CN207244686U - A kind of foundation pile static loading test reaction frame - Google Patents

A kind of foundation pile static loading test reaction frame Download PDF

Info

Publication number
CN207244686U
CN207244686U CN201721240411.3U CN201721240411U CN207244686U CN 207244686 U CN207244686 U CN 207244686U CN 201721240411 U CN201721240411 U CN 201721240411U CN 207244686 U CN207244686 U CN 207244686U
Authority
CN
China
Prior art keywords
block
foundation pile
reaction frame
loading test
static loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721240411.3U
Other languages
Chinese (zh)
Inventor
任嫱
王兴园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangtze River Construction Engineering Quality Inspection Co Ltd
Original Assignee
Jiangsu Yangtze River Construction Engineering Quality Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangtze River Construction Engineering Quality Inspection Co Ltd filed Critical Jiangsu Yangtze River Construction Engineering Quality Inspection Co Ltd
Priority to CN201721240411.3U priority Critical patent/CN207244686U/en
Application granted granted Critical
Publication of CN207244686U publication Critical patent/CN207244686U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a kind of foundation pile static loading test reaction frame, including the jack being placed at the top of foundation pile, level is placed with girder on the jack, the more secondary beams set on the girder perpendicular to girder length direction, the secondary beam both ends are equipped with the supporting block placed on the ground, and the supporting block includes U-shaped block, and the U-shaped block includes horizontally disposed bottom plate, the bottom plate both sides are equipped with two block baffles vertically, and the horizontally disposed cushion block of polylith is stacked with successively between the baffle.Supporting block is set to replace the cement buttress of in-situ casting, in this way, supporting block can be used for multiple times, with cost-effective and saving time of measuring;When building reaction frame, before secondary beam is placed, supporting block is placed in ground both sides first;Then cushion block is placed into U-shaped block according to girder height;Finally secondary beam is lifted on girder, and the end of secondary beam is placed into supporting block, can start static test after counterweight will be placed on secondary beam.

Description

A kind of foundation pile static loading test reaction frame
Technical field
A kind of reaction frame is the utility model is related to, more particularly to a kind of foundation pile static loading test reaction frame.
Background technology
Static test is that one kind applies vertical pressure, vertical uplift force or horizontal thrust in stake top portion step by step, observes stake top Sedimentation, uplift displacement or the horizontal displacement that portion is produced with the time, to determine corresponding single pile vertical resistance pressure bearing capacity, single-pile vertical orientation The experimental method of anti-pulling capacity or horizontal bearing capacity of single pile.Reaction frame is a kind of device for being used to detect test specimen compression strength.
At present, the preloading formula foundation pile static loading test reaction frame of in the market as shown in Figure 1, including more horizontal positioned time Beam 4, every 4 both ends of secondary beam lower section are placed with buttress 10, and 4 downward vertical of secondary beam is led in horizontal be equipped with of 4 length direction of secondary beam Beam 12, the upper surface of girder 12 are against 4 lower surface centre position of secondary beam, and the 12 lower surface centre position of girder, which abuts, placement Jack 11 on foundation pile 1.During measurement, clump weight 13 is placed above secondary beam 4, driving jack 11 pushes up girder 12, the sedimentation of observation foundation pile 1 under pressure.
Although this preloading formula foundation pile static loading test reaction frame can be built immediately on measurement place, and can measure foundation pile Vertical Compressive Bearing Capacity;But carry out being required for being placed according to girder during foundation pile static loading test every time highly pours branch again Pier, not only cost is higher, and cumbersome.
Utility model content
The purpose of this utility model is to provide a kind of foundation pile static loading test reaction frame, is acted on using supporting block instead of buttress, It is and versatile using the cushion block adjustment supporting block height stacked successively, the different height of adaptation different tests middle girder.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of foundation pile static loading test Reaction frame, including be placed on the jack at the top of foundation pile, level is placed with girder on the jack, perpendicular to master on the girder The more secondary beams that beam length direction is set, the secondary beam both ends are equipped with the supporting block placed on the ground, and the supporting block includes U Shape block, the U-shaped block include horizontally disposed bottom plate, and the bottom plate both sides are equipped with two block baffles vertically, between the baffle according to It is secondary to be stacked with the horizontally disposed cushion block of polylith.
By using above-mentioned technical proposal, supporting block is set to replace the cement buttress of in-situ casting, in this way, supporting block can It is used for multiple times, with cost-effective and saving time of measuring;When building reaction frame, before secondary beam is placed, put first in ground both sides Put supporting block;Then cushion block is placed into U-shaped block according to girder height;Finally secondary beam is lifted on girder, and secondary beam End is placed into supporting block, can start static test after counterweight will be placed on secondary beam.
Further, it is equipped with flange in opposite directions on the baffle of the U-shaped block side opening both sides.
By using above-mentioned technical proposal, since the superposition of multiple cushion blocks is placed in U-shaped block, opened in U-shaped block side side Flange is fixed with opposite directions on edge at mouthful, and flange can prevent cushion block from being skidded off during lifting and use from U-shaped block.
Further, the opening both sides of the U-shaped block opposing flanges side are rotated equipped with limiting plate respectively.
By using above-mentioned technical proposal, it is rotatablely connected on the edge of the opening both sides of U-shaped block opposing flanges side limited Position plate, on the one hand, limiting plate can mating flanges cushion block is fixed in U-shaped block, avoid influencing because of the sliding of cushion block anti- The security of power frame, on the other hand, rotating the limiting plate of setting can facilitate operating personnel to pick and place cushion block, so as to adjust supporting block Height.
Further, edge of the limiting plate away from baffle side is provided with through hole vertically, slides and sets in the through hole There is securing rod, coordinate securing rod to be provided with lock hole on the bottom plate.
By using above-mentioned technical proposal, in order to which limiting plate is fixed on aperture position, limiting plate squeezing in cushion block is avoided Limiting plate is pushed in pressure open, opens through hole vertically in edge of the limiting plate away from baffle side, lead to the hole site is corresponded on bottom plate Clamping block is provided with, the securing rod of setting is slid in through hole to be inserted in lock hole, and limiting plate is fixed on to the opening of U-shaped block Position, so as to limit U-shaped cushion block in the block.
Further, the outer wall of one piece of U-shaped block is equipped with winder, is connected with drawstring in the winder, relatively The outer wall of U-shaped block indicates the scale being vertically arranged described in side.
By using above-mentioned technical proposal, in order to further determine two pieces of opposite supporting blocks whether in same level On, winder is fixed on U-shaped block outer wall, pulls drawstring connected horizontally on winder to the U-shaped block position of opposite side, to contrast Drawstring position and the position of horizontal scale line on U-shaped block outer wall, if horizontally disposed drawstring deviates horizontal scale line, according to deviation Distance by cushion block adjust supporting block height, be horizontally situated secondary beam.
Further, the cushion block is equipped with draw ring close to limiting plate side.
By using above-mentioned technical proposal, the fixed pull ring on cushion block side wall, facilitates operating personnel to pull draw ring to pick and place pad Block, supporting block to be highly adjusted.
Further, the cushion block bottom surface is equipped with roller, and the cushion block upper surface is provided with the guide rail coordinated with roller, described Guide rail parallel is in baffle plate setting.
By using above-mentioned technical proposal, upper roller is all set in the bottom of each piece of cushion block, in the upper of each piece of cushion block Surface is all provided with the guide rail for coordinating roller, and guide rail parallel is in baffle plate setting, in this way, operating personnel are going to work as cushion block using draw ring When, the friction between cushion block can be reduced by roller and guide rail, it is more laborsaving.
Further, the symmetrical both sides outer wall of the U-shaped block is equipped with hanging ring.
By using above-mentioned technical proposal, hanging ring is fixed on the outer wall of the symmetrical both sides of U-shaped block, facilitates operating personnel to U Shape block is lifted and transported.
Further, perforation is provided with screw hole on the secondary beam and cushion block, and bolt is screwed with the screw hole.
By using above-mentioned technical proposal, penetrated through on secondary beam and cushion block and open screw hole, on the one hand, bolt is screwed into screw hole In can fix secondary beam, avoid clump weight that secondary beam is pushed away initial position in placement, on the other hand, corresponding screwhole position Operating personnel can be facilitated to quickly find the riding position of secondary beam in lifting, accelerate the installation of reaction frame.
In conclusion the utility model has the advantages that:
1. replacing the effect of buttress by the good supporting block of pre-production, experiment progress can not only be accelerated, and can The supporting block of Reusability can also be tested cost-effective;
2. by sliding the cushion block of setting in U-shaped block, the height of supporting block is adjusted to coordinate girder highly to install secondary beam.
Brief description of the drawings
Fig. 1 is prior art overall structure diagram;
Fig. 2 is a kind of overall structure diagram of foundation pile static loading test reaction frame of the utility model;
Fig. 3 is the explosive view of supporting block;
Fig. 4 is the explosive view of supporting block and secondary beam part.
In figure, 1, foundation pile;10th, buttress;11st, jack;12nd, girder;13rd, clump weight;2nd, supporting block;21st, spirit level; 22nd, U-shaped block;221st, bottom plate;222nd, baffle;23rd, cushion block;231st, draw ring;232nd, roller;233rd, guide rail;24th, winder;241、 Drawstring;3rd, flange;31st, limiting plate;311st, through hole;312nd, securing rod;313rd, lock hole;314th, turning handle;4th, secondary beam;41st, screw hole; 42nd, bolt;43rd, hanging ring.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:A kind of foundation pile static loading test reaction frame, as shown in Figure 1, the supporting block 2 including being placed on ground both sides (Supporting block 2 is arranged to rectangular-shape), supported on both sides piece 2 arranged in parallel, is fixed in ground on inbuilt foundation pile 1 very heavy Behind top 11, girder 12 is placed on jack 11, and jack 11 is located at 12 position of centre of gravity of girder with force balance, in girder Secondary beam 4 is placed with perpendicular to girder 12 on 12, and 4 both ends of secondary beam are placed on supported on both sides piece 2.
As shown in Fig. 2, supporting block 2 includes the cushion block 23 that polylith stacks successively.Secondary beam 4 is placed on cushion block 23.Here, pad Block 23 is illustrated exemplified by being arranged to six pieces, 2 height of supporting block can be adjusted by picking and placeing cushion block 23, so as to adapt to The different height of different tests middle girder 12.In addition, this supporting block 2 can be standardized making, rather than utilize cement Cast in situs buttress is used, and improves the precision of reaction frame measurement;Further, it is possible to the repeated multiple times supporting block 2 used, It is not only cost-effective, also eliminate buttress and pour and conserve the time wasted.
In order to avoid cushion block 23 slips away 2 position of supporting block, as shown in Fig. 2, supporting block 2 further includes U-shaped block 22, U-shaped block 22 Two block baffles 222 being vertically arranged including horizontally disposed bottom plate 221 and 221 both sides of bottom plate, cushion block 23 are placed on bottom plate 221, Baffle 222 is clipped in 23 both sides of cushion block, so that cushion block 23 overlays the intracavitary that 22 inner bottom plating 221 of U-shaped block and baffle 222 are formed, Cushion block 23 is prevented to be skidded off from 22 both sides of U-shaped block.Due to leaving opening between baffle 222, in order to avoid cushion block 23 is from 22 liang of U-shaped block The opening of side skids off, as shown in Fig. 2, being fixed with flange 3, flange in opposite directions on 222 edge of baffle of 22 side opening of U-shaped block 3 block the cushion block 23 in U-shaped block 22.In this way, operating personnel are when picking and placeing cushion block 23, from opening for 22 opposing flanges of U-shaped block, 3 side Mouth position is operated.
During secondary beam 4 and experiment is placed, cushion block 23 may be skidded off from the opening of 3 side of opposing flanges, therefore, As shown in Fig. 2, limiting plate 31 is rotatably connected to using hinge on the baffle 222 of the opening of 3 side of opposing flanges, here, One piece of limiting plate 31 is connected in two block baffles 222, limiting plate 31 is vertically arranged, and height is consistent with baffle 222.In order to Limiting plate 31 is set to be fixed on aperture position, so that cushion block 23 is blocked, as shown in Fig. 2, in limiting plate 31 away from baffle 222 A through hole 311 is vertically opened in edge, coordinates through hole 311 to open locking in the edge of 221 upper surface of bottom plate Hole 313(Here the through hole 311 corresponded on two pieces of limiting plates 31 is provided with two lock holes 313, and is provided with spiral shell in lock hole 313 Line), a securing rod 312 is inserted with through hole 311, the screw thread coordinated with lock hole 313 is provided with securing rod 312.Use When, limiting plate 31 will can be fixed in 312 precession lock hole 313 of securing rod.In addition, in order to avoid limiting plate 31 leaves bottom After plate 221, securing rod 312 is dropped out from through hole 311, and the turning handle more than 311 diameter of through hole is fixed with 312 upper end of securing rod 314, on the one hand, turning handle 314 can block securing rod 312, and on the other hand, the setting of turning handle 314 can facilitate operating personnel to turn Dynamic securing rod 312.
Since whole supporting block 2 is made of steel, 23 weight of cushion block is larger, and personnel pick and place cushion block 23 in order to facilitate the operation, As shown in Figure 3 and Figure 4, roller 232 is provided with the bottom surface of each piece of cushion block 23, and is provided with and leads on the upper surface of cushion block 23 Rail 233, here, roller 232 be arranged to four and respectively positioned at cushion block 23 four corners in, guide rail 233 be arranged to two and Set parallel to baffle 222, two rollers 232 of 23 the same side of cushion block are embedded in guide rail 233 and slide so that reduce cushion block 23 it Between frictional force, facilitate operating personnel drag cushion block 23.In addition, as shown in figure 3, in cushion block 23 close to the side wall of 31 side of limiting plate On be fixed with draw ring 231, facilitate operating personnel to catch draw ring 231 to move and carry to drag cushion block 23.
As shown in Fig. 2, in the present embodiment, spirit level 21 is horizontally fixed with 2 side wall of supporting block, according in spirit level 21 Bubble position determines whether supporting block 2 is smooth with ground, if bubble deviates, operating personnel are according to offset direction to ground Handled, untill supporting block 2 is adjusted to horizontal level.In addition, in order to determine the supporting block 2 of symmetrical both sides in same water In plane, as shown in Figure 3 and Figure 4, winder 24 is fixed on the outer wall of side U-shaped block 22, volume has drawstring on winder 24 241, level indicates graduation mark on the outer wall of 22 homonymy of opposite side U-shaped block, the distances of adjacent two graduation marks and cushion block 23 Consistency of thickness.Outer wall position where drawstring 241 is pulled to graduation mark, and drawstring 241 is kept horizontal level, with 241 He of drawstring Spacing between graduation mark determines the difference in height between both sides U-shaped block 22, and adjusting the cushion block 23 on U-shaped block 22 according to difference in height counts Amount repairs ground, ensures that the cushion block 23 on both sides top is located in same level.
The secondary beam 4 lifted in order to prevent is subject to the influence of subsequent parts lifting and deviates initial position, as shown in figure 3, Perforation is provided with screw hole 41 on 4 both ends of secondary beam and cushion block 23, using the bolt 42 being screwed in screw hole 41 that secondary beam 4 and cushion block 23 is tight Gu live.
In addition, the lifting of supporting block 2 for convenience, as shown in figure 3, being fixed respectively on the symmetrical both sides side wall of U-shaped block 22 There is hanging ring 43.
The course of work:Operating personnel are determined after test pile 1, and foundation pile 1 is nearby handled on ground, treats floor treatment After supporting block 2 is lifted into 1 both sides of foundation pile.Determine whether ground is smooth according to spirit level 21, pull the alignment of drawstring 241 to carve Line is spent, determines supported on both sides piece 2 whether in same level;If supporting block 2 turns turning handle 314, opens limit there are height difference Position plate 31, is adjusted the cushion block 23 in U-shaped block 22, after adjustment, shuts limiting plate 31, tighten securing rod 312.Treat thousand After jin top 11 and girder 12 install, secondary beam 4 is lifted on girder 12 one by one, and the bolt 42 at 4 both ends of secondary beam is screwed into In the screw hole 41 of cushion block 23, and after the secondary beam 4 fixed hangs oneself and loads onto clump weight 13, you can start to test.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical solutions belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (9)

1. a kind of foundation pile static loading test reaction frame, including it is placed on foundation pile(1)The jack at top(11), the jack(11) Upper level is placed with girder(12), the girder(12)On perpendicular to girder(12)The more secondary beams that length direction is set(4), it is special Sign is:The secondary beam(4)Both ends are equipped with the supporting block placed on the ground(2), the supporting block(2)Including U-shaped block(22), The U-shaped block(22)Including horizontally disposed bottom plate(221), the bottom plate(221)Both sides are equipped with two block baffles vertically(222), The baffle(222)Between be stacked with the horizontally disposed cushion block of polylith successively(23).
A kind of 2. foundation pile static loading test reaction frame according to claim 1, it is characterised in that:The U-shaped block(22)Side The baffle of opening both sides(222)It is upper to be equipped with flange in opposite directions(3).
A kind of 3. foundation pile static loading test reaction frame according to claim 2, it is characterised in that:The U-shaped block(22)Relatively Flange(3)The opening both sides of side are rotated equipped with limiting plate respectively(31).
A kind of 4. foundation pile static loading test reaction frame according to claim 3, it is characterised in that:The limiting plate(31)Far From baffle(222)The edge of side is provided with through hole vertically(311), the through hole(311)Middle sliding is equipped with securing rod(312), The bottom plate(221)Upper cooperation securing rod(312)It is provided with lock hole(313).
A kind of 5. foundation pile static loading test reaction frame according to claim 1, it is characterised in that:One piece of U-shaped block(22) Outer wall be equipped with winder(24), the winder(24)Inside it is connected with drawstring(241), U-shaped block described in opposite side(22) Outer wall indicate the scale being vertically arranged.
A kind of 6. foundation pile static loading test reaction frame according to claim 3, it is characterised in that:The cushion block(23)Close to limit Position plate(31)Side is equipped with draw ring(231).
A kind of 7. foundation pile static loading test reaction frame according to claim 6, it is characterised in that:The cushion block(23)Bottom surface is set There is roller(232), the cushion block(23)Upper surface is provided with and roller(232)The guide rail of cooperation(233), the guide rail(233)It is flat Row is in baffle(222)Set.
A kind of 8. foundation pile static loading test reaction frame according to claim 1, it is characterised in that:The U-shaped block(22)Symmetrically The outer wall of both sides is equipped with hanging ring(43).
A kind of 9. foundation pile static loading test reaction frame according to claim 1, it is characterised in that:The secondary beam(4)And cushion block (23)Upper perforation is provided with screw hole(41), the screw hole(41)In be screwed with bolt(42).
CN201721240411.3U 2017-09-25 2017-09-25 A kind of foundation pile static loading test reaction frame Expired - Fee Related CN207244686U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721240411.3U CN207244686U (en) 2017-09-25 2017-09-25 A kind of foundation pile static loading test reaction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721240411.3U CN207244686U (en) 2017-09-25 2017-09-25 A kind of foundation pile static loading test reaction frame

Publications (1)

Publication Number Publication Date
CN207244686U true CN207244686U (en) 2018-04-17

Family

ID=61886807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721240411.3U Expired - Fee Related CN207244686U (en) 2017-09-25 2017-09-25 A kind of foundation pile static loading test reaction frame

Country Status (1)

Country Link
CN (1) CN207244686U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112547959A (en) * 2020-11-19 2021-03-26 东风(武汉)实业有限公司 Mechanical hysteresis ejection device
CN115305841A (en) * 2022-08-05 2022-11-08 云南省公路科学技术研究院 Road surface height adjusting device at upper part of highway engineering culvert and using method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112547959A (en) * 2020-11-19 2021-03-26 东风(武汉)实业有限公司 Mechanical hysteresis ejection device
CN115305841A (en) * 2022-08-05 2022-11-08 云南省公路科学技术研究院 Road surface height adjusting device at upper part of highway engineering culvert and using method thereof
CN115305841B (en) * 2022-08-05 2024-05-14 云南省公路科学技术研究院 Highway engineering culvert upper pavement height adjusting device and use method thereof

Similar Documents

Publication Publication Date Title
CN109487822B (en) Method for installing and adjusting steel pipe column in reverse construction and control device
CN210766774U (en) Positioning device for steel reinforcement cage and lattice column
CN207244686U (en) A kind of foundation pile static loading test reaction frame
CN205954716U (en) A counterforce device for foundation pile resistance to compression static test
CN214573987U (en) Conveniently adjusted lattice column positioning frame
CN108756890A (en) A kind of sliding mode system being in the milk for vertical shaft concreting and rock mass
CN210177554U (en) Pile foundation static load test equipment
CN205917601U (en) Integrally lift up device of bridge arch rib
CN107326944A (en) A kind of lattice column construction plumbing device and application method
CN103556626B (en) Hanging structure for hoisting large-diameter hole drilling filling pile steel bar cage
CN206681359U (en) One kind cheats new formwork system in hole
CN208219720U (en) A kind of building pile foundation dead-load detection device
CN110886332A (en) Wall foundation underpinning device and construction method thereof
CN207538040U (en) Drilled pile reinforcing cage detachably recycles hangs muscle
CN207160091U (en) A kind of Novel pile foundation static-load testing device
CN217027119U (en) Seepage-proofing underground supporting structure for foundation pit
CN109987500A (en) A kind of building material cage
CN205990205U (en) The auxiliary device of jack construction
CN115613548A (en) Prefabricated diaphragm wall construction device and construction method thereof
CN107882028A (en) A kind of caterpillar telescopic arm piling machine
CN203625891U (en) Hanging structure for large-diameter hole drilling cast pile reinforcement cage hanging
CN210177560U (en) Ballast platform counterforce device convenient for loading balancing weight
CN220537301U (en) Novel four-pile jacket lifting appliance
CN219548589U (en) Safety fence
CN206000167U (en) Adjustable Alminum Project slab form support meanss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417

Termination date: 20210925

CF01 Termination of patent right due to non-payment of annual fee