CN207258990U - Offset hook gear - Google Patents
Offset hook gear Download PDFInfo
- Publication number
- CN207258990U CN207258990U CN201720779096.5U CN201720779096U CN207258990U CN 207258990 U CN207258990 U CN 207258990U CN 201720779096 U CN201720779096 U CN 201720779096U CN 207258990 U CN207258990 U CN 207258990U
- Authority
- CN
- China
- Prior art keywords
- connecting portion
- suspension hook
- lifting
- offset
- installing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
A kind of offset hook gear is the utility model is related to, offset hook gear includes:Installing plate;First suspension hook, including first connecting portion and it is connected to described first connecting portion one end and the first lifting portion that relatively described first connecting portion is obliquely installed, the first connecting portion are rotatably installed on the installing plate;Driving mechanism, is installed on the installing plate, the driving mechanism connects the first connecting portion away from described first lifting portion one end, to drive the first lifting portion in the rotation with surface intersected with the first connecting portion pivot center by the first connecting portion.Above-mentioned offset hook gear, first suspension hook can lift by crane the structures such as precast concrete and can be rotated under the drive of driving mechanism, so as to change the isostructural lifting direction of precast concrete as needed, to meet different lifting requirements, so that the suspender equipped with the offset hook gear has larger using flexible.
Description
Technical field
Engineering machinery field is the utility model is related to, more particularly to a kind of offset hook gear.
Background technology
In flat-type preform production factory, polylith building panel pouring molding on a steel table top, after the demoulding,
Sling wallboard by the suspension hook being fixed on crane and wallboard is transferred to storeroom and stored.Wherein, crane refers to
Within the specific limits more action hoisting machineries of vertical-lift and horizontal carrying heavy goods generally include lifting mechanism, travelling mechanism,
Rotating mechanism and jib lubbing mechanism.Wherein, lifting mechanism is usually by driving device, brake apparatus, transmission device and load-engaging device group
Into, suspension hook is installed on the suspender of load-engaging device, suspension hook driving device, stop device, transmission device collaborative work under hang
Fill wallboard.
Since the suspension hook in above-mentioned crane is fixed on suspender, the lifting of wallboard can not be changed during lifting
Direction, so as to be that the placement of wallboard brings inconvenience with less flexibility ratio.
Utility model content
Based on this, it is necessary to the problem of lifting direction can not be changed for the suspension hook of crane, there is provided one kind, which can change, hangs
Fill the offset hook gear in direction.
A kind of offset hook gear, the offset hook gear include:
Installing plate;
First suspension hook, including first connecting portion and it is connected to described first connecting portion one end and relatively described first connecting portion
The first lifting portion being obliquely installed, the first connecting portion are rotatably installed on the installing plate;And
Driving mechanism, is installed on the installing plate, and the driving mechanism connects the first connecting portion away from described first
Lifting portion one end, with by the first connecting portion drive the first lifting portion with the first connecting portion pivot center phase
The rotation with surface of friendship.
Above-mentioned offset hook gear, the first suspension hook can lift by crane the structures such as precast concrete and can be in the bands of driving mechanism
Dynamic lower rotation, so as to change the isostructural lifting direction of precast concrete as needed, to meet different lifting requirements,
So that the suspender equipped with the offset hook gear has larger using flexible.
In one of the embodiments, the driving mechanism includes actuator and driving member, and the actuator is installed on institute
Installing plate is stated, described driving member one end is rotatably connected at the actuator, and the other end is connected to the institute of first suspension hook
State first connecting portion.
In one of the embodiments, the actuator is hydraulic cylinder, and the hydraulic cylinder is equipped with can linear reciprocation fortune
Dynamic piston rod, described driving member one end are rotatably connected at the piston rod, and the other end is sheathed on first suspension hook
The first connecting portion.
In one of the embodiments, the first lifting portion of first suspension hook is away from described first connecting portion one end
Offer hole for hoist.
In one of the embodiments, the first lifting portion is laterally away from the peace from the first connecting portion one is connected
Loading board direction is obliquely installed.
In one of the embodiments, the offset boom hoisting further includes the second suspension hook, and second suspension hook includes
Second connecting portion and it is rotatably installed on institute positioned at the second lifting portion of described second connecting portion one end, the second connecting portion
Installing plate is stated, and can be rotated synchronously with the relatively described installing plate of first suspension hook.
In one of the embodiments, the driving mechanism further includes Synchronization Component, the Synchronization Component connection described the
The second connecting portion of the first connecting portion of one suspension hook and second suspension hook is so that second suspension hook and described the
One suspension hook rotates synchronously.
In one of the embodiments, the Synchronization Component includes connecting rod and is rotationally connected with the connecting rod two end respectively
The first oscillating rod and the second oscillating rod, the described one end of first oscillating rod away from the connecting rod is connected to first suspension hook
The first connecting portion, the described one end of second oscillating rod away from the connecting rod are connected to second company of second suspension hook
Socket part.
In one of the embodiments, the second lifting portion of second suspension hook is away from described second connecting portion one end
Offer hole for hoist.
In one of the embodiments, the second lifting portion is laterally away from the peace from the second connecting portion one is connected
Loading board direction is obliquely installed.
Brief description of the drawings
Fig. 1 is the top view of the offset boom hoisting of an embodiment;
Fig. 2 is the side view of the offset boom hoisting shown in Fig. 1.
Embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings
State.The preferred embodiment of the utility model is given in attached drawing.But the utility model can come in many different forms
Realize, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments makes to the utility model
The understanding of disclosure more thorough and comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element
Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to the technology of the utility model
The normally understood implication of technical staff in domain is identical.It is simply in the term used in the description of the utility model herein
The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include
The arbitrary and all combination of one or more relevant Listed Items.
As shown in Figures 1 and 2, a kind of offset hook gear 100 of this better embodiment, including installing plate 10,
One suspension hook 20 and driving mechanism 30.
Wherein, the first suspension hook 20 includes first connecting portion 22 and is connected to 22 one end of first connecting portion and opposite first connection
The first lifting portion 24 that portion 22 is obliquely installed, first connecting portion 22 are rotatably installed on installing plate 10.Driving mechanism 30 is installed
In installing plate 10, driving mechanism 30 connects first connecting portion 22 away from 24 one end of the first lifting portion, to pass through first connecting portion 22
The first lifting portion 24 is driven in the rotation with surface intersected with 22 pivot center of first connecting portion.
Above-mentioned offset hook gear 100, the first suspension hook 20 can lift by crane the structures such as precast concrete and can be in driving machines
Rotated under the drive of structure 30, it is different to meet so as to change the isostructural lifting direction of precast concrete as needed
Lifting requirements, so that the suspender equipped with the offset hook gear 100 has larger using flexible.
In the present embodiment, first connecting portion 22 in central axis upright in the cylindrical-shaped structure of installing plate 10, in this way, the
One connecting portion 22 is rotated using the central axis of itself as rotation axis relative to installing plate 10, and then is driven and mixed by the second lifting portion 24
Solidifying soil prefabricated component lifts direction in the rotation with surface perpendicular to above-mentioned central axis to change.
Please continue to refer to Fig. 1 and Fig. 2, driving mechanism 30 includes actuator 32 and driving member 34, and actuator 32 is installed on
Loading board 10,34 one end of driving member are connected to actuator 32, and the other end is sheathed on the first connecting portion 22 of the first suspension hook 20.In this way,
Actuator 32 can drive the first suspension hook 20 to rotate by driving member 34, so as to complete the change in lifting direction.
Specifically, actuator 32 is hydraulic cylinder, hydraulic cylinder be equipped with can straight reciprocating motion piston rod, driving member 34
One end is rotatably connected at piston rod, and the other end is sheathed on the first connecting portion 22 of the first suspension hook 20.In this way, piston rod can be into
Row straight reciprocating motion, and then drive driving member 34 to be rotated by rotation axis of the central shaft of first connecting portion 22, while drive the
One suspension hook 20 is rotated using the central shaft of first connecting portion 22 as rotation axis relative to installing plate 10, so as to change lifting direction.
Further, the first lifting portion 24 of the first suspension hook 20 offers hole for hoist 242 away from 22 one end of first connecting portion.
In this way, the structures such as concrete prefabricated board can be lifted on the first suspension hook 20 by operator by hole for hoist 242.It is appreciated that the
Structure not limited to this of the one lifting portion 24 away from 22 one end of first connecting portion, can be arranged as required to.
Further, the first lifting portion 24 is laterally away from the inclination of 10 direction of installing plate from connection first connecting portion 22 1 and sets
Put and be a certain included angle with the central axis with first connecting portion 22, and the angle is obtuse angle, so as to facilitate coagulation prefabricated board etc.
The installation of structure.In the present embodiment, first connecting portion 22 is inserted in installing plate 10, the first lifting portion 24 and first connecting portion 22
Setting is integrally formed, the first lifting portion 24 tilts extension from 22 side of connection first connecting portion.It is appreciated that in other embodiments
In, the mounting means not limited to this of first connecting portion 22, can be installed on installing plate 10 using other manner as needed.First
Lifting portion 24 and first connecting portion 22 or non-integral molding structure.
In one embodiment, offset hook gear 100 further includes the second suspension hook 40, which can hang with first
Hook 20 coordinates to lift the structures such as concrete prefabricated board jointly.
Similar to the first suspension hook 20, specifically, the second suspension hook 40 includes second connecting portion 42 and positioned at second connecting portion 42
The second lifting portion 44 of one end, second connecting portion 42 are rotatably installed on installing plate 10 to change lifting angle.This second hangs
Second lifting portion 44 of hook 40 offers hole for hoist away from 42 one end of second connecting portion, and the second lifting portion 44 is connected from connection second
Portion 42 1 is laterally away from 10 direction of installing plate and is obliquely installed, in order to connect the structures such as concrete prefabricated board.
Further, driving mechanism 30 further includes Synchronization Component 36, and Synchronization Component 36 connects the first company of the first suspension hook 20
The second connecting portion 42 of 22 and second suspension hook 40 of socket part, so that the second suspension hook 40 and the first suspension hook 20 are rotated synchronously with synchronous change
Lift direction.
Specifically, Synchronization Component 36 includes connecting rod 366 and the first oscillating rod for being rotationally connected with 366 both ends of connecting rod respectively
362 and second oscillating rod 364, first one end of oscillating rod 362 away from connecting rod 366 is connected to the first connecting portion of the first suspension hook 20
22 can follow first connecting portion 22 to rotate, and second one end of oscillating rod 364 away from connecting rod 366 is connected to the of the second suspension hook 40
Two connecting portions 42 are can drive second connecting portion 42 to rotate.In this way, driving mechanism 30 drives the first connecting portion of the first suspension hook 20
22 rotate, and then drive the first oscillating rod 362 to rotate, and the first oscillating rod 362 and then drive connecting rod 366 to swing, eventually through the
Two oscillating rods 364 drive the second suspension hook 40 to rotate.In the present embodiment, the first oscillating rod 362 is set in the stacking of driving member 34
In the first connecting portion 42 of first suspension hook 40.In another embodiment, the first oscillating rod 362 is integrally formed with driving member 34 sets
Put.
Above-mentioned offset hook gear 100, can drive interval setting by exporting the driving mechanism 30 of straight reciprocating motion
The first suspension hook 20 and the second suspension hook 40 rotate predetermined angle so that complete lifting direction change, can be by the concrete of lifting
Prefabricated board turns to certain angle with respect to installing plate 10 and meets different production needs.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the utility model, its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (10)
1. a kind of offset hook gear, it is characterised in that the offset hook gear includes:
Installing plate;
First suspension hook, including first connecting portion and it is connected to described first connecting portion one end and the first connecting portion tilts relatively
The the first lifting portion set, the first connecting portion are rotatably installed on the installing plate;And
Driving mechanism, is installed on the installing plate, and the driving mechanism connects the first connecting portion away from the described first lifting
Portion one end, to drive the first lifting portion intersecting with the first connecting portion pivot center by the first connecting portion
Rotation with surface.
2. offset hook gear according to claim 1, it is characterised in that the driving mechanism includes actuator and biography
Moving part, the actuator are installed on the installing plate, and described driving member one end is rotatably connected at the actuator, the other end
It is connected to the first connecting portion of first suspension hook.
3. offset hook gear according to claim 2, it is characterised in that the actuator is hydraulic cylinder, described
Hydraulic cylinder be equipped with can straight reciprocating motion piston rod, described driving member one end is rotatably connected at the piston rod, separately
One end is sheathed on the first connecting portion of first suspension hook.
4. offset hook gear according to claim 1, it is characterised in that first lifting of first suspension hook
Portion offers hole for hoist away from described first connecting portion one end.
5. offset hook gear according to claim 1, it is characterised in that the first lifting portion is from connecting described the
One connecting portion one is laterally away from the installing plate direction and is obliquely installed.
6. offset hook gear according to claim 1, it is characterised in that the offset boom hoisting further includes
Two suspension hooks, second suspension hook include second connecting portion and positioned at the second lifting portions of described second connecting portion one end, and described the
Two connecting portions are rotatably installed on the installing plate, and can be rotated synchronously with the relatively described installing plate of first suspension hook.
7. offset hook gear according to claim 6, it is characterised in that the driving mechanism further includes synchronization group
Part, the Synchronization Component connect the first connecting portion of first suspension hook and the second connecting portion of second suspension hook
So that second suspension hook is rotated synchronously with first suspension hook.
8. offset hook gear according to claim 7, it is characterised in that the Synchronization Component includes connecting rod and difference
The first oscillating rod and the second oscillating rod of the connecting rod two end are rotationally connected with, first oscillating rod is away from the connecting rod
One end is connected to the first connecting portion of first suspension hook, and the described one end of second oscillating rod away from the connecting rod is connected to
The second connecting portion of second suspension hook.
9. offset hook gear according to claim 6, it is characterised in that second lifting of second suspension hook
Portion offers hole for hoist away from described second connecting portion one end.
10. offset hook gear according to claim 6, it is characterised in that described in the second lifting portion from connection
Second connecting portion one is laterally away from the installing plate direction and is obliquely installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720779096.5U CN207258990U (en) | 2017-06-29 | 2017-06-29 | Offset hook gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720779096.5U CN207258990U (en) | 2017-06-29 | 2017-06-29 | Offset hook gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207258990U true CN207258990U (en) | 2018-04-20 |
Family
ID=61926232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720779096.5U Active CN207258990U (en) | 2017-06-29 | 2017-06-29 | Offset hook gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207258990U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108726344A (en) * | 2018-07-10 | 2018-11-02 | 泸州智通自动化设备有限公司 | A kind of automatic hoisting mechanism for intelligent travelling crane |
CN108726345A (en) * | 2018-07-10 | 2018-11-02 | 泸州智通自动化设备有限公司 | A kind of brew house material transporting system |
CN108913423A (en) * | 2018-07-10 | 2018-11-30 | 泸州智通自动化设备有限公司 | A kind of white spirit brewing mechanized production system |
-
2017
- 2017-06-29 CN CN201720779096.5U patent/CN207258990U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108726344A (en) * | 2018-07-10 | 2018-11-02 | 泸州智通自动化设备有限公司 | A kind of automatic hoisting mechanism for intelligent travelling crane |
CN108726345A (en) * | 2018-07-10 | 2018-11-02 | 泸州智通自动化设备有限公司 | A kind of brew house material transporting system |
CN108913423A (en) * | 2018-07-10 | 2018-11-30 | 泸州智通自动化设备有限公司 | A kind of white spirit brewing mechanized production system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207258990U (en) | Offset hook gear | |
CN101830391B (en) | Lifting appliance and front handling mobile crane with same | |
CN106586826A (en) | Four-freedom-degree self-stabilization box grab bucket based on parallel mechanism | |
CN107445065B (en) | Hanging device | |
CN204022340U (en) | A kind of wide-angle hoisting crane | |
CN206798967U (en) | Lifting assembly and crane gear | |
CN108928757A (en) | A kind of lifting machine and its construction method of packaged type | |
KR20030012146A (en) | Hoisting apparatus using counterweight | |
CN107905250A (en) | A kind of environmentally-friendly asphalt Concrete Highway builds integrated construction machine with retaining wall | |
CN202321978U (en) | Combined lifting appliance for metallurgical environment | |
CN202658902U (en) | Hoisting and distributing dual-purpose concrete distributing machine | |
CN103058069B (en) | Flat-arm tower crane | |
CN105129624B (en) | Hydraulic support hook | |
CN207030742U (en) | Mobile hanging apparatus | |
CN104192705A (en) | Anti-swing tower crane | |
CN209038910U (en) | Gantry crane | |
CN104444843B (en) | A kind of full circle swinging small-sized crane | |
CN207030788U (en) | Hanging device | |
CN207030751U (en) | Boom hoisting | |
CN212863850U (en) | Concrete prefabricated part hoist | |
CN107140528B (en) | Boom hoisting | |
CN205892558U (en) | Horizontal rotation's hoist and mount frame | |
CN210505310U (en) | Detachable hoisting device | |
CN208856779U (en) | A kind of tile hanging apparatus | |
CN206088769U (en) | Portal slewing crane's four rope hoists |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |