CN207265540U - A kind of tangent tower overhead line lifter - Google Patents
A kind of tangent tower overhead line lifter Download PDFInfo
- Publication number
- CN207265540U CN207265540U CN201720668029.6U CN201720668029U CN207265540U CN 207265540 U CN207265540 U CN 207265540U CN 201720668029 U CN201720668029 U CN 201720668029U CN 207265540 U CN207265540 U CN 207265540U
- Authority
- CN
- China
- Prior art keywords
- overhead line
- lifter
- line lifter
- bridge
- overhead
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
一种直线塔架空线提升器,包括架空线挂线点横担头角铁组合装置,架空线提升器压板,架空线提升器可调丝杠,架空线提升器恒桥水平加强杆,架空线提升器横桥铁梁;其中:架空线挂线点横担头角铁组合装置通过架空线提升器压板安装在架空线提升器横桥铁梁上,两个架空线提升器恒桥水平加强杆安装在架空线提升器横桥铁梁上,架空线提升器可调丝杠安装在架空线提升器恒桥水平加强杆上。本实用新型的优点:利用提升器的可调丝杠,提升架空地线。在铁塔上单人就可以独立完成此项工作,能有效地提高工作效率和劳动生产力;操作简单方便,降低了作业难度和安全风险系数,能使作业人员更加安全。
An overhead line lifter for a straight tower, including an overhead line hanging point cross-arm head angle iron combination device, an overhead line lifter pressure plate, an overhead line lifter adjustable screw, an overhead line lifter constant bridge horizontal reinforcing rod, and an overhead line lifter Iron girder of the horizontal bridge of the overhead line; among them: the combination device of the cross arm head angle iron assembly of the overhead line hanging point is installed on the iron beam of the overhead line lifter through the pressure plate of the overhead line lifter, and the two horizontal reinforcement bars of the constant bridge of the overhead line lifter are installed on the On the iron girder of the cross bridge of the overhead line lifter, the adjustable lead screw of the overhead line lifter is installed on the horizontal reinforcing bar of the constant bridge of the overhead line lifter. The utility model has the advantages of using the adjustable lead screw of the lifter to lift the overhead ground wire. A single person on the iron tower can complete this work independently, which can effectively improve work efficiency and labor productivity; the operation is simple and convenient, which reduces the difficulty of operation and the safety risk factor, making operators safer.
Description
技术领域technical field
本实用新型涉及输电线路施工及运行维护工具领域,特别涉及了一种直线塔架空线提升器。The utility model relates to the field of power transmission line construction and operation maintenance tools, in particular to a linear tower overhead line lifter.
背景技术Background technique
目前在输电线路直线杆塔提升架空地线的方式分为四种:At present, there are four ways to lift the overhead ground wire on the straight line tower of the transmission line:
1、圆木抱杆配合手扳葫芦起吊法,此种方法在实际工作中,由于铁塔是表面光滑的钢材料,且横担上的固定圆孔与边缘距离太远,作业人员很难直接把手扳葫芦固定在架空地线挂线点上方。配合作业的圆木抱杆长3m,直径达150mm,需铁线缠绕在圆木抱杆上,在用手扳葫芦挂接。此种方法在作业人员操作过程中耗费较大体力,危险系数高。1. The lifting method of round wood holding poles and lever hoists. In actual work, because the iron tower is made of smooth steel, and the distance between the fixed round hole on the cross arm and the edge is too far, it is difficult for the operator to directly handle The lever hoist is fixed above the hanging point of the overhead ground wire. The log holding pole that cooperates with the operation is 3m long and 150mm in diameter. Iron wires need to be wound on the log holding pole, and then hooked with a hand hoist. This kind method expends greater physical strength in the operation process of the operator, and the risk factor is high.
2、大绳配合滑轮组起吊法。此种方法耗费大量人力、物力,当杆塔较高或架空地线荷载较大时,存在较大危险系数。2. Lifting method with big rope and pulley block. This method consumes a lot of manpower and material resources, and there is a large risk factor when the tower is high or the load of the overhead ground wire is large.
3、单丝杠挂钩起吊器。此种提线器挂钩的长度是固定的,只能适合一种距离的提升方式,不能调节高度。提升器的底面与架空地线横担的接触面积小,而且提升器是单边丝杠,提升架空地线时受力不均匀,如遇大风天气,更增加了作业难度。3. Single lead screw hook lifter. The length of the hook of this kind of wire lifter is fixed, and it can only be suitable for a lifting method of a distance, and the height cannot be adjusted. The contact area between the bottom surface of the lifter and the cross arm of the overhead ground wire is small, and the lifter is a single-sided screw, so the force is not uniform when lifting the overhead ground wire. In case of strong wind, the work is more difficult.
4、架空地线横向受力作业法。此种方法使用手扳葫芦配合双卡线器作业,当横向架空地线不受力时会下降一段距离,在安装线夹时,需要人力扛起才能安装。此种方法在工具的传递、操作上把作业复杂化,不仅可使架空地线磨损,存在作业人员人身安全隐患。4. Overhead ground wire lateral force operation method. In this method, a lever hoist is used to work with double clamps. When the horizontal overhead ground wire is not stressed, it will drop for a certain distance. When installing the wire clip, it needs to be lifted by manpower to install it. This method complicates the operation in the transfer and operation of the tool, which not only causes the wear and tear of the overhead ground wire, but also poses a hidden danger to the personal safety of the operators.
实用新型内容Utility model content
本实用新型的目的是为了克服上述问题,特提供了一种直线塔架空线提升器。The purpose of the utility model is to overcome the above-mentioned problems, and specially provides a linear tower overhead line lifter.
本实用新型提供了一种直线塔架空线提升器,其特征在于:所述的直线塔架空线提升器,包括架空线挂线点横担头角铁组合装置1,架空线提升器压板2,架空线提升器可调丝杠3,架空线提升器恒桥水平加强杆4,架空线提升器横桥铁梁5;The utility model provides a linear tower overhead line lifter, which is characterized in that: the linear tower overhead line lifter includes an overhead line hanging point cross-arm head angle iron combination device 1, an overhead line lifter pressure plate 2, an overhead line Adjustable lead screw 3 for the line lifter, horizontal reinforcing rod 4 for the constant bridge of the overhead line lifter, and 5 iron beams for the cross bridge of the overhead line lifter;
其中:架空线挂线点横担头角铁组合装置1通过架空线提升器压板2安装在架空线提升器横桥铁梁5上,两个架空线提升器恒桥水平加强杆4安装在架空线提升器横桥铁梁5上,架空线提升器可调丝杠 3安装在架空线提升器恒桥水平加强杆4上。Among them: the overhead line hanging point cross arm head angle iron combination device 1 is installed on the overhead line lifter cross bridge iron beam 5 through the overhead line lifter pressure plate 2, and the two overhead line lifter constant bridge horizontal reinforcing rods 4 are installed on the overhead line On the iron girder 5 of the lifter cross bridge, the adjustable lead screw 3 of the overhead line lifter is installed on the horizontal reinforcing bar 4 of the constant bridge of the overhead line lifter.
所述的架空线提升器可调丝杠3底部带有硬质钩。There is a hard hook at the bottom of the adjustable lead screw 3 of the overhead line lifter.
所述的架空线提升器横桥铁梁5为侧面带有通槽的槽钢结构。The iron girder 5 of the cross bridge of the overhead line hoist is a channel steel structure with a through groove on the side.
所述的架空线提升器恒桥水平加强杆4为槽钢结构,侧面上部带有增大摩擦系数的锯齿结构。The horizontal reinforcing bar 4 of the constant bridge of the overhead line lifter is a channel steel structure, and the upper part of the side has a sawtooth structure that increases the friction coefficient.
解决提升输电线路直线杆塔架空地线的传统施工中存在的作业程序复杂,作业人员人身安全隐患风险点多,作业时间较长以及耗费大量人力、物力等问题。使用这种新型架空地线提升器,可以使在提升架空地线的作业过程更加安全、可靠、方便、快捷,同时减轻作业人员劳动强度,提高工作效率。Solve the problems in the traditional construction of lifting the overhead ground wire of the straight pole tower of the transmission line, such as complex operation procedures, many hidden dangers to the personal safety of operators, long operation time, and a large amount of manpower and material resources. The use of this new type of overhead ground wire lifter can make the operation process of lifting the overhead ground wire safer, more reliable, more convenient and quicker, reduce the labor intensity of operators, and improve work efficiency.
本实用新型的优点:Advantage of the utility model:
将提升器压板固定在铁塔挂线点上部的角铁上,然后利用提升器的可调丝杠,提升架空地线。在铁塔上单人就可以独立完成此项工作,能有效地提高工作效率和劳动生产力;操作简单方便,降低了作业难度和安全风险系数,能使作业人员更加安全,同时节省了作业时间、人力、物力及财力。Fix the lifter pressure plate on the angle iron above the wire hanging point of the iron tower, and then use the adjustable lead screw of the lifter to lift the overhead ground wire. A single person on the iron tower can complete this work independently, which can effectively improve work efficiency and labor productivity; the operation is simple and convenient, reduces the difficulty of operation and safety risk factor, makes the operators safer, and saves operation time and manpower , material and financial resources.
附图说明Description of drawings
下面结合附图及实施方式对本实用新型作进一步详细的说明:Below in conjunction with accompanying drawing and embodiment the utility model is described in further detail:
图1为直线塔架空线提升器结构示意图;Fig. 1 is a structural schematic diagram of a linear tower overhead line lifter;
图2为架空线提升器恒桥水平加强杆结构示意图;Fig. 2 is a structural schematic diagram of the constant bridge horizontal reinforcing bar of the overhead line lifter;
图3为架空线提升器横桥铁梁结构示意图。Fig. 3 is a structural schematic diagram of the iron girder of the cross bridge of the overhead line lifter.
具体实施方式Detailed ways
实施例1Example 1
本实用新型提供了一种直线塔架空线提升器,其特征在于:所述的直线塔架空线提升器,包括架空线挂线点横担头角铁组合装置1,架空线提升器压板2,架空线提升器可调丝杠3,架空线提升器恒桥水平加强杆4,架空线提升器横桥铁梁5;The utility model provides a linear tower overhead line lifter, which is characterized in that: the linear tower overhead line lifter includes an overhead line hanging point cross-arm head angle iron combination device 1, an overhead line lifter pressure plate 2, an overhead line Adjustable lead screw 3 for the line lifter, horizontal reinforcing rod 4 for the constant bridge of the overhead line lifter, and 5 iron beams for the cross bridge of the overhead line lifter;
其中:架空线挂线点横担头角铁组合装置1通过架空线提升器压板2安装在架空线提升器横桥铁梁5上,两个架空线提升器恒桥水平加强杆4安装在架空线提升器横桥铁梁5上,架空线提升器可调丝杠 3安装在架空线提升器恒桥水平加强杆4上。Among them: the overhead line hanging point cross arm head angle iron combination device 1 is installed on the overhead line lifter cross bridge iron beam 5 through the overhead line lifter pressure plate 2, and the two overhead line lifter constant bridge horizontal reinforcing rods 4 are installed on the overhead line On the iron girder 5 of the lifter cross bridge, the adjustable lead screw 3 of the overhead line lifter is installed on the horizontal reinforcing bar 4 of the constant bridge of the overhead line lifter.
所述的架空线提升器可调丝杠3底部带有硬质钩。There is a hard hook at the bottom of the adjustable lead screw 3 of the overhead line lifter.
所述的架空线提升器横桥铁梁5为侧面带有通槽的槽钢结构。The iron girder 5 of the cross bridge of the overhead line hoist is a channel steel structure with a through groove on the side.
所述的架空线提升器恒桥水平加强杆4为槽钢结构,侧面上部带有增大摩擦系数的锯齿结构。The horizontal reinforcing bar 4 of the constant bridge of the overhead line lifter is a channel steel structure, and the upper part of the side has a sawtooth structure that increases the friction coefficient.
解决提升输电线路直线杆塔架空地线的传统施工中存在的作业程序复杂,作业人员人身安全隐患风险点多,作业时间较长以及耗费大量人力、物力等问题。使用这种新型架空地线提升器,可以使在提升架空地线的作业过程更加安全、可靠、方便、快捷,同时减轻作业人员劳动强度,提高工作效率。Solve the problems in the traditional construction of lifting the overhead ground wire of the straight pole tower of the transmission line, such as complex operation procedures, many hidden dangers to the personal safety of operators, long operation time, and a large amount of manpower and material resources. The use of this new type of overhead ground wire lifter can make the operation process of lifting the overhead ground wire safer, more reliable, more convenient and quicker, reduce the labor intensity of operators, and improve work efficiency.
实施例2Example 2
本实用新型提供了一种直线塔架空线提升器,其特征在于:所述的直线塔架空线提升器,包括架空线挂线点横担头角铁组合装置1,架空线提升器压板2,架空线提升器可调丝杠3,架空线提升器恒桥水平加强杆4,架空线提升器横桥铁梁5;The utility model provides a linear tower overhead line lifter, which is characterized in that: the linear tower overhead line lifter includes an overhead line hanging point cross-arm head angle iron combination device 1, an overhead line lifter pressure plate 2, an overhead line Adjustable lead screw 3 for the line lifter, horizontal reinforcing rod 4 for the constant bridge of the overhead line lifter, and 5 iron beams for the cross bridge of the overhead line lifter;
其中:架空线挂线点横担头角铁组合装置1通过架空线提升器压板2安装在架空线提升器横桥铁梁5上,两个架空线提升器恒桥水平加强杆4安装在架空线提升器横桥铁梁5上,架空线提升器可调丝杠 3安装在架空线提升器恒桥水平加强杆4上。Among them: the overhead line hanging point cross arm head angle iron combination device 1 is installed on the overhead line lifter cross bridge iron beam 5 through the overhead line lifter pressure plate 2, and the two overhead line lifter constant bridge horizontal reinforcing rods 4 are installed on the overhead line On the iron girder 5 of the lifter cross bridge, the adjustable lead screw 3 of the overhead line lifter is installed on the horizontal reinforcing bar 4 of the constant bridge of the overhead line lifter.
所述的架空线提升器恒桥水平加强杆4为槽钢结构,侧面上部带有增大摩擦系数的锯齿结构。The horizontal reinforcing bar 4 of the constant bridge of the overhead line lifter is a channel steel structure, and the upper part of the side has a sawtooth structure that increases the friction coefficient.
解决提升输电线路直线杆塔架空地线的传统施工中存在的作业程序复杂,作业人员人身安全隐患风险点多,作业时间较长以及耗费大量人力、物力等问题。使用这种新型架空地线提升器,可以使在提升架空地线的作业过程更加安全、可靠、方便、快捷,同时减轻作业人员劳动强度,提高工作效率。Solve the problems in the traditional construction of lifting the overhead ground wire of the straight pole tower of the transmission line, such as complex operation procedures, many hidden dangers to the personal safety of operators, long operation time, and a large amount of manpower and material resources. The use of this new type of overhead ground wire lifter can make the operation process of lifting the overhead ground wire safer, more reliable, more convenient and quicker, reduce the labor intensity of operators, and improve work efficiency.
实施例3Example 3
本实用新型提供了一种直线塔架空线提升器,其特征在于:所述的直线塔架空线提升器,包括架空线挂线点横担头角铁组合装置1,架空线提升器压板2,架空线提升器可调丝杠3,架空线提升器恒桥水平加强杆4,架空线提升器横桥铁梁5;The utility model provides a linear tower overhead line lifter, which is characterized in that: the linear tower overhead line lifter includes an overhead line hanging point cross-arm head angle iron combination device 1, an overhead line lifter pressure plate 2, an overhead line Adjustable lead screw 3 for the line lifter, horizontal reinforcing rod 4 for the constant bridge of the overhead line lifter, and 5 iron beams for the cross bridge of the overhead line lifter;
其中:架空线挂线点横担头角铁组合装置1通过架空线提升器压板2安装在架空线提升器横桥铁梁5上,两个架空线提升器恒桥水平加强杆4安装在架空线提升器横桥铁梁5上,架空线提升器可调丝杠 3安装在架空线提升器恒桥水平加强杆4上。Among them: the overhead line hanging point cross arm head angle iron combination device 1 is installed on the overhead line lifter cross bridge iron beam 5 through the overhead line lifter pressure plate 2, and the two overhead line lifter constant bridge horizontal reinforcing rods 4 are installed on the overhead line On the iron girder 5 of the lifter cross bridge, the adjustable lead screw 3 of the overhead line lifter is installed on the horizontal reinforcing bar 4 of the constant bridge of the overhead line lifter.
所述的架空线提升器可调丝杠3底部带有硬质钩。There is a hard hook at the bottom of the adjustable lead screw 3 of the overhead line lifter.
所述的架空线提升器横桥铁梁5为侧面带有通槽的槽钢结构。The iron girder 5 of the cross bridge of the overhead line hoist is a channel steel structure with a through groove on the side.
解决提升输电线路直线杆塔架空地线的传统施工中存在的作业程序复杂,作业人员人身安全隐患风险点多,作业时间较长以及耗费大量人力、物力等问题。使用这种新型架空地线提升器,可以使在提升架空地线的作业过程更加安全、可靠、方便、快捷,同时减轻作业人员劳动强度,提高工作效率。Solve the problems in the traditional construction of lifting the overhead ground wire of the straight pole tower of the transmission line, such as complex operation procedures, many hidden dangers to the personal safety of operators, long operation time, and a large amount of manpower and material resources. The use of this new type of overhead ground wire lifter can make the operation process of lifting the overhead ground wire safer, more reliable, more convenient and quicker, reduce the labor intensity of operators, and improve work efficiency.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720668029.6U CN207265540U (en) | 2017-06-09 | 2017-06-09 | A kind of tangent tower overhead line lifter |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720668029.6U CN207265540U (en) | 2017-06-09 | 2017-06-09 | A kind of tangent tower overhead line lifter |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207265540U true CN207265540U (en) | 2018-04-20 |
Family
ID=61915273
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720668029.6U Expired - Fee Related CN207265540U (en) | 2017-06-09 | 2017-06-09 | A kind of tangent tower overhead line lifter |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207265540U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117458328A (en) * | 2023-09-20 | 2024-01-26 | 国网浙江省电力有限公司绍兴供电公司 | A robotic up and down line lifting device for power transmission lines |
-
2017
- 2017-06-09 CN CN201720668029.6U patent/CN207265540U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117458328A (en) * | 2023-09-20 | 2024-01-26 | 国网浙江省电力有限公司绍兴供电公司 | A robotic up and down line lifting device for power transmission lines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101409434B (en) | ground riser | |
| CN102689849A (en) | Lifting device for replacing transformer | |
| CN203998746U (en) | Portable suspension installation | |
| CN206250670U (en) | It is a kind of to be easy to operation and safe replacing device for insulator | |
| CN207581115U (en) | A kind of elevator dragging wire rope length adjustment auxiliary device | |
| CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
| CN102191874B (en) | Insulating cross arm with movable arc grooves | |
| CN201312084Y (en) | Ground wire raiser | |
| CN219009694U (en) | Hoisting device for box culvert | |
| CN203193189U (en) | Portable overhead ground wire lifting device | |
| CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
| CN207863502U (en) | A kind of Construction of Steel Structure life line bracket | |
| CN116409703A (en) | A safe erection spreader for high pier columns and large-span prestressed beams and its application method | |
| CN204198306U (en) | A kind of device for purlin lifting in building operation | |
| CN202474680U (en) | Ground wire lifting pulley yoke used on intermediate support of power transmission line | |
| CN203333224U (en) | Steel structural beam upward lifting tool | |
| CN209322324U (en) | A kind of large form handling apparatus | |
| CN204873418U (en) | Large -span component hoist device | |
| CN201605579U (en) | Tubular pile trade steel cage hoist device | |
| CN209053444U (en) | Steel construction purlin hoisting device | |
| CN206051284U (en) | A kind of instrument for lifting concrete reinforced pipe | |
| CN205151615U (en) | Small -size hoisting machine suitable for cable shaft well head | |
| CN220886717U (en) | Steel wire rope safety hoisting clamp of steel structure | |
| CN204112748U (en) | Roof truss secondary member suspender | |
| CN203783111U (en) | Lifting frame for structural steelscaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180420 |