CN207268177U - A kind of extruding trolley of the first branch bearing capacity in tunnel - Google Patents

A kind of extruding trolley of the first branch bearing capacity in tunnel Download PDF

Info

Publication number
CN207268177U
CN207268177U CN201721046980.4U CN201721046980U CN207268177U CN 207268177 U CN207268177 U CN 207268177U CN 201721046980 U CN201721046980 U CN 201721046980U CN 207268177 U CN207268177 U CN 207268177U
Authority
CN
China
Prior art keywords
trolley
extruding
branch
tunnel
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721046980.4U
Other languages
Chinese (zh)
Inventor
温磊
孟祥友
景彦儒
周冉
季礼
李琛琛
张俞
闫占其
冯新兆
孙爱田
刘艳伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Beijing MTR Construction Administration Corp
Original Assignee
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Beijing MTR Construction Administration Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Beijing Railway Construction Co of China Railway Sixth Group Co Ltd, Beijing MTR Construction Administration Corp filed Critical China Railway Sixth Group Co Ltd
Priority to CN201721046980.4U priority Critical patent/CN207268177U/en
Application granted granted Critical
Publication of CN207268177U publication Critical patent/CN207268177U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of extruding trolley of the first branch bearing capacity in tunnel belongs to constructing tunnel field.Extruding trolley includes:More vertical H profile steels (6) are welded on trolley, traverse transverse direction H profile steel (5) in vertical H profile steel, 4 jack (4) is positioned in horizontal H profile steel (5), jack (4) top surface withstands steel jacking (3), and rubber pad (2) is lined between steel jacking and first branch face.Each component of trolley, which will be extruded, using gantry crane is hung to underground;Each component of trolley will be extruded and be transported to pilot tunnel test section;Lay railway sleepers and rail in pilot tunnel inverted arch, each parts assembly shaping of trolley will be extruded;Squeeze test is carried out to vault, extruding force adds jack to realize by steel jacking;Extrude trolley dismounting, transport.Extruding trolley is intended to the stressing conditions of the lining assembling machine support boots of simulation two, when grasping using two lining assembling machines progress tunnel double-linings assembly, whether the extruding force that first branch structure is subject to meets needs of constructing, while understands the stress deformation situation of just branch, so as to the construction of follow-up two lining assembling machines.

Description

A kind of extruding trolley of the first branch bearing capacity in tunnel
Technical field
First branch bearing capacity is required when the utility model belongs to constructing tunnel, it is to be understood that used during first branch stressing conditions A kind of instrument.
Background technology
With the rapidly propulsion of Urbanization in China, urban population sharp increase, in inner city, the population of work is high Degree is concentrated, and city is slept in the outer suburbs generally as the auxiliary of inner city, this results in the trip requirements for a large amount of long ranges occur.Cause The top priority of this China's urban transportation is to construct metropolitan integrative traffic system, and subway be future city railway and highway system can not or Scarce part, two lining construction usage assembly trolleys are more efficient, the duration is shorter, construction cost is lower.
The assembled trolley needs of two linings are horizontal to two bushing pipe pieces at the same time using supportting stretcher for boot and shoe in first branch and applying vertical pretightning force Extruding force is provided to ensure that the section of jurisdiction of adjacent ring is closely connected, reaches waterproof requirement.But vertical pretightning force is excessive may cause just to prop up Destruction, pretightning force is too small, can not provide enough extruding forces.Therefore need in advance to test first branch bearing capacity, find Most suitable parameter.
The content of the invention
To solve the above-mentioned problems, the purpose of this utility model is to provide one kind to test first branch bearing capacity Construction equipment.
The extruding trolley of the first branch bearing capacity in a kind of tunnel, it is characterised in that more vertical H profile steels, vertical H are welded on trolley Traverse transverse direction H profile steel on shaped steel, 4 jack are positioned in horizontal H profile steel, and jack top surface withstands steel jacking, steel jacking with Rubber pad is lined between first branch face.
Using the test method of branch bearing capacity at the beginning of the tunnel of the extruding trolley, it is characterised in that comprise the following steps:
1) each component of trolley will be extruded using gantry crane and be hung to underground;
2) each component of trolley will be extruded and be transported to pilot tunnel test section;
3) lay railway sleepers and rail in pilot tunnel inverted arch, each parts assembly shaping of trolley will be extruded;
4) squeeze test is carried out to vault, extruding force adds jack to realize by steel jacking;
5) trolley dismounting, transport are extruded.
Brief description of the drawings
Fig. 1 is extruding trolley structure elevation.
Fig. 2 is extruding trolley structure profile.
Fig. 3 is extruding trolley structure top view.
The meaning of digital representation in figure:
1st, first branch face
2nd, rubber pad
3rd, steel jacking
4th, jack
5th, horizontal H profile steel
6th, vertical H profile steel
7th, trolley
8th, rail
9th, sleeper
Embodiment
Branch bearing capacity test instrument at the beginning of tunnel provided by the utility model is carried out with specific embodiment below in conjunction with the accompanying drawings Explanation.
Now illustrated by taking certain engineering test as an example:The test site is located in certain subway pioneer bore, it is contemplated that tunnel First branch vault is behind there may be gap and the mixed leakiness situation of spray, therefore carried out for this most unfavorable combination using trolley is extruded Squeeze test:
1) vault absolute altitude initial value is measured;
2) in-site installation extruding trolley:Trolley each several part component, hydraulic oil pump will be extruded with electric three-wheel and other are supporting Facility is transported to work surface, and sleeper 9 and rail 8 are laid with pilot tunnel inverted arch, by extruding trolley each several part component assembly shaping, trolley 7 It is placed on rail 8;8 vertical H profile steels 6 are welded on trolley, 5,4 jack 4 of traverse transverse direction H profile steel are placed in vertical H profile steel In in horizontal H profile steel 5,4 top surface of jack withstands steel jacking 3, and rubber pad 2 is padded between steel jacking (support boots) and first branch face, avoids damaging Bad just branch face 1.
3) installation is complete for extruding trolley, after being placed into specified testing position, uniformly applies pressure to 4 jack 4 of trolley Power, so that rubber pad 2 and first branch face 1 are closely connected above support boots, oil pump initial press 5MPa, and stablize 2min, measure vault absolute altitude Shift value;
4) jack point level Four loads every grade and is loaded onto stable oil pressure 2min after design load, and measures vault absolute altitude position step by step Shifting value, observes first branch face due to abnormal (deformation or crack) step by step;
5) hierarchical loading design load such as following table:
6) squeeze test is carried out to the first branch vault of diverse location, and has obtained corresponding just branch deformation data.
Squeeze test has been carried out to the first branch vault of 2 diverse locations, and has obtained corresponding just branch deformation data.From examination Testing in result can obtain to draw a conclusion:
1) just branch vault maximum distortion under the load for bearing 138t is 8mm to small pilot tunnel, is deformed in allowed band, far away Reach structural failure degree;
2) the small pilot tunnel support boots that just branch vault converts under the load for bearing 138t are 0.55MPa to the pressure in first branch face, Consider just branch face irregularity, support boots cannot be completely closely connected with first branch face, and local pressure can be slightly larger than 0.55MPa;
3) just locally there is stone peeling phenomenon in branch face during hierarchical loading, and predominantly just branch face is uneven for analysis reason It is suitable locally to have gap with support boots, cause load gradually increase during just branch surface stone be extruded peeling, can determine that institute's loading Carry smaller on the influence of first branch structure.

Claims (1)

1. the extruding trolley of the first branch bearing capacity in a kind of tunnel, it is characterised in that more vertical H profile steels (6) are welded on trolley, vertically Traverse transverse direction H profile steel (5) in H profile steel, 4 jack (4) are positioned in horizontal H profile steel (5), and jack (4) top surface withstands steel Jacking (3), is lined with rubber pad (2) between steel jacking and first branch face.
CN201721046980.4U 2017-08-21 2017-08-21 A kind of extruding trolley of the first branch bearing capacity in tunnel Expired - Fee Related CN207268177U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721046980.4U CN207268177U (en) 2017-08-21 2017-08-21 A kind of extruding trolley of the first branch bearing capacity in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721046980.4U CN207268177U (en) 2017-08-21 2017-08-21 A kind of extruding trolley of the first branch bearing capacity in tunnel

Publications (1)

Publication Number Publication Date
CN207268177U true CN207268177U (en) 2018-04-24

Family

ID=61960287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721046980.4U Expired - Fee Related CN207268177U (en) 2017-08-21 2017-08-21 A kind of extruding trolley of the first branch bearing capacity in tunnel

Country Status (1)

Country Link
CN (1) CN207268177U (en)

Similar Documents

Publication Publication Date Title
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN100526000C (en) Combination method mounting technique for ultra-large type steel converter
CN108019076A (en) Large-size rebar concrete silo construction method and the device for conical shell construction
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN203947771U (en) A kind of Bailey beam pendent form support system
CN104652293B (en) A kind of Cable-Stayed Bridge Structure for reinforcing PSC Continuous Box Girder Bridge and construction method
CN109520851B (en) Segment staggering test method
CN203794498U (en) Built-in self-elevating tower crane device
CN103572763B (en) Large-span steel supports pattern foundation pit supporting structure Demolition Construction method
CN106368714A (en) Tire type automatic lifting assembly rack for tunnel excavation construction
CN105201074A (en) Replacing support seat for steel structure sliding construction and construction method
KR101322251B1 (en) Dismantling method of bottom section of blast furnace
CN108222978A (en) A kind of metro shield driving freezes synchronization job belt stress stent system and installation method with service channel
CN201635410U (en) Temporary reinforcing device for concrete structure for bearing hoisting construction load
CN107503772A (en) A kind of first branch bearing capacity test method in tunnel
CN210396748U (en) Shield tunnel repairing and reinforcing platform
CN109629449B (en) Mounting and positioning support and alignment method for steel-concrete combined section of arch foot of steel box arch bridge
CN207268177U (en) A kind of extruding trolley of the first branch bearing capacity in tunnel
CN104652244A (en) Suspension bridge structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN103726449B (en) Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof
CN103382842B (en) A kind of construction method preventing push-bench and tube coupling from rotating
CN106760565B (en) A kind of automatic method for discharging construction of structure
CN104989427A (en) Tunnel construction lining amount determination device and construction method thereof
CN105382784B (en) Change the frock of mixed iron blast base and roller-way
CN106930334A (en) A kind of method that pile cover is substituted in foundation pile static test

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180424