CN207267958U - Assembling type steel structure-concrete composite bridge - Google Patents

Assembling type steel structure-concrete composite bridge Download PDF

Info

Publication number
CN207267958U
CN207267958U CN201720927401.0U CN201720927401U CN207267958U CN 207267958 U CN207267958 U CN 207267958U CN 201720927401 U CN201720927401 U CN 201720927401U CN 207267958 U CN207267958 U CN 207267958U
Authority
CN
China
Prior art keywords
steel
shaped steel
bridge
concrete
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720927401.0U
Other languages
Chinese (zh)
Inventor
程林
金海�
朱罗军
巩海亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Wuhu Heng Heng Steel Co Ltd
Original Assignee
HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Wuhu Heng Heng Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HENGDA STEEL STRUCTURE CO Ltd, Wuhu Heng Heng Steel Co Ltd filed Critical HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Priority to CN201720927401.0U priority Critical patent/CN207267958U/en
Application granted granted Critical
Publication of CN207267958U publication Critical patent/CN207267958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

It the utility model is related to steel and concrete structure bridge, it is desirable to provide a kind of assembling type steel structure concrete composite bridge.The bridge span structure of bridge includes the U-shaped steel beam being erected at by bearing on two neighboring bridge pier, its both sides vertical beam is in 90 ° of angles with middle lower wall panels;It is placed equidistant with multiple vertical I-shaped steel construction connection beams in the lower wall panels of U-shaped steel beam, the vertical beam among steel construction connection beam is parallel with the vertical beam of U-shaped steel beam both sides, is fixedly connected between its downside transverse direction strutbeam and the lower wall panels of U-shaped steel beam;Concrete prefabricated board is shelved on the upside transverse direction strutbeam of steel construction connection beam and the vertical beam of U-shaped steel beam, its upper surface sets concrete cast-in-place slab, bituminous concrete and waterproof layer successively from lower to upper.The utility model can be diffused local compression, improve the anti-fatigue performance of bridge;Solve the problems, such as that traditional steel box girder bridge beam is big, fabrication and installation are difficult and bridge floor partial pressing poor performance;Improve bridge prefabrication assembling rate.

Description

Assembling type steel structure-concrete composite bridge
Technical field
The utility model relates to steel and concrete structure bridge, and more particularly to a kind of assembling type steel structure-concrete composite bridge, can use In municipal administration, highway field.
Background technology
Traditional municipal administration, the beam of traditional steel box girder bridge in highway bridge is big, fabrication and installation are difficult;And traditional coagulation Then there are the shortcomings that beam is heavy, span is small for native precast box.In consideration of it, country widelys popularize steel construction, packaged type bridges at present, Component is proposed to make in factory, it is simple at the scene to set up, field operation intensity is reduced, ensures construction quality.
Utility model content
The technical problems to be solved in the utility model is to overcome deficiency of the prior art, there is provided a kind of assembled steel knot Structure-concrete composite bridge.
To solve technical problem, solution is used by the utility model:
A kind of assembling type steel structure-concrete composite bridge, including bridge pier and bridge span structure are provided;It is characterized in that, institute The U-shaped steel beam that bridge span structure includes being erected at by bearing on two neighboring bridge pier is stated, its both sides vertical beam is in middle lower wall panels 90 ° of angles;Multiple vertical I-shaped steel construction connection beams, steel construction contact are placed equidistant with the lower wall panels of U-shaped steel beam Vertical beam among beam is parallel with the vertical beam of U-shaped steel beam both sides, fixed between the horizontal strutbeam in its downside and the lower wall panels of U-shaped steel beam to connect Connect;Concrete prefabricated board is shelved on the upside transverse direction strutbeam of steel construction connection beam and the vertical beam of U-shaped steel beam, it is concrete prefabricated The upper surface of plate sets concrete cast-in-place slab, bituminous concrete and waterproof layer successively from lower to upper.
As an improvement the floor for reinforcement is additionally provided with the vertical beam of the steel construction connection beam.
As an improvement stiffener is additionally provided between two adjacent steel construction connection beams, the central part in its section The oval or polygon in position, has four deep floors and the radial surrounding arranged with centre.
As an improvement pass through between the downside transverse direction strutbeam of the steel construction connection beam and the lower wall panels of U-shaped steel beam Bolt, bolt weldering or welding manner achieve a fixed connection.
As an improvement setting the connection shear key of protrusion on the upside transverse direction strutbeam of steel construction connection beam, connect The height of shear key is more than the thickness of concrete prefabricated board.
It is fixedly connected as an improvement being accomplished in the following manner between two adjacent U-shaped steel beams:Two pieces of steel plate folders Hold on the vertical beam of two steel construction connection beams on different U-shaped steel beams, the company of being bolted between steel plate and vertical beam Connect to form bolt connection node;The vertical beam of two steel construction connection beams is generally aligned in the same plane, and makes the folder of two blocks of steel plates and U-shaped steel beam Angle is in 90 °.
Compared with prior art, the beneficial effects of the utility model are:
(1) solve the problems, such as that traditional steel box girder bridge beam is big, fabrication and installation are difficult and bridge floor partial pressing poor performance, Local compression can be diffused, improve the anti-fatigue performance of bridge;
(2) solve the problems, such as that conventional concrete prefabricated case beam component weight, span are small.
(3) bridge prefabrication assembling rate is improved, meets industrial policy.
Brief description of the drawings
Fig. 1 is assembling type steel structure-concrete composite bridge horizontal layout;
Fig. 2 is a kind of profile construction of assembling type steel structure-concrete composite bridge.
Fig. 3 is the profile construction of another assembling type steel structure-concrete composite bridge.
Reference numeral in figure:U-shaped steel beam 1, steel construction connection beam 2, bolt connection node 3, concrete prefabricated board 4, coagulation Native Bars In Poured Concrete Slab 5, bituminous concrete and waterproof layer 6, connection shear key 7, bearing 8, stiffener 9.
Embodiment
The utility model is further illustrated below in conjunction with attached drawing.
Assembling type steel structure-concrete composite bridge, including bridge pier and bridge span structure;Bridge span structure includes passing through bearing 8 The U-shaped steel beam 1 being erected on two neighboring bridge pier, the both sides vertical beam of U-shaped steel beam 1 are in 90 ° of angles with middle lower wall panels.U-shaped Multiple vertical I-shaped steel construction connection beams 2 are placed equidistant with the lower wall panels of girder steel 1, the centre of steel construction connection beam 2 is erected Beam is parallel with the vertical beam of 1 both sides of U-shaped steel beam, is welded between the horizontal strutbeam in its downside and the lower wall panels of U-shaped steel beam 1 by bolt, bolt Or welding manner achieves a fixed connection.Shelved on the upside transverse direction strutbeam of steel construction connection beam 2 and the vertical beam of U-shaped steel beam 1 Concrete prefabricated board 4, the upper surface of concrete prefabricated board 4 set concrete cast-in-place slab 5, bituminous concrete and prevent successively from lower to upper Water layer 6.
As shown in figure 3, in order to lift the intensity of girder steel supporting structure, can also be equipped with the vertical beam of steel construction connection beam Floor for reinforcement.Add alternatively, being equipped between two steel construction connection beams 2 that can also be adjacent on same U-shaped steel beam 1 Strength plate, the centre in its section is oval or polygon, has four deep floors and radial arrangement and central part The surrounding of position.
Due to bridge width requirement, it usually needs multiple U-shaped steel beams 1 (as shown in Figure 1) being arranged in juxtaposition.For lift bridge across The integral strength of structure, is accomplished in the following manner between adjacent two U-shaped steel beams 1 and is fixedly connected:By two pieces of steel plate clampings On the vertical beam of two steel construction connection beams 2 on different U-shaped steel beams 1, the company of being bolted between steel plate and vertical beam Connect to form bolt connection node 3;The vertical beam of two steel construction connection beams 2 is generally aligned in the same plane, and makes two blocks of steel plates and U-shaped steel beam 1 Angle be in 90 °.
, can be in the upside transverse direction strutbeam of steel construction connection beam 2 in order to lift the bonding strength between bridge floor and steel beam structure The upper connection shear key 7 for setting protrusion, the height of connection shear key 7 are more than the thickness of concrete prefabricated board 4.Such structure is set Meter can be such that connection shear key 7 stretches to inside concrete cast-in-place slab 5, strengthen the connection between bridge floor and steel beam structure.
In the utility model, U-shaped steel beam 1, steel construction connection beam 2 complete in steel construction workshop, concrete prefabricated board 4 Complete in concrete prefabricated factory, connection shear key 7 uses electric resistance welding, concrete cast-in-place slab 5, drip in steel construction workshop Blue or green concrete and waterproof layer 6 is cast-in-place and mat formation in building-site.U-shaped steel beam 1 can use steel plate weld, also can use H profile steel with Steel plate is welded.
U-shaped steel beam 1 arrives in-site installation with steel construction connection beam 2 after factory makes, and erection stage establishes one's own system at the scene, The load of construction stage can voluntarily be undertaken.The not only template as the Roadway Construction stage, but also show with concrete of concrete prefabricated board 4 Pour the wainscot that plate 5 forms bridge floor service stage.
Assembling type steel structure-concrete composite bridge in the utility model can play the tension stroke and concrete of steel Compression stroke:The lower wall panels tension of U-shaped steel beam 1, concrete prefabricated board 4 and concrete cast-in-place slab 5 are combined into box-type section Wainscot, bears compression and partial pressing, plays the Compressive Performance of concrete.
Above-described embodiment illustrates it is not the limitation to the utility model, and the utility model is also not limited to the example above, For those skilled in the art, make adjustment in the essential scope of the utility model, it is new to belong to this practicality The protection domain of type.

Claims (6)

1. a kind of assembling type steel structure-concrete composite bridge, including bridge pier and bridge span structure;It is characterized in that, the spanning Structure includes the U-shaped steel beam being erected at by bearing on two neighboring bridge pier, its both sides vertical beam is with middle lower wall panels in 90 ° of folders Angle;Multiple vertical I-shaped steel construction connection beams are placed equidistant with the lower wall panels of U-shaped steel beam, among steel construction connection beam Vertical beam it is parallel with the vertical beam of U-shaped steel beam both sides, be fixedly connected between its horizontal strutbeam in downside and the lower wall panels of U-shaped steel beam; Concrete prefabricated board is shelved on the upside transverse direction strutbeam of steel construction connection beam and the vertical beam of U-shaped steel beam, concrete prefabricated board Upper surface sets concrete cast-in-place slab, bituminous concrete and waterproof layer successively from lower to upper.
2. combined bridge according to claim 1, it is characterised in that be additionally provided with use on the vertical beam of the steel construction connection beam In the floor of reinforcement.
3. combined bridge according to claim 1, it is characterised in that two adjacent steel knots on same U-shaped steel beam Be additionally provided with stiffener between structure connection beam, the centre in its section is oval or polygon, have four deep floors and Radial arrangement and the surrounding in centre.
4. combined bridge according to claim 1, it is characterised in that the downside transverse direction strutbeam of the steel construction connection beam with Achieved a fixed connection between the lower wall panels of U-shaped steel beam by bolt, bolt weldering or welding manner.
5. combined bridge according to claim 1, it is characterised in that set on the upside transverse direction strutbeam of steel construction connection beam The connection shear key of protrusion is put, the height for connecting shear key is more than the thickness of concrete prefabricated board.
6. according to the combined bridge described in claim 1 to 5 any one, it is characterised in that two adjacent U-shaped steel beams it Between be accomplished in the following manner and be fixedly connected:Two pieces of steel plate clampings are in two steel construction connection beams on different U-shaped steel beams Vertical beam on, be bolted to connection to form bolt connection node between steel plate and vertical beam;Two steel construction connection beams it is perpendicular Beam is generally aligned in the same plane, and the angle for making two blocks of steel plates and U-shaped steel beam is in 90 °.
CN201720927401.0U 2017-07-28 2017-07-28 Assembling type steel structure-concrete composite bridge Active CN207267958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720927401.0U CN207267958U (en) 2017-07-28 2017-07-28 Assembling type steel structure-concrete composite bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720927401.0U CN207267958U (en) 2017-07-28 2017-07-28 Assembling type steel structure-concrete composite bridge

Publications (1)

Publication Number Publication Date
CN207267958U true CN207267958U (en) 2018-04-24

Family

ID=61959826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720927401.0U Active CN207267958U (en) 2017-07-28 2017-07-28 Assembling type steel structure-concrete composite bridge

Country Status (1)

Country Link
CN (1) CN207267958U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455799A (en) * 2019-12-20 2020-07-28 中国市政工程中南设计研究总院有限公司 Double-layer assembled viaduct and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455799A (en) * 2019-12-20 2020-07-28 中国市政工程中南设计研究总院有限公司 Double-layer assembled viaduct and construction method thereof
CN111455799B (en) * 2019-12-20 2022-01-18 中国市政工程中南设计研究总院有限公司 Double-layer assembled viaduct and construction method thereof

Similar Documents

Publication Publication Date Title
CN100507150C (en) Corrugated steel web box girder with steel-concrete combined board lower wing edges
CN108824162A (en) A kind of steel_concrete composite beam and its construction method using plain plate and corrugated sheet steel mixing web
CN202416148U (en) Bridge structure of pre-stressed concrete hollow slabs
CN105544373B (en) A kind of steel case Combined concrete girder and construction method for long-span cablestayed bridges
CN106245511A (en) A kind of two-fold shape combined beam structure and construction method thereof
CN106368359A (en) Honeycomb steel beam rib concrete laminated slab
CN101775775A (en) Combined bridge with self-anti-cracking function and construction method thereof
CN106835930B (en) A kind of bolt connecting type steel concrete combination beam
CN109403465B (en) Steel-concrete combined node and manufacturing method thereof
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN207267958U (en) Assembling type steel structure-concrete composite bridge
CN110747996A (en) Corrugated steel plate combined frame structure system and application
CN107268417A (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN108316164B (en) Structure for reinforcing old assembled hollow slab girder bridge by using new girder and construction method
CN108978432A (en) A kind of middle span assembled steel hollow sandwich slab bridge and production method
CN113356052A (en) Novel steel bar truss superposed bridge deck and production method
CN109736511A (en) Prefabricated composite structural column based on Ripple Sternum and preparation method thereof
CN206328669U (en) The narrow composite beam of steel box of new concrete
CN208933808U (en) Using the steel_concrete composite beam of plain plate and corrugated sheet steel mixing web
CN206545308U (en) A kind of Steel Castellated Beams rib concrete folding plate
CN207032605U (en) A kind of wide cut hollow superimposed sheet
CN214245384U (en) Assembled steel-concrete bent cap
CN203383137U (en) Transversely assembled corrugated steel web combined box girder
CN211499184U (en) Corrugated steel plate combined frame structure system
CN211395312U (en) Upper structure for wide box girder and short tower cable-stayed bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant