CN207295468U - Prefabricated case beam bearing installation auxiliary device - Google Patents

Prefabricated case beam bearing installation auxiliary device Download PDF

Info

Publication number
CN207295468U
CN207295468U CN201720891840.0U CN201720891840U CN207295468U CN 207295468 U CN207295468 U CN 207295468U CN 201720891840 U CN201720891840 U CN 201720891840U CN 207295468 U CN207295468 U CN 207295468U
Authority
CN
China
Prior art keywords
case beam
prefabricated case
mobile base
auxiliary device
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720891840.0U
Other languages
Chinese (zh)
Inventor
王付聪
何义
贺烈马
周翔
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201720891840.0U priority Critical patent/CN207295468U/en
Application granted granted Critical
Publication of CN207295468U publication Critical patent/CN207295468U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a kind of prefabricated case beam bearing installation auxiliary device, including mobile elevating machine, reflecting assembly, bearing supporting plate, mobile elevating machine includes mobile base and the elevating mechanism in mobile base, bearing supporting plate is arranged on elevating mechanism top, and reflecting assembly sets mobile base both sides to be hinged and connected with mobile base.In prefabricated case beam bearing installation process, utilize prefabricated case beam bearing installation auxiliary device provided by the utility model, it is moved easily by mobile base to installation region, bearing supporting plate height is adjusted by elevating mechanism, significantly improve the installation effectiveness of bearing, the time is saved for the lifting of box beam, economy, technical benefits are obvious;Using reflective sem observation prefabricated case beam bottom, the risk that operator is subject to mechanical wounding is reduced, improves processing safety.

Description

Prefabricated case beam bearing installation auxiliary device
Technical field
It the utility model is related to prefabricated case beam installation auxiliary Tools Technology, and in particular to prefabricated case beam bearing is installed Auxiliary device.
Background technology
The installment work of progress bearing is needed before prefabricated box girder hoisting.Since bearing weight is big, spiro keyhole position is more, construction Required precision is high, and construction personnel generally holds bearing in erection support using fork truck at this stage, worker squat under precast beam into The mode of row installation, forklift operator personnel's limited view, causes installation personnel under beam to there is very big security risk, and uses Such construction method, installation progress is slow, the lifting operation of prefabricated case beam behind meeting strong influence.If it can use small The hand elevator of type carrys out support carriers, and carries out installation bolt using L-type spanner, then can cancel fork truck, and erector People frees under beam, effectively avoids installer from coming to harm, and can also improve the installation effectiveness of bearing.
The content of the invention
Goal of the invention:The utility model aim is in view of the deficiencies of the prior art, there is provided a kind of prefabricated case beam bearing peace Auxiliary device is filled, is capable of the bearing of safe, efficient installation prefabricated case beam.
Technical solution:Prefabricated case beam bearing installation auxiliary device described in the utility model, including it is mobile elevating machine, reflective Component, bearing supporting plate, mobile elevating machine include mobile base and the elevating mechanism in mobile base, and bearing supporting plate is set On elevating mechanism top, reflecting assembly sets mobile base both sides to be hinged and connected with mobile base.
Above-mentioned technical proposal is further improved, the mobile elevating machine is hand fork type elevator.
Further, a length of 800mm of the hand fork type elevator, width 800mm, adjustable height 1500mm.
Further, the bearing supporting plate is equipped with several bolts hole, passes through the connector and bearing arranged on bolt hole It is connected.
Further, the mobile base bottom is equipped with the pulley that can be locked, and side is equipped with manumotive armrest.
Further, the reflecting assembly includes frame and the reflective mirror being embedded in frame, frame and mobile base It is hinged and connected.
Further, a length of 600mm of the reflective mirror, width 400mm.
Beneficial effect:In prefabricated case beam bearing installation process, pacified using prefabricated case beam bearing provided by the utility model Auxiliary device is filled, is moved easily by mobile base to installation region, bearing supporting plate height is adjusted by elevating mechanism, is significantly carried The installation effectiveness of high bearing, is that the time is saved in the lifting of box beam, economy, technical benefits are obvious;Utilize reflective sem observation precast box Beam bottom, reduces the risk that operator is subject to mechanical wounding, improves processing safety;The utility model is simple in structure, installation Convenient, operation is simple, has good practicality.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model;
In figure:1st, bearing supporting plate, 2, hand fork type elevator, 3, reflective mirror, 4, L-type spanner.
Embodiment
Technical solutions of the utility model are described in detail below by attached drawing, but the scope of protection of the utility model It is not limited to the embodiment.
Embodiment 1:Prefabricated case beam bearing installation auxiliary device as shown in Figure 1, including it is hand fork type elevator 2, anti- Light microscopic 3, bearing supporting plate 1, hand 2 dimensions of fork type elevator are:Long 800mm, width 800mm, maximum adjustable height 1500mm, hand fork type elevator 2 include mobile base and elevating mechanism, the cunning that the installation of mobile base corner can be fixed Wheel, side are equipped with manumotive armrest;Bearing supporting plate 1 carries out perforate according to the quantity and diameter of bearing upper bolt hole;Long 600mm, width The reflective mirror 3 of 400mm is nested in wooden frame.
It is as follows using process:
1st, bearing supporting plate 1 is fixed on elevating mechanism top, frame is hinged on mobile base both sides, so as to basis Need to adjust the angle.
2nd, bearing is placed on the bearing supporting plate 1 on elevating mechanism top and by the reserved bolt on bolt hole and supporting plate 1 Align in hole;
3rd, hand fork type elevator 2 is pushed under prefabricated case beam(Prefabricated case beam is put on live temporary rest pier), and adjust Reflective mirror 3 is saved to proper angle, after observing that box beam bottom, hand fork type elevator 2 reach precalculated position, Fixed mobile base pulley;
4th, the hand height of fork type elevator 2 is adjusted, after treating that bearing reaches precalculated position, installation bolt simultaneously uses L-type The tight bolt of 4 plate of spanner;After installation is complete, the pulley of mobile base is unclamped, hand fork type elevator 2 is removed into beam bottom;
5th, 2~4 are repeated, carries out the installation of next bearing.
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, but it must not It is construed to the limitation to the utility model itself.The spirit and scope of the utility model that appended claims define are not being departed from Under the premise of, can various changes can be made in the form and details to it.

Claims (7)

1. prefabricated case beam bearing installation auxiliary device, it is characterised in that:Including mobile elevating machine, reflecting assembly, bearing supporting plate, Mobile elevating machine includes mobile base and the elevating mechanism in mobile base, and bearing supporting plate is arranged on elevating mechanism top End, reflecting assembly set mobile base both sides to be hinged and connected with mobile base.
2. prefabricated case beam bearing installation auxiliary device according to claim 1, it is characterised in that:The mobile elevating machine For hand fork type elevator.
3. prefabricated case beam bearing installation auxiliary device according to claim 2, it is characterised in that:The hand scissor-type liter A length of 800mm, the width 800mm of drop machine, adjustable height 1500mm.
4. prefabricated case beam bearing installation auxiliary device according to claim 1, it is characterised in that:Set on the bearing supporting plate There are several bolts hole, be connected by the connector arranged on bolt hole with bearing.
5. prefabricated case beam bearing installation auxiliary device according to claim 1, it is characterised in that:The mobile base bottom Equipped with the pulley that can be locked, side is equipped with manumotive armrest.
6. prefabricated case beam bearing installation auxiliary device according to claim 1, it is characterised in that:The reflecting assembly includes Frame and the reflective mirror being embedded in frame, frame are hinged and connected with mobile base.
7. prefabricated case beam bearing installation auxiliary device according to claim 6, it is characterised in that:The reflective mirror is a length of 600mm, width 400mm.
CN201720891840.0U 2017-07-21 2017-07-21 Prefabricated case beam bearing installation auxiliary device Expired - Fee Related CN207295468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720891840.0U CN207295468U (en) 2017-07-21 2017-07-21 Prefabricated case beam bearing installation auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720891840.0U CN207295468U (en) 2017-07-21 2017-07-21 Prefabricated case beam bearing installation auxiliary device

Publications (1)

Publication Number Publication Date
CN207295468U true CN207295468U (en) 2018-05-01

Family

ID=62447421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720891840.0U Expired - Fee Related CN207295468U (en) 2017-07-21 2017-07-21 Prefabricated case beam bearing installation auxiliary device

Country Status (1)

Country Link
CN (1) CN207295468U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113322811A (en) * 2021-04-27 2021-08-31 湖南娄底路桥建设有限责任公司 Box girder support mounting equipment and support mounting method using same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113322811A (en) * 2021-04-27 2021-08-31 湖南娄底路桥建设有限责任公司 Box girder support mounting equipment and support mounting method using same

Similar Documents

Publication Publication Date Title
CN202345727U (en) Flat-plate transport trolley
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
WO2022037080A1 (en) Removal and cleanup apparatus for vertical support structure
CN105480688B (en) A kind of reciprocal automatic panel-turnover method of lift
CN207142717U (en) Small-sized hanging device
CN207295468U (en) Prefabricated case beam bearing installation auxiliary device
CN207856096U (en) A kind of fire-fighting equipment lifting deliverance apparatus
CN212832684U (en) Self-propelled combined lifting multifunctional aerial work platform truck
CN106744404A (en) Method for hoisting mill housing by using movable tower
CN110700604B (en) Assembly type laminated slab mounting trolley and using method thereof
CN214003287U (en) Three-wave guardrail plate stacker crane
CN112477734B (en) Construction pipeline moving device
CN101664963B (en) Multifunctional operating platform for large-volume prestressed concrete box girder tensioning
CN210738106U (en) Material transfer platform applied to construction
CN106760568A (en) A kind of construction servicing unit
CN203392111U (en) Prefabricated concrete wall plate transporting device
CN209760046U (en) Transport support and transport device
CN207774676U (en) A kind of storage tank installation lifting means
CN206156657U (en) Lifting device
CN107857205A (en) A kind of storage tank installation lifting means and method
CN212671149U (en) Deep hole access door slot construction hanging basket
CN115162772B (en) Demolishing process for high-rise building
CN215245045U (en) Switch cabinet installation vehicle
CN213673626U (en) Turning device suitable for barrel container

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501

CF01 Termination of patent right due to non-payment of annual fee