CN207273541U - Prestressing force mortar Decorative hanging board molding die - Google Patents

Prestressing force mortar Decorative hanging board molding die Download PDF

Info

Publication number
CN207273541U
CN207273541U CN201721113708.3U CN201721113708U CN207273541U CN 207273541 U CN207273541 U CN 207273541U CN 201721113708 U CN201721113708 U CN 201721113708U CN 207273541 U CN207273541 U CN 207273541U
Authority
CN
China
Prior art keywords
prestressing force
steel
hole
mould
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721113708.3U
Other languages
Chinese (zh)
Inventor
毛生莲
周阿龙
刘金升
姜俊
方兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201721113708.3U priority Critical patent/CN207273541U/en
Application granted granted Critical
Publication of CN207273541U publication Critical patent/CN207273541U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model discloses a kind of prestressing force mortar Decorative hanging board molding die, including the steel platform mould with upper table surface, if dry forming side mould and compressor wire tensioning equipment on steel platform mould upper table surface, the shaping side mould is by long cheek board, short side template surrounds the hanging plate die cavity of rectangle, if dry forming side mould is arranged in a row along steel platform mould upper table surface, and the long cheek board is parallel with steel platform mould length direction, the short side template is parallel with steel platform mould width, the long cheek board and short side template are equipped with the steel wire through hole passed through for compressor wire, pre-buried back of the body bolt is placed with the hanging plate die cavity, the pre-buried back of the body bolt is vacantly positioned by pre-buried back of the body bolt location structure.The utility model can once be molded polylith prestressing force mortar Decorative hanging board, can also once complete the tensioning of compressor wire in polylith prestressing force mortar Decorative hanging board.

Description

Prestressing force mortar Decorative hanging board molding die
Technical field
It the utility model is related to technical field of building construction, and in particular to a kind of prestressing force mortar Decorative hanging board shaping mould Tool.
Background technology
At present, as the development of Building technology, the use of concrete mortar Decorative hanging board curtain wall are more and more extensive.Prestressing force Mortar Decorative hanging board is to main steel bar stress therein, implements tensioning in advance and produces tension, hanging plate is produced pressure in advance should Power.Since the area of curtain wall is increasing, the size of monolithic Decorative hanging board is up to 3.0m*2.0m*0.03m, this is answered to pre- The shaping of power mortar Decorative hanging board brings certain difficulty, and conventional molding die shaping efficiency is relatively low, meets not The shaping demand of high-volume Decorative hanging board.
Utility model content
Technical problem to be solved in the utility model is just to provide a kind of prestressing force mortar Decorative hanging board molding die, carries High shaping efficiency and Forming Quality.
In order to solve the above technical problems, the utility model adopts the following technical solution:Prestressing force mortar Decorative hanging board is molded Mould, if including the steel platform mould with upper table surface, dry forming side mould and prestress steel on steel platform mould upper table surface Silk tensioning equipment, the shaping side mould is surrounded the hanging plate die cavity of rectangle by long cheek board, short side template, if dry forming side mould It is arranged in a row along steel platform mould upper table surface, and the long cheek board is parallel with steel platform mould length direction, the short side template Parallel with steel platform mould width, the long cheek board and short side template are equipped with the steel wire passed through for compressor wire and lead to Hole, is placed with pre-buried back of the body bolt in the hanging plate die cavity, the pre-buried back of the body bolt is vacantly positioned by pre-buried back of the body bolt location structure, described pre- Burying back of the body bolt location structure includes supporting rod and the wing bar along the distribution of supporting rod length direction, and the wing bar is symmetricly set on two-by-two On supporting rod, the both ends of the supporting rod are supported on shaping side mould, and the pre-buried back of the body bolt is connected by screw with wing bar, described Pre-buried back of the body bolt is equipped with threaded hole, and the wing bar is equipped with connecting hole, and the screw is threadedly coupled through connecting hole with threaded hole, described Pre-buried back of the body bolt is equipped with the steel wire via passed through for compressor wire, and the compressor wire tensioning equipment includes being arranged on a row The fixed beam being molded on the outside of the mould of side, corresponds to compressor wire in the fixed beam and is equipped with fixed beam through hole, wherein a long side is consolidated The outside of Ding Liang and a short brink fixed beam is equipped with the wire clamp being connected with the first end of compressor wire, in addition a long side The outside of fixed beam and a short brink fixed beam is equipped with walking beam side by side, and the second end of the walking beam and tensioning connecting screw connects Connect, the first end of the tensioning connecting screw is connected after passing through fixed beam through hole with the second end of compressor wire, the tensioning The locking nut by tensioning connecting screw and fixed beam locking is connected with connecting screw, the walking beam is connected with driving activity Jack of the beam away from fixed beam.
Preferably, the long cheek board and short side template are made by angle steel, and ribs is distributed with angle steel along its length, Connected between the long cheek board and short side template by connection sheet.
Preferably, the steel wire through hole on the long cheek board is made of upper row's steel wire through hole and lower row's steel wire through hole, described Upper row's steel wire through hole and lower row's steel wire through hole are staggered up and down along long side template length direction, and with the steel wire in short side template Through hole staggers up and down.
Preferably, the second end of the compressor wire is equipped with pier nose portion, and the first end of the tensioning connecting screw passes through Pier nose wiring connector is connected with pier nose portion.
Preferably, the walking beam is equipped with the walking beam through hole passed through for tensioning connecting screw, the tensioning connecting screw Tensioning nut is connected with the outside of walking beam.
Preferably, the jack is equipped with displacement sensor.
Preferably, it is corresponding that at least two jack, and at least two jack and same liquid are equipped with per side walking beam Press pump station connects.
Preferably, the supporting rod is square steel tube, and the wing bar is angle steel, and the wing bar is welded and fixed with supporting rod.
Preferably, the bottom of the pre-buried back of the body bolt is equipped with peripheral flange.
The utility model uses above-mentioned technical proposal, if dry forming side mould is arranged in a row along steel platform mould upper table surface, one It is secondary to be molded polylith prestressing force mortar Decorative hanging board;And vertically and horizontally compressor wire respectively uses one group of compressor wire tensioning Device, two groups of compressor wire tensioning equipments can work at the same time, and can also once complete polylith prestressing force mortar Decorative hanging board The tensioning of middle compressor wire.Therefore, the utility model greatly improves prestressing force mortar Decorative hanging board shaping efficiency, together When, the prestressing force of compressor wire can also obtain control more accurately and consistently, ensure that Forming Quality.
Brief description of the drawings
The utility model is further described with reference to the accompanying drawings and detailed description:
Fig. 1 is the top view of prestressing force mortar Decorative hanging board molding die;
Fig. 2 is the structure diagram of prestressing force mortar Decorative hanging board;
Fig. 3 is the structure diagram of pre-buried back of the body bolt;
Fig. 4 is the structure diagram of side mould template;
Fig. 5 is the structure diagram of pre-buried back of the body bolt location structure;
Fig. 6 is the structure diagram of compressor wire tensioning equipment.
Embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.The description only actually at least one exemplary embodiment is illustrative to be never used as to this practicality below New and its application or any restrictions used.Based on the embodiment in the utility model, those of ordinary skill in the art are not having All other embodiments obtained under the premise of creative work are made, shall fall within the protection scope of the present invention.
As shown in Figures 2 and 3, prestressing force mortar Decorative hanging board 1 is pre-formed by high-strength light microdilatancy mortar, and pre- The compressor wire for intersecting distribute as net shape in length and breadth is equipped with stress mortar Decorative hanging board.Indentation through Overheating Treatment in advance should Power steel wire (diameter 4mm), among being evenly distributed in plate in length and breadth with 10cm spacing, average every steel wire is anti-with 500 kilograms Drawing ability.Prestressing force mortar Decorative hanging board 1 is fixed on the metal joist in fabric structure, in order to facilitate the installation of the prestressing force Mortar Decorative hanging board 1, pre-buried back of the body bolt 11 is embedded with prestressing force mortar Decorative hanging board, and the pre-buried back of the body bolt 11 is equipped with and supplies prestressing force The steel wire via 112 that steel wire passes through and the threaded hole 113 for installing connection.Pre-buried back of the body bolt 11 and the company of compressor wire Connect, the bond strength of pre-buried back of the body bolt 11 and prestressing force mortar Decorative hanging board 1 can be improved, in addition, the bottom of the pre-buried back of the body bolt Equipped with peripheral flange 111, it can further increase pre-buried back of the body bolt 11 and the combination power of prestressing force mortar Decorative hanging board 1.
As shown in Figure 1 and Figure 4, prestressing force mortar Decorative hanging board molding die, including the steel platform mould 2 with upper table surface, If dry forming side mould 21 and compressor wire tensioning equipment on steel platform mould upper table surface, the shaping side mould 21 is by growing Cheek board, short side template surround the hanging plate die cavity of rectangle.Here, it will be appreciated by persons skilled in the art that long cheek board Length is not necessarily longer than short side template, for example, it is also possible to it is equal, to mold the prestressing force mortar Decorative hanging board of square, That is, the specific size of long cheek board and short side template can be adjusted as needed.
In order to by it is a set of can two directions tension (vertical and horizontal) compressor wire tensioning equipment, carry out polylith prestressing force The tensioning of compressor wire in mortar Decorative hanging board 1, to improve shaping efficiency.If dry forming side mould 21 is along steel platform mould Table top is arranged in a row, and steel platform mould 2 is in rectangular configuration, and the long cheek board is parallel with 2 length direction of steel platform mould, described short Cheek board is parallel with 2 width of steel platform mould.
Wherein, as shown in figure 4, the long cheek board and short side template are made by angle steel 211, steel can be weldingly fixed on On platform mould upper table surface.Using the angle steel of 30mm × 30mm, brill is set according to the vertical side of angle steel that is arranged in of compressor wire Hole, forms the steel wire through hole 2111 passed through for compressor wire, aperture 6mm, slightly larger than compressor wire diameter.211 edge of angle steel Ribs 212 is distributed with length direction, with enhancing structure intensity.Connected between the long cheek board and short side template by connection sheet Connect, connection sheet is L-shaped, and two sides are fixed with long cheek board and short side template respectively.It will be appreciated by persons skilled in the art that Specific fixed form can use bolt or welding.
Further, compressor wire 12, which vertically and horizontally interlocks, passes through hanging plate die cavity, on the long cheek board and short side template It is equipped with the steel wire through hole 2111 passed through for compressor wire.Steel wire through hole on the long cheek board by upper row's steel wire through hole and Lower row's steel wire through hole composition.Upper row's steel wire via height is identical, and lower row's steel wire via height is identical, and upper row's steel wire via height is high In lower row's steel wire via height.Upper row's steel wire through hole and lower row's steel wire through hole are staggeredly set up and down along long side template length direction Put (in two adjacent wires through holes 2111, one is upper row's steel wire through hole, and one is lower row's steel wire through hole), and with short side template Steel wire through hole up and down stagger.Above-mentioned design is for the setting phase with compressor wire 12 in prestressing force mortar Decorative hanging board 1 It is corresponding, so that compressor wire 12 is evenly distributed among hanging plate in length and breadth with 10cm spacing.
In addition, be placed with pre-buried back of the body bolt 11 in hanging plate die cavity, the specific location of pre-buried back of the body bolt 11 and set quantity according to Design requirement is distributed.Because after pre-buried back of the body bolt 11 is molded with prestressing force mortar Decorative hanging board 1, apart from prestressing force mortar Decorative hanging board There is certain distance in 1 front, therefore pre-buried back of the body bolt 11 is vacantly positioned by pre-buried back of the body bolt location structure 22.
As shown in figure 5, pre-buried back of the body bolt location structure 22 includes supporting rod 221 and is distributed along 221 length direction of supporting rod Wing bar 222, the wing bar 222 is symmetricly set on supporting rod 221 two-by-two, and the both ends of the supporting rod are supported on shaping side mould Upper (on long cheek board or short side template), the pre-buried back of the body bolt 11 are connected by screw with wing bar 222, and the wing bar 222 is set There is connecting hole 2221, screw is threadedly coupled through connecting hole with threaded hole.In this way, can by one group of pre-buried back of the body bolt location structure 22 To complete the positioning of multiple pre-buried back of the body bolt at the same time, after the shaping of prestressing force mortar Decorative hanging board 1, screw is backed out, by pre-buried back of the body bolt Location structure 22 is separated with pre-buried back of the body bolt 11, you can is removed pre-buried back of the body bolt location structure 22, is prepared the demoulding.
In the present embodiment, the supporting rod 221 is square steel tube, and the wing bar 222 is angle steel, the wing bar 222 and branch Strut 221 is welded and fixed.Pre-buried back of the body bolt 11 is made of 304 stainless steels, has good rust-proof effect.
As shown in fig. 6, compressor wire tensioning equipment is including lining up the fixed beam 23 on the outside of the mould of type side, institute arranged on described one State and compressor wire 12 is corresponded in fixed beam 23 be equipped with fixed beam through hole.Fixed beam welds to form angle steel using the steel plate of 8mm thickness Form, rigidity requirement during to meet tensioning, in the longitudinal direction, welds reinforced steel floor at a certain distance.
Wherein the outside of a long side fixed beam and a short brink fixed beam is equipped with and is connected with the first end of compressor wire Wire clamp 121, in addition the outside of a long side fixed beam and a short brink fixed beam be equipped with walking beam 24, the work side by side Dynamic beam 24 is connected with the second end of tensioning connecting screw 25, and the first end of the tensioning connecting screw 25 is through after fixed beam through hole It is connected with the second end of compressor wire 12.Wire clamp 121 includes casing and locking cone, locking cone and compressor wire First end is fixed, and the first end of compressor wire is sleeved on outside casing, and compressor wire 12 is moved to second end, locking cone and casing Endoporus is locked, and casing is acted against in fixed beam 23, therefore fixes the first end of compressor wire 12.
The locking nut for locking tensioning connecting screw 25 and fixed beam 23 is connected with the tensioning connecting screw 25 231, the walking beam 24 is connected with driving jack 26 of the walking beam 24 away from fixed beam 23.Jack 26 drives walking beam 24 Mobile, walking beam 24 drives 12 tensioning of compressor wire, after tensioning in place, is locked, maintained pre- by locking nut 231 Prestressing force after 12 tensioning of stress wire.
The second end of the compressor wire 12 is equipped with pier nose portion, and the first end of the tensioning connecting screw passes through pier nose steel Silk connector 251 is connected with pier nose portion.Being equipped with pier nose wiring connector can realize that the tensioning of other pedestals recycles.
The walking beam 24 is equipped with the walking beam through hole passed through for tensioning connecting screw 25, and the tensioning connecting screw 25 exists The outside of walking beam 24 is connected with tensioning nut 232, allows walking beam 24 to drive tensioning connecting screw 25 to move.
The jack 26 is equipped with displacement sensor.It is corresponding to be equipped with least two jack per side walking beam.In this implementation In example, short brink is equipped with two jack, and two jack 26 are arranged on short brink both sides.Since long side is longer, three are equipped with A jack, is respectively arranged on middle and both sides, moreover, at least two jack per side are connected with same hydraulic power unit 27, by Hydraulic pump 27 controls pulling force and the shift position of jack, and after being moved into place, displacement sensor amount of movement is shown by display.
After being anchored using pier nose wiring connector 251 to the pier nose portion of compressor wire 12, compressor wire 12 is first single The 10%-20% of control stress for prestressing is adjusted to torque spanner, it is then overall to control jack 26 synchronous with hydraulic power unit 27 Tensioning is finally pinned to proof stress with locking nut 231.Hydraulic power unit 27 is equipped with the display being connected with displacement sensor, Can real-time display stretching force and stretch value, realize dual control, integral tension to proof stress.
In addition to above preferred embodiment, the utility model also has other embodiments, and those skilled in the art can root Made various changes and modifications according to the utility model, without departing from the spirit of the utility model, the utility model should all be belonged to Scope as defined in the claims.

Claims (9)

1. prestressing force mortar Decorative hanging board molding die, it is characterised in that:Put down including the steel platform mould with upper table surface, arranged on steel If dry forming side mould and compressor wire tensioning equipment on platform mould upper table surface, the shaping side mould is by long cheek board, short side Template surrounds the hanging plate die cavity of rectangle, if dry forming side mould is arranged in a row along steel platform mould upper table surface, and the long side Template is parallel with steel platform mould length direction, and the short side template is parallel with steel platform mould width, the long cheek board and Short side template is equipped with the steel wire through hole passed through for compressor wire, and pre-buried back of the body bolt is placed with the hanging plate die cavity, described pre- Bury back of the body bolt vacantly to be positioned by pre-buried back of the body bolt location structure, the pre-buried back of the body bolt location structure includes supporting rod and grows along supporting rod The wing bar of directional spreding is spent, the wing bar is symmetricly set on supporting rod two-by-two, and the both ends of the supporting rod are supported on shaping side On mould, the pre-buried back of the body bolt is connected by screw with wing bar, and the pre-buried back of the body bolt is equipped with threaded hole, and the wing bar is equipped with connection Hole, the screw are threadedly coupled through connecting hole with threaded hole, and the pre-buried back of the body bolt is equipped with the steel wire passed through for compressor wire Via, the compressor wire tensioning equipment include being arranged on the fixed beam on the outside of shaping side mould, correspond in the fixed beam and in advance should Power steel wire is equipped with fixed beam through hole, wherein the outside of a long side fixed beam and a short brink fixed beam is equipped with and compressor wire First end connection wire clamp, in addition the outside of a long side fixed beam and a short brink fixed beam side by side be equipped with activity Beam, the walking beam are connected with the second end of tensioning connecting screw, and the first end of the tensioning connecting screw is led to through fixed beam The second end of Kong Houyu compressor wires connects, and is connected with the tensioning connecting screw and locks tensioning connecting screw and fixed beam Tight locking nut, the walking beam are connected with driving jack of the walking beam away from fixed beam.
2. prestressing force mortar Decorative hanging board molding die according to claim 1, it is characterised in that:The long cheek board and Short side template is made by angle steel, and ribs is distributed with angle steel along its length, leads between the long cheek board and short side template Cross connection sheet connection.
3. prestressing force mortar Decorative hanging board molding die according to claim 2, it is characterised in that:On the long cheek board Steel wire through hole be made of upper row's steel wire through hole and lower row's steel wire through hole, upper row's steel wire through hole and lower row's steel wire through hole are along long Cheek board length direction is staggered up and down, and staggers up and down with the steel wire through hole in short side template.
4. prestressing force mortar Decorative hanging board molding die according to claim 1, it is characterised in that:The compressor wire Second end be equipped with pier nose portion, the first end of the tensioning connecting screw is connected by pier nose wiring connector with pier nose portion.
5. prestressing force mortar Decorative hanging board molding die according to claim 1, it is characterised in that:The walking beam is equipped with The walking beam through hole passed through for tensioning connecting screw, the tensioning connecting screw are connected with tensioning nut on the outside of walking beam.
6. prestressing force mortar Decorative hanging board molding die according to claim 1, it is characterised in that:The jack is equipped with Displacement sensor.
7. prestressing force mortar Decorative hanging board molding die according to claim 1, it is characterised in that:Corresponding every side walking beam Equipped with least two jack, and at least two jack is connected with same hydraulic power unit.
8. prestressing force mortar Decorative hanging board molding die according to claim 1, it is characterised in that:The supporting rod is side Steel pipe, the wing bar are angle steel, and the wing bar is welded and fixed with supporting rod.
9. prestressing force mortar Decorative hanging board molding die according to claim 1, it is characterised in that:The pre-buried back of the body bolt Bottom is equipped with peripheral flange.
CN201721113708.3U 2017-09-01 2017-09-01 Prestressing force mortar Decorative hanging board molding die Expired - Fee Related CN207273541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721113708.3U CN207273541U (en) 2017-09-01 2017-09-01 Prestressing force mortar Decorative hanging board molding die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721113708.3U CN207273541U (en) 2017-09-01 2017-09-01 Prestressing force mortar Decorative hanging board molding die

Publications (1)

Publication Number Publication Date
CN207273541U true CN207273541U (en) 2018-04-27

Family

ID=61989338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721113708.3U Expired - Fee Related CN207273541U (en) 2017-09-01 2017-09-01 Prestressing force mortar Decorative hanging board molding die

Country Status (1)

Country Link
CN (1) CN207273541U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107498703A (en) * 2017-09-01 2017-12-22 中天建设集团有限公司 The two-way automatic Tensioning mould of prestressing force mortar Decorative hanging board
CN109397523A (en) * 2018-12-25 2019-03-01 郴州远大住宅工业有限公司 A kind of deformed bar tensioning tooling and its application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107498703A (en) * 2017-09-01 2017-12-22 中天建设集团有限公司 The two-way automatic Tensioning mould of prestressing force mortar Decorative hanging board
CN109397523A (en) * 2018-12-25 2019-03-01 郴州远大住宅工业有限公司 A kind of deformed bar tensioning tooling and its application method

Similar Documents

Publication Publication Date Title
CN207267290U (en) Compressor wire tensioning equipment
CN106088573A (en) A kind of assembled stretches mould bases
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN207273541U (en) Prestressing force mortar Decorative hanging board molding die
CN107498703A (en) The two-way automatic Tensioning mould of prestressing force mortar Decorative hanging board
CN209817430U (en) Template supporting structure of tower crane reserved hole
CN205955173U (en) Modular link wall spare subassembly
CN205578009U (en) Two lined steel bones RACK in tunnel equipment of being under construction
CN211974342U (en) Floor slab reserved hole device with embedded bar planting holes
CN211421838U (en) Beam plate post-cast strip pouring system
CN217151235U (en) Beam bottom template supporting system
CN207206718U (en) The pre-buried back of the body bolt location structure of prestressing force hanging plate
CN109514709B (en) Adjusting system of special-shaped beam combined template
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN114250965A (en) Climbing frame wall-attaching device for variable cross-section construction of high-rise building and construction method thereof
CN213268878U (en) Aluminum-wood combination device for adjusting layer height
CN211285276U (en) Assembly type continuous rigid frame 0# block bracket
CN210452649U (en) Corrugated plate auxiliary supporting device
CN205822767U (en) A kind of assembled stretches mould bases
CN202519960U (en) Overhung type scaffold
CN207296412U (en) Wall adjusting mechanism
CN104120805B (en) A kind of concrete is built a wall the construction method of body and structure
CN109440990A (en) A kind of light steel composite floor of assembled and preparation method thereof
CN218438241U (en) Hyperboloid arch passageway template
CN215107481U (en) Prefabricated outer wall auxiliary positioning combined member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

Termination date: 20180901

CF01 Termination of patent right due to non-payment of annual fee