CN207290645U - A kind of rubber processing system - Google Patents

A kind of rubber processing system Download PDF

Info

Publication number
CN207290645U
CN207290645U CN201720704011.7U CN201720704011U CN207290645U CN 207290645 U CN207290645 U CN 207290645U CN 201720704011 U CN201720704011 U CN 201720704011U CN 207290645 U CN207290645 U CN 207290645U
Authority
CN
China
Prior art keywords
track
groove
motorcycle
elevator
processing system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720704011.7U
Other languages
Chinese (zh)
Inventor
蒋国启
彭荣坤
钟履席
杨逵
刘云鹏
杨银明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dingteng Meng Xin Industrial Co Ltd
Original Assignee
Dingteng Meng Xin Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dingteng Meng Xin Industrial Co Ltd filed Critical Dingteng Meng Xin Industrial Co Ltd
Priority to CN201720704011.7U priority Critical patent/CN207290645U/en
Application granted granted Critical
Publication of CN207290645U publication Critical patent/CN207290645U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to rubber process apparatus field, more particularly to a kind of rubber processing system, including conveyer belt, cutting machine, cutting die groove, circulating water chennel, elevator, kneading compactor, rub up blanking groove, infiltration net, suction pump, separation of solid and liquid storehouse, return pipe, discharge nozzle, feeding track, baking groove, feeding device, mobile motorcycle, motorcycle track, feed rail, baking box, drawing mechanism and discharging track;The utility model coefficient safe to use is high, and place area occupied is small, and equipment energy consumption is small, has saved cost;Impurity good separating effect, can remove impurity in time;Raw rubber is heated abundant and uniform, and cured effect is good;Dry glue discharging is convenient, easy to shift, does not interfere with follow-up discharging.

Description

A kind of rubber processing system
Technical field
The utility model belongs to rubber process apparatus field, and in particular to a kind of rubber processing system.
Background technology
During processing and fabricating natural rubber, matched somebody with somebody by Zou's piece machines and comminutor of more than ten and be combined into production line.Raw rubber passes through After production line processing, uniform raw rubber quality, while impurity is separated out, then cleaned by snakelike sink, take out wherein impurity, then pass through Overbaking operation, output dry glue.
Above processing technology has the following disadvantages:First, raw rubber homogeneous removal of impurities power consumption is big, processing efficiency is low, of high cost; Second, repeatedly there is the event of hurting sb.'s feelings there are security risk in the work of Zou's piece machine;Third, occupation area of equipment is big, place of production expense is held high It is expensive;Fourth, equipment independent work, switching on and shutting down are inconvenient, and human resources take big;Fifth, impurity inferior separating effect, it is difficult to clear in time Except impurity;Sixth, raw rubber distribution and uneven heating, cured effect are poor in baking operation;Seventh, it is difficult to discharge after output dry glue, effect Rate is low.
Utility model content
To solve the problems, such as that above technology exists, the utility model provides a kind of rubber processing system, coefficient safe to use Height, place area occupied is small, and equipment energy consumption is small, has saved cost.
Its technical solution is:
A kind of rubber processing system, including conveyer belt, cutting machine, cutting die groove, circulating water chennel, elevator, kneader, Rub up blanking groove, infiltration net, suction pump, separation of solid and liquid storehouse, return pipe, discharge nozzle, feeding track, baking groove, feeding device, shifting Dynamic motorcycle, motorcycle track, feed rail, baking box, drawing mechanism and discharging track;
The conveying end of tape is connected to cutting machine import, and cutting machine outlet is connected to cutting die groove, cutting die groove Circulating water chennel is connected to, elevator is provided with the circulating water chennel, is provided with lifting filter on elevator, on the elevator Be provided with kneader at end, the kneader outlet is connected to rub up blanking groove, it is described rub up blanking groove and be connected to next stage follow Ring sink, is provided with discharge nozzle on the final stage circulating water chennel, the discharge nozzle is connected to separation of solid and liquid storehouse, institute by suction pump State separation of solid and liquid storehouse and final stage circulating water chennel is connected to by return pipe, every grade of circulating water chennel both sides are provided with infiltration net, ooze Underground canal is provided with below the network of rivers;
Baking groove is provided with the feeding track, feeding device, the separation of solid and liquid storehouse are provided with above feeding track Discharge port be arranged on above feeding device, the feeding track is provided with feed rail on one side, at the feeding track end Motorcycle track beginning is provided with, feed rail beginning is provided with motorcycle track end, movement is provided with the motorcycle track Motorcycle, the feed rail end are connected to discharging track, and the discharging track is arranged in baking box, the discharging track end End is extended outside baking box, and drawing mechanism is provided with above the discharging track outside the baking box.
Further, the cutting die groove in the cutting machine exit and rubbing up for kneader exit are provided with blanking groove Spray tube, the blanking trench bottom that rubs up below the spray tube are arranged to strainer, sewage sump are provided with below the strainer.
Further, the circulating water chennel includes groove body, kidney-shaped column, motor, shaft, water extraction board, deblending slot, impurity removal port, oozes Miscellaneous grid, dislodger, drainpipe, blow-off pipe, switch valve, web plate and filling pipe, the groove body middle part are provided with kidney-shaped column, kidney-shaped Column both ends are fixedly installed motor, and the motor is connected to shaft, and the shaft both ends are respectively arranged with polylith water extraction board, described Wash cycles area is formed between groove body and kidney-shaped column, the elevator is arranged in wash cycles area, the elevator side Web plate is provided with wash cycles area, is provided with filling pipe above the groove body, wash cycles area top is fixedly installed More than one deblending slot, the deblending slot part are arranged in wash cycles area, and deblending slot another part is arranged on circulation Outside cleaning area, the deblending slot side being arranged in wash cycles area is arranged to ooze miscellaneous grid, described to ooze miscellaneous grid towards water Direction is flowed, the removal of impurities trench bottom being arranged on outside wash cycles area is provided with impurity removal port, and the dislodger is arranged on groove body bottom Portion, the dislodger are connected to drainpipe, are provided with blow-off pipe on drainpipe vertically upward, switch is provided with the drainpipe Valve.
Further, the baking groove includes base, side frame, partition plate, spacer screen and raising plate, and the base is arranged on feeding rail On road, spacer screen is provided with the base, side frame is placed with base, partition plate is provided with side frame, side frame outer upper end is set There is raising plate.
Further, the feeding device includes stent, cross bar, sliding block and elevating hopper, and the stent is arranged on feeding track Both sides, are provided with cross bar between stent, sliding block are provided with cross bar, the elevating hopper is fixed on sliding block.
Further, both sides are provided with transfer track above the mobile motorcycle, and pulley, pulley are provided with below mobile motorcycle It is arranged on motorcycle track, pin hole, the mobile motorcycle side is provided with the feeding track end and feed rail beginning Face is provided with latch.
Further, the feeding track end and discharging track end are hingedly provided with spacer pin.
Further, the drawing mechanism includes lifting sliding slot, lifting sliding block, connecting shaft, transit plate, connecting rod, jacking block, steel cable With electric hoist elevator, the discharge guide both sides are provided with two groups of lifting sliding slots, and every group of lifting sliding slot is provided with two sliding slots, It is provided with one piece of lifting sliding block between each sliding slot, two pieces of sliding blocks between every group of lifting sliding slot are connected by connecting shaft, the company Bearing is cased with axis, bearing is connected to transit plate, and the transit plate upper end is connected to electric hoist elevator by steel cable, in described Jacking block is connected to by connecting rod on flap, the jacking block length is more than the length of distance between two sliding slots of every group of lifting sliding slot Degree.
Further, the transit plate lower end is provided with clump weight.
The beneficial effects of the utility model:
(1)The utility model has replaced mechanical equipment, reduces quantity, has saved energy consumption, reduces production cost;
(2)The utility model is easy to operate, and safety coefficient is high, avoids equipment and hurts sb.'s feelings event;
(3)The utility model have changed cleaning sink, reduce mechanical equipment, and baking box utilizes segmentation revolution conveying, contracting Short production line length, floor space is small, has saved space expenses, convenient management;
(4)The utility model Personnel Resources occupancy is small, and switch is machine integrated;
(5)The utility model impurity good separating effect, can remove impurity in time;
(6)The utility model raw rubber is heated abundant and uniform, and cured effect is good;
(7)The discharging of the utility model dry glue is convenient, easy to shift, does not interfere with follow-up discharging.
Brief description of the drawings
Fig. 1 is the structure diagram of rubber processing system;
Fig. 2 is the structure diagram of circulating water chennel;
Fig. 3 is the structure diagram of rubber baking system;
Fig. 4 is the structure diagram of baking groove;
Fig. 5 is the lifting state diagram of drawing mechanism;
Wherein, 1- conveyer belts, 2- cutting machines, 3- cutting die grooves, 4- circulating water chennels, 401- groove bodies, 402- kidney-shaped columns, 403- motors, 404- shafts, 405- water extraction boards, 406- deblending slots, 407- impurity removal ports, 408- ooze miscellaneous grid, 409- dislodgers, 410- drainpipes, 411- blow-off pipes, 412- switch valves, 413- web plates, 414- filling pipes, 5- elevators, 501-, 6- kneaders, 7- spray tubes, 8- rub up blanking groove, 801-, 9- sewage sumps, 10- infiltration nets, 11- suction pumps, 12- separation of solid and liquid storehouse, 13- backwater Pipe, 14- discharge nozzles, 15- feeding tracks, 16- baking grooves, 161- bases, 162- side frames, 163- partition plates, 164- spacer screens, 165- tops Lift slab, 17- feeding devices, 171- stents, 172- cross bars, 173- sliding blocks, 174- elevating hoppers, 18- movement motorcycles, 181- pulleys, 182- latches, 19- motorcycle tracks, 20- feed rails, 21- baking boxes, 22- drawing mechanisms, 221- lifting sliding slots, 222- liftings Sliding block, 223- connecting shafts, 224- transit plates, 225- connecting rods, 226- jacking blocks, 227- steel cables, 228- electric hoist elevators, 229- match somebody with somebody Pouring weight, 23- discharging tracks, 231- spacer pins.
Embodiment
It is shown as shown in figures 1 and 3, a kind of rubber processing system, including conveyer belt 1, cutting machine 2, cutting die groove 3, Circulating water chennel 4, elevator 5, kneader 6, rub up blanking groove 8, infiltration net 10, suction pump 11, separation of solid and liquid storehouse 12, return pipe 13rd, discharge nozzle 14, feeding track 15, baking groove 16, feeding device 17, mobile motorcycle 18, motorcycle track 19, feed rail 20, Baking box 21, drawing mechanism 22 and discharging track 23;
1 end of conveyer belt is connected to 2 import of cutting machine, and the outlet of cutting machine 2 is connected to cutting die groove 3, under cut-out Hopper 3 is connected to circulating water chennel 4, and elevator 5 is provided with the circulating water chennel 4, and lifting filter 501 is provided with elevator 5, Kneader 6 is provided with 5 upper end of elevator, the outlet of kneader 6 is connected to rub up blanking groove 8, described to rub up blanking Groove 8 is connected to next stage circulating water chennel 4, and discharge nozzle 14 is provided with the final stage circulating water chennel 4, and the discharge nozzle 14 passes through pumping Water pump 11 is connected to separation of solid and liquid storehouse 12, and the separation of solid and liquid storehouse 12 is connected to final stage circulating water chennel 4 by return pipe 13, described Every grade of 4 both sides of circulating water chennel are provided with infiltration net 10, and 10 lower section of infiltration net is provided with underground canal;
Baking groove 16 is provided with the feeding track 15, the top of feeding track 15 is provided with feeding device 17, described solid The discharge port of liquid separation bin 12 is arranged on the top of feeding device 17, and described 15 one side of feeding track is provided with feed rail 20, institute To state 15 end of feeding track and be provided with 19 beginning of motorcycle track, 19 end of motorcycle track is provided with 20 beginning of feed rail, Mobile motorcycle 18 is provided with the motorcycle track 19,20 end of feed rail is connected to discharging track 23, the discharging Track 23 is arranged in baking box 21, and 23 end of discharging track is extended outside baking box 21, going out outside the baking box 21 23 top of material track is provided with drawing mechanism 22.
When equipment works, all mechanical energy capable of being opened by one key.After raw rubber is crushed by conveyer belt 1 into 2 internal cutting off of cutting machine, Enter flush clean in circulating water chennel 4 from cutting die groove 3, remove thin block impurity.Again kneader is being promoted to by elevator 5 In 6, moisture is filtered out in the lifting filter 501 on elevator 5.Raw rubber separates out impurity after kneader 6 rubs up, and quality, from Rub up blanking groove 8 and enter flush clean in next stage circulating water chennel 4, impurity is taken out in separation.Kneader 6 can set 2-3 in equipment Platform, progress fully rub up homogeneous.In the equipment course of work, often there is water to spill and fall to the ground, by seeping water, net 10 reaches underground canal, Prevent processing environment ponding.After raw rubber crushes homogeneous, clean by multiple stage circulation sink 4, removal of impurities is thorough in final stage circulating water chennel 4 Bottom, is evacuated to separation of solid and liquid storehouse 12 by water and raw rubber by suction pump 11 and separates, and the water after separation flows back to final stage circulating water chennel 4, real Existing water circulation use, using water wisely.Baking groove 16 moves on feeding track 15 at this time, and feeding is carried out in moving process.Solid-liquid 12 separated raw rubber of separation bin enters feeding device 17, eventually falls into baking groove 16.Operate mobile motorcycle 18 at the same time, and with it is upper 15 end of material track integrates with, and waits groove 16 to be baked to be moved in mobile motorcycle 18, and mobile motorcycle 18 is moved along motorcycle track 19 To 20 beginning of feed rail, eventually enter into and toasted in the discharging track 23 in baking box 21.Pass through discharging after baking Device 22 takes out dry glue.
The rubbing up for 6 exit of cutting die groove 3 and kneader in 2 exit of cutting machine is provided with spray on blanking groove 8 Shower pipe 7,8 bottom of blanking groove that rubs up of the lower section of spray tube 7 are arranged to strainer 801, and the lower section of strainer 801 is provided with dirt collection Groove 9.
Spray tube 7 can tentatively wash away separation impurity, fall into the strainer 801 of a part of impurity and water from 8 bottom of blanking groove In sewage sump 9, play the role of tentatively removing impurity and push raw rubber.
As shown in Fig. 2, the circulating water chennel 4 includes groove body 401, kidney-shaped column 402, motor 403, shaft 404, water extraction board 405th, deblending slot 406, impurity removal port 407, ooze miscellaneous grid 408, dislodger 409, drainpipe 410, blow-off pipe 411, switch valve 412, Web plate 413 and filling pipe 414, the middle part of groove body 401 are provided with kidney-shaped column 402, and 402 both ends of kidney-shaped column are fixedly installed motor 403, the motor 403 is connected to shaft 404, and 404 both ends of shaft are respectively arranged with polylith water extraction board 405, the groove body Wash cycles area is formed between 401 and kidney-shaped column 402, the elevator 5 is arranged in wash cycles area, the elevator 5 one It is provided with web plate 413 in the wash cycles area of side, the top of groove body 401 is provided with filling pipe 414, in the wash cycles area Portion is fixedly installed more than one deblending slot 406, and 406 part of deblending slot is arranged in wash cycles area, deblending slot 406 another part are arranged on outside wash cycles area, and 406 side of deblending slot being arranged in wash cycles area is arranged to ooze miscellaneous Grid 408, it is described to ooze miscellaneous grid 408 towards water (flow) direction, 406 bottom of the deblending slot setting being arranged on outside wash cycles area There is impurity removal port 407, the dislodger 409 is arranged on 401 bottom of groove body, and the dislodger 409 is connected to drainpipe 410, draining Blow-off pipe 411 is provided with pipe 410 vertically upward, switch valve 412 is provided with the drainpipe 410.
After raw rubber cuts off or rubs up, formed between groove body 401 and kidney-shaped column 402 in wash cycles area, circulation cleaning Wash in area and be put into enough ejected wash waters, water level reaches oozes miscellaneous grid 408 on deblending slot 406.Motor 403 works, and drives water extraction board 405 rotations, make the water in wash cycles area flow in one direction, the impurity on cleaning separation raw rubber.After impurity separation, lightweight Impurity floats, and floats on the water surface, and after oozing miscellaneous grid 408 and filtering, light impurities and a part of water enter deblending slot 406 It is interior, and discharged from impurity removal port 407.The separation of the heavy impurities such as sand is sunk, and is fallen into dislodger 409, is moved with current, into draining In pipe 410, switch valve on drainpipe closes 412 at this time, and the mixture of the heavy impurity such as silt and water can only be from blow-off pipe stream Go out 411.Blow-off pipe upper end opening height is close with height of water level, prevents excessive water from flowing away.After cleaning, life therein is dragged for Glue, opens switch valve, water and residual impurity is quickly discharged from drainpipe.Before elevator 5 starts operation, web plate 413 is utilized Wash cycles area is blocked, only allows water to flow through, before raw rubber is come together in web plate 413, facilitates 5 operation of elevator.The groove body 401 Top is provided with filling pipe 414, and the water in circulating water chennel 4 can be replenished in time.
As shown in figure 4, the baking groove 16 includes base 161, side frame 162, partition plate 163, spacer screen 164 and raising plate 165, The base 161 is arranged on feeding track 15, and spacer screen 164 is provided with the base 161, side frame is placed with base 161 162, partition plate 163 is provided with side frame 162, and 162 outer upper end of side frame is provided with raising plate 165.
Partition plate 163, which will be toasted in groove 16, is divided into multiple groove bodies, while toasts 16 bottom of groove to be netted, so raw rubber is heated Fully and uniformly, cured effect is good.
The feeding device 17 includes stent 171, cross bar 172, sliding block 173 and elevating hopper 174, and the stent 171 is set In 15 both sides of feeding track, cross bar 172 is provided between stent 171, sliding block 173, the elevating hopper are provided with cross bar 172 174 are fixed on sliding block 173.
Elevating hopper 174 is moved back and forth by sliding block 173 on cross bar 172, raw rubber is uniformly fallen into baking groove 16.
The 18 top both sides of mobile motorcycle are provided with transfer track, and the mobile lower section of motorcycle 18 is provided with pulley 181, pulley 181 are arranged on motorcycle track 19, and pin hole, the shifting are provided with 15 end of feeding track and 20 beginning of feed rail Dynamic 19 side of motorcycle is provided with latch 182.
15 end of feeding track and 23 end of discharging track are hingedly provided with spacer pin 231.
Mobile motorcycle 18 integrates with 15 end of feeding track, and feeding rail is inserted into using the latch 182 of mobile 18 side of motorcycle The pin hole of road end, fixes mobile motorcycle 18, the transfer track for waiting groove 16 to be baked to be moved in mobile motorcycle 18.If Toast groove 16 and move 15 end of feeding track, and move motorcycle 18 also without in place, just utilize the spacing of 15 end of feeding track The limitation baking groove 16 of pin 231 moves, and prevents baking groove 16 from derailing.After motorcycle 18 is moved in place, then open spacer pin 231 and put OK.
As shown in figure 5, the drawing mechanism 22 includes lifting sliding slot 221, lifting sliding block 222, connecting shaft 223, transit plate 224th, connecting rod 225, jacking block 226, steel cable 227 and electric hoist elevator 228,23 both sides of discharge guide are provided with two groups and carry Sliding slot 221 is risen, every group of lifting sliding slot 221 is provided with two sliding slots, one piece of lifting sliding block 222 is provided between each sliding slot, often Two pieces of sliding blocks 222 between group lifting sliding slot 221 are connected by connecting shaft 223, and bearing, bearing connection are cased with the connecting shaft 223 Transit plate 224,224 upper end of transit plate is connected to electric hoist elevator 228 by steel cable 227, on the transit plate 224 Jacking block 226 is connected to by connecting rod 225,226 length of jacking block is more than the spacing of two sliding slots of every group of lifting sliding slot 221 From length.
224 lower end of transit plate is provided with clump weight 229.
After baking, baking groove 16 is removed along discharge guide 23, is subject to the limitation positioning of spacer pin 231.Start at this time Electric hoist elevator 228 shrinks steel cable 227, and steel cable 227 pulls transit plate 224, and the jacking block 226 on transit plate 224 passes through bearing Rotated along connecting shaft 223, and withstand the raising plate 226 on baking 16 frame of groove.Jacking block 226 is subject to baking groove 16 to limit, transfer Plate 224 stops rotating around connecting shaft 223, thus it is elevated along lifting sliding slot 222, while the frame of groove 26 is toasted by jacking block 226 Effect is also elevated, so that dry glue and frame on detachable base, facilitate dry glue to take out transfer.After dry glue is taken out, electric hoist liter Drop machine 228 turns round, baking groove 16 frame drop on base after, be subject to clump weight 229 to act on, transit plate 224 and jacking block 226 Revolution, stops, wait feeding next time after jacking block 226 contact with lifting sliding slot 222 and is limited.
Operation principle:
After raw rubber is crushed by conveyer belt 1 into 2 internal cutting off of cutting machine, enter from cutting die groove 3 in circulating water chennel 4, The spray tube 7 in 2 exit of cutting machine can tentatively wash away the raw rubber in cutting die groove 3 at this time, play the work of moisturizing push raw rubber With.After raw rubber cut-out, formed between groove body 401 and kidney-shaped column 402 in wash cycles area, wash cycles are put into foot in area Enough ejected wash waters, water level reaches oozes miscellaneous grid 408 on deblending slot 406.Motor 403 works, and drives water extraction board 405 to rotate, makes to follow Water in ring cleaning area flows in one direction, the heavy such as thin block raw rubber and the silt of deposition and slot bottom after cleaning separation is broken Impurity.It is then passed through level-one elevator 5 and is promoted in kneader 6 rub up homogeneous, separates out impurity.6 exit of kneader Spray tube 7 can tentatively wash away separation impurity, the strainer 801 of a part of impurity and water from 8 bottom of blanking groove is fallen into sewage sump 9 In, play the role of tentatively removing impurity and push raw rubber.After raw rubber rubs up, into shape between groove body 401 and kidney-shaped column 402 Into in wash cycles area, enough ejected wash waters are put into wash cycles area, water level reaches oozes miscellaneous grid 408 on deblending slot 406, into Row impurity separates and except auxiliary work.After two to three-level kneader 6 rub up homogeneous and the cleaning removal of impurities of circulating water chennel 4, in final stage Removal of impurities is thorough in circulating water chennel 4, and water and raw rubber are evacuated to separation of solid and liquid storehouse 12 by suction pump 11 and separated, the water after separation is flow back to Final stage circulating water chennel 4, realizes water circulation use.Baking groove 16 moves on feeding track 15 at this time, is carried out in moving process Material.12 separated raw rubber of separation of solid and liquid storehouse enters feeding device 17, and elevating hopper 174 is back and forth transported by sliding block 173 on cross bar 172 It is dynamic, raw rubber is uniformly fallen into baking groove 16.Mobile motorcycle 18 is operated at the same time, and is integrated with 15 end of feeding track, utilizes shifting The latch 182 of dynamic 18 side of motorcycle is inserted into the pin hole of feeding track end, fixes mobile motorcycle 18, waits groove 16 to be baked to move Move to the transfer track in mobile motorcycle 18.If toasting groove 16 moves 15 end of feeding track, and moving motorcycle 18 does not have also In place, just moved using the limitation baking groove 16 of spacer pin 231 of 15 end of feeding track, prevent baking groove 16 from derailing.Deng movement After motorcycle 18 is in place, then opens spacer pin 231 and let pass.Mobile motorcycle 18 is moved to feed rail 20 along motorcycle track 19 and begins End, eventually enters into and is toasted in the discharging track 23 in baking box 21.After baking, groove 16 is toasted along discharge guide 23 Remove, be subject to the limitation positioning of spacer pin 231.Start electric hoist elevator 228 at this time and shrink steel cable 227, steel cable 227 pulls transfer Plate 224, the jacking block 226 on transit plate 224 are rotated by bearing along connecting shaft 223, and withstand the jacking on baking 16 frame of groove Plate 226.Jacking block 226 be subject to toast groove 16 limit, transit plate 224 stops rotating around connecting shaft 223, thus along lifting sliding slot 222 It is elevated, at the same the frame for toasting groove 26 acted on by jacking block 226 it is also elevated so that dry glue and frame on detachable base, side Just dry glue takes out transfer.Dry glue take out after, electric hoist elevator 228 turns round, baking groove 16 frame drop on base after, by Acted on to clump weight 229, transit plate 224 and jacking block 226 turn round, until jacking block 226 with lifting sliding slot 222 contact be limited after stop Only, feeding next time is waited.

Claims (9)

1. a kind of rubber processing system, it is characterised in that including conveyer belt(1), cutting machine(2), cutting die groove(3), circulation Sink(4), elevator(5), kneading compactor(6), rub up blanking groove(8), infiltration net(10), suction pump(11), separation of solid and liquid storehouse (12), return pipe(13), discharge nozzle(14), feeding track(15), baking groove(16), feeding device(17), mobile motorcycle(18)、 Motorcycle track(19), feed rail(20), baking box(21), drawing mechanism(22)And discharging track(23);
The conveyer belt(1)End is connected to cutting machine(2)Import, cutting machine(2)Outlet is connected to cutting die groove(3), cut Disconnected blanking groove(3)It is connected to circulating water chennel(4), the circulating water chennel(4)Inside it is provided with elevator(5), elevator(5)Upper setting There is lifting filter(501), the elevator(5)Kneading compactor is provided with upper end(6), the kneading compactor(6)Outlet is connected to rub And blanking groove(8), it is described to rub up blanking groove(8)It is connected to next stage circulating water chennel(4), final stage circulating water chennel(4)On be provided with Discharge nozzle(14), the discharge nozzle(14)Pass through suction pump(11)It is connected to separation of solid and liquid storehouse(12), the separation of solid and liquid storehouse (12)Pass through return pipe(13)It is connected to final stage circulating water chennel(4), every grade of circulating water chennel(4)Both sides are provided with infiltration net(10), Seep water net(10)Lower section is provided with underground canal;
The feeding track(15)On be provided with baking groove(16), feeding track(15)Top is provided with feeding device(17), institute State separation of solid and liquid storehouse(12)Discharge port be arranged on feeding device(17)Top, the feeding track(15)It is provided with charging on one side Track(20), the feeding track(15)End is provided with motorcycle track(19)Beginning, motorcycle track(19)End is set There is feed rail(20)Beginning, the motorcycle track(19)On be provided with mobile motorcycle(18), the feed rail(20)End It is connected to discharging track(23), the discharging track(23)It is arranged on baking box(21)It is interior, the discharging track(23)Prolong end Stretch out baking box(21)Outside, the baking box(21)Outer discharging track(23)Top is provided with drawing mechanism(22).
A kind of 2. rubber processing system according to claim 1, it is characterised in that the cutting machine(2)Cut in exit Disconnected blanking groove(3)And kneading compactor(6)Exit rubs up blanking groove(8)On be provided with spray tube(7), the spray tube(7)Under Side rubs up blanking groove(8)Bottom is arranged to strainer(801), the strainer(801)Lower section is provided with sewage sump(9).
A kind of 3. rubber processing system according to claim 1, it is characterised in that the circulating water chennel(4)Including groove body (401), kidney-shaped column(402), motor(403), shaft(404), water extraction board(405), deblending slot(406), impurity removal port(407), ooze Miscellaneous grid(408), dislodger(409), drainpipe(410), blow-off pipe(411), switch valve(412), web plate(413)And filling pipe (414), the groove body(401)Middle part is provided with kidney-shaped column(402), kidney-shaped column(402)Both ends are fixedly installed motor(403), The motor(403)It is connected to shaft(404), the shaft(404)Both ends are respectively arranged with polylith water extraction board(405), it is described Groove body(401)With kidney-shaped column(402)Between form wash cycles areas, the elevator(5)It is arranged in wash cycles area, it is described Elevator(5)Web plate is provided with the wash cycles area of side(413), the groove body(401)Top is provided with filling pipe (414), wash cycles area top is fixedly installed more than one deblending slot(406), the deblending slot(406)A part It is arranged in wash cycles area, deblending slot(406)Another part is arranged on outside wash cycles area, described to be arranged on wash cycles area Interior deblending slot(406)Side is arranged to ooze miscellaneous grid(408), it is described to ooze miscellaneous grid(408)Towards water (flow) direction, the setting Deblending slot outside wash cycles area(406)Bottom is provided with impurity removal port(407), the dislodger(409)It is arranged on groove body (401)Bottom, the dislodger(409)It is connected to drainpipe(410), drainpipe(410)On be provided with blow-off pipe vertically upward (411), the drainpipe(410)On be provided with switch valve(412).
A kind of 4. rubber processing system according to claim 1, it is characterised in that the baking groove(16)Including base (161), side frame(162), partition plate(163), spacer screen(164)And raising plate(165), the base(161)It is arranged on feeding track (15)On, the base(161)Inside it is provided with spacer screen(164), base(161)On be placed with side frame(162), side frame(162)It is interior It is provided with partition plate(163), side frame(162)Outer upper end is provided with raising plate(165).
A kind of 5. rubber processing system according to claim 1, it is characterised in that the feeding device(17)Including stent (171), cross bar(172), sliding block(173)And elevating hopper(174), the stent(171)It is arranged on feeding track(15)Both sides, branch Frame(171)Between be provided with cross bar(172), cross bar(172)On be provided with sliding block(173), the elevating hopper(174)Fixed setting In sliding block(173)On.
A kind of 6. rubber processing system according to claim 1, it is characterised in that the mobile motorcycle(18)Top both sides It is provided with transfer track, mobile motorcycle(18)Lower section is provided with pulley(181), pulley(181)It is arranged on motorcycle track(19)On, The feeding track(15)End and feed rail(20)Pin hole, the mobile motorcycle are provided with beginning(18)Side is set There is latch(182).
A kind of 7. rubber processing system according to claim 1, it is characterised in that the feeding track(15)End and go out Expect track(23)End is hingedly provided with spacer pin(231).
A kind of 8. rubber processing system according to claim 1, it is characterised in that the drawing mechanism(22)Including lifting Sliding slot(221), lifting sliding block(222), connecting shaft(223), transit plate(224), connecting rod(225), jacking block(226), steel cable(227) With electric hoist elevator(228), the discharging track(23)Both sides are provided with two groups of lifting sliding slots(221), every group of lifting sliding slot (221)Two sliding slots are provided with, one piece of lifting sliding block is provided between each sliding slot(222), every group of lifting sliding slot(221)Between Two pieces of sliding blocks(222)Pass through connecting shaft(223)Connection, the connecting shaft(223)On be cased with bearing, bearing is connected to transit plate (224), the transit plate(224)Upper end passes through steel cable(227)It is connected to electric hoist elevator(228), the transit plate(224) On pass through connecting rod(225)It is connected to jacking block(226), the jacking block(226)Length is more than every group of lifting sliding slot(221)Two The length of distance between sliding slot.
A kind of 9. rubber processing system according to claim 8, it is characterised in that the transit plate(224)Lower end is set There is clump weight(229).
CN201720704011.7U 2017-06-16 2017-06-16 A kind of rubber processing system Active CN207290645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720704011.7U CN207290645U (en) 2017-06-16 2017-06-16 A kind of rubber processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720704011.7U CN207290645U (en) 2017-06-16 2017-06-16 A kind of rubber processing system

Publications (1)

Publication Number Publication Date
CN207290645U true CN207290645U (en) 2018-05-01

Family

ID=62450156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720704011.7U Active CN207290645U (en) 2017-06-16 2017-06-16 A kind of rubber processing system

Country Status (1)

Country Link
CN (1) CN207290645U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107053527A (en) * 2017-06-16 2017-08-18 孟定腾鑫实业有限责任公司 A kind of rubber processing system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107053527A (en) * 2017-06-16 2017-08-18 孟定腾鑫实业有限责任公司 A kind of rubber processing system

Similar Documents

Publication Publication Date Title
CN110228864A (en) A kind of wastewater reuse approach device of new countryside construction
CN112482334A (en) River course floating garbage clearance gate
CN105417790A (en) Movable belt type condensing and filter-pressing complete machine
CN207290645U (en) A kind of rubber processing system
CN207290646U (en) A kind of rubber removal of impurities homogenizer
CN207071249U (en) A kind of water curtain dedusting fiber crops hair separator
CN105903748A (en) Kitchen waste residue-liquid separator
CN107053527A (en) A kind of rubber processing system
DE2929857C2 (en)
CN107043176A (en) Relay-type food and drink waste water exhaust apparatus
CN216041035U (en) Dirt filtering type self-flowing water draining hole for hydropower station
CN206800355U (en) Trash before a kind of grid
CN112264373B (en) Automatic pseudo-ginseng processing production line
CN211069464U (en) Movable spraying system of storage bin
CN211273867U (en) Concrete tank car carwash sewage recovery system
CN210786345U (en) Sedimentation tank cleaning device for sewage treatment
CN210482517U (en) Integrated sewage lifting pump station with dredging device
KR101303844B1 (en) Dirt sliding transfer device
CN107042595A (en) A kind of rubber removal of impurities homogenizer
CN213527566U (en) A fine sand extractor for concrete thick liquid
CN217247393U (en) Inclined plate sedimentation treatment device for rural sewage
CN211226692U (en) Concrete sewage treatment equipment
CN216573547U (en) Rough filtration equipment for panning
CN211080387U (en) Municipal drainage community rainwater regulation pond
CN216320244U (en) Dredging device for hydraulic engineering convenient to solid-liquid separation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant