CN207228385U - A kind of Shock-proof for building device - Google Patents
A kind of Shock-proof for building device Download PDFInfo
- Publication number
- CN207228385U CN207228385U CN201721180186.9U CN201721180186U CN207228385U CN 207228385 U CN207228385 U CN 207228385U CN 201721180186 U CN201721180186 U CN 201721180186U CN 207228385 U CN207228385 U CN 207228385U
- Authority
- CN
- China
- Prior art keywords
- support plate
- slide bar
- chute
- bracket
- rubber pad
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 12
- 239000010959 steel Substances 0.000 claims description 12
- 230000000703 anti-shock Effects 0.000 claims description 6
- 230000001737 promoting effect Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 4
- 230000035939 shock Effects 0.000 description 4
- 239000006096 absorbing agent Substances 0.000 description 2
- 239000011111 cardboard Substances 0.000 description 2
- 230000001066 destructive effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000001595 contractor effect Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑技术领域,具体为一种建筑防震装置。The utility model relates to the technical field of buildings, in particular to a building anti-shock device.
背景技术Background technique
现代化包括建筑的现代化,高楼林立,此起彼伏,但是由于防震技术远没有达到水泥钢筋承受抗震的范围,因此一旦发生地震后果不堪设想,地震的破坏力主要来自于水平方向上,如果水平方向上的破坏力得到遏制,防震效果将是十分明显,但是目前防震装置始终不理想,需要研究开发,例如申请号为 201520394807.8的专利,包括第一建筑、第二建筑和锚定钢板,所述第一建筑、第二建筑之间安装有锚定钢板,所述锚定钢板上安装有支撑杆,所述支撑杆上安装有横梁,所述支撑杆上安装有减震装置,所述减震装置一端与第一建筑周壁相连,所述减震装置另一端与第二建筑周壁相连,所述第一建筑顶部与横梁之间安装有阻尼器,所述第二建筑顶部与横梁之间安装有阻尼器,虽然配合阻性橡胶和橡胶垫等进一步加强防震效果,但是它的减震效果差,在震动时伸缩效果不佳,容易出现震裂的现象出现。Modernization includes the modernization of buildings. There are many tall buildings, one after another. However, because the anti-seismic technology is far from the range that the cement and steel bars can withstand earthquakes, the consequences of an earthquake will be unimaginable. The destructive power of the earthquake mainly comes from the horizontal direction. If the destructive power in the horizontal direction If the anti-seismic effect is contained, the anti-seismic effect will be very obvious, but the current anti-seismic device is not ideal all the time, and needs research and development. An anchor steel plate is installed between the two buildings, a support rod is installed on the anchor steel plate, a beam is installed on the support rod, a shock absorber is installed on the support rod, and one end of the shock absorber is connected to the first The surrounding wall of the building is connected, the other end of the shock-absorbing device is connected with the surrounding wall of the second building, a damper is installed between the top of the first building and the beam, and a damper is installed between the top of the second building and the beam. Resistive rubber and rubber pads further enhance the shockproof effect, but its shock absorption effect is poor, and the expansion and contraction effect is not good during vibration, and the phenomenon of shock cracking is prone to occur.
实用新型内容Utility model content
本实用新型的目的在于提供一种建筑防震装置,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a building anti-shock device to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本实用新型提供如下技术方案:一种建筑防震装置,包括横梁,所述横梁之间安装有支柱,所述支柱的上下两端均安装有支板,所述支柱与支板的连接处安装有连接座,所述支板的内侧左右两端均安装有第三滑杆,所述第三滑杆的底端设有第一滑槽,所述第一滑槽的内侧设有第二滑槽,所述支板的内侧安装有支架,所述支架的顶端左右两侧均设有第一凹槽,所述第一凹槽的底端左右两侧均安装有卡杆Ⅰ,所述支架的顶端安装有第二橡胶垫,所述第二橡胶垫与第一凹槽配合相连,所述第二橡胶垫底端左右两侧均设有夹槽,所述夹槽与卡杆Ⅰ配合相连,所述支架的左右两侧均设有第三滑槽,所述第三滑槽与第三滑杆配合相连,所述支架的左右两侧底端均安装有第一滑杆,所述第一滑杆与第一滑槽配合相连,所述第一滑杆的底端安装有第二滑杆,所述第二滑杆与第二滑槽配合相连,所述支架的底端安装有第一橡胶垫,所述第一橡胶垫与支板相连。In order to achieve the above object, the utility model provides the following technical solutions: a building anti-seismic device, including beams, pillars are installed between the beams, support plates are installed at the upper and lower ends of the pillars, and the pillars and the support plates A connection seat is installed at the joint of the support plate, and a third slide bar is installed at the left and right ends of the inner side of the support plate. The bottom end of the third slide bar is provided with a first chute, and the inside of the first chute is provided with There is a second chute, a bracket is installed on the inner side of the support plate, first grooves are provided on the left and right sides of the top of the bracket, and clamping rods I are installed on the left and right sides of the bottom of the first groove , the top of the bracket is equipped with a second rubber pad, the second rubber pad is connected with the first groove, the left and right sides of the bottom of the second rubber pad are provided with clamping grooves, and the clamping groove and the clamping rod Ⅰ Cooperate and connect, the left and right sides of the bracket are provided with a third chute, the third chute is connected with the third slide bar, the bottom ends of the left and right sides of the bracket are equipped with a first slide bar, The first slide bar is connected with the first chute, the bottom end of the first slide bar is equipped with a second slide bar, the second slide bar is connected with the second chute, and the bottom end of the bracket A first rubber pad is installed, and the first rubber pad is connected with the support plate.
优选的,所述支板的左右两侧均设有第二卡槽,所述第一滑杆的外侧设有第一卡槽,所述第一卡槽的内侧安装有卡杆Ⅱ,所述卡杆Ⅱ与第一卡槽配合相连,所述卡杆Ⅱ的上下两侧均安装有卡板,所述卡板与第二卡槽配合相连。Preferably, the left and right sides of the support plate are provided with second card slots, the outer side of the first slide bar is provided with a first card slot, and the inner side of the first card slot is installed with card bar II. The clamping rod II is connected with the first clamping slot, and the upper and lower sides of the clamping rod II are equipped with clamping plates, and the clamping plate is connected with the second clamping slot.
优选的,所述支架的内侧设有第二凹槽。Preferably, the inner side of the bracket is provided with a second groove.
优选的,所述支柱的外侧安装有连接板。Preferably, a connecting plate is installed on the outer side of the pillar.
优选的,所述支柱的内侧安装有钢筋,所述钢筋与支板相连。Preferably, steel bars are installed on the inside of the pillar, and the steel bars are connected to the support plate.
与现有技术相比,本实用新型的有益效果是:该建筑防震装置,通过推动支架,通过支架带动第一滑杆进入第一滑槽的内侧,通过第三滑杆进入第三滑槽的内侧,从而将支架和支板连接在一起,通过第二滑杆进入第二滑槽的内侧,从而防止支架在支板的内侧左右移动,通过支架与支板之间处设有微量缝隙,从而在震动时,支架与支板之间留有移动空间,通过支架的顶端和底端分别安装有具有弹性的第一橡胶垫和第二橡胶垫,从而有效地扩展了伸缩空间,有效地避免了因结构之间连接过于紧密,在震动时发生结构断裂无法复原,造成危险。Compared with the prior art, the beneficial effect of the utility model is: the building anti-shock device, by pushing the bracket, the bracket drives the first slide bar to enter the inner side of the first chute, and the third slide bar enters the third chute. The inner side, thereby connecting the bracket and the support plate together, enters the inner side of the second chute through the second slide bar, thereby preventing the bracket from moving left and right on the inner side of the support plate, and there is a slight gap between the support and the support plate, thereby When vibrating, there is a moving space between the bracket and the support plate, and the elastic first rubber pad and the second rubber pad are respectively installed on the top and bottom of the bracket, thereby effectively expanding the telescopic space and effectively avoiding the Because the connection between the structures is too tight, the structure breaks and cannot be restored when the vibration occurs, causing danger.
附图说明Description of drawings
图1为本实用新型结构示意图;Fig. 1 is a structural representation of the utility model;
图2为本实用新型支板的结构示意图;Fig. 2 is the structural representation of support plate of the present utility model;
图3为本实用新型卡杆Ⅱ的结构示意图。Fig. 3 is a structural schematic diagram of the clamp rod II of the present invention.
图中:1、横梁,2、支板,3、支柱,4、连接板,5、连接座,6、支架,7、第一凹槽,8、夹槽,9、卡杆Ⅰ,10、第一滑槽,11、第一滑杆,12、第二滑杆,13、第二凹槽,14、钢筋,15、第一橡胶垫,16、第二滑槽,17、第三滑杆,18、第三滑槽,19、第二橡胶垫,20、卡板,21、卡杆Ⅱ,22、第一卡槽, 23、第二卡槽。In the figure: 1. Beam, 2. Support plate, 3. Pillar, 4. Connecting plate, 5. Connecting seat, 6. Bracket, 7. First groove, 8. Clamping groove, 9. Clamping rod I, 10. The first chute, 11, the first sliding bar, 12, the second sliding bar, 13, the second groove, 14, the steel bar, 15, the first rubber pad, 16, the second chute, 17, the third sliding bar , 18, the third chute, 19, the second rubber pad, 20, the card plate, 21, the card bar II, 22, the first card slot, 23, the second card slot.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-3,本实用新型提供一种技术方案:一种建筑防震装置,包括横梁1,横梁1之间安装有支柱3,支柱3的上下两端均安装有支板2,支板2用于支撑横梁1,支柱3用于支撑支板2,支柱3的外侧安装有连接板4,连接板 4用于将支柱3连接在一起,使其安装更加稳固,支柱3与支板2的连接处安装有连接座5,连接座5用于加固支柱3和支板2的连接,支柱3的内侧安装有钢筋14,钢筋14与支板2相连,钢筋14固定在支板2的内侧,钢筋14用于加固支柱3和支板2的连接,支板2的内侧左右两端均安装有第三滑杆17,第三滑杆17的底端设有第一滑槽10,第一滑槽10的内侧设有第二滑槽16,支板2的内侧安装有支架6,支架6和支板2之间设有缝隙,用于在震动时避免支板2内侧和横梁1连接过于紧密而裂开,造成塌悬,支架6的内侧设有第二凹槽13,支架6的顶端左右两侧均设有第一凹槽7,第一凹槽7的底端左右两侧均安装有卡杆Ⅰ9,支架6的顶端安装有第二橡胶垫19,第二橡胶垫19为具有弹性的橡胶材质制作而成,第二橡胶垫19与第一凹槽7配合相连,第二橡胶垫19能够安装到第一凹槽7的内侧,第二橡胶垫19底端左右两侧均设有夹槽8,夹槽8 与卡杆Ⅰ9配合相连,卡杆Ⅰ9能够进入夹槽8的内侧,用于将第二橡胶垫19 固定住,防止第二橡胶垫19在第一凹槽7的内侧由于热胀冷缩发生移位,支架 6的左右两侧均设有第三滑槽18,第三滑槽18与第三滑杆17配合相连,第三滑杆17能够在第三滑槽18的内侧移动,支架6的左右两侧底端均安装有第一滑杆11,第一滑杆11与第一滑槽10配合相连,第一滑杆11能够在第一滑槽 10的内侧移动,使支架6与支板2连接在一起,第一滑杆11的底端安装有第二滑杆12,第二滑杆12与第二滑槽16配合相连,第二滑杆12能够在第二滑槽 16的内侧移动,用于防止支架6在支板2的内侧左右移动,支架6的底端安装有第一橡胶垫15,第一橡胶垫15为具有弹性的橡胶材质制作而成,第一橡胶垫 15用于在震动时对支架6起到缓冲的作用,第一橡胶垫15与支板2相连,支板 2的左右两侧均设有第二卡槽23,第一滑杆11的外侧设有第一卡槽22,第一卡槽22的内侧安装有卡杆Ⅱ21,卡杆Ⅱ21与第一卡槽22配合相连,卡杆Ⅱ21进入第一卡槽22的内侧,用于将第一滑杆11固定,从而将支架6固定在支板2 的内侧,卡杆Ⅱ21的上下两侧均安装有卡板20,卡板20与第二卡槽23配合相连,卡板20能够在第二卡槽23的内侧移动,卡板20用于支撑卡杆Ⅱ21。Please refer to Figures 1-3, the utility model provides a technical solution: a building anti-seismic device, including a beam 1, a pillar 3 is installed between the beams 1, and a support plate 2 is installed on the upper and lower ends of the pillar 3, and the support plate 2 is used to support the beam 1, and the pillar 3 is used to support the support plate 2. The connecting plate 4 is installed on the outside of the pillar 3, and the connecting plate 4 is used to connect the pillars 3 together to make the installation more stable. The pillar 3 and the support plate 2 A connection seat 5 is installed at the joint, and the connection seat 5 is used to strengthen the connection between the pillar 3 and the support plate 2. The inner side of the pillar 3 is equipped with a steel bar 14, and the steel bar 14 is connected with the support plate 2, and the steel bar 14 is fixed on the inner side of the support plate 2. , the steel bars 14 are used to strengthen the connection between the pillar 3 and the support plate 2, the inner left and right ends of the support plate 2 are equipped with a third slide bar 17, the bottom end of the third slide bar 17 is provided with a first chute 10, the first The inboard of chute 10 is provided with the second chute 16, and the inboard of support plate 2 is equipped with support 6, is provided with gap between support 6 and support plate 2, is used for avoiding that support plate 2 inboard and crossbeam 1 are connected too much when vibrating. Tight and split, causing collapse, the inner side of the bracket 6 is provided with a second groove 13, the top left and right sides of the bracket 6 are provided with a first groove 7, and the left and right sides of the bottom of the first groove 7 are installed There is a clamping rod I9, and a second rubber pad 19 is installed on the top of the bracket 6. The second rubber pad 19 is made of elastic rubber material. The second rubber pad 19 is connected with the first groove 7. The second rubber pad 19 can be installed on the inner side of the first groove 7, the left and right sides of the bottom of the second rubber pad 19 are provided with clamping grooves 8, the clamping grooves 8 are connected with the clamping rod I9, and the clamping rod I9 can enter the inner side of the clamping groove 8, It is used to fix the second rubber pad 19 to prevent the second rubber pad 19 from shifting due to thermal expansion and contraction inside the first groove 7. The left and right sides of the bracket 6 are provided with a third chute 18. Three chute 18 is connected with the 3rd slide bar 17, and the 3rd slide bar 17 can move in the inner side of the 3rd chute 18, and the left and right sides bottom ends of support 6 all are equipped with the first slide bar 11, and the first slide bar 11 11 is connected with the first sliding groove 10, the first sliding rod 11 can move inside the first sliding groove 10, so that the bracket 6 is connected with the support plate 2, and the bottom end of the first sliding rod 11 is equipped with a second sliding Rod 12, the second slide bar 12 is connected with the second chute 16, the second slide bar 12 can move in the inner side of the second chute 16, for preventing the support 6 from moving left and right inside the support plate 2, the support 6 The bottom end is equipped with a first rubber pad 15, the first rubber pad 15 is made of elastic rubber material, the first rubber pad 15 is used to buffer the support 6 when vibrating, the first rubber pad 15 and The support plates 2 are connected, the left and right sides of the support plate 2 are provided with a second card slot 23, the outer side of the first slide bar 11 is provided with a first card slot 22, and the inside of the first card slot 22 is equipped with a card bar II 21, the card Rod II 21 is connected with the first card slot 22, and the card bar II 21 enters the inner side of the first card slot 22, and is used to fix the first slide bar 11, thereby fixing the bracket 6 on the inner side of the support plate 2, and the upper and lower sides of the card bar II 21 Both sides are equipped with card board 20, card board 20 and the second card The slots 23 are mated and connected, and the clamping plate 20 can move inside the second clamping slot 23 , and the clamping plate 20 is used to support the clamping rod II 21 .
推动支架6,支架6带动第一滑杆11进入第一滑槽10的内侧,第三滑杆 17进入第三滑槽18的内侧,从而将支架6和支板2连接在一起,第二滑杆12 进入第二滑槽16的内侧,从而防止支架6在支板2的内侧左右移动,支架6与支板2之间处设有微量缝隙,从而在震动时,支架6与支板2之间留有移动空间,支架6的顶端和底端分别安装有具有弹性的第一橡胶垫15和第二橡胶垫19,从而有效地扩展了伸缩空间。Push the bracket 6, the bracket 6 drives the first slide bar 11 to enter the inside of the first chute 10, the third slide bar 17 enters the inside of the third chute 18, thereby connecting the bracket 6 and the support plate 2 together, the second slide Rod 12 enters the inner side of the second chute 16, thereby preventing support 6 from moving left and right on the inner side of support plate 2, and there is a slight gap between support 6 and support plate 2, so that when vibrating, the gap between support 6 and support plate 2 There is a moving space between them, and elastic first rubber pads 15 and second rubber pads 19 are respectively installed on the top and bottom of the bracket 6, thereby effectively expanding the telescopic space.
在本实用新型的描述中,需要理解的是,术语“同轴”、“底部”、“一端”、“顶部”、“中部”、“另一端”、“上”、“一侧”、“顶部”、“内”、“前部”、“中央”、“两端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present utility model, it should be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", " The orientation or positional relationship indicated by "top", "inner", "front", "central", "both ends" etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the utility model and simplifying the description , rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as limiting the utility model.
此外,术语“第一”、“第二”、“第三”、“第四”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量,由此,限定有“第一”、“第二”、“第三”、“第四”的特征能够明示或者隐含地包括至少一个该特征。In addition, the terms "first", "second", "third" and "fourth" are used for descriptive purposes only, and should not be understood as indicating or implying relative importance or implicitly specifying the number of indicated technical features, Thus, a feature defined as "first", "second", "third" and "fourth" can explicitly or implicitly include at least one of the features.
在本实用新型中,除非另有明确的规定和限定,术语“安装”、“设置”、“连接”、“固定”、“旋接”等术语应做广义理解,例如,能够是固定连接,也能够是可拆卸连接,或成一体;能够是机械连接,也能够是电连接;能够是直接相连,也能够通过中间媒介间接相连,能够是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定,对于本领域的普通技术人员而言,能够根据具体情况理解上述术语在本实用新型中的具体含义。In this utility model, unless otherwise clearly specified and limited, terms such as "installation", "setting", "connection", "fixation" and "rotation" should be understood in a broad sense, for example, it can be a fixed connection, It can also be a detachable connection, or integrated; it can be a mechanical connection, it can also be an electrical connection; it can be directly connected, or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction of two components Unless otherwise clearly defined, those skilled in the art can understand the specific meanings of the above terms in the present utility model according to specific situations.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,能够理解在不脱离本实用新型的原理和精神的情况下能够对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721180186.9U CN207228385U (en) | 2017-09-15 | 2017-09-15 | A kind of Shock-proof for building device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721180186.9U CN207228385U (en) | 2017-09-15 | 2017-09-15 | A kind of Shock-proof for building device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207228385U true CN207228385U (en) | 2018-04-13 |
Family
ID=61862094
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721180186.9U Expired - Fee Related CN207228385U (en) | 2017-09-15 | 2017-09-15 | A kind of Shock-proof for building device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207228385U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110306682A (en) * | 2019-07-05 | 2019-10-08 | 江苏博拓新型建筑材料有限公司 | A kind of assembled architecture anti-seismic structure using cement prefabricated component |
-
2017
- 2017-09-15 CN CN201721180186.9U patent/CN207228385U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110306682A (en) * | 2019-07-05 | 2019-10-08 | 江苏博拓新型建筑材料有限公司 | A kind of assembled architecture anti-seismic structure using cement prefabricated component |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207793853U (en) | A kind of anti-seismic damping bridge support | |
| CN104695578A (en) | Self-resetting magneto-rheological multidimensional vibration isolation and reduction device | |
| CN110005901A (en) | A multi-dimensional integrated friction damping tuned mass shock mount | |
| CN205088814U (en) | Building engineering is with buffering steel casting that takes precautions against earthquakes | |
| CN207228385U (en) | A kind of Shock-proof for building device | |
| CN205242249U (en) | Anti -seismic bridge bearing | |
| CN204703330U (en) | A kind of shockproof structure of modularization mobile house | |
| CN108824923A (en) | A kind of Double damping device amplifying device | |
| CN110219379A (en) | A kind of Anti-seismic building structure | |
| CN210887574U (en) | A new type of dry connection node for prefabricated concrete beams and columns | |
| CN105201095A (en) | Restrained brace anti-seismic structure for super high-rise building and manufacturing method | |
| CN206438390U (en) | A kind of high-performance bridge aseismatic bearing | |
| CN110820960B (en) | A housing construction expansion joint structure | |
| CN204551783U (en) | The magnetorheological multidimensional seismic isolation device of a kind of Self-resetting | |
| CN206091503U (en) | Frame construction takes precautions against earthquakes | |
| CN204826280U (en) | Many building systems of taking precautions against earthquakes | |
| CN205276581U (en) | Antidetonation curtain | |
| CN220016340U (en) | A kind of seismic design bracket with stable connection for house building | |
| CN209323695U (en) | A kind of container construction and its frame structure | |
| CN207147290U (en) | A kind of heat pipe earth's surface heat energy utilization system | |
| CN219060450U (en) | A wall panel splicing device | |
| CN206460394U (en) | A kind of computer antishock device | |
| CN214227730U (en) | Anti-seismic cable bridge expansion joint device | |
| CN114016606B (en) | Connecting structure for assembled building support and connecting method thereof | |
| CN205378398U (en) | Rack base takes precautions against earthquakes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180413 Termination date: 20180915 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |