CN207294427U - A kind of quick processing system of beneficiation wastewater - Google Patents
A kind of quick processing system of beneficiation wastewater Download PDFInfo
- Publication number
- CN207294427U CN207294427U CN201721070986.5U CN201721070986U CN207294427U CN 207294427 U CN207294427 U CN 207294427U CN 201721070986 U CN201721070986 U CN 201721070986U CN 207294427 U CN207294427 U CN 207294427U
- Authority
- CN
- China
- Prior art keywords
- pipe
- dam
- beneficiation wastewater
- valve
- processing system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Treatment Of Sludge (AREA)
Abstract
It the utility model is related to a kind of quick processing system of beneficiation wastewater, belong to sewage disposal device, the quick processing system of the beneficiation wastewater is provided with cistern on the right side of ore dressing pond, medicament is added in cistern makes beneficiation wastewater natural subsidence, beneficiation wastewater enters in band sedimentation basin, realize that solid-liquid is layered after sedimentation a period of time, liquid enters clear water reserviors from outlet pipe, liquid is returned to by return pipe in clear water reserviors is used as mill water in ore dressing pond, realize that Sewage treatment utilizes, sedimentation has tailings mud in settling tank, after current enter clear water reserviors, open sludge out pipe, after being connected with outside, tailings mud is exited into Tailings Dam from sludge out pipe, realize mining tailing, by beneficiation wastewater separation of solid and liquid, it is separately recovered, realize the processing of beneficiation wastewater.
Description
Technical field
The utility model belongs to field of sewage treatment equipment, specifically, it is fast to the utility model is related to a kind of beneficiation wastewater
Fast processing system.
Background technology
In existing Proccessing technology, many techniques using the ore-dressing technique of washing, will be all produced containing a large amount of tails
The waste water of ore deposit, solid suspension are one of major control indexs in sewage discharge, and the discharge beyond standards of solid suspension can feed water
Environment and human body bring huge direct harm, and the processing of High SS contained wastewater is a weight of current ore dressing sewage disposal
Point and difficult point, existing processing technological flow are longer, and complex process, stability is poor, and control is difficult, and capital expenditure is larger, directly
Influenced the treatment effect and treating capacity to solid suspension waste water, there are substantial amounts of discharge beyond standards, to local environment and
Health brings huge hidden danger.
Therefore, developing a kind of system of processing of effectively processing High SS contained wastewater becomes the technology of urgent need to resolve
Problem.
The content of the invention
To overcome problem present in background technology, the utility model discloses a kind of quick processing system of beneficiation wastewater,
Purpose be to provide it is a kind of it is easy to operate, can effective Beneficiation Wastewater system of processing, the beneficiation wastewater quickly handles
System is provided with cistern on the right side of ore dressing pond, and medicament is added in cistern makes beneficiation wastewater natural subsidence, beneficiation wastewater into
Enter in band sedimentation basin, realize that solid-liquid is layered after settling a period of time, liquid enters clear water reserviors from outlet pipe, and liquid leads in clear water reserviors
Cross return pipe and return to and be used as mill water in ore dressing pond, realize that Sewage treatment utilizes, being settled in settling tank has tailings mud, and water flows into
After entering clear water reserviors, sludge out pipe is opened, after being connected with outside, tailings mud is exited into Tailings Dam from sludge out pipe, realizes tailing
Recycling, beneficiation wastewater separation of solid and liquid is separately recovered, realizes the processing of beneficiation wastewater.
To achieve the above object, the utility model is achieved by the following technical solution:
The quick processing system of the beneficiation wastewater mainly include ore dressing pond, cistern, water inlet pipe, inlet valve, drug-feeding tube,
Into medicine valve, settling tank, oral siphon, enter water valve, sludge out pipe, clear water reserviors, outlet pipe, outlet valve, return pipe, back water pump, back-water valve (BWV),
The ore dressing pond and cistern are connected by water inlet pipe, and inlet valve is provided with water inlet pipe, and drug-feeding tube is arranged on the cistern right side
Side, is provided with into medicine valve, settling tank and cistern on drug-feeding tube and is connected by oral siphon, be provided with into water valve, go out on oral siphon
Mud pipe is arranged on the right side of settling tank, and clear water reserviors and settling tank are connected by outlet pipe, and outlet pipe is arranged on outlet valve, return pipe
It is arranged between clear water reserviors and ore dressing pond, back water pump is arranged on return pipe, and back-water valve (BWV) is arranged on return pipe, the settling tank
Check dam, dam-through pipe, mud-suction hole are internally provided with, the dam-through pipe crosses check dam, and mud-suction hole is arranged on dam-through pipe.
Tailings Dam is connected with after the sludge out pipe.
The dam-through pipe and settling tank bottom surface are tangent, and dam-through pipe passes through check dam, is connected with sludge out pipe.
The mud-suction hole is provided with least five, is evenly distributed on dam-through pipe surface.
The beneficial effects of the utility model:The utility model is provided with cistern on the right side of ore dressing pond, adds in cistern
Entering medicament makes beneficiation wastewater natural subsidence, and beneficiation wastewater enters in band sedimentation basin, realizes that solid-liquid is layered after settling a period of time, liquid
Body enters clear water reserviors from outlet pipe, and liquid is returned to by return pipe in clear water reserviors is used as mill water in ore dressing pond, realize waste water
Recycle, after sedimentation has tailings mud, current to enter clear water reserviors in settling tank, open sludge out pipe, after being connected with outside, tailings mud
Exited into from sludge out pipe into Tailings Dam, realize mining tailing, beneficiation wastewater separation of solid and liquid is separately recovered, realizes ore dressing
The processing of waste water, there is provided it is a kind of it is easy to operate, can effective Beneficiation Wastewater processing system.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the structure diagram of settling tank.
In figure, 1- ore dressings pond, 2- cisterns, 3- water inlet pipes, 4- inlet valves, 5- drug-feeding tubes, 6- into medicine valve, 7- settling tanks,
8- oral siphons, 9- enter water valve, 10- sludge out pipe, 11- clear water reserviors, 12- outlet pipes, 13- outlet valves, 14- return pipes, 15- backwater
Pump, 16- back-water valve (BWV)s, 17- check dams, 18- dam-through pipes, 19- mud-suction holes.
Embodiment
To make above-mentioned purpose, technical solution and beneficial effect become apparent from clearly, below in conjunction with attached drawing to the utility model
Illustrate.
As shown in Figs. 1-2, the quick processing system of the beneficiation wastewater mainly includes ore dressing pond 1, cistern 2, water inlet pipe
3rd, inlet valve 4, drug-feeding tube 5, into medicine valve 6, settling tank 7, oral siphon 8, enter water valve 9, sludge out pipe 10, clear water reserviors 11, outlet pipe 12,
Outlet valve 13, return pipe 14, back water pump 15, back-water valve (BWV) 16, the ore dressing pond 1 and cistern 2 are connected by water inlet pipe 3, into
Inlet valve 4 is provided with water pipe 3, drug-feeding tube 3 is arranged on the right side of cistern 2, is provided with drug-feeding tube 5 into medicine valve 6, settling tank 7
And cistern 2 is connected by oral siphon 8, it is provided with oral siphon 8 into water valve 9, sludge out pipe 10 is arranged on the right side of settling tank 7, goes out
Tailings Dam is connected with after mud pipe 10, clear water reserviors 11 and settling tank 7 are connected by outlet pipe 12, and outlet pipe 12 is arranged on outlet valve 13
On, return pipe 14 is arranged between clear water reserviors 11 and ore dressing pond 1, and back water pump 15 is arranged on return pipe 14, and back-water valve (BWV) 16 is arranged on
On return pipe 14, the settling tank 7 is internally provided with check dam 17, dam-through pipe 18, mud-suction hole 19, and the dam-through pipe 18 crosses
Check dam 17, dam-through pipe 18 and 7 bottom surface of settling tank are tangent, and dam-through pipe 18 passes through check dam 17, is connected with sludge out pipe 10, mud-suction hole
19 are arranged on dam-through pipe 18, and mud-suction hole 19 is provided with least five, are evenly distributed on 18 surface of dam-through pipe.
The quick processing system of the beneficiation wastewater is provided with cistern 2 on the right side of ore dressing pond 1, is added in cistern 2
Medicament makes beneficiation wastewater natural subsidence, and beneficiation wastewater enters in sedimentation basin 1, realizes that solid-liquid is layered after settling a period of time, liquid
From the entrance clear water reserviors 11 of outlet pipe 12, in clear water reserviors 11, liquid is returned in ore dressing pond 1 by return pipe 14 is used as mill water, real
Existing Sewage treatment utilizes, and is recycled compared to waiting current to flow to Tailings Dam, goes out in clear water reserviors 11 and current are recycled, shorten
The blowback distance of recycling current, economizes on resources, and current largely recycle, a part stay with settling tank 7, there is provided certain punching
Power, for excluding the tailings mud of sedimentation in settling tank 7, inside settling tank 7, dam-through pipe 18 and 7 bottom surface of settling tank are tangent, are not present
Gap, soil can be flowed out from bottommost, and dam-through pipe 18 passes through check dam 17, connects with sludge out pipe 10, is connected with after sludge out pipe 10
Tailings Dam, after current enter clear water reserviors 11, opens sludge out pipe 10, after being connected with outside, tailings mud is by mud-suction hole, from sludge out pipe
10 exit into Tailings Dam, realize mining tailing, and mud-suction hole 19 is provided with least five, are evenly distributed on 18 table of dam-through pipe
Face, ensures that tailings mud is uniformly flowed out from 7 bottom of settling tank, tailing can be avoided to remain, by beneficiation wastewater solid-liquid point in settling tank 7
From being separately recovered, realize the processing of beneficiation wastewater, there is provided it is a kind of it is easy to operate, can effective Beneficiation Wastewater processing system.
When carrying out beneficiation wastewater processing using the utility model, the waste water in ore dressing pond 1 is entered in cistern 2, is led to
Cross drug-feeding tube 5 and add medicament promotion beneficiation wastewater sedimentation, go out to enter in settling tank 7 from oral siphon 8 after current dissolving medicine, select
Ore deposit waste water fully settles in settling tank 7, after from 12 water outlet of outlet pipe, enter in clear water reserviors 11 and collect, tailings mud is deposited on
In settling tank 7, follow-up ore dressing operation will be carried out in current blowback ore dressing pond 1 in clear water reserviors 11 by starting back water pump 15, be opened out
Mud pipe 10, the soil in settling tank 7 flow into Tailings Dam from sludge out pipe 10 by mud-suction hole 19 and collect.
The utility model is provided with cistern on the right side of ore dressing pond, and medicament is added in cistern makes beneficiation wastewater naturally heavy
Drop, beneficiation wastewater enter in band sedimentation basin, realize that solid-liquid is layered after settling a period of time, and liquid enters clear water reserviors from outlet pipe,
Liquid is returned to by return pipe in clear water reserviors is used as mill water in ore dressing pond, realize that Sewage treatment utilizes, sedimentation in settling tank
After having tailings mud, current to enter clear water reserviors, sludge out pipe is opened, after being connected with outside, tailings mud is exited into tail from sludge out pipe
In ore deposit storehouse, mining tailing is realized, beneficiation wastewater separation of solid and liquid is separately recovered, realize the processing of beneficiation wastewater, there is provided Yi Zhongcao
Make it is easy, can effective Beneficiation Wastewater processing system.
Finally illustrate, preferred embodiment above is merely intended for describing the technical solutions of the present application, but not for limiting the present application, to the greatest extent
Pipe has been described in detail the utility model by above preferred embodiment, but those skilled in the art should manage
Solution, in the form and details can make it various changes, without departing from the utility model claims book institute
The scope of restriction.
Claims (4)
1. a kind of quick processing system of beneficiation wastewater, it is characterised in that the quick processing system of the beneficiation wastewater mainly includes
Ore dressing pond, cistern, water inlet pipe, inlet valve, drug-feeding tube, into medicine valve, settling tank, oral siphon, enter water valve, sludge out pipe, clear water reserviors,
Outlet pipe, outlet valve, return pipe, back water pump, back-water valve (BWV), the ore dressing pond and cistern are connected by water inlet pipe, water inlet pipe
On be provided with inlet valve, drug-feeding tube is arranged on the right side of cistern, is provided with into medicine valve, settling tank and cistern and is passed through on drug-feeding tube
Oral siphon connects, and is provided with oral siphon into water valve, and sludge out pipe is arranged on the right side of settling tank, and clear water reserviors and settling tank pass through water outlet
Pipe connects, and outlet pipe is arranged on outlet valve, and return pipe is arranged between clear water reserviors and ore dressing pond, and back water pump is arranged on return pipe
On, back-water valve (BWV) is arranged on return pipe, and the settling tank is internally provided with check dam, dam-through pipe, mud-suction hole, the dam-through pipe
Check dam is crossed, mud-suction hole is arranged on dam-through pipe.
2. according to the quick processing system of a kind of beneficiation wastewater described in claim 1, it is characterised in that:Connect after the sludge out pipe
It is connected to Tailings Dam.
3. according to the quick processing system of a kind of beneficiation wastewater described in claim 1, it is characterised in that:The dam-through pipe is with sinking
Drop bottom of pond face is tangent, and dam-through pipe passes through check dam, is connected with sludge out pipe.
4. according to the quick processing system of a kind of beneficiation wastewater described in claim 1, it is characterised in that:The mud-suction hole is set
There is at least five, be evenly distributed on dam-through pipe surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721070986.5U CN207294427U (en) | 2017-08-25 | 2017-08-25 | A kind of quick processing system of beneficiation wastewater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721070986.5U CN207294427U (en) | 2017-08-25 | 2017-08-25 | A kind of quick processing system of beneficiation wastewater |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207294427U true CN207294427U (en) | 2018-05-01 |
Family
ID=62438729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721070986.5U Active CN207294427U (en) | 2017-08-25 | 2017-08-25 | A kind of quick processing system of beneficiation wastewater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207294427U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110541451A (en) * | 2019-09-10 | 2019-12-06 | 中国恩菲工程技术有限公司 | Water inlet pool of tailing pond backwater booster pump station |
-
2017
- 2017-08-25 CN CN201721070986.5U patent/CN207294427U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110541451A (en) * | 2019-09-10 | 2019-12-06 | 中国恩菲工程技术有限公司 | Water inlet pool of tailing pond backwater booster pump station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103232132B (en) | Magnetic separation method and apparatus for mine water underground treatment | |
CN203513348U (en) | Sludge water treatment and reuse system for settling pond | |
CN104016520B (en) | Device for pre-treating coal chemical industry wastewater by air flotation coupled with coagulation and method for pre-treating coal chemical industry wastewater by device | |
CN108408802A (en) | System is cut down in the overflow of combined system pipe network and water pollution integration | |
CN105668740A (en) | Integrated sand washing waste water reuse device | |
CN207294427U (en) | A kind of quick processing system of beneficiation wastewater | |
CN103768836A (en) | High-turbidity water adjusting-precipitating treatment system | |
CN206735879U (en) | Integrated high-efficiency magnetic-coagulation precipitation equipment | |
CN203782003U (en) | Anti-blockage sludge thickener | |
CN108947137A (en) | A kind of kitchen garbage percolation liquid treatment method | |
CN205347028U (en) | Ore dressing plant or system sand sewage treatment system of factory | |
CN204113292U (en) | Shield machine sewage-treatment plant in a kind of subway tunnel shield method construction | |
CN208561732U (en) | System is cut down in the overflow of combined system pipe network and water pollution integration | |
CN204134756U (en) | A kind of novel deliming equipment | |
CN215161695U (en) | Lead-zinc beneficiation wastewater flotation organic reagent rapid separation pretreatment device | |
CN202785861U (en) | Oil removing integrated comprehensive water treatment machine | |
CN206927676U (en) | A kind of coal slime backflow coagulation-sedimentation equipment | |
CN202212065U (en) | Car washing water circulation all-in-one machine | |
CN105417660B (en) | A kind of processing method and processing device of wastewater from water treatment plant | |
CN204079679U (en) | Integrated form multilayer sewage treatment tank | |
CN208561977U (en) | A kind of mobile integrated mining method construction wastewater treatment equipment | |
CN207973610U (en) | A kind of sewage disposal system suitable for aggregate production | |
CN206051801U (en) | A kind of transportable water treatment apparatus | |
CN205627207U (en) | Sewage treatment carries sand machine | |
CN209752257U (en) | Magnetite wastewater recycling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |