CN207261013U - For slurry-water balance type pipe jacking tunnelling machine under rock geology - Google Patents

For slurry-water balance type pipe jacking tunnelling machine under rock geology Download PDF

Info

Publication number
CN207261013U
CN207261013U CN201721291920.9U CN201721291920U CN207261013U CN 207261013 U CN207261013 U CN 207261013U CN 201721291920 U CN201721291920 U CN 201721291920U CN 207261013 U CN207261013 U CN 207261013U
Authority
CN
China
Prior art keywords
cutting
housing
slurry
broken
pipe jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721291920.9U
Other languages
Chinese (zh)
Inventor
孙小军
杨东发
王建军
张凤宁
徐立志
胡涛
单其林
程明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hualin Pneumatic Hydraulic Equipment Co Ltd
Jiasheng Construction Group Co Ltd
Original Assignee
Jiangsu Hualin Pneumatic Hydraulic Equipment Co Ltd
Jiasheng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hualin Pneumatic Hydraulic Equipment Co Ltd, Jiasheng Construction Group Co Ltd filed Critical Jiangsu Hualin Pneumatic Hydraulic Equipment Co Ltd
Priority to CN201721291920.9U priority Critical patent/CN207261013U/en
Application granted granted Critical
Publication of CN207261013U publication Critical patent/CN207261013U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses one kind to be used for slurry-water balance type pipe jacking tunnelling machine under rock geology, it includes cutting system, dynamical system, deviation-rectifying system, muddy water system, measuring system and electric system successively;It is above-mentioned to realize efficient push pipe driving processing under rock geology environment by relatively low construction cost for slurry-water balance type pipe jacking tunnelling machine under rock geology, and then construction cost can reduced, it is ensured that laying of the construction efficiency with completing pipeline on the premise of quality is handled.

Description

For slurry-water balance type pipe jacking tunnelling machine under rock geology
Technical field
It is especially a kind of to be used for slurry-water balance type push pipe under rock geology the present invention relates to ground and Geological Engineering field Development machine.
Background technology
Jacking construction is to be using the piping laying construction technology for not excavating or lacking excavation technology, its concrete operations: The top power produced in working pit by means of jacking device, overcomes the frictional force of pipeline and surrounding soil, the slope by pipeline by design Degree is headed into soil, and the earthwork is transported;Handled by the continuous jacking for more tube couplings, you can the completion pair in target area Handled in the laying of pipeline.A wide range of with pipe jacking construction technique promotes and applies, the geology encountered in jacking construction process Condition also becomes increasingly complex, and especially in work progress is carried out for rock geology environment, is influenced by the high rigidity of rock in itself, Push pipe is difficult to effectively push, and the rock debris that rock is formed after broken is also difficult to be discharged, and then causes push pipe Equipment is easy to clogging occur during the work time, and then causes existing jacking construction equipment or method can not be effectively in rock Work under stone geological environment.And remaining treatment process under above-mentioned geological environment is directed to both at home and abroad, as blasting procedure, static state are quick-fried Broken method, the construction of fluid pressure type rock splitter etc., there are constructional difficulties, it is less efficient the problem of.
The content of the invention
The technical problem to be solved in the present invention is to provide one kind be used for rock geology under slurry-water balance type pipe jacking tunnelling machine and Push pipe driving method, it can carry out efficient push pipe driving processing under rock geology environment.
In order to solve the above technical problems, the present invention relates to one kind to be used for slurry-water balance type pipe jacking tunnelling machine under rock geology, It includes cutting system, dynamical system, deviation-rectifying system, muddy water system, measuring system and electric system successively;The cutting System includes cutting housing, and cutting housing includes cutting end face and connecting end surface, cuts and sets among the cutting end face of housing Cutter holder assembly is equipped with, multiple first knife rests and the second knife rest are provided with cutter holder assembly, multiple first knife rests edge cutting housings Circumferentially it is uniformly distributed, multiple second knife rests are radially extended along the difference of cutting housing respectively, multiple first knife rests and multiple second Knife rest is welded in inside cutter holder assembly, wherein, the first hobboing cutter is respectively arranged with each first knife rest, each second knife Multiple second hobboing cutters are respectively arranged with frame, multiple second hobboing cutters are uniformly distributed along the extending direction of the second knife rest.
Include drive shaft among the dynamical system, it is connected among the cutter holder assembly in cutting housing, described Cut housing connecting end surface on be provided with connecting flange, be provided with the end face of connecting flange be connected to muddy water system it In muddy water port;
Second-time breakage mechanism is provided between the cutting end face of the cutting housing and connecting end surface, it includes via cutting The broken end body that the cutting end of housing is extended facing to its connecting end surface is cut, and is faced via the cutting end of cutting housing The broken end plate extended to the axis of cutting housing, the broken end body uses loop configuration, and is set on its end face There are multiple broken rollers, the internal diameter of broken end body is gradual on the direction that the cutting end of cutting housing extends facing to connecting end surface Reduce, the radial section of broken end body optional position uses oval structure;The broken end plate, which includes, extends to cutting shell First end face in the cutting end face of body, and the second end face relative to each other with broken end body, crush the first end face of end plate Extend towards the axis of cutting housing into line tilt, the second end face of broken end plate is extended parallel to broken end body.
As a modification of the present invention, among the cutting system, the side end of each the first knife rest is both provided with First scraper, the side of each the second knife rest are both provided with multiple second scrapers.Using above-mentioned technical proposal, it can pass through The setting of one scraper and the second scraper is so that its first hobboing cutter of cooperation and the second hobboing cutter, cause rock can after hobboing cutter cutting is broken Further break process is able under scraper effect, and it is entered to cutting enclosure interior with scraper effect.
As a modification of the present invention, the cutting enclosure interior is provided with multigroup broken end plate, multigroup broken end plate Corresponded each other with multiple second knife rests among cutter holder assembly, each group crushes what end plate extended parallel to each other by two Broken end plate is formed, it is relative to each other with the side end of corresponding second knife rest.Using above-mentioned technical proposal, it can be by multigroup Broken end plate is set so that it is consistent with the cutting crushing motion of the second hobboing cutter, to improve broken contact of the end plate with rock Spend.
As a modification of the present invention, 3 groups of driving motors are included among the dynamical system, it passes through deceleration respectively Machine is connected with drive shaft;The end set of the drive shaft has the auxiliary cutterhead using pyramidal structure.Above-mentioned dynamical system The setting of system can provide efficient power for cutting system to carry out break process for rock.
It is described to be used among slurry-water balance type pipe jacking tunnelling machine include under rock geology as a modification of the present invention Postposition housing, among the dynamical system, muddy water system, measuring system and electric system may be contained within postposition housing, postposition It is attached between housing and cutting housing by multiple correction oil cylinders, the deviation-rectifying system is by above-mentioned multiple correction oil cylinder structures Into the correction oil cylinder is connected on connecting flange.
As a modification of the present invention, the muddy water system includes inlet channel and spoil disposal pipeline, it passes through respectively Muddy water port is conducted to cutting enclosure interior;The inlet channel is connected to peripheral hardware water source, the inlet channel and spoil disposal pipeline On be respectively arranged with ball valve, and for controlling the butterfly valve turned between inlet channel and spoil disposal pipeline.
As a modification of the present invention, the measuring system include the measurement target that is installed on postposition housing and Pitch dipmeter.
It is used for above-mentioned under rock geology on the basis of slurry-water balance type pipe jacking tunnelling machine, the application is dug using a kind of push pipe Into method, it includes following processing step:
1) hole of pending driving processing will be placed in for slurry-water balance type pipe jacking tunnelling machine under rock geology, and will pipe Section is connected to the end of pipe jacking tunnelling machine, drives pipe jacking tunnelling machine to operate, so that promotion and top of the tube coupling in exterior oil cylinder The drive of pipe development machine is entered in hole;
2) treat that tube coupling in step 1) enters in hole, by the bellmouth center of next section of tube coupling face leading portion tube coupling, make its End face under the driving of external oil cylinder with leading portion tube coupling fits closely each other, and enters in hole;Repeat the above steps so that more Duan Guanjie is under the promotion of exterior oil cylinder and the drive of pipe jacking tunnelling machine with 3 to 5cm/min speed successively towards transporting in hole It is dynamic;
3) in hole external modulation mud, in above-mentioned steps 2) carry out during by mud be injected into the outer wall of the tube coupling with Between the wall of hole;Inside muddy water system introducing to the pipe jacking tunnelling machine that mud is passed through pipe jacking tunnelling machine at the same time, to be produced for cutting Raw rock debris is cleaned;
4) repeat step 2) to 3), required until the pipeline of multiple tube couplings composition reaches required distance;Pipeline, which is laid with, to be completed Afterwards, towards cement injection processing is carried out between the outer wall and hole wall of pipeline, with the mud between the outer wall for pipeline and hole wall Into line replacement.
As a modification of the present invention, in the step 3), mud is by bentonite: water: alkali according to 100: 614: 2 weight Amount is formed than carrying out configuration;In the step 4), the proportioning of the cement mortar for replacing mud is 2: 1.
As a modification of the present invention, in the step 3), the collocation method of mud includes:Quantitative water is put into Mix and stir inside bucket, bentonite is put into by mixing machine, and carry out mixing and stirring processing 2 to 3min;Alkali is added in bucket to mixing and stirring, continues to mix With 7 to 8min, you can into mud first product;Above-mentioned mud first product is discharged into reserve pit and deposits 10 to 12h, you can forms mud finished product.
Slurry-water balance type pipe jacking tunnelling machine under rock geology is used for using above-mentioned technical proposal, it can use push pipe to tunnel The structure setting of multiple hobboing cutters in machine in cutting system, to carry out cutting process for rock geology in pipe jacking tunnelling machine In, uniform and efficient machining is formed for rock, and then ensure smooth jacking of the pipe jacking tunnelling machine together with tube coupling;With this Meanwhile by the first hobboing cutter and the second hobboing cutter cutting after rock enter to cutting housing cutting end face and connecting end surface between into Row second-time breakage is handled.During above-mentioned second-time breakage technique carries out, broken end plate is connected with cutter holder assembly, and total in knife rest Into and drive shaft under the action of relative to broken end body carry out real time rotation, rock debris rotated by above-mentioned broken end plate Shock in real time is produced under effect between broken end body, and break process is carried out under the action of broken roller.By above-mentioned two Rock fragment after secondary break process is able to be broken for more careful rock debris, in order to its be mixed and fed into mud to Inside pipeline in mud system, and then it is set to avoid the occurrence of clogging when discharging pipe jacking equipment.It is meanwhile above-mentioned secondary broken Oval structure causes broken end plate to be rotated through relative to broken end body used by broken end body among broken processing mechanism Cheng Zhong, certain offset is formed between broken end plate and broken end body, cause rock with broken end plate relative to broken end Body is carried out in rotation shattering process, its broken spacing is able to real-time change, so that its broken degree and effect are able to further Improvement.
It is above-mentioned be used for rock geology under slurry-water balance type pipe jacking tunnelling machine can be by relatively low construction cost with rock Efficient push pipe driving processing is realized under matter environment, and then construction cost can reduced, it is ensured that the premise of construction efficiency and quality The lower laying processing for completing pipeline.
Brief description of the drawings
Fig. 1 is schematic diagram of the present invention;
Fig. 2 is cutting system schematic diagram in the present invention;
Fig. 3 cuts end view to be cut in the present invention in housing;
Fig. 4 is cutting enclosure interior schematic diagram in the present invention;
Fig. 5 is muddy water system schematic in the present invention;
Reference numerals list:
1- cuttings housing, 101- cuttings end face, 102- connecting end surfaces, 2- cutter holder assembly, the first knife rests of 3-, the second knives of 4- Frame, the first hobboing cutters of 5-, the second hobboing cutters of 6-, 7- connecting flanges, 8- drive shafts, 9- ball valves, 10- muddy water port, 11- crush end Body, 12-, which crush end plate, 1201- first end faces, 1202- second end faces, 13- and crush roller, the first scrapers of 14-, 15- second, to be scraped Knife, 16- drivings motor, 17- gear reducers, 18- postpositions housing, 19- correction oil cylinders, 20- butterfly valves, 21- inlet channels, 22- spoil disposals Pipeline.
Embodiment
With reference to embodiment, the present invention is furture elucidated, it should be understood that following embodiments are only used for It is bright the present invention rather than limit the scope of the invention.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to the direction in attached drawing, and word " interior " and " outer " are referred respectively to towards or away from specific The direction at component geometry center.
Embodiment 1
It is used for slurry-water balance type pipe jacking tunnelling machine under rock geology with one kind shown in Fig. 3 as shown in Figure 1, Figure 2, it includes successively There are cutting system, dynamical system, deviation-rectifying system, muddy water system, measuring system and electric system;The cutting system includes Housing 1 is cut, cutting housing 1 includes cutting end face 101 and connecting end surface 102, among the cutting end face 101 for cutting housing 1 Cutter holder assembly 2 is provided with, is provided with multiple first knife rest, 3 and second knife rests 4 in cutter holder assembly 2, multiple first knife rests 3 are along cutting The circumferential direction of housing 1 is uniformly distributed, and multiple second knife rests 4 are radially extended along the difference of cutting housing 1 respectively, multiple first knife rests 3 It is welded in inside cutter holder assembly 2 with multiple second knife rests 4, wherein, it is respectively arranged with the first hobboing cutter in each first knife rest 3 5, multiple second hobboing cutters 6, extending direction of multiple second hobboing cutters 6 along the second knife rest 4 are respectively arranged with each second knife rest 4 It is uniformly distributed.
Include drive shaft 8 among the dynamical system, it is connected among the cutter holder assembly 2 in cutting housing 1, institute State and be provided with connecting flange 7 on the connecting end surface of cutting housing, be provided with the end face of connecting flange 7 and be connected to muddy water system Muddy water port 10 among system.
As best shown in figs. 1 and 4, it is provided between the cutting end face 101 of the cutting housing 1 and connecting end surface 102 secondary Crushing mechanism, it includes the broken end extended via the cutting end face 101 of cutting housing 1 towards its connecting end surface 102 Body 11, and the broken end plate 12 extended via the cutting end face 101 for cutting housing 1 towards the axis for cutting housing 1, institute State broken end body 11 and use loop configuration, and multiple broken rollers 13 are provided with its end face, the internal diameter of broken end body 11 exists It is gradually reduced on the direction that the cutting end face 101 of cutting housing 1 extends towards connecting end surface 102, crushes end 11 optional position of body Radial section use oval structure;The broken end plate 12 includes in the cutting end face 101 for extending to cutting housing 1 First end face 1201, and the second end face 1202 relative to each other with broken end body 11, crush the first end face 1201 of end plate 12 Extend towards the axis of cutting housing 1 into line tilt, the second end face 1202 of broken end plate 12 is carried out parallel to broken end body 11 Extension.
It is used for above-mentioned under rock geology on the basis of slurry-water balance type pipe jacking tunnelling machine, the application is dug using a kind of push pipe Into method, it includes following processing step:
1) hole of pending driving processing will be placed in for slurry-water balance type pipe jacking tunnelling machine under rock geology, and will pipe Section is connected to the end of pipe jacking tunnelling machine, drives pipe jacking tunnelling machine to operate, so that promotion and top of the tube coupling in exterior oil cylinder The drive of pipe development machine is entered in hole;
2) treat that tube coupling in step 1) enters in hole, by the bellmouth center of next section of tube coupling face leading portion tube coupling, make its End face under the driving of external oil cylinder with leading portion tube coupling fits closely each other, and enters in hole;Repeat the above steps so that more Duan Guanjie is under the promotion of exterior oil cylinder and the drive of pipe jacking tunnelling machine with 3 to 5cm/min speed successively towards transporting in hole It is dynamic;
3) in hole external modulation mud, in above-mentioned steps 2) carry out during by mud be injected into the outer wall of the tube coupling with Between the wall of hole;Inside muddy water system introducing to the pipe jacking tunnelling machine that mud is passed through pipe jacking tunnelling machine at the same time, to be produced for cutting Raw rock debris is cleaned;
4) repeat step 2) to 3), required until the pipeline of multiple tube couplings composition reaches required distance;Pipeline, which is laid with, to be completed Afterwards, towards cement injection processing is carried out between the outer wall and hole wall of pipeline, with the mud between the outer wall for pipeline and hole wall Into line replacement.
As a modification of the present invention, in the step 3), mud is by bentonite: water: alkali according to 100: 614: 2 weight Amount is formed than carrying out configuration;In the step 4), the proportioning of the cement mortar for replacing mud is 2: 1.
As a modification of the present invention, in the step 3), the collocation method of mud includes:Quantitative water is put into Mix and stir inside bucket, bentonite is put into by mixing machine, and carry out mixing and stirring processing 2 to 3min;Alkali is added in bucket to mixing and stirring, continues to mix With 7 to 8min, you can into mud first product;Above-mentioned mud first product is discharged into reserve pit and deposits 10 to 12h, you can forms mud finished product.
Slurry-water balance type pipe jacking tunnelling machine under rock geology is used for using above-mentioned technical proposal, it can use push pipe to tunnel The structure setting of multiple hobboing cutters in machine in cutting system, to carry out cutting process for rock geology in pipe jacking tunnelling machine In, uniform and efficient machining is formed for rock, and then ensure smooth jacking of the pipe jacking tunnelling machine together with tube coupling;With this Meanwhile by the first hobboing cutter and the second hobboing cutter cutting after rock enter to cutting housing cutting end face and connecting end surface between into Row second-time breakage is handled.During above-mentioned second-time breakage technique carries out, broken end plate is connected with cutter holder assembly, and total in knife rest Into and drive shaft under the action of relative to broken end body carry out real time rotation, rock debris rotated by above-mentioned broken end plate Shock in real time is produced under effect between broken end body, and break process is carried out under the action of broken roller.By above-mentioned two Rock fragment after secondary break process is able to be broken for more careful rock debris, in order to its be mixed and fed into mud to Inside pipeline in mud system, and then it is set to avoid the occurrence of clogging when discharging pipe jacking equipment.It is meanwhile above-mentioned secondary broken Oval structure causes broken end plate to be rotated through relative to broken end body used by broken end body among broken processing mechanism Cheng Zhong, certain offset is formed between broken end plate and broken end body, cause rock with broken end plate relative to broken end Body is carried out in rotation shattering process, its broken spacing is able to real-time change, so that its broken degree and effect are able to further Improvement.
It is above-mentioned be used for rock geology under slurry-water balance type pipe jacking tunnelling machine can be by relatively low construction cost with rock Efficient push pipe driving processing is realized under matter environment, and then construction cost can reduced, it is ensured that the premise of construction efficiency and quality The lower laying processing for completing pipeline.
Embodiment 2
As a modification of the present invention, among the cutting system, the side end of each the first knife rest 3 is both provided with First scraper 14, the side of each the second knife rest 4 are both provided with multiple second scrapers 15.Using above-mentioned technical proposal, it can By the setting of the first scraper and the second scraper so that its first hobboing cutter of cooperation and the second hobboing cutter, cause rock broken in hobboing cutter cutting Further break process can be able under scraper effect after broken, and it is entered to cutting enclosure interior with scraper effect.
The remaining features and advantages of the present embodiment are same as Example 1.
Embodiment 3
As a modification of the present invention, the cutting housing 1 is internally provided with multigroup broken end plate, multigroup broken end plate Corresponded each other with multiple second knife rests 4 among cutter holder assembly 2, each group crushes end plate and extend parallel to each other by two Broken end plate 12 form, it is relative to each other with the side end of corresponding second knife rest 4.Using above-mentioned technical proposal, it can lead to The setting of multigroup broken end plate is crossed so that it is consistent with the cutting crushing motion of the second hobboing cutter, to improve broken end plate and rock Contact spend.
The remaining features and advantages of the present embodiment are same as Example 2.
Embodiment 4
As a modification of the present invention, 3 groups of driving motors 16 are included among the dynamical system, it is respectively by subtracting Fast machine 17 is connected with drive shaft 8;The end set of the drive shaft has the auxiliary cutterhead using pyramidal structure.It is above-mentioned dynamic The setting of Force system can provide efficient power for cutting system to carry out break process for rock.
The remaining features and advantages of the present embodiment are same as Example 3.
Embodiment 5
As a modification of the present invention, as shown in Figure 1, described be used for slurry-water balance type pipe jacking tunnelling machine under rock geology Among include postposition housing 18, the dynamical system, muddy water system, measuring system and electric system may be contained within postposition shell Among body 18, it is attached between postposition housing 18 and cutting housing 1 by multiple correction oil cylinders 19, the deviation-rectifying system is by upper State multiple correction oil cylinders 19 to form, the correction oil cylinder 19 is connected on connecting flange 9.
The remaining features and advantages of the present embodiment are same as Example 4.
Embodiment 6
As a modification of the present invention, as shown in figure 5, the muddy water system includes inlet channel 21 and spoil disposal pipeline 22, it is conducted to inside cutting housing 1 by muddy water port 10 respectively;The inlet channel 21 is connected to peripheral hardware water source, described Ball valve 9 is respectively arranged with inlet channel 21 and spoil disposal pipeline 22, and for controlling inlet channel 21 and spoil disposal pipeline 22 Between the butterfly valve 20 that is turned on.
The remaining features and advantages of the present embodiment are same as Example 5.
Embodiment 7
As a modification of the present invention, the measuring system include the measurement target that is installed on postposition housing 19 with And pitch dipmeter.
The remaining features and advantages of the present embodiment are same as Example 6.

Claims (7)

1. one kind is used for slurry-water balance type pipe jacking tunnelling machine under rock geology, it is characterised in that described to be used for mud under rock geology Balanced type pipe jacking tunnelling machine include successively cutting system, dynamical system, deviation-rectifying system, muddy water system, measuring system and Electric system;The cutting system includes cutting housing, and cutting housing includes cutting end face and connecting end surface, cuts housing Cutting end face among be provided with cutter holder assembly, be provided with multiple first knife rests and the second knife rest in cutter holder assembly, multiple first Knife rest is uniformly distributed along the circumferential direction of cutting housing, and multiple second knife rests are radially extended along the difference of cutting housing respectively, Duo Ge One knife rest is welded in inside cutter holder assembly with multiple second knife rests, wherein, it is respectively arranged with first in each first knife rest Hobboing cutter, is respectively arranged with multiple second hobboing cutters, extending direction of multiple second hobboing cutters along the second knife rest in each second knife rest It is uniformly distributed;
Include drive shaft among the dynamical system, it is connected among the cutter holder assembly in cutting housing, the cutting Connecting flange is provided with the connecting end surface of housing, is provided with and is connected among muddy water system on the end face of connecting flange Muddy water port;
Second-time breakage mechanism is provided between the cutting end face of the cutting housing and connecting end surface, it includes via cutting shell The broken end body that the cutting end of body is extended facing to its connecting end surface, and via cutting housing cutting end facing to cutting The broken end plate that the axis of housing is extended is cut, the broken end body uses loop configuration, and is provided with its end face more A broken roller, the internal diameter of broken end body gradually subtract on the direction that the cutting end of cutting housing extends facing to connecting end surface Small, the radial section of broken end body optional position uses oval structure;The broken end plate, which includes, extends to cutting housing Cutting end face in first end face, and the second end face relative to each other with broken end body, crushes the first end face court of end plate Extend to the axis of cutting housing into line tilt, the second end face of broken end plate is extended parallel to broken end body.
2. described in accordance with the claim 1 be used for slurry-water balance type pipe jacking tunnelling machine under rock geology, it is characterised in that described to cut Among cutting system, the side of each the first knife rest is both provided with the first scraper, and the side of each the second knife rest is both provided with Multiple second scrapers.
3. described in accordance with the claim 1 be used for slurry-water balance type pipe jacking tunnelling machine under rock geology, it is characterised in that described to cut Cut enclosure interior and be provided with multigroup broken end plate, multigroup broken end plate and multiple second knife rests among cutter holder assembly are each other one by one Corresponding, each group crushes end plate and is formed by two broken end plates to extend parallel to each other, its side with corresponding second knife rest End is relative to each other.
4. it is used for slurry-water balance type pipe jacking tunnelling machine under rock geology according to described in Claims 2 or 3, it is characterised in that institute State and include 3 groups of driving motors among dynamical system, it is connected by gear reducer with drive shaft respectively;The drive shaft End set have auxiliary cutterhead using pyramidal structure.
5. described in accordance with the claim 1 be used for slurry-water balance type pipe jacking tunnelling machine under rock geology, it is characterised in that the use Include postposition housing, the dynamical system, muddy water system, measurement among slurry-water balance type pipe jacking tunnelling machine under rock geology Among system and electric system may be contained within postposition housing, postposition housing and cutting housing between by multiple correction oil cylinders into Row connection, the deviation-rectifying system are made of above-mentioned multiple correction oil cylinders, and the correction oil cylinder is connected on connecting flange.
6. it is used for slurry-water balance type pipe jacking tunnelling machine under rock geology according to described in claim 5, it is characterised in that the mud Water system includes inlet channel and spoil disposal pipeline, it is conducted to cutting enclosure interior by muddy water port respectively;The water inlet Pipeline is connected to peripheral hardware water source, and the inlet channel is intake with being respectively arranged with ball valve on spoil disposal pipeline, and for controlling The butterfly valve turned between pipeline and spoil disposal pipeline.
7. it is used for slurry-water balance type pipe jacking tunnelling machine under rock geology according to described in claim 6, it is characterised in that the survey Amount system includes the measurement target being installed on postposition housing and pitches dipmeter.
CN201721291920.9U 2017-09-30 2017-09-30 For slurry-water balance type pipe jacking tunnelling machine under rock geology Active CN207261013U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721291920.9U CN207261013U (en) 2017-09-30 2017-09-30 For slurry-water balance type pipe jacking tunnelling machine under rock geology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721291920.9U CN207261013U (en) 2017-09-30 2017-09-30 For slurry-water balance type pipe jacking tunnelling machine under rock geology

Publications (1)

Publication Number Publication Date
CN207261013U true CN207261013U (en) 2018-04-20

Family

ID=61916827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721291920.9U Active CN207261013U (en) 2017-09-30 2017-09-30 For slurry-water balance type pipe jacking tunnelling machine under rock geology

Country Status (1)

Country Link
CN (1) CN207261013U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107559019A (en) * 2017-09-30 2018-01-09 嘉盛建设集团有限公司 For slurry-water balance type pipe jacking tunnelling machine under rock geology and push pipe driving method
CN108625873A (en) * 2018-08-16 2018-10-09 安徽卓科智能装备有限公司 A kind of slurry balance pipe-jacking tunneling machine
CN108952747A (en) * 2018-08-08 2018-12-07 淮南中泰矿山装备制造有限公司 Pipe jacking tunnelling machine is into mud discharging device
CN110284897A (en) * 2019-07-09 2019-09-27 中建七局安装工程有限公司 A kind of jacking construction engineering method under major diameter cobble complex geological condition

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107559019A (en) * 2017-09-30 2018-01-09 嘉盛建设集团有限公司 For slurry-water balance type pipe jacking tunnelling machine under rock geology and push pipe driving method
CN107559019B (en) * 2017-09-30 2023-11-24 嘉盛建设集团有限公司 Slurry balance type pipe jacking tunneling machine and pipe jacking tunneling method for rock geology
CN108952747A (en) * 2018-08-08 2018-12-07 淮南中泰矿山装备制造有限公司 Pipe jacking tunnelling machine is into mud discharging device
CN108625873A (en) * 2018-08-16 2018-10-09 安徽卓科智能装备有限公司 A kind of slurry balance pipe-jacking tunneling machine
CN110284897A (en) * 2019-07-09 2019-09-27 中建七局安装工程有限公司 A kind of jacking construction engineering method under major diameter cobble complex geological condition
CN110284897B (en) * 2019-07-09 2021-08-27 中建七局安装工程有限公司 Pipe jacking construction method under complex geological condition of large-diameter pebbles

Similar Documents

Publication Publication Date Title
CN207261013U (en) For slurry-water balance type pipe jacking tunnelling machine under rock geology
CN107559019A (en) For slurry-water balance type pipe jacking tunnelling machine under rock geology and push pipe driving method
CN110206546B (en) Shaft cutter head, shaft heading machine and shaft drilling machine
CN105297807B (en) A kind of integrated pipe canal open cut development machine with automatic backfill function
CN105443138A (en) Small-diameter hard rock pipe-jacking machine suitable for complex strata
CN109779651B (en) Sand ginger clay stratum short-distance mud-water balance pipe jacking construction method
CN112392500A (en) High-strength rock crushing push bench for composite stratum
CN115726806A (en) Slag discharging system of slurry TBM dual-mode shield tunneling machine and switching slag discharging method thereof
CN113309534B (en) Earth pressure type spiral unearthing push bench and spiral unearthing method
CN208918541U (en) A kind of device for abolishing cutterhead mud cake
CN204530407U (en) Device is dug in a kind of milling
CN112610271A (en) Drilling tank slurry backfilling device and method for coal mining subsidence area treatment
CN106032674A (en) Bulldozer for groove digging and backfill excavation
CN111140243A (en) Slurry balance shield machine and pipe-jacking tunneling construction method applying same
KR101416716B1 (en) rotary table of excavation device of having water jet
CN105316994B (en) Device is dug in a kind of milling
JP3124503B2 (en) Shield machine
CN114352293A (en) Mud film reinforcement construction method for shield cutter changing tunnel face and mud film component
CN112267895A (en) Pipe-jacking tunneling machine
CN111827390A (en) Construction method of continuous high-spraying impervious wall by planing and milling method
CN218063392U (en) Push bench main shaft seal structure and have its long distance push bench
CN110259465A (en) A kind of method that list shield double mode TBM pre-grouting reinforces fault belt
CN212803241U (en) Prevent mud water balanced type pipe jacking rock machine of mud storehouse suction jam
CN215520894U (en) Pipe-jacking tunneling machine
CN109718595A (en) A kind of Multi-stage adjustable shield machine mud filter residue equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant