CN207258452U - A kind of easily construction savings tank arrangement - Google Patents
A kind of easily construction savings tank arrangement Download PDFInfo
- Publication number
- CN207258452U CN207258452U CN201721147585.5U CN201721147585U CN207258452U CN 207258452 U CN207258452 U CN 207258452U CN 201721147585 U CN201721147585 U CN 201721147585U CN 207258452 U CN207258452 U CN 207258452U
- Authority
- CN
- China
- Prior art keywords
- entrance
- tank
- concrete pedestal
- steel plate
- easily construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
A kind of easily construction savings tank arrangement, including concrete pedestal, with the tank bottom being set in turn on the concrete pedestal, can body and tank deck, concrete pedestal entrance is set inside the concrete pedestal, steel plate entrance is set between the concrete pedestal and the tank bottom, the steel plate entrance is passed through inside the concrete pedestal entrance, concrete pedestal entrance is set inside concrete pedestal, it is adapted to suitable welding personnel to be crawled into from tank bottom in tank, the instrument used is also more convenient to bring into tank, greatly save the time into tank, it is and safer quick, after tank body integrally completes, the population of tank bottom is sealed up with steel plate, concrete pedestal entrance is sealed up with cement does not interfere with tank body use.
Description
Technical field
Technical field of construction equipment is the utility model is related to, more particularly to a kind of easily construction savings tank arrangement.
Background technology
In large-scale accumulator tank work progress, it is necessary to construct to can body after the completion of tank bottom and tank deck, can body construction can be one layer
One has been laminated and has increased, and height is several meters to more than ten meters general.Welding personnel will enter welding in tank, it is necessary to the ladder outside by tank body
Climbing gets to welding in tank up, and tank body increasing in layer, welding personnel also more ascends height, and welds people every time
Member needs instrument to shoulder into constructing in tank, so extremely dangerous during climbing and waste time.
Utility model content
In order to overcome disadvantages mentioned above and deficiency, the purpose of this utility model is to provide a kind of easily construction to save tank arrangement,
The thickness of plug division is reduced, reduces the contact area of plug division, improves retentivity problems of too.
The purpose of this utility model is achieved through the following technical solutions:
A kind of easily construction savings tank arrangement, including concrete pedestal, and be set in turn on the concrete pedestal tank bottom, tank
Body and tank deck, the concrete pedestal inside set concrete pedestal entrance, and the bottom of the tank bottom sets steel plate entrance, described
Steel plate entrance and the width dimensions of the concrete pedestal entrance match.
In one of the embodiments, the concrete pedestal entrance is 1 meter -1.5 meters long, width 0.3-1.
In one of the embodiments, the concrete pedestal entrance is a length of 1.2 meters, and width is 0.6 meter,
In one of the embodiments, a height of 0.6 meter of the concrete pedestal entrance.
In one of the embodiments, the section of the steel plate entrance for circle, the steel plate entrance it is a diameter of
0.3-1 meters.
In one of the embodiments, a diameter of 0.6 meter of the steel plate entrance.
Compared with prior art, one kind of the utility model easily construction savings tank arrangement has the advantages that:
1. setting concrete pedestal entrance inside concrete pedestal, it is adapted to suitable welding personnel to be crawled into from tank bottom in tank, makes
Instrument is also more convenient to bring into tank, greatlys save into the time in tank, and safer quick.
2. after tank body integrally completes, the entrance of tank bottom is sealed up with steel plate, and concrete pedestal entrance is sealed up with cement, Bu Huiying
Tank body is rung to use.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the vertical view figure structure schematic representation of the utility model.
Embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings
State.The better embodiment of the utility model is given in attached drawing.But the utility model can come in many different forms
Realize, however it is not limited to embodiments described herein.On the contrary, the purpose for providing these embodiments is to make to this practicality newly
The more thorough and comprehensive that the disclosure of type understands.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element
Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
For illustrative purposes only, it is unique embodiment to be not offered as " right side " and similar statement.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to the technology of the utility model
The normally understood implication of technical staff in domain is identical.It is simply in the term used in the description of the utility model herein
The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " bag
Include the arbitrary and all combination of one or more relevant Listed Items.
- 2 are please referred to Fig.1, tank arrangement, including concrete pedestal 6 are saved in a kind of easily construction, and are set in turn in the cement base
Tank bottom 3, can body 2 and tank deck 1 on plinth 6, the inside of concrete pedestal 6 set concrete pedestal entrance 5, the bottom of the tank bottom 3
Portion sets steel plate entrance 4, and the width dimensions of the steel plate entrance 4 and the concrete pedestal entrance 5 match.
Concrete pedestal entrance 5 is set inside concrete pedestal 6, is adapted to suitable welding personnel to be crawled into from tank bottom 3 in tank, makes
Instrument is also more convenient to bring into tank, greatlys save into the time in tank, and safer quick, avoids the prior art
Welding personnel by tank body outside ladder climbing, the problem of entering back into welding in tank, reduce the risk of construction, when saving construction
Between.
In one of the embodiments, the concrete pedestal entrance is 1 meter -1.5 meters long, width 0.3-1, it is preferable that
The concrete pedestal entrance is a length of 1.2 meters, and width is 0.6 meter, facilitates welding personnel to be crawled into from tank bottom in tank, the instrument used
Also it is more convenient to bring into tank, greatlys save into the time in tank, and it is safer quick.
In one of the embodiments, a height of 0.6 meter of the concrete pedestal entrance, facilitates welding personnel to be climbed from tank bottom
Into in tank, easy to construct.
In one of the embodiments, the section of the steel plate entrance for circle, the steel plate entrance it is a diameter of
0.3-1 meters, steel plate entrance 4 and the width dimensions of concrete pedestal entrance 5 match, after tank body integrally completes, the people of tank bottom
Mouth is sealed up with steel plate, and concrete pedestal entrance is sealed up with cement does not interfere with tank body use.
In one of the embodiments, a diameter of 0.6 meter of the steel plate entrance, the width with concrete pedestal entrance 5
Degree size matches, and easy to construct, after the completion of construction, convenient steel plate seals, and whole work progress is safe and efficient.
Embodiment described above only expresses the several embodiments of the utility model, its description is more specific and detailed,
But it should not be interpreted as limiting the scope of the present invention.It should be pointed out that for the common of this area
For technical staff, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to
In the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (6)
1. a kind of easily construction savings tank arrangement, it is characterised in that including concrete pedestal, and be set in turn on the concrete pedestal
Tank bottom, can body and tank deck, concrete pedestal entrance is set inside the concrete pedestal, the bottom of the tank bottom sets steel plate to go out
Entrance, the width dimensions of the steel plate entrance and the concrete pedestal entrance match.
2. a kind of easily construction savings tank arrangement according to claim 1, it is characterised in that the concrete pedestal entrance is
It is 1 meter -1.5 meters long, width 0.3-1.
3. a kind of easily construction savings tank arrangement according to claim 2, it is characterised in that the concrete pedestal entrance is
A length of 1.2 meters, width is 0.6 meter.
4. according to any described one kind of claim 1-3 easily construction savings tank arrangement, it is characterised in that the concrete pedestal goes out
A height of 0.6 meter of entrance.
A kind of 5. easily construction savings tank arrangement according to claim 1, it is characterised in that the section of the steel plate entrance
For circle, a diameter of 0.3-1 meters of the steel plate entrance.
A kind of 6. easily construction savings tank arrangement according to claim 5, it is characterised in that the diameter of the steel plate entrance
For 0.6 meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721147585.5U CN207258452U (en) | 2017-09-08 | 2017-09-08 | A kind of easily construction savings tank arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721147585.5U CN207258452U (en) | 2017-09-08 | 2017-09-08 | A kind of easily construction savings tank arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207258452U true CN207258452U (en) | 2018-04-20 |
Family
ID=61920736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721147585.5U Active CN207258452U (en) | 2017-09-08 | 2017-09-08 | A kind of easily construction savings tank arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207258452U (en) |
-
2017
- 2017-09-08 CN CN201721147585.5U patent/CN207258452U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203891752U (en) | Anti-climbing ladder of angular tower | |
CN205551845U (en) | Steel is high -tension electricity welding machine for bridge | |
CN207258452U (en) | A kind of easily construction savings tank arrangement | |
CN203693100U (en) | Large-scale storehouse shelf | |
CN204266665U (en) | The anti-climbing device of steel tube tower | |
CN205558785U (en) | Portable flexible double ladder | |
CN104120868B (en) | The collapsible scaffold of a kind of building iron structure | |
CN206636157U (en) | One kind is suitable to job site assembling steel construction | |
CN205396963U (en) | Base is put things in good order to whole steel pipe on scaffold | |
CN206798174U (en) | A kind of stabiliser bar turnover rack | |
CN203488077U (en) | Ladder for building workers | |
CN203685012U (en) | Safety ladder cage for high-altitude operation | |
CN206301555U (en) | A kind of construction site construction warning sign | |
CN205396962U (en) | Whole scaffold steel pipe puts things in good order frame | |
CN203835014U (en) | Flange-plate rust-prevention reinforced concrete pole | |
CN204255360U (en) | A kind of wrap attachment | |
CN104675105A (en) | Single upright and double upright connection | |
CN204027643U (en) | A kind of liquid level electrode | |
CN208294033U (en) | A kind of reinforcing support construction for architectural engineering | |
CN204920041U (en) | Bent type single face angle bead of stair for building | |
CN205046912U (en) | Work platform is operated to steel pipe tower temporarily | |
CN204163361U (en) | A kind of building implements scaffold | |
CN203934179U (en) | A kind of regulator cubicle with radiation-inhibiting function | |
CN203705632U (en) | Portable metering device on-site calibration working platform | |
CN204163367U (en) | Cat ladder frame operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |