 is located at the surface of first clamping plate 3, the second hammer First 10 are located at the surface of second clamping plate 11, and first clamping plate 3 and second clamping plate 11 are in arc-shaped, under second support bar 8 Side is provided with the second fixed link 9, and second one end of fixed link 9 away from fixed plate 16 is welded with second clamping plate 11, by setting the One supporting rod 5, second support bar 8, the first fixed link 6, the second fixed link 9 and servomotor 7 are used cooperatively, in the process of construction In, timber is placed in clamping plate, then drives 8 reciprocating rotation of first support bar 5 and second support bar using servomotor 7, just Timber can be pounded into ground, use is more time saving and energy saving, and need not manually keep the stabilization of timber, can be to avoid danger Generation, the downside of the first fixed link 6 and the second fixed link 9 is installed with buffer unit 12, and buffer unit 12 includes the One connecting cylinder 121 and the second connecting cylinder 125, and buffer bar 124 is provided between the first connecting cylinder 121 and the second connecting cylinder 125, The top of buffer bar 124 extends to the inside of the first connecting cylinder 121 and is installed with the first limited block 123, the first connecting cylinder 121 are internally provided with the first spring 122, and during tup hits timber, clamping plate and fixed link can be subject to very big hit Hit power, by setting buffer unit 12, can by the impact force that the first fixed link 6 and the second fixed link 9 are subject into row buffering, from And can be damaged to avoid the first fixed link 6 and the second fixed link 9, the bottom of buffer bar 124 extends to the second connecting cylinder 125 Inside and be installed with the second limited block 126, the second connecting cylinder 125 is internally provided with second spring 127, fixed plate 16 Both sides be installed with storage box 2.
In summary:The construction piling equipment, by setting first support bar 5, second support bar 8, first solid Fixed pole 6, the second fixed link 9 and servomotor 7 are used cooperatively, and during construction, timber is placed in clamping plate, is then utilized Servomotor 7 drives 8 reciprocating rotation of first support bar 5 and second support bar, it is possible to pounds timber into ground, using comparing province Shi Shengli, and need not manually keep the stabilization of timber, can to avoid dangerous generation, solve use in the prior art than The problem of relatively hazardous.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed, or further include as this process, method, article or equipment Intrinsic key element.In the absence of more restrictions.By sentence, " including the key element that a reference structure limits is not arranged Except also there are other identical element in the process, method, article or apparatus that includes the element ", and go out in this article Existing electric elements are electrically connected with extraneous main controller and 220V or 110V alternating currents, and main controller can be that computer etc. rises To the conventionally known equipment of control.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from the principle of the utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of construction piling equipment, including support plate (1), it is characterised in that:The two of support plate (1) upper surface Side is installed with fixed plate (16), and the both sides of support plate (1) lower surface are installed with universal wheel (13), described The side of fixed plate (16) is installed with servomotor (7), and is provided with transmission shaft (18), institute between two fixed plates (16) State the bearing block (17) that transmission shaft (18) is set by its both ends to be hinged with fixed plate (16), the shaft of the servomotor (7) It is sequentially connected through fixed plate (16) and by shaft coupling and transmission shaft (18), the both sides of the transmission shaft (18) are respectively welded First support bar (5) and second support bar (8), the one end of the first support bar (5) away from transmission shaft (18) are welded with first Tup (4), the one end of the second support bar (8) away from transmission shaft (18) are welded with the second tup (10), first support It is provided with the first fixed link (6) on the downside of bar (5), the one end of first fixed link (6) away from fixed plate (16) is welded with the One clamping plate (3), the second fixed link (9) is provided with the downside of the second support bar (8), second fixed link (9) is away from solid One end of fixed board (16) is welded with second clamping plate (11), and the downside of first fixed link (6) and the second fixed link (9) is fixed Buffer unit (12) is installed, the both sides of the fixed plate (16) are installed with storage box (2).
A kind of 2. construction piling equipment according to claim 1, it is characterised in that:First tup (4) position In the surface of first clamping plate (3), second tup (10) is located at the surface of second clamping plate (11), and first clamping plate (3) It is in arc-shaped with second clamping plate (11).
A kind of 3. construction piling equipment according to claim 1, it is characterised in that:Support plate (1) following table Electric pushrod (15) is installed with the outside of face, the bottom of the electric pushrod (15) is installed with sucker (14).
A kind of 4. construction piling equipment according to claim 1, it is characterised in that:Buffer unit (12) bag The first connecting cylinder (121) and the second connecting cylinder (125) are included, and is set between the first connecting cylinder (121) and the second connecting cylinder (125) There is buffer bar (124).
A kind of 5. construction piling equipment according to claim 4, it is characterised in that:The buffer bar (124) Top extends to the inside of the first connecting cylinder (121) and is installed with the first limited block (123), first connecting cylinder (121) be internally provided with the first spring (122).
A kind of 6. construction piling equipment according to claim 4, it is characterised in that:The buffer bar (124) Bottom extends to the inside of the second connecting cylinder (125) and is installed with the second limited block (126), second connecting cylinder (125) be internally provided with second spring (127).
CN201720933849.3U 2017-07-30 2017-07-30 A kind of construction piling equipment Expired - Fee Related CN207295709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720933849.3U CN207295709U (en) 2017-07-30 2017-07-30 A kind of construction piling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720933849.3U CN207295709U (en) 2017-07-30 2017-07-30 A kind of construction piling equipment

Publications (1)

Publication Number Publication Date
CN207295709U true CN207295709U (en) 2018-05-01

Family

ID=62447990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720933849.3U Expired - Fee Related CN207295709U (en) 2017-07-30 2017-07-30 A kind of construction piling equipment

Country Status (1)

Country Link
CN (1) CN207295709U (en)

Similar Documents

Publication Publication Date Title
US11359999B2 (en) Experimental platform and experimental method for simulating coal rock disaster of coal mine stope
CN102837140B (en) Turnover welding and molding production line of H profile steel
CN202763321U (en) H-beam tilting welding line
CN206957578U (en) A kind of piling machine for building with anti-fracture function
CN205857015U (en) A kind of viaduct pier anti-settling bracing means
CN203924147U (en) The compound counterforce device of anchoring pile ballast
CN105926575A (en) Tamping device used for electric power engineering construction
CN214883535U (en) Heavy dynamic sounding instrument
CN204780909U (en) Construct pre -buried foundation pile tamping unit
CN207295709U (en) A kind of construction piling equipment
CN204389316U (en) Stacked radical operators large direct shear apparatus
CN109208573A (en) A kind of movable type double end compacting of subsoil pendulum
CN103924827A (en) Electric pole erecting machine for electric power industry
CN204225116U (en) Steel concrete pile crown shearing-crushing device
CN207278178U (en) A kind of construction piling equipment
CN206570810U (en) A kind of roof pressing type pile compacting equipment
CN101514556A (en) Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof
CN205100202U (en) Vibrator for building
CN212641423U (en) Small-size ramming machine for construction
CN105382056B (en) A kind of press arrangement for correcting large-diameter steel pipe longitudinal seam welding deformation
CN104234670A (en) Tower linear pumping unit
CN208455619U (en) A kind of buffer unit of piling machine
CN210315147U (en) Ground tamping device for highway bridge construction
CN109235364B (en) Energy storage power station bank protection reinforcing apparatus
CN206902686U (en) A kind of dynamic compaction machinery of soil-stone embankment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190730

Address after: 430000 Mingze Liwan, No. 519 Lushi South Road, Hongshan District, Wuhan City, Hubei Province, 2 buildings, 6 floors and 04

Patentee after: Hubei Jiangchuan Water Conservancy and Hydropower Engineering Co.,Ltd.

Address before: 312500 Xikeng 98, Qishicun, Nanxiang Township, Xinchang County, Shaoxing City, Zhejiang Province

Patentee before: XINCHANG QINZHEN MACHINERY MANUFACTURING Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501

Termination date: 20210730

CF01 Termination of patent right due to non-payment of annual fee