CN207268025U CN201721108677.2U CN201721108677U CN207268025U CN 207268025 U CN207268025 U CN 207268025U CN 201721108677 U CN201721108677 U CN 201721108677U CN 207268025 U CN207268025 U CN 207268025U
Authority
CN
China
Prior art keywords
angle bar
connecting device
agent structure
flexible connecting
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721108677.2U
Other languages
Chinese (zh)
Inventor
潘溢滔
丁炳国
陈洪帅
池敏华
张明明
吴昊
彭伟炯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201721108677.2U priority Critical patent/CN207268025U/en
Application granted granted Critical
Publication of CN207268025U publication Critical patent/CN207268025U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

It the utility model is related to a kind of flexible connecting device, between the constructional column filled in wall and the agent structure for bearing dynamic load, the wall trend for filling wall is length direction, two angle bar are oppositely arranged along its length at the bottom face constructional column top surface of the agent structure, the horizontal part of the angle bar and iron plate and agent structure Joint, the vertical portion of angle bar is close to the outside of constructional column, gap is reserved between the horizontal part and constructional column top surface of the angle bar, flexible material is filled with the gap.The vibration that the utility model can bear dynamic load structure for top provides vertical deformation space, and superstructure can be absorbed because bearing vibration of the dynamic load to filled wall transmission, it effectively prevent superstructure and earthquake produced to wall in vibration processes and causes crack to generate.

Description

A kind of flexible connecting device
Technical field
A kind of flexible connecting device is the utility model is related to, is referred in particular to, for the completely self-contained filling wall of foundation structure Body and the flexible connecting device between dynamic load agent structure is born, belonged between two kinds of different structure types of bearing load property Connection construction technical field.
Background technology
Nowadays, in Large-sized Communication multi-purpose project, structural system becomes increasingly complex, to the requirement using function also increasingly Height, since bearing load property is different and foundation structure is completely independent, the difference of the displacement deformation between different structure, according to It cannot meet actual needs by the elastic-plastic deformation of building structure itself to consume the system of vibration displacement.Such as certain airport In improvement project, for using the confined space, overhead lower section sets commercial building room or equipment installation room, elevated structure before building Belong to stress system of different nature with house architectural structure, overhead superstructure is box concrete continuous girder construction, is mainly held By vehicular traffic dynamic load, elevated structure malformation caused by the vehicle of different loads, vibrates.And commercial building Predominantly static load, its structure are relatively small by ectocine.Meanwhile commercial building structure basic (strip footing) and elevated bridge Basic (pile foundation support table) is completely independent, and commercial building basis is primarily subjected to self structure weight, and internal unit facility is quiet Carry and live load, elevated structure then in addition to overhead self structure weight is born, further include top vehicle live load, two systems become Shape sedimentation is different by about factor, therefore has differences consolidating settlement between the two and certain horizontal displacement is poor.
In China's Aseismic Design Theory system, it is intended that by appropriate design with reach " no damage in small earthquake, middle shake can repair, No collapsing with strong earthquake " purpose,《Code for design of masonry strucres》(GB50003-2011) connection to filling wall and frame also gives Disengage and do not disengage two kinds of ways.Do not disengage and be rigidly connected, disengage and be flexibly connected.Fig. 1 and Fig. 2 are《Masonry filler wall structure Make detail drawing (two)》The structure node schematic diagram being flexibly connected in (10SG614-2) atlas, as shown in the figure, filling wall and main body knot Flexible connection between structure is using 6 way of reserved dowel 5 or built-in fitting, this Traditional flexible construction measure, in structure construction Period is reserved or pre-buried reinforcing bar, embedded part produce off normal such as there are construction error, may result in and does over again or unserviceable Phenomenon;Further, since the reinforcing bar in constructional column 4 is connected with the reserved steel bar in agent structure or built-in fitting, agent structure Dilatation and bear dynamic load generation vibration deformation still can to filling wall produce earthquake, and cause wall body slit produce or wall The destruction of facial plane.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of flexible connecting device, it is installed on and bears dynamic load Between agent structure and the constructional column for filling wall, the shake that can effectively avoid the vibration deformation of agent structure from producing filled wall Evil.
To solve the above-mentioned problems, the technical solution adopted in the utility model is as follows:
A kind of flexible connecting device, it is described between the constructional column filled in wall and the agent structure for bearing dynamic load The foundation structure of filling wall and agent structure is completely independent, and the wall trend for filling wall is length direction, the agent structure Two angle bar, the horizontal part of the angle bar and iron plate and main body knot are oppositely arranged at the face constructional column top surface of bottom along its length Structure Joint, the vertical portion of angle bar are close to the outside of constructional column, are reserved between the horizontal part and constructional column top surface of the angle bar There is gap, flexible material is filled with the gap.
Further, it is additionally provided with iron plate between the horizontal part of two angle bar and the agent structure.
Further, the horizontal part of two angle bar offers hole respectively in correspondence position, is provided with the hole for connecting The expansion bolt of angle bar, iron plate and agent structure.
Further, the quantity in the hole on each angle bar is 2, is arranged symmetrically in the width direction on the horizontal part of angle bar.
Further, the shape in the hole is the oval set along its length.
Further, it is welded with angle bar connecting plate between the horizontal part of two angle bar.
Further, the angle bar connecting plate is welded on the centre position of horizontal part.
The agent structure is box concrete continuous girder construction, and the thickness of the filling wall is 240mm.
Preferably, the height in the gap is 20mm~40mm.
Preferably, the flexible material is rock wool.It so disclosure satisfy that fire protection requirement.
The principle of the utility model is that the flexible connecting device fixes connection mode on the body construction by angle bar, Agent structure structure of the reinforcing bar in constructional column completely with top is completely disengaged, the vertical portion of two angle bar is attached to construction The both sides of column, reserve certain vertical deformation gap between the top of constructional column and agent structure, can absorb superstructure by Dynamic load produces vibration to filled wall;It can ensure that with expansion bolt and be connected firmly between angle bar and iron plate and agent structure, at the same time The slotted hole set using length direction, the horizontal displacement that can be compensated between upper and lower two different stress systems is poor, such as, for height Bridge dilatation provides certain compensation space with the displacement difference that lower wall body produces.
Compared with prior art, the beneficial effects of the utility model are:
1st, the utility model can bear dynamic load structural vibration for top and provide vertical deformation space, and can absorb top knot Structure avoids superstructure from producing earthquake to wall in vibration processes and generate because bearing vibration of the dynamic load to filled wall transmission Crack.
2nd, using the utility model, construction when can effectively avoid main structure construction because of set aside pre-embedded reinforcing bar or embedded part misses Difference and produce off normal or phenomenon can not be utilized.
3rd, the utility model produces the horizontal position of horizontal displacement difference and different stress systems for two relatively independent bases The supplement for the compensation space that difference provides is moved considerably beyond the reserved dowel way of tradition, is effectively avoided to destroying generation outside wall plane Crack.
4th, using the utility model, the crack that can effectively avoid wall from being produced by earthquake and basic displacement difference, for wall in the future Body and structural maintenance are cost-effective.
5th, the utility model is without the presetting preburied in main structure construction, and can be synchronous during stuffing wall construction Installation.
Brief description of the drawings
Fig. 1 is《The masonry filler wall detail of construction (two)》Flexible connection is using reserved dowel in (10SG614-2) atlas Structure node figure.
Fig. 2 is《The masonry filler wall detail of construction (two)》Flexible connection uses the structure of built-in fitting in (10SG614-2) atlas Make node diagram.
Fig. 3 is the elevational schematic view that wall is filled in one preferred embodiment of the utility model.
Fig. 4 is the structure node figure of one preferred embodiment of the utility model.
Fig. 5 is the elevation of one preferred embodiment of the utility model.
Fig. 6 is the plan of one preferred embodiment of the utility model.
In figure:1st, wall is filled;2nd, agent structure;3rd, flexible material;4th, constructional column;
5th, dowel is reserved;6th, built-in fitting;7th, iron plate;8th, angle bar;9th, expansion bolt.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.Said according to following Bright, the purpose of this utility model, technical solution and advantage will be apparent from.It should be noted that described embodiment is this The preferred embodiment of utility model, instead of all the embodiments.
With reference to shown in Fig. 3 to Fig. 5, a kind of flexible connecting device, the constructional column 4 in filling wall 1 is with bearing dynamic load Agent structure 2 between, the filling wall 1 and the foundation structure of agent structure 2 are completely independent, it is specified that the wall for filling wall 1 is walked To for length direction.The bottom of the agent structure 2 faces is oppositely arranged two angle bar along its length at 4 top surface of constructional column 8, horizontal part 8a and 2 Joint of agent structure of the angle bar 8, the vertical portion 8b of angle bar 8 is close to the outside of constructional column, described Gap A is reserved between the horizontal part and constructional column top surface of angle bar, the highly preferred of the gap A is 20mm~40mm.It is described Flexible material 3 is filled with gap.In order to meet fire protection requirement, the flexible material is rock wool.
Iron plate 7 is additionally provided between the horizontal part 8a and the agent structure 2 of two angle bar.For ensureing two angle bar levels Portion is in same level.
As preferable connection mode, the horizontal parts of two angle bar offers hole 8c respectively in correspondence position, in the hole Expansion bolt 9 is installed, for angle bar, iron plate and agent structure to be linked together.
With reference to figure 6, the quantity in the hole on each angle bar is preferably 2, symmetrical in the width direction on the horizontal part of angle bar Arrangement.Angle bar can so be connected with agent structure more firm.The shape in the hole is the oval set along its length. In order to be relatively fixed the distance between two angle bar, angle bar connecting plate 8d is welded between the horizontal part of two angle bar.The angle Iron connecting plate is preferably welded in the centre position of horizontal part.
The utility model can be applicable to bear dynamic vehicle load lotus overhead and overhead lower section set commercial building with room it Between, overhead agent structure is box concrete continuous girder construction, and commercial building is 240mm with the thickness of the filling wall in room.
The principle of the utility model is that the flexible connecting device fixes connection on the body construction by angle bar and iron plate Mode, completely disengages agent structure structure of the reinforcing bar in constructional column completely with top, only makes the vertical portion patch of two angle bar In the both sides of constructional column, certain vertical deformation gap is reserved between the top of constructional column and agent structure, top can be absorbed Structure is produced vibration by dynamic load to filled wall;It can ensure that with expansion bolt and jail connected between angle bar and iron plate and agent structure Gu while the slotted hole set using length direction, the horizontal displacement that can be compensated between upper and lower two different stress systems is poor, than Such as, the displacement difference produced for elevated bridge dilatation and lower wall body provides certain compensation space.
The utility model carries out construction lofting, and determine in use, first according to the plan-position of filling wall to scene Constructional column position, goes out constructional column position in corresponding beam bottom setting-out, is then set according to constructional column position in agent structure bottom soft Property attachment device, and carry out constructional column reinforcing bar binding, carry out building wall and constructional column concreting, it is then empty to wall top portion Gap is filled processing according to fire protection requirement using corresponding flexible material.
The above, is only the description explanation of the preferred embodiment in the utility model, not to scope of protection of the utility model Restriction, it is clear that any those skilled in the art are based on above-described embodiment, can readily occur in replacement or change to obtain Other embodiment, these should all cover within the scope of protection of the utility model.

Claims (10)

1. a kind of flexible connecting device, constructional column (4) in filling wall (1) and bear dynamic load agent structure (2) it Between, the filling wall (1) and the foundation structure of agent structure (2) are completely independent, and the wall trend of filling wall (1) is length side To, it is characterised in that:
Two angle bar (8), the angle are oppositely arranged along its length at the bottom face constructional column top surface of the agent structure (2) The horizontal part (8a) of iron (8) and agent structure (2) Joint, the vertical portion (8b) of angle bar (8) is close to the outside of constructional column, angle Gap (A) is reserved between the horizontal part and constructional column top surface of iron (8), flexible material (3) is filled with the gap.
2. flexible connecting device according to claim 1, it is characterised in that:
Iron plate (7) is additionally provided between the horizontal part (8a) and the agent structure (2) of two angle bar.
3. flexible connecting device according to claim 1, it is characterised in that:
The horizontal part (8a) of two angle bar offers hole (8c) respectively in correspondence position, is provided with the hole for connecting angle iron And the expansion bolt (9) of agent structure.
4. flexible connecting device according to claim 3, it is characterised in that:
The quantity in the hole on each angle bar is 2, is arranged symmetrically in the width direction on the horizontal part of angle bar.
5. the flexible connecting device according to claim 3 or 4, it is characterised in that:
The shape in the hole is the oval set along its length.
6. according to the flexible connecting device described in Claims 1-4 any claim, it is characterised in that:
Angle bar connecting plate (8d) is welded between the horizontal part of two angle bar.
7. flexible connecting device according to claim 6, it is characterised in that:
The angle bar connecting plate is welded on the centre position of horizontal part.
8. flexible connecting device according to claim 1, it is characterised in that:
The agent structure is box concrete continuous girder construction, and the thickness of the filling wall is 240mm.
9. flexible connecting device according to claim 1, it is characterised in that:
The height of the gap (A) is 20mm~40mm.
10. flexible connecting device according to claim 1, it is characterised in that:
The flexible material is rock wool.
CN201721108677.2U 2017-08-31 2017-08-31 A kind of flexible connecting device Expired - Fee Related CN207268025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721108677.2U CN207268025U (en) 2017-08-31 2017-08-31 A kind of flexible connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721108677.2U CN207268025U (en) 2017-08-31 2017-08-31 A kind of flexible connecting device

Publications (1)

Publication Number Publication Date
CN207268025U true CN207268025U (en) 2018-04-24

Family

ID=61960199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721108677.2U Expired - Fee Related CN207268025U (en) 2017-08-31 2017-08-31 A kind of flexible connecting device

Country Status (1)

Country Link
CN (1) CN207268025U (en)

Similar Documents

Publication Publication Date Title
CN106869368A (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN208702444U (en) A kind of prefabricated rail top air channel structure of postposition
CN109898691B (en) Damping grounding type fabricated reinforced concrete tuned mass damping wall
CN209194766U (en) A kind of building isolation structure
CN107386495A (en) A kind of reinforced light steel keel partition of shaped steel and construction method
CN106436558A (en) Three-way limiting buffering bridge anti-seismic stop dog structure and arranging and installing method
CN107859197A (en) A kind of building aseismicity, vibration absorber
CN112854570B (en) Shock attenuation joins externally prefabricated wallboard
CN103352537A (en) Integral load-bearing heat-insulating wall plate and production and construction technology thereof
CN208251764U (en) Modular assembly formula mixing control house structural system
CN106869379A (en) A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure
CN207268025U (en) A kind of flexible connecting device
CN208168032U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN207277619U (en) The reinforced light steel keel partition of shaped steel
CN205677114U (en) Installation node for assembled inside casing light partition wall
CN206607724U (en) A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure
CN210529471U (en) Bridge package mound on urban rail transit cable
CN205669283U (en) The cast-in-place Integral Steel frame wall filled with masonry system of the spacing connection of steel disc
CN211037391U (en) Shear wall structure for optimizing stress distribution
CN205259405U (en) Steel frame building wall with shock attenuation node
CN210767945U (en) Brick-concrete building with underground added layer
CN206607709U (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN205875472U (en) A concrete inside casing partition wall installation node for steel frame
CN110777843A (en) Cantilever type retaining wall and construction method thereof
CN205804663U (en) building damping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180424