CN207245147U - 一种新型的转角铝合金防护网 - Google Patents
一种新型的转角铝合金防护网 Download PDFInfo
- Publication number
- CN207245147U CN207245147U CN201720774934.XU CN201720774934U CN207245147U CN 207245147 U CN207245147 U CN 207245147U CN 201720774934 U CN201720774934 U CN 201720774934U CN 207245147 U CN207245147 U CN 207245147U
- Authority
- CN
- China
- Prior art keywords
- protection network
- aluminium alloy
- hinged
- fastener
- supporting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buffer Packaging (AREA)
Abstract
本实用新型公开了一种新型的转角铝合金防护网,包括防护网、两个扣件、若干根支撑杆和若干根内外伸缩管;所述支撑杆的下端经一所述扣件铰接在脚手架上部;所述内外伸缩管上端铰接在所述支撑杆的上部,下端经另一所述扣件铰接在脚手架的下部;所述防护网固定在所有所述支撑杆上。本实用新型安装方便;结构轻便,运输及安装省力;角度可以调节;采用高强度防护网材质,承受的冲击力比传统的防护网要强;整体效果比较美观,填补了铝合金防护网在转角处的漏洞。
Description
技术领域
本实用新型涉及建筑防护设备技术领域,尤其是一种新型的转角铝合金防护网。
背景技术
在建筑脚手架行业,防护网是在脚手架的某一层设置的沿建筑物一周的防护装置,一般设置在施工楼层的下方一段距离,具体作用是以防施工时的石块杂物从高空落下而砸伤下面的行人。
现有的防护网结构一般是在脚手架上用扣件支起一圈斜撑,在斜撑杆上绕着建筑物设置一圈防护网,现有的施工方案存在着施工强度大、防护网角度调节困难、承受的冲击力较差的缺点。虽然有采用新型的铝合金防护网1,但在两个相邻铝合金防护网1之间的转角部位出现一个扇形的缺口,见图1所示,原先的防护网无法解决此处的缺口,容易发生安全事故。
实用新型内容
本实用新型针对现有技术的不足,提出一种新型的转角铝合金防护网,结构简单,防护性能好。
为了实现上述实用新型目的,本实用新型提供以下技术方案:一种新型的转角铝合金防护网,包括防护网、两个扣件、若干根支撑杆和若干根内外伸缩管;所述支撑杆的下端经一所述扣件铰接在脚手架上部;所述内外伸缩管上端铰接在所述支撑杆的上部,下端经另一所述扣件铰接在脚手架的下部;所述防护网固定在所有所述支撑杆上。
进一步地,还包括拉绳,所述拉绳系在所述支撑杆的顶端。
进一步地,所述内外伸缩管是由两根管轴向套设构成,两管套设部位上插设有锁定块。
进一步地,所述扣件包括一个能抱住脚手架钢管的合页,该合页一侧上固定连接有若干个连接件。
进一步地,所述连接件为销轴孔或销轴。
进一步地,所述支撑杆的数量为5个,所述内外伸缩管的数量为3个。
与现有技术相比,本实用新型具有以下优点:
1、安装方便。
2、结构轻便,运输及安装省力。
3、角度可以调节。
4、采用高强度防护网材质,承受的冲击力比传统的防护网要强。
5、整体效果比较美观,填补了铝合金防护网在转角处的漏洞。
附图说明
图1为现有铝合金防护网结构示意图;
图2为本实用新型一种新型的转角铝合金防护网的使用状态图;
图3为本实用新型的部分结构示意图;
图4为扣件的结构示意图;
图5为扣件的另一结构示意图;
图示标记:
1-铝合金防护网、2-下扣件、3-内外伸缩管、4-上扣件、5-支撑杆、6-防护网、7-拉绳。
具体实施方式
下面结合附图对本实用新型进行详细描述,本部分的描述仅是示范性和解释性,不应对本实用新型的保护范围有任何的限制作用。
如图2、3、4和5所示,一种新型的转角铝合金防护网,包括防护网6、上扣件4、下扣件2、若干根支撑杆5和若干根内外伸缩管3;所述支撑杆5的下端经上扣件4铰接在脚手架上部;所述内外伸缩管3上端铰接在所述支撑杆5的上部,下端经下扣件2铰接在脚手架的下部;所述防护网6固定在所有所述支撑杆5上;图2中所示,支撑杆5的数量为5根,内外伸缩管3为3根。
新型的转角铝合金防护网还包括拉绳7,所述拉绳7系在所述支撑杆5的顶端。
所述内外伸缩管3是由两根管轴向套设构成,两管套设部位上插设有锁定块。
上扣件4或下扣件2包括一个能抱住脚手架钢管的合页,该合页一侧上固定连接有若干个连接件,如图4或5所示,连接件为销轴孔或销轴。
本实用新型是结合铝合金防护网1的设计特点,解决了在它们转角处的防护问题,可将上扣件4设计成与铝合金防护网1的上扣件进行共用,下扣件2也为共用。本实用新型结构的转角铝合金防护网采用五根铝合金圆管套在一张扇形的高强度防护网6上,通过棉绳7的松放达到与铝合金防护网1相同的撑开角度,然后用相同的内外伸缩管3装到上扣件4和下扣件2上,松开棉绳7,完全封闭住转角处的缺口。
此种结构防护网与原先的传统的防护网相比,具有以下的优点:1、安装方便。2、结构轻便,运输及安装省力。3、角度可以调节。4、采用高强度防护网材质,承受的冲击力比传统的防护网要强。5、整体效果比较美观,填补了铝合金防护网在转角处的漏洞。
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。
Claims (5)
1.一种新型的转角铝合金防护网,其特征在于:包括防护网、两个扣件、若干根支撑杆和若干根内外伸缩管;所述支撑杆的下端经一所述扣件铰接在脚手架上部;所述内外伸缩管上端铰接在所述支撑杆的上部,下端经另一所述扣件铰接在脚手架的下部;所述防护网固定在所有所述支撑杆上。
2.如权利要求1所述新型的转角铝合金防护网,其特征在于:还包括拉绳,所述拉绳系在所述支撑杆的顶端。
3.如权利要求1所述新型的转角铝合金防护网,其特征在于:所述内外伸缩管是由两根管轴向套设构成,两管套设部位上插设有锁定块。
4.如权利要求1所述新型的转角铝合金防护网,其特征在于:所述扣件包括一个能抱住脚手架钢管的合页,该合页一侧上固定连接有若干个连接件。
5.如权利要求1所述新型的转角铝合金防护网,其特征在于:所述支撑杆的数量为5个,所述内外伸缩管的数量为3个。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720774934.XU CN207245147U (zh) | 2017-06-29 | 2017-06-29 | 一种新型的转角铝合金防护网 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720774934.XU CN207245147U (zh) | 2017-06-29 | 2017-06-29 | 一种新型的转角铝合金防护网 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207245147U true CN207245147U (zh) | 2018-04-17 |
Family
ID=61877372
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720774934.XU Expired - Fee Related CN207245147U (zh) | 2017-06-29 | 2017-06-29 | 一种新型的转角铝合金防护网 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207245147U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107190968A (zh) * | 2017-06-29 | 2017-09-22 | 无锡市晨源建筑器材有限公司 | 一种新型的转角铝合金防护网 |
GB2577668A (en) * | 2018-05-14 | 2020-04-08 | Specialist Safety Netting Ltd | An extendable scaffolding safety barrier and method |
-
2017
- 2017-06-29 CN CN201720774934.XU patent/CN207245147U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107190968A (zh) * | 2017-06-29 | 2017-09-22 | 无锡市晨源建筑器材有限公司 | 一种新型的转角铝合金防护网 |
GB2577668A (en) * | 2018-05-14 | 2020-04-08 | Specialist Safety Netting Ltd | An extendable scaffolding safety barrier and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207245147U (zh) | 一种新型的转角铝合金防护网 | |
CN204627010U (zh) | 一种适用于爬架的外侧防护网 | |
CN107178205A (zh) | 一种新型的铝合金网防护装置及其安装方法 | |
CN107190968A (zh) | 一种新型的转角铝合金防护网 | |
CN204752026U (zh) | 塔吊安全通道 | |
CN207959899U (zh) | 一种新型的铝合金网防护装置 | |
CN207469718U (zh) | 一种可周转使用的外墙脚手架拉结装置 | |
CN204040556U (zh) | 伸缩式一二级配电箱防护棚 | |
CN205713050U (zh) | 一种市政工程用的脚手架防护网 | |
CN206220649U (zh) | 施工围挡 | |
CN206091273U (zh) | 一种土建用脚手架连接装置 | |
CN211974292U (zh) | 一种脚手架剪刀撑连接扣件 | |
CN211622558U (zh) | 脚手架层间可调节水平防护支撑架 | |
CN204282850U (zh) | 钢结构-混凝土组合楼板预留洞口防护网架 | |
CN206971679U (zh) | 一种安全防摔脚手架 | |
CN206205452U (zh) | 一种伸缩式大体积素混凝土浇筑定型化操作平台 | |
CN209159747U (zh) | 多功能屏柜搬运小车 | |
CN106760530B (zh) | 一种用于塔吊附墙杆拆卸的操作平台及其施工方法 | |
CN207032915U (zh) | 一种建筑工程用安全防护网 | |
CN206205765U (zh) | 一种野外电力作业梯 | |
CN207314896U (zh) | 一种调节式建筑安全防护三角栏杆 | |
CN207063560U (zh) | 一种钢爬架组合工具式内防护活动翻板 | |
CN204940900U (zh) | 一种建筑施工用防护护栏 | |
CN206153467U (zh) | 一种盾构管片钢筋笼制造用台架 | |
CN206693658U (zh) | 一种可调节安全防护套管装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180417 Termination date: 20190629 |
|
CF01 | Termination of patent right due to non-payment of annual fee |