CN207224243U - A kind of prefabricated components maintenance equipment - Google Patents

A kind of prefabricated components maintenance equipment Download PDF

Info

Publication number
CN207224243U
CN207224243U CN201720458544.1U CN201720458544U CN207224243U CN 207224243 U CN207224243 U CN 207224243U CN 201720458544 U CN201720458544 U CN 201720458544U CN 207224243 U CN207224243 U CN 207224243U
Authority
CN
China
Prior art keywords
curing cover
curing
cover
fixed
prefabricated components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720458544.1U
Other languages
Chinese (zh)
Inventor
胡潮
张技飞
孙志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aerospace Additive Technology Beijing Co ltd
Beijing Xinghang Electromechanical Equipment Co Ltd
Original Assignee
Beijing Xinghang Electromechanical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xinghang Electromechanical Equipment Co Ltd filed Critical Beijing Xinghang Electromechanical Equipment Co Ltd
Priority to CN201720458544.1U priority Critical patent/CN207224243U/en
Application granted granted Critical
Publication of CN207224243U publication Critical patent/CN207224243U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model proposes a kind of maintenance of prefabricated components to equip, including curing cover and curing cover suspension arrangement, curing cover are installed on outside prefabricated components to be conserved by curing cover suspension arrangement.The utility model is furnished with the curing cover of cushion seals and curing cover suspension arrangement that is height-adjustable, having elevating function using folding retractable design, bottom, and in-site installation or dismounting can be needed to move field according to use, applied widely to conserving component and maintenance scene.

Description

A kind of prefabricated components maintenance equipment
Technical field
A kind of prefabricated components maintenance equipment is the utility model is related to, belongs to building concrete conservation technology field.
Background technology
At present, the maintenance of existing building concrete pre-member, it is more using tarpaulin cover with curing kilns (three-dimensional curing kilns or Fixed curing cover) it is conserved.Tarpaulin covers maintenance:It is few to equip input cost, concrete prefabricated element can be showed Field maintenance, but the heat leakage caused by tarpaulin thermal conductivity factor (K values) is high, cannot effectively obstruct infrared radiation, cover sternly also Hot steam in curing kilns can be caused to leak.Heat insulation effect is poor, and heat-energy losses are serious, causes the maintenance energy consumption of concrete component product Cost improves.Three-dimensional curing kilns maintenance:Suitable specification kind is few, quantity is big, mass produces in batch.Equipment investment cost Greatly, because of the limitation of kiln space and structure design, the concrete prefabricated element for being not suitable for different size kind is conserved with kiln.It is fixed Curing kilns maintenance of equipment input cost is less, and generally individual layer is piled up, the concrete prefabricated element quantity that kiln interior energy once conserves It is few, it is not easy in die station to carry out concrete prefabricated element live maintenance, takes up a large area.
Widelyd popularize, quickly sent out with progressively maturation, this green building industry of assembled architecture technology Exhibition.The concrete construction prefabricated components maintenance technology supporting with it and equipment equipment are left to be desired raising, to meet that assembled is built The demand in market is built, promotes the process of building industry modernization.
Utility model content
The purpose of the utility model is to overcome prior art deficiency, there is provided a kind of high insulating effect, cost are low, use spirit It is living, applied widely to maintenance component and maintenance scene, can in-site installation, the prefabricated components of dismounting recycling conserve equipment.
The technical solution of the utility model:A kind of prefabricated components maintenance equipment, including curing cover and curing cover suspension Device, the curing cover are installed on outside prefabricated components to be conserved by curing cover suspension arrangement;
The curing cover is by n curing cover monomer composition, n >=1, on the top of curing cover outer layer and side processing cloth Set;
The curing cover suspension arrangement includes some curing cover hack levers, fixed hanging beam, guide rail beam, curing cover front haulage Fixed beam after frame, some curing cover fixed beams, curing cover, jacking system and some to main body frame;
The curing cover hack lever is penetrated in cloth set, and respectively with curing cover fixed beam, curing cover front haulage frame and maintenance Fixed beam connects after cover, curing cover is installed on curing cover suspension arrangement;
Fixed beam is fixed on main body frame after the fixation hanging beam and curing cover, and guide rail beam is hanged by jacking system Hang under fixed hanging beam, curing cover fixed beam is suspended under guide rail beam by jacking system, curing cover front haulage frame with most before The curing cover fixed beam at end is connected;
When drawing curing cover front haulage frame, curing cover fixed beam drives curing cover to make anterior-posterior horizontal direction along guide rail beam and moves It is dynamic, drive guide rail beam to be moved up and down as vertical direction by jacking system, guide rail beam drives curing cover by curing cover fixed beam Moved up and down as vertical direction.
The curing cover monomer is made of curing cover cover body, curing cover cover body from outside to inside by waterproof layer, insulating layer and Reflecting layer forms.
The air cushion to seal is arranged at the curing cover bottom, and front end sets Jiao Men.
It is the aeroge insulation quilt of the compound EPE in two sides among the insulating layer.
The main body frame includes suspension holdfast and bracket base, and the suspension holdfast is fixedly connected with bracket base Support is formed, bracket base is fixed with ground.
The curing cover suspension arrangement further includes the first postive stop baffle and the second postive stop baffle, the installation of the first postive stop baffle On the suspension holdfast of front end, the second postive stop baffle is installed on the suspension holdfast of rearmost end.
The jacking system includes some suspension pulleys, some hanging steel ropes, some universal Guide rollers, steel wire Rope draw off gear, multi-thread leading block, connector, haulage cable and leading block, the installation of the second postive stop baffle outside are multi-thread Leading block and leading block, haulage cable one end are connected with steel wire rope draw off gear, and the other end is slided by being oriented to after winding Wheel is connected with connector, and fixed beam is installed between the suspension holdfast of rearmost end after curing cover, is installed after curing cover in fixed beam Steel wire rope draw off gear;
The fixation hanging beam is fixedly mounted between the suspension holdfast of homonymy, and some suspensions are installed in fixed hanging beam Pulley, one end of every hanging steel rope are all connected with connector, after the other end is oriented to by multi-thread leading block, then via outstanding Hang pulley guiding to be connected with guide rail beam, some universal Guide rollers are installed on guide rail beam, and universal Guide rollers can be along guide rail beam Horizontal shifting, is fixedly connected in each universal Guide rollers lower part with a curing cover fixed beam.
Installation limiting plate on the inside of first and second postive stop baffle.
The suspension holdfast and the support structure height that bracket base forms are adjustable.
The suspension holdfast both ends respectively set 1 fixed hanging beam, the multigroup curing cover of Parallel Design as needed.
A kind of prefabricated components maintenance equipment, including curing cover and curing cover suspension arrangement, the curing cover pass through maintenance Cover suspension arrangement is installed on outside prefabricated components to be conserved;The curing cover is by some curing cover monomer compositions, in curing cover Outer layer processing cloth set;
The curing cover suspension arrangement includes some curing cover hack levers, fixed hanging beam, guide rail beam, curing cover front haulage Fixed beam after frame, some curing cover fixed beams, curing cover, the first postive stop baffle, the second postive stop baffle, jacking system and some right Main body frame;
The main body frame includes suspension holdfast and bracket base, and suspension holdfast and bracket base are fixedly connected to form branch Support, bracket base are fixed with ground, and the first postive stop baffle is installed on the suspension holdfast of front end, and the second postive stop baffle is installed on most The limiting plate that limitation guide rail beam all around moves is installed on rear suspension stent, on the inside of first and second postive stop baffle;
The jacking system includes some suspension pulleys, some hanging steel ropes, some universal Guide rollers, steel wire Rope draw off gear, multi-thread leading block, connector, haulage cable and leading block, the installation of the second postive stop baffle outside are multi-thread Leading block and leading block, haulage cable one end are connected with steel wire rope draw off gear, and the other end is slided by being oriented to after winding Wheel is connected with connector, and fixed beam is installed between the suspension holdfast of rearmost end after curing cover, is installed after curing cover in fixed beam Steel wire rope draw off gear;
The fixation hanging beam is fixedly mounted between the suspension holdfast of homonymy, and some suspensions are installed in fixed hanging beam Pulley, one end of every hanging steel rope are all connected with connector, after the other end is oriented to by multi-thread leading block, then via outstanding Hang pulley guiding to be connected with guide rail beam, some universal Guide rollers are installed on guide rail beam, and universal Guide rollers can be along guide rail beam Horizontal shifting, is fixedly connected, the curing cover of front end in each universal Guide rollers lower part with a curing cover fixed beam Fixed beam is connected with curing cover front haulage frame, and the curing cover hack lever is penetrated in the cloth set of curing cover cover body outer layer, respectively with Fixed beam is bound after curing cover fixed beam, curing cover front haulage frame and curing cover.
During to front haulage curing cover front haulage frame, drive curing cover to make anterior-posterior horizontal direction along guide rail beam and move, rotate steel Handwheel on cord draw off gear, drives the guide rail beam for being fixed with curing cover to make to move down in vertical direction by haulage cable It is dynamic, adjusted so as to fulfill the horizontal folding of curing cover and upper-lower height.
The curing cover monomer is made of curing cover cover body, curing cover cover body from outside to inside by waterproof layer, insulating layer and Reflecting layer forms.
The air cushion to seal is arranged at the curing cover bottom.
It is the aeroge insulation quilt of the compound EPE in two sides among the insulating layer.
The suspension holdfast and the support structure height that bracket base forms are adjustable.
One end of the curing cover sets Jiao Men.
The main body frame can be increased according to the quantity of curing cover monomer.
Each curing cover monomer will have corresponding curing cover fixed beam.
The beneficial effect of the utility model compared with prior art:
(1) the utility model is using folding retractable design, curing cover of the bottom equipped with cushion seals and height-adjustable, tool There is the curing cover suspension arrangement of elevating function, in-site installation or dismounting can be needed to move field according to use, to maintenance component and maintenance Scene is applied widely;
(2) the utility model uses the multilayer and sealing structure curing cover of special designing, and thermal-insulating sealing effect is good, with tarpaulin Curing cover effectively saves space, energy-saving effect is close therewith compared to can save energy half or so compared with fixed curing cover;
(3) the utility model uses the curing cover suspension arrangement of special construction, and curing means is foldable, lifting is big to adjust It is small, it is big to the specification scope of application of concrete prefabricated element;
(4) the utility model device small investment, high insulating effect, easy for operation;
(5) the utility model be suitably for middle and small scale assembled architecture organize nearby production concrete prefabricated element provide Curing condition, can also carry out the concrete prefabricated element of open work live maintenance, wide market.
Brief description of the drawings
Fig. 1 is the utility model curing cover cover material structure diagram;
Fig. 2~Fig. 5 is the view under the utility model curing cover different conditions, and wherein Fig. 2 packs up side view for curing cover, Fig. 3 packs up top view for curing cover, and Fig. 4 uses side view for curing cover, and Fig. 5 uses top view for curing cover;
Fig. 6 is the utility model front view (curing cover use);
Fig. 7 is the utility model rearview (curing cover use);
Fig. 8 is the utility model side view (curing cover use);
Fig. 9 is the utility model top view (curing cover use);
Figure 10 is the utility model front view (curing cover is packed up);
Figure 11 is the utility model rearview (curing cover is packed up);
Figure 12~Figure 16 is the partial enlarged view of the utility model steel wire rope folding and unfolding part, and wherein Figure 12 is a innings in Fig. 7 Portion's enlarged drawing, Figure 13 are b partial enlarged views in Fig. 7, and Figure 14 is c partial enlarged views in Fig. 7, and Figure 15 is d partial enlargements in Fig. 8 Figure, Figure 16 are e partial enlarged views in Fig. 8;
Figure 17~Figure 22 is fixed for the utility model curing cover and the partial enlarged view of suspended portion, and wherein Figure 17 is figure F partial enlarged views in 10, Figure 18 are g partial enlarged views in Fig. 6, and Figure 19 is h partial enlarged views in Fig. 6, and Figure 20 is i innings in Fig. 7 Portion's enlarged drawing, Figure 21 are j partial enlarged views in Fig. 7, and Figure 22 is k partial enlarged views in Fig. 7;
Figure 23 is the utility model postive stop baffle structure diagram.
Embodiment
The utility model is described in detail with reference to instantiation and attached drawing.
Utility model is as shown in Fig. 6~22, including curing cover 13 and curing cover suspension arrangement, the maintenance of curing cover suspension arrangement Cover is installed on outside prefabricated components to be conserved by curing cover suspension arrangement.
Curing cover 13 as shown in Figure 2-5, is made of some curing cover monomers 131, is set before the curing cover monomer 131 of front end Cellar for storing things door 132 is put, there is the air cushion 15 to seal in curing cover bottom, on the top of curing cover outer layer and side processing cloth set 133.The curing cover hack lever 12 in cloth set 133 above curing cover is bound with curing cover fixed beam 7 with suspender belt, the cloth on front and rear both sides Set penetrates curing cover hack lever 12 and is bound respectively with fixed beam 14 after curing cover front haulage frame 11 and curing cover with suspender belt, side cloth set Curing cover hack lever is penetrated to play a supportive role.
Curing cover monomer 131 is made of curing cover cover body, curing cover cover material as indicated with 1, from outside to inside by waterproof layer, Insulating layer and reflecting layer composition, curing cover cover body is by cutting out, heat seal impression, bonding sewing process, and bottom is made and is designed with gas Pad the foldable of (effectively contacted with ground and play sealing function, prevent hot steam from leaking) has stretching structure.
Curing cover 13 has waterproof, thermal conductivity factor low k:≤0.022(w/m2K) and barrier infrared radiation hot property. Waterproof outer layer cuts waterproof cloth using anti-, and a waterproof, which resists to cut, improves the resistance to fastness of product.Intermediate insulating layer uses aeroge, because of heat conduction Coefficient is low, can lift heat preservation and insulation;The compound EPE expanded materials (pearl cotton) in aeroge both sides, itself and outer layer, internal layer and gas Gel rubber material has good cementability, plays the role of cementing medium layer and improves the anti-fracture property of middle aeroge, its Also there is heat-holding dampproof effect for closed-cell foam.Internal layer reflecting layer uses the vacuum aluminum-coated paper tinsel films of PET, has reflective thermal radiation performance Effectively prevent radiation heat leakage.
Curing cover suspension arrangement as shown in Fig. 6~22, including some curing cover hack levers 12, fixed hanging beam 1, guide rail beam 5, Fixed beam 14, the first postive stop baffle 8, the second limiting block after curing cover front haulage frame 11, some curing cover fixed beams 7, curing cover Plate 8 ', jacking system and some to main body frame.
As shown in figure 23, medial surface structure is consistent for first postive stop baffle 8 and the second postive stop baffle 8 ', installation limitation guide rail beam Multi-thread leading block 16 and leading block 18 are installed in the limiting plate 81 of 5 movements around, the processing of the 8 ' back side of the second postive stop baffle Mounting hole.
Main body frame is as shown in Fig. 6,7,8,9,12~22, and main body frame is provided with three pairs altogether in the present embodiment.Including outstanding Hanging bracket 2 and bracket base 9, suspension holdfast 2 and bracket base 9 are fixedly connected to form support, and bracket base 9 is fixed with ground, First postive stop baffle 8 is installed on the suspension holdfast 2 of front end, and the second postive stop baffle 8 ' is installed on the suspension holdfast 2 of rearmost end On, limiting plate 81 is installed on first and second postive stop baffle 8,8 ' inner sides, plays to position-limiting action around guide rail beam 5, makes it It can only move up and down.
As shown in fig. 7, (due to setting three pairs of main body frames, multi-thread leading block will be oriented to three to multi-thread leading block 16 Hanging steel rope) and leading block 18 be installed on the second postive stop baffle 8 ' on, steel wire rope draw off gear 10 be installed on curing cover after In fixed beam 14, steel wire rope draw off gear 10 controls haulage cable 4 ', and be oriented to 18 through leading block is connected with connector 17 It is oriented to through multi-thread leading block 16, is fixedly connected by the suspension pulley 5 in fixed hanging beam 1 with guide rail beam 5 again afterwards.Clockwise Rotating wire rope draw off gear handwheel releases steel wire rope and falls curing cover, and rotation hand wheel counterclockwise withdraws steel wire rope and rises maintenance Cover.
As shown in figure 16, multi-thread leading block 16 is that machined the groove that 3 hanging steel ropes 4 can be supplied to be oriented to.Connector 17 As shown in Figure 14,16,3 hanging steel ropes 4 are fixed in one end, and one end fixed traction steel wire rope 4 ', its structure type is unlimited, only Above-mentioned purpose can be reached.
Jacking system as shown in Fig. 6,7,9,12~22, including 3 suspension pulley 3 (for suspension stablize, be typically chosen 3, Also 3 can be more than, in this example selection set 3), 3 hanging steel ropes 4 (corresponding with suspension pulley quantity), 7 universal lead Rail pulley 6 (corresponding with curing cover amount of monomer, to ensure that each curing cover monomer will at least have a curing cover fixed beam 7), steel Cord draw off gear 10, multi-thread leading block 16, connector 17, haulage cable 4 ' and leading block 18, the second postive stop baffle Multi-thread leading block 16 is installed at the 8 ' back sides and leading block 18, the one end of haulage cable 4 ' are connected with steel wire rope draw off gear 10, The other end is connected by leading block 18 with connector 17 after winding, and fixed beam 14 is installed on the suspension branch of rearmost end after curing cover Between frame 2, steel wire rope draw off gear 10 is installed after curing cover in fixed beam 14.
It is fixed between the longitudinally fixed suspension holdfast 2 installed in homonymy of fixed hanging beam 1 as shown in Fig. 8,9,12~22 3 suspension pulleys 3 are installed, one end of every hanging steel rope 4 is all connected with connector 17, and the other end passes through more in hanging beam 1 After line leading block 16 is oriented to, then it is oriented to via suspension pulley 3 and is connected with guide rail beam 5,7 universal Guide rollers 6, which are installed on, leads On beam-and-rail 5, universal Guide rollers 6 can be supported along 5 horizontal shifting of guide rail beam each universal 6 lower part of Guide rollers and one Shield fixed beam 7 is fixedly connected, and the curing cover fixed beam 7 and curing cover front haulage frame 11 of front end connect.
The both ends of the suspension holdfast 2 of the utility model can respectively set 1 fixed hanging beam, can Parallel Design as needed Multigroup curing cover.
The utility model curing cover suspension arrangement uses twin beams adjustable trestle structure, and fixed hanging beam 1 and stent are (outstanding Hanging bracket 2, bracket base 9 form) it is fixedly connected, it is right by the built-in suspension pulley 3 of fixed hanging beam 1 and hanging steel rope 4 Guide rail beam 5 realizes Liftable hanging, plays the role of supported and suspended, up and down adjustment.Suspension holdfast 2 is assembled into bracket base 9 Stent, bracket base 9 are fixedly mounted with ground, and the height of main structural frame is can adjust by adjusting positioning bolt.Guide rail beam 5 Built-in universal Guide rollers 6, universal Guide rollers 6 are connected with curing cover fixed beam 7, curing cover 13 by curing cover hack lever 12 with Fixed beam 14 is bound with suspender belt and connected after curing cover fixed beam 7, curing cover front haulage frame 11 and curing cover, so as to fulfill curing cover 13 anterior-posterior horizontal on guide rail beam 5 slides and can make oscilaltion with guide rail beam 5.
Main body frame uses cold-rolled forming section and structural steel and iron in this example, by cutting, drilling, welding, lacquer spraying technique, makes Fixed beam, guide rail beam, curing cover are fixed after into fixed hanging beam, stent (suspension holdfast and bracket base are assembled into), curing cover 8 kinds of beam, curing cover front haulage frame and postive stop baffle components.Fixed beam, postive stop baffle and stent spiral shell after fixed hanging beam, curing cover Fixation is connect, bracket base is fixed with expansion bolt and ground, and adjustable for height curing means main structural frame is completed in assembling, real Now maintenance equipment can need to carry out the function of height adjusting according to prefabricated components.Pulley, multi-thread leading block are hung, is oriented to and slides Wheel, steel wire rope draw off gear and connector material are tool steel, are completed by metal machining technique, and universal guide rail is slided Wheel and steel wire rope are standard component (market purchasing).Pulley is hung in installation in fixed hanging beam, and multi-thread guiding is installed on limiting plate Pulley and leading block, steel wire rope draw off gear is installed after curing cover in fixed beam.Haulage cable one end is fixed on steel wire rope On the reel of draw off gear, the other end is linked by leading block and connector after winding, and three hanging steel ropes are again with connecting Fitting links, and after being oriented to by multi-thread leading block, is oriented to by suspension pulley fixation is connected with guide rail beam respectively, complete maintenance dress Standby curing cover jacking system installation.Rotating clockwise the connected gear of handwheel promotes the gear on winding wheel to drive winding Wheel rotates releasing steel wire rope and falls curing cover, and curing cover is then risen in rotation counterclockwise, realizes the hand-operated lifting function of curing cover.
Use operation:1st, housing maintenance order:According to prefabricated components height to be conserved is placed in fixed die station 19, adjust solid Fixed rack height.Drive curing cover guide rail beam to make the movement of anterior-posterior horizontal direction to front haulage curing cover front haulage frame, stretch out in place Afterwards, rotate clockwise steel wire rope draw off gear handwheel and fall curing cover, close wicket, filled by gas nozzle to curing cover lower part air cushion Gas (playing the role of cushion seals) seals beginning prefabricated components with ground and is conserved.2nd, cover kiln discharge order is received:Air cushion is put --- opening wicket --- rising cover manually ---, hand traction withdraws curing cover to gas.
The utility model unspecified part is known to the skilled person technology.

Claims (10)

  1. A kind of 1. prefabricated components maintenance equipment, it is characterised in that:Including curing cover (13) and curing cover suspension arrangement, described supports Shield (13) is installed on outside prefabricated components to be conserved by curing cover suspension arrangement;
    The curing cover (13) is made of n curing cover monomer (131), and n >=1, adds on the top of curing cover outer layer and side Work cloth set (133);
    The curing cover suspension arrangement includes some curing cover hack levers (12), fixed hanging beam (1), guide rail beam (5), curing cover Fixed beam (14) after front haulage frame (11), some curing cover fixed beams (7), curing cover, jacking system and some to main body frame;
    The curing cover hack lever (12) is penetrated in cloth set, and respectively with curing cover fixed beam (7), curing cover front haulage frame (11) Connected with fixed beam after curing cover (14), curing cover (13) is installed on curing cover suspension arrangement;
    Fixed beam (14) is fixed on main body frame after the fixation hanging beam (1) and curing cover, and guide rail beam (5) passes through lifting System hangs are under fixed hanging beam (1), and curing cover fixed beam (7) is suspended under guide rail beam (5) by jacking system, curing cover Front haulage frame (11) and the curing cover fixed beam (7) of front end are connected;
    When drawing curing cover front haulage frame (11), curing cover fixed beam (7) drives curing cover (13) along water before and after guide rail beam (5) work Square to movement, guide rail beam (5) is driven to be moved up and down as vertical direction by jacking system, guide rail beam (5) is consolidated by curing cover Determining beam (7) drives curing cover (13) to be moved up and down as vertical direction.
  2. A kind of 2. prefabricated components maintenance equipment according to claim 1, it is characterised in that:The curing cover monomer (131) it is made of curing cover cover body, curing cover cover body is made of waterproof layer, insulating layer and reflecting layer from outside to inside.
  3. A kind of 3. prefabricated components maintenance equipment according to claim 1, it is characterised in that:Described curing cover (13) bottom There is the air cushion (15) to seal, front end sets Jiao Men (132).
  4. A kind of 4. prefabricated components maintenance equipment according to claim 2, it is characterised in that:It is two among the insulating layer The aeroge insulation quilt of the compound EPE in face.
  5. A kind of 5. prefabricated components maintenance equipment according to claim 1, it is characterised in that:The main body frame includes outstanding Hanging bracket (2) and bracket base (9), the suspension holdfast (2) and bracket base (9) are fixedly connected to form support, stent bottom Seat (9) is fixed with ground.
  6. A kind of 6. prefabricated components maintenance equipment according to claim 5, it is characterised in that:The curing cover suspension arrangement The first postive stop baffle (8) and the second postive stop baffle (8 ') are further included, the first postive stop baffle (8) is installed on the suspension holdfast of front end (2) on, the second postive stop baffle (8 ') is installed on the suspension holdfast (2) of rearmost end.
  7. A kind of 7. prefabricated components maintenance equipment according to claim 6, it is characterised in that:If the jacking system includes It is dry suspension pulley (3), some hanging steel ropes (4), some universal Guide rollers (6), steel wire rope draw off gear (10), multi-thread Leading block (16), connector (17), haulage cable (4 ') and leading block (18), the installation of the second postive stop baffle (8 ') outside Multi-thread leading block (16) and leading block (18), haulage cable (4 ') one end are connected with steel wire rope draw off gear (10), twine It is connected around the rear other end by leading block (18) with connector (17), fixed beam (14) is installed on the outstanding of rearmost end after curing cover Between hanging bracket (2), steel wire rope draw off gear (10) is installed after curing cover in fixed beam (14);
    The fixation hanging beam (1) is fixedly mounted between the suspension holdfast (2) of homonymy, fixed hanging beam (1) if on install Dry suspension pulley (3), one end of every hanging steel rope (4) are all connected with connector (17), and the other end is slided by multi-thread be oriented to After taking turns (16) guiding, then it is oriented to via suspension pulley (3) and is connected with guide rail beam (5), some universal Guide rollers (6) is installed on and leads On beam-and-rail (5), universal Guide rollers (6) can be along guide rail beam (5) horizontal shifting, in each universal Guide rollers (6) lower part It is fixedly connected with a curing cover fixed beam (7).
  8. A kind of 8. prefabricated components maintenance equipment according to claim 6, it is characterised in that:First and second limiting block Installation limiting plate (81) on the inside of plate (8,8 ').
  9. A kind of 9. prefabricated components maintenance equipment according to claim 1, it is characterised in that:The suspension holdfast (2) with The support structure height of bracket base (9) composition is adjustable.
  10. A kind of 10. prefabricated components maintenance equipment according to claim 5, it is characterised in that:The suspension holdfast (2) two Hold 1 fixed hanging beam (1) of each setting, the multigroup curing cover of Parallel Design (13) as needed.
CN201720458544.1U 2017-04-28 2017-04-28 A kind of prefabricated components maintenance equipment Withdrawn - After Issue CN207224243U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720458544.1U CN207224243U (en) 2017-04-28 2017-04-28 A kind of prefabricated components maintenance equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720458544.1U CN207224243U (en) 2017-04-28 2017-04-28 A kind of prefabricated components maintenance equipment

Publications (1)

Publication Number Publication Date
CN207224243U true CN207224243U (en) 2018-04-13

Family

ID=61838514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720458544.1U Withdrawn - After Issue CN207224243U (en) 2017-04-28 2017-04-28 A kind of prefabricated components maintenance equipment

Country Status (1)

Country Link
CN (1) CN207224243U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108789795A (en) * 2017-04-28 2018-11-13 北京星航机电装备有限公司 A kind of prefabricated components maintenance equipment
CN108821793A (en) * 2018-06-06 2018-11-16 扬州大学 A kind of assembled architecture component cast-in-situ concrete linear node frequency electromagnetic waves curing means

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108789795A (en) * 2017-04-28 2018-11-13 北京星航机电装备有限公司 A kind of prefabricated components maintenance equipment
CN108789795B (en) * 2017-04-28 2024-06-11 北京星航机电装备有限公司 Prefabricated component maintenance equipment
CN108821793A (en) * 2018-06-06 2018-11-16 扬州大学 A kind of assembled architecture component cast-in-situ concrete linear node frequency electromagnetic waves curing means
CN108821793B (en) * 2018-06-06 2021-06-25 扬州大学 Assembly type building element cast-in-place concrete linear node high-frequency electromagnetic wave curing means

Similar Documents

Publication Publication Date Title
CN207224243U (en) A kind of prefabricated components maintenance equipment
CN208039764U (en) A kind of vertical automatic Wall brick device of construction
CN109203634A (en) A kind of compound PU hard bubble insulation board tinuous production of mineral wool rock wool
CN108005276B (en) A kind of inner wall of building wall and its construction method
CN107297682A (en) A kind of material processing auxiliaring lifting equipment
CN108532988A (en) A kind of bus station with ventilation parameters and article placement function
CN105755788B (en) A kind of coat-sleeve apparatus for shaping of automatic ironer
CN213626208U (en) Energy-saving building glass curtain wall
CN108789795A (en) A kind of prefabricated components maintenance equipment
CN209466796U (en) A kind of compound PU hard bubble insulation board tinuous production of mineral wool rock wool
CN107956301A (en) A kind of mobile combination factory for producing glass curtain wall
CN109132941A (en) It is a kind of building, Decoration Design lift work platform
CN202697375U (en) Novel sunlight greenhouse roller shutter machine
CN104876161B (en) A kind of a kind of rhyme scheme in Chinese operas serving as the prelude to a complete score for voices flap device and its control method
CN201254772Y (en) Novel energy-conserving beancurd leaf hollow glass curtain wall
CN206458127U (en) A kind of spatially-variable movable energy-saving building
CN206646799U (en) One kind is based on the multi-faceted adjustable type operating platform in job site
CN215054427U (en) Roof structure of green energy-saving building
CN109138390B (en) Lifting device for right side semi-rotation extension for decorating ceiling by decorating worker
CN209099831U (en) It is a kind of without rigid load bearing support structure
CN208135739U (en) Suspender is used in a kind of transport of color steel plate
CN207357422U (en) A kind of automobile counterbalance spraying automatic turning device
CN207143209U (en) A kind of full-automatic uploading in rice steamer system
CN201850981U (en) Sunshade window
CN206734762U (en) A kind of plastic packaging bag sealing embossing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220316

Address after: 100074, Beijing, Fengtai District, 9 North East Road, No.

Patentee after: Beijing Xinghang Electro-mechanical Equipment Co.,Ltd.

Patentee after: Aerospace additive technology (Beijing) Co.,Ltd.

Address before: 100074, Beijing, Fengtai District, 9 North East Road, No.

Patentee before: Beijing Xinghang Electro-mechanical Equipment Co.,Ltd.

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20180413

Effective date of abandoning: 20240611

AV01 Patent right actively abandoned

Granted publication date: 20180413

Effective date of abandoning: 20240611

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned