CN207276650U - Vacuum refining furnace feeds the fume dust remover during silk - Google Patents

Vacuum refining furnace feeds the fume dust remover during silk Download PDF

Info

Publication number
CN207276650U
CN207276650U CN201721057329.7U CN201721057329U CN207276650U CN 207276650 U CN207276650 U CN 207276650U CN 201721057329 U CN201721057329 U CN 201721057329U CN 207276650 U CN207276650 U CN 207276650U
Authority
CN
China
Prior art keywords
vacuum
cover
station
valve
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721057329.7U
Other languages
Chinese (zh)
Inventor
吕培先
杨荣林
陈为
蒋桥兵
酆龙
张夏月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hangzhen Energy Technology Co Ltd
Original Assignee
Zhejiang Hangzhen Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hangzhen Energy Technology Co Ltd filed Critical Zhejiang Hangzhen Energy Technology Co Ltd
Priority to CN201721057329.7U priority Critical patent/CN207276650U/en
Application granted granted Critical
Publication of CN207276650U publication Critical patent/CN207276650U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The fume dust remover during silk is fed this application involves a kind of vacuum refining furnace, fume dust remover includes sealing vacuum chamber device, vacuum lead system, sealing vacuum chamber device is connected by vacuum lead system with vacuum pump system road, it is characterized in that it is additionally provided with flue gas ash removal pipe-line system, sealing vacuum chamber device is connected by vacuum lead system with flue gas ash removal pipe-line system, dust-extraction unit, dust-extraction unit is opened when vacuum refining furnace feeds silk, dedusting is carried out to the vacuum chamber to work.The application equipment is simple, operates easy, small investment, is safe and reliable to operation, and a clean working environment is provided for vacuum refining station.

Description

Vacuum refining furnace feeds the fume dust remover during silk
Technical field
The fume dust remover during silk is fed this application involves a kind of vacuum refining furnace, is primarily adapted for use in metallurgy environment guarantor Shield.
Background technology
Vacuum refining furnace wire feeding process is the furnace outer refining technology to grow up the 1980s.In Fruit storage After the completion of, it be according to different steel grades and quality requirement, by wire feeder to add in the molten steel of ladle it is Ca-Si a certain amount of, Aluminium wire, rare-earth wires or certain B alloy wire, under the kinetics function of argon gas stirring, can be effectively accomplished the deoxidation to molten steel, take off Sulphur, removal is mingled with, changes and is mingled with form and accurately finely tunes alloying component, and yield of alloy height, the element of feeding is accurate, changes Kind metallographic structure, the performance for improving metal to be treated, improve its cleanliness factor etc., so as to improve the quality and performance of steel.
With the rapid development of science and technology, steel performance and quality are increasingly taken seriously, STEELMAKING PRODUCTION rate and cost etc. Requirement it is also higher and higher.In order to improve product quality, productivity and reduce production cost, wire feeding process changes the inherence of molten steel Quality, mobility and continuous flow procedure;Its not independent holding time processing, shortens and pours steel and secondary oxidation occurs for molten steel Time;Ladle long nozzle can be avoided to block.The steel grade that chemical composition ranges are very narrow, purposes is important can be produced by feeding silk, and It can guarantee that the homogeneity of the steel mechanics performance of different grades of steel.Being combined using ladle wire feeding and Argon can be in the short period of time Refining operation is completed, is to obtain high-purity, high uniformity, high-precision steel, ensures the important measures of balanced production.
It is after the completion of working as vacuum refining, to close main vacuum valve that vacuum refining furnace, which feeds silk method, at present, opens air valve, makes true Empty room is returned to atmospheric pressure, lifts vacuum cover, and vacuum is moved to standby station by vacuum cover car, and operation wire feeder presses technological requirement To ladle feeding is Ca-Si a certain amount of, aluminium wire, rare-earth wires or certain B alloy wire, to ladle wire feeding machine in the process of running, its The line of addition can produce substantial amounts of flue dust with molten steel reaction, because not setting dust-extraction unit in vacuum refining station, feed silk process The flue gas of generation is all emitted in workshop, which feeds silk method can not meet clear production requirement, main Drawback is wanted to be embodied in the following aspects:
(1)The substantial amounts of exhaust gas and flue dust that can be produced during to ladle wire feeding, these exhaust gas and smokes are in environmental pollution It account for greatly, containing a large amount of solid particles in exhaust gas in proportion, the PM2.5 mass in the workshop made in air is tight Weight is exceeded, produces serious influence to the health of direct labor, and flue gas can be to air after being diffused into from workshop outside workshop Environmental quality causes serious pollution.
(2)The substantial amounts of exhaust gas produced during to ladle wire feeding also containing pernicious gases such as SO2, NOx, CO, produces work People's long-term work produces serious shadow in the environment containing pernicious gases such as SO2, NOx, CO, to the health of direct labor Ring, cause the disease rates such as lung cancer, the leukaemia of worker to greatly increase.
Utility model content
The technical problem that the application solves is to overcome existing vacuum refining furnace to feed the silk process technology that does not have flue gas ash removal to lack Sunken, to be provided during vacuum refining furnace hello silk, a kind of equipment is simple, operation is easy, small investment, vacuum safe and reliable to operation Refining furnace feeds the fume dust remover during silk.
Technical solution includes used by the application solves above-mentioned technical problem:
Vacuum refining furnace feed silk during fume dust remover, including sealing vacuum chamber device, vacuum lead system, Flue gas ash removal pipe-line system, sealing vacuum chamber device are connected by vacuum lead system with vacuum pump system road, seal vacuum Chamber device is connected by vacuum lead system with flue gas ash removal pipe-line system, dust-extraction unit, when vacuum refining furnace feeds Si Shikai Dust-extraction unit is opened, dedusting is carried out to the vacuum chamber to work.
Sealing vacuum chamber device described in the utility model includes vacuum tank, vacuum cover, Splashproof cover, vacuum cover car, pneumatic Flap valve, vacuum tank coordinate with vacuum cover, and vacuum tank and vacuum lead system connectivity, vacuum tank are formed after being closed with vacuum cover The vacuum chamber of one integral sealing, vacuum tank inside, which is built, refractory material, and vacuum interior surface, which is built to have refractory material and hang, to exist On vacuum cover car, Splashproof cover is formed and hung inside vacuum cover using refractory material laying or water cooled steel pipe dish system, treats ladle After being put into vacuum tank, vacuum tank is closed with vacuum cover, as an integral sealing container, is provided with vacuum cover and is fed wire hole, gas Dynamic flap valve is installed on vacuum cover and coordinates with feeding wire hole, feeds wire hole for opening or closing, vacuum cover car is arranged on vacuum On the track of tank both sides, for lifting vacuum cover and Mobile vacuum lid, ladle is facilitated to pass in and out.
Vacuum tank described in the utility model is made of A stations vacuum tank, B station vacuum tanks, and A stations vacuum tank, B stations are true Slack tank coordinates with vacuum cover, and A stations vacuum tank is closed with vacuum cover forms A station vacuum chambers, B stations vacuum tank and vacuum cover Close form B station vacuum chambers, A stations vacuum tank, B stations vacuum tank with vacuum lead system connectivity.
Vacuum lead system described in the utility model includes vacuum pipe, mobile handoff device, main vacuum stop valve Door, air valve, main vacuum cutting-off valve on the vacuum pipe between sealing vacuum chamber device and vacuum pump system, cut by movement Changing device is on the vacuum pipe between sealing vacuum chamber device and main vacuum cutting-off valve, for two vacuum tanks of switching Vacuum refining is handled, and air valve is on the vacuum pipe between main vacuum cutting-off valve and mobile handoff device.When molten steel is true After the completion of empty refining treatment, main vacuum cutting-off valve is closed, air valve is opened, makes the indoor pressure recovery of vacuum to atmospheric pressure.
Pneumatic flap valve described in the utility model includes turnover panel and driving cylinder, and turnover panel, driving cylinder are rotatablely installed On vacuum cover, turnover panel is hinged with driving cylinder.When the completion of vacuum refining treatment, main vacuum cutting-off valve is closed, opens broken sky Valve, makes the indoor pressure recovery of vacuum using compressed air-driven cylinder, open the turnover panel fed in wire hole to atmospheric pressure, start Wire feeder, by the silk fed wire hole and needs are fed into ladle at the top of vacuum cover, until that completes to need feeds silk quantity.
Flue gas ash removal pipe-line system described in the utility model includes A station pneumatics switch valve, flue, B station gas Dynamic switch valve, A station pneumatics switch valve are used for opening or closing the connection between A stations vacuum chamber and dust pelletizing system, B station gas Dynamic switch valve 18 is used for opening or closing the connection between B stations vacuum chamber and dust pelletizing system.When wire feeder is to before ladle wire feeding The pneumatic on-off valve on flue before the vacuum tank for needing to feed silk is opened, until completing to feed silk, waits molten steel to stir several minutes, makes After the silk of feeding is fully reacted with molten steel, vacuum cover is opened, vacuum cover is moved on to standby station by vacuum cover car, is closed on flue Pneumatic on-off valve, then hang away ladle to casting or continuous casting station operation.Silk reacts what is produced with molten steel during feeding silk Flue gas is sucked into dust-extraction unit by flue, is discharged into after dust-extraction unit is handled in air.
The application has the following advantages:Equipment is simple, operates easy, small investment, is safe and reliable to operation, is vacuum refining work Position provides a clean working environment.
Brief description of the drawings
Fig. 1 is the structure diagram of the embodiment of the present application.
Embodiment
Referring to Fig. 1, a kind of vacuum refining furnace of the utility model embodiment feeds the fume dust remover during silk, including close Seal vacuum chamber device, vacuum lead system, flue gas ash removal pipe-line system;Sealing vacuum chamber device passes through vacuum lead system It is connected with vacuum pump system road, sealing vacuum chamber device is filled by vacuum lead system and flue gas ash removal pipe-line system, dedusting Put connection.Dust-extraction unit uses the existing LF stoves deduster of factory or dust remover, without sole investment equipment.
The sealing vacuum chamber device includes A stations vacuum tank 1, ladle 2, Splashproof cover 3, vacuum cover 4, vacuum cover car 6, gas Dynamic flap valve 7, B stations vacuum tank 14, station is handled in A(Fig. 1 left sides)When A stations vacuum tank 1 closed with vacuum cover 4 after conduct One integral sealing container(A station vacuum chambers), the B stations vacuum tank 14 when B handles station(On the right of Fig. 1)Closed with vacuum cover 4 An integral sealing container is used as after upper(B station vacuum chambers), building inside two vacuum tanks and a vacuum cover 4 has fire proofed wood Material, Splashproof cover 3 are formed and hung inside vacuum cover 4 using refractory material laying or water cooled steel pipe dish system, and Pneumatic flap valve 7 is pacified On vacuum cover 4, vacuum cover car 6 is arranged on the track of two vacuum tank both sides, for lifting vacuum cover 4 and Mobile vacuum Lid 4.
Vacuum lead system includes A stations vacuum pipe 8, mobile handoff device 9, connection vacuum pipe 10, air valve 11st, main vacuum cutting-off valve 12, B stations vacuum pipe 13.Mobile handoff device 9 is using all-electric/all-hydraulic/electro-hydraulic mixing three Kind drive pattern, main vacuum cutting-off valve 12 is between sealing vacuum chamber and vacuum pump system, and mobile handoff device 9 is positioned at close Seal between vacuum chamber and main vacuum cutting-off valve 12, for switching the vacuum refining of A stations vacuum tank 1 and B stations vacuum tank 14 Processing.
Threads feeding apparatus includes A stations threads feeding apparatus 5 and B stations threads feeding apparatus 15, and two threads feeding apparatus are identical, includes feeding Silk machine, wire tray frame, conduit and annex, control operation cabinet.Threads feeding apparatus is arranged on the side of corresponding vacuum tank, respectively into ladle Molten steel carry out feeding silk work, wire feeder uses mariages wire feeder or four machines.
Pneumatic flap valve 7 is arranged on the top of vacuum cover 4 and feeds above wire hole, including valve plate and driving cylinder.
Flue gas ash removal pipe-line system includes A station pneumatics switch valve 16, flue 17, B station pneumatics switch valve 18, A Station pneumatic switch valve 16 is arranged on the flue 17 between A stations vacuum pipe 8 and dust pelletizing system, and B station pneumatics are opened Close valve 18 to be arranged on the flue 17 between B stations vacuum pipe 13 and dust pelletizing system, flue 17 is used to connect two The dust-extraction unit of a vacuum tank.A station pneumatics switch valve 16 is opened when A processing stations feed silk work, B station pneumatics is closed and opens Close valve 18;A station pneumatics switch valve 16 is closed when B processing stations feed silk work, opens B station pneumatics switch valve 18.
The present embodiment:Flue gas ash removal method work step during vacuum refining furnace hello silk is as follows:
(1)A processing stations feed silk operation:
A) ladle 2 for filling molten steel is hung in by A stations vacuum tank 1 by the driving in workshop, mobile handoff device 9 is moved to A stations (Fig. 1 states), slowly put down mobile elbow, A stations vacuum tank 1 is passed through A stations vacuum pipe 8 and connection vacuum tube Road 10 is connected with vacuum pump system.
B) vacuum cover car 6 is reached on A stations vacuum tank 1, slowly puts down vacuum cover 4, makes vacuum cover 4 and A stations vacuum tank 1 Closing seam.
C) main vacuum cutting-off valve 12 is opened, closes A station pneumatics switch valve 16, B station pneumatics switch valve 18, is opened true Empty pumping system, carries out vacuum refining processing, the vacuum refining that molten steel is completed by technological requirement is handled to the molten steel of A processing stations.
D) main vacuum cutting-off valve 12 is closed, air valve 11 is opened, sky is carried out brokenly to A station vacuum chambers, makes A station vacuum Room returns to atmospheric pressure, closes down vacuum pump system, closes air valve 11.
E) A station pneumatics switch valve 16 is opened, starts dust-extraction unit, A station vacuum chambers are connected with dust-extraction unit, open gas Dynamic flap valve 7, operation A stations threads feeding apparatus 5, passes through the molten steel in charging aperture addition ladle by technological requirement by the silk of needs In, feed the flue gas that produces during silk be drawn into by flue 17 handled in dust-extraction unit after be discharged into air.
F) after the completion of feeding silk, A station pneumatics switch valve 16 to be closed, lifts vacuum cover 4, vacuum cover car 6 reaches standby station, Ladle 2 is hung into casting station with driving.
(2)B processing stations feed silk operation:
A) ladle 2 for filling molten steel is hung in by B stations vacuum tank 14 by the driving in workshop, mobile handoff device 9 moves
To B stations, mobile elbow is slowly put down, B stations vacuum tank 14 is passed through B stations vacuum pipe 13 and connection vacuum Pipeline 10 is connected with vacuum pump system.
B) vacuum cover car 6 reaches 14 station of B stations vacuum tank, slowly puts down vacuum cover 4, makes vacuum cover 4 and B station vacuum 14 closing seam of tank.
C) main vacuum cutting-off valve 12 is opened, closes A station pneumatics switch valve 16 and B station pneumatics switch valve 18, is opened Vacuum pump system, carries out vacuum refining processing, at the vacuum refining that molten steel is completed by technological requirement to the molten steel of B processing stations Reason.
D) main vacuum cutting-off valve 12 is closed, air valve 11 is opened, sky is carried out brokenly to B station vacuum chambers, makes vacuum chamber
Atmospheric pressure is returned to, closes down vacuum pump system, closes air valve 11.
E) B station pneumatics switch valve 18 is opened, B station vacuum chambers are connected with dust-extraction unit, open Pneumatic flap valve 7, behaviour Make B stations threads feeding apparatus 15, the silk of needs is added in the molten steel in ladle by charging aperture by technological requirement, feeds silk process The flue gas of middle generation is drawn into dust-extraction unit after processing by flue 17 and is discharged into air.
F) after the completion of feeding silk, B station pneumatics switch valve 18 to be closed, lifts vacuum cover 4, vacuum cover car 6 reaches standby station, Ladle 2 is hung into casting station with driving.
Although the utility model is disclosed as above with embodiment, it is not limited to the protection model of the utility model Enclose, any technical staff for being familiar with this technology, the change made in the spirit and scope for do not depart from the utility model and profit Decorations, all should belong to the protection range of the utility model.

Claims (6)

1. a kind of vacuum refining furnace feeds the fume dust remover during silk, including sealing vacuum chamber device, vacuum lead system System, sealing vacuum chamber device are connected with vacuum pump system road by vacuum lead system, are removed it is characterized in that being additionally provided with flue gas Dirt pipe-line system, sealing vacuum chamber device are connected by vacuum lead system with flue gas ash removal pipe-line system, dust-extraction unit.
2. vacuum refining furnace feeds the fume dust remover during silk according to claim 1, it is characterized in that:The sealing is true Empty room device includes vacuum tank, vacuum cover, Splashproof cover, vacuum cover car, Pneumatic flap valve, and vacuum tank coordinates with vacuum cover, vacuum Tank and vacuum lead system connectivity, vacuum tank form the vacuum chamber of an integral sealing after being closed with vacuum cover, in vacuum tank Portion, which is built, refractory material, and vacuum interior surface, which is built, to be had refractory material and hang on vacuum cover car, and Splashproof cover uses refractory material Build by laying bricks or stones or water cooled steel pipe dish system is formed and hung inside vacuum cover, be provided with vacuum cover and feed wire hole, Pneumatic flap valve installation Coordinate on vacuum cover and with feeding wire hole, vacuum cover car is arranged on the track of vacuum tank both sides.
3. vacuum refining furnace feeds the fume dust remover during silk according to claim 2, it is characterized in that:The vacuum tank It is made of A stations vacuum tank, B station vacuum tanks, A stations vacuum tank, B stations vacuum tank coordinate with vacuum cover, A station vacuum Tank is closed with vacuum cover forms A station vacuum chambers, and B stations vacuum tank is closed with vacuum cover forms B station vacuum chambers, and A stations are true Slack tank, B stations vacuum tank with vacuum lead system connectivity.
4. vacuum refining furnace feeds the fume dust remover during silk according to claim 3, it is characterized in that:It is described to vacuumize Pipe-line system includes vacuum pipe, mobile handoff device, main vacuum cutting-off valve, air valve, and main vacuum cutting-off valve is positioned at close Seal on the vacuum pipe between vacuum chamber device and vacuum pump system, mobile handoff device is true with master positioned at sealing vacuum chamber device On vacuum pipe between empty cutting-off valve, vacuum tube of the air valve between main vacuum cutting-off valve and mobile handoff device On road.
5. vacuum refining furnace feeds the fume dust remover during silk according to claim 3, it is characterized in that:The flue gas Dedusting pipe-line system includes A station pneumatics switch valve, flue, B station pneumatic switch valves, and A station pneumatic switch valves are used for The connection between A stations vacuum chamber and dust pelletizing system is opened or closed, B station pneumatics switch valve 18 is used for opening or closing B works Connection between position vacuum chamber and dust pelletizing system.
6. vacuum refining furnace feeds the fume dust remover during silk according to claim 2, it is characterized in that:Described is pneumatic Flap valve includes turnover panel and driving cylinder, and turnover panel, driving cylinder are rotatably installed on vacuum cover, turnover panel and driving cylinder hinge Connect.
CN201721057329.7U 2017-08-23 2017-08-23 Vacuum refining furnace feeds the fume dust remover during silk Active CN207276650U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721057329.7U CN207276650U (en) 2017-08-23 2017-08-23 Vacuum refining furnace feeds the fume dust remover during silk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721057329.7U CN207276650U (en) 2017-08-23 2017-08-23 Vacuum refining furnace feeds the fume dust remover during silk

Publications (1)

Publication Number Publication Date
CN207276650U true CN207276650U (en) 2018-04-27

Family

ID=61984536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721057329.7U Active CN207276650U (en) 2017-08-23 2017-08-23 Vacuum refining furnace feeds the fume dust remover during silk

Country Status (1)

Country Link
CN (1) CN207276650U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109576446A (en) * 2018-12-10 2019-04-05 北京首钢股份有限公司 RH external refining system and dust removal method
CN110273048A (en) * 2019-06-11 2019-09-24 首钢京唐钢铁联合有限责任公司 Online processing position wire feeding device and method for VD furnace
CN112375875A (en) * 2020-10-26 2021-02-19 宝钢工程技术集团有限公司 Vacuum refining device for molten steel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109576446A (en) * 2018-12-10 2019-04-05 北京首钢股份有限公司 RH external refining system and dust removal method
CN109576446B (en) * 2018-12-10 2021-03-26 北京首钢股份有限公司 RH external refining system and dust removal method
CN110273048A (en) * 2019-06-11 2019-09-24 首钢京唐钢铁联合有限责任公司 Online processing position wire feeding device and method for VD furnace
CN112375875A (en) * 2020-10-26 2021-02-19 宝钢工程技术集团有限公司 Vacuum refining device for molten steel

Similar Documents

Publication Publication Date Title
CN107447077A (en) Fume dust remover and its dust removal method during vacuum refining furnace hello silk
CN207276650U (en) Vacuum refining furnace feeds the fume dust remover during silk
CN205382186U (en) Outer molten steel dephosphorization processing system of stove
CN203421186U (en) Dust outlet switch mechanism of dust remover
CN104846151A (en) Vacuum tank vacuumizing method and liquid steel vacuum refining method thereof
CN205556759U (en) Cleaning type continuous type nitrogen carbon oxygen composite treatment system
CN214088244U (en) Environment-friendly smelting device convenient for dust removal
CN104846153A (en) Vacuum refining method for molten steel by using two-tank single-cover type VD refining furnace
CN203923261U (en) Alloy adding device of non-vacuum induction furnace
CN204404800U (en) One is sealed full-automatic tungsten powder shifting device under nitrogen protection
CN204661757U (en) A kind of double-pot type steel-making VD furnace structure
CN210176900U (en) Argon sealing device for argon sealing refined steel
CN207646233U (en) Smoke collecting device of converter slag ladle tipping device
CN205505744U (en) Liftable industrial furnace of dust absorption bell mechanism and applied this mechanism
CN207537473U (en) A kind of blast furnace taphole Environmental-protecting dust-removing operating room
CN206638031U (en) A kind of new fuming furnace
CN206736297U (en) A kind of vacuum cycle smelting device, medium frequency induction melting furnace system
CN206477007U (en) A kind of LF stoves feed silk station dust arrester
CN112824543A (en) Bell-less top charging equipment feeding part with good sealing performance and easy maintenance
CN206276156U (en) Mobile exhaust fume collecting hood flue gas pipeline and smoke eliminator bindiny mechanism
CN219311596U (en) Dust removing and noise reducing device for tundish repairing operation area
CN211394595U (en) Flux blowing device for smelting furnace
CN211261823U (en) Dust collector for intermediate frequency furnace
CN204385264U (en) A kind of novel reductive jar slag discharging device
CN219560861U (en) Movable dust hood for molten iron ladle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant