CN207216681U - A kind of basement construction system based on BIM - Google Patents
A kind of basement construction system based on BIM Download PDFInfo
- Publication number
- CN207216681U CN207216681U CN201720836252.7U CN201720836252U CN207216681U CN 207216681 U CN207216681 U CN 207216681U CN 201720836252 U CN201720836252 U CN 201720836252U CN 207216681 U CN207216681 U CN 207216681U
- Authority
- CN
- China
- Prior art keywords
- bim
- model
- module
- construction
- basement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model is disclosed and provided a kind of beneficial to basement construction, reduction difficulty of construction and the basement construction system based on BIM for improving efficiency of construction.The utility model includes processor and the BIM modeling modules electrically connected with the processor, model storage contrast module, guidance panel module, cloud server, display apparatus module and power module, the guidance panel module electrically connects with the BIM modeling modules, and the model storage contrast module electrically connects with the BIM modeling modules.The utility model can be used for the technical field of construction.
Description
Technical field
It the utility model is related to a kind of basement construction system based on BIM.
Background technology
Traditional construction to basement, typically arrive scene and site operation arrangement is carried out according to construction blueprint.According to figure
Paper site operation often runs into drawing information and the incongruent situation of field data, so live change can be caused, so as to add
Big site operation difficulty, drawing are chaotic;BIM (Building Information Modeling, i.e. BIM) be after
In the another revolutionary Computer Applied Technology of engineering construction industry after CAD (CAD) technology.Set using BIM
Meter, will detect to build the problem of interior equipment properties are present and potential safety hazard when designing engineering project first draft, so as to
Just solves safety problem in time in design.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of beneficial to basement construction, reduction difficulty of construction and raising
The basement construction system based on BIM of efficiency of construction.
Technical scheme is used by the utility model:The utility model includes processor and is electrically connected with the processor
BIM modeling modules, model storage contrast module, guidance panel module, cloud server, display apparatus module and the power supply mould connect
Block, the guidance panel module electrically connect with the BIM modeling modules, and the model storage contrast module models with the BIM
Module electrically connects.
From such scheme, the utility model integrates each drawing using BIM technology and by the BIM modeling modules
And basement job site is modeled for the first time, recycle the guidance panel module to be modified model data and improve mould
Type, new model is stored and is used for compared with old model by model storage contrast module, so as to obtain most
Excellent model scheme, for basement construction, the change of reduction scene can be reached, accelerate the effect of efficiency of construction;Described in setting
Cloud server can be used for model data being uploaded to cloud network, be easy to site operation personnel to be compared existing by download model
Field construction.
Further, the display apparatus module includes the first display, second display and live camera, and described first
Display electrically connects with the BIM modeling modules, and the live camera is arranged on the job site of the basement, and described
Two displays are coordinated by the cloud server and the live camera signals.
From such scheme, in the utility model, the live camera is set to carry out figure to job site
As catching so that modeling personnel can remotely grasp the situation of job site, model is modified in time perfect.This practicality is new
Type uses two displays, can distinguish monitoring model and job site, can make staff understand construction speed and according to
The completeness that model is constructed.
Further, the power module includes main power source and stand-by power supply.
From such scheme, in the utility model, it is power supply to set the main power source and the stand-by power supply
Effect, the stand-by power supply are used to prevent from causing the damage of the vital documents such as construction information, model when having a power failure or lose, and give construction item
Mesh makes troubles.
Brief description of the drawings
Fig. 1 is structured flowchart schematic diagram of the present utility model.
Embodiment
As shown in figure 1, specific embodiment of the present utility model is:The utility model include processor 1 and with it is described
The BIM modeling modules 2 of the electrical connection of processor 1, model storage contrast module 3, guidance panel module 4, cloud server 5, display
Device module 6 and power module 7, the guidance panel module 4 are electrically connected by the processor 1 with the BIM modeling modules 2,
The model storage contrast module 3 electrically connects with the BIM modeling modules 2.The BIM modeling modules 2 apply to be existing
The modeling software of BIM technology, for establishing 3D construction simulation models;The model storage contrast module 3 is that existing storage is set
It is standby, there is the function of storage model and calling model, the model for being generated to the BIM modeling modules 2 carry out storage and
Call, the main purpose of calling is in order to be contrasted with imperfect old model, so as to choose more excellent scheme;The operating surface
Plate module 4 is used for model data typing, and physical button and virtual case are provided with the guidance panel module 4;The high in the clouds
Server 5 is prior art, information can be uploaded into cloud network by wireless network, for the mobile devices such as mobile phone or other
Equipment is downloaded;The display apparatus module 6 is used for display image;The power module 7 is used to power.
In this specific embodiment, the display apparatus module 6 includes the first display 8, second display 9 and scene shooting
First 10, first display 8 electrically connects with the BIM modeling modules 2, and the live camera 10 is arranged on the basement
Job site, the second display 9 passes through the cloud server 5 and coordinates with the live signal of camera 10.Set
The live camera 10 can carry out picture catching to job site so that modeling personnel can remotely grasp job site
Situation, model is modified in time perfect.The utility model uses two displays, can distinguish monitoring model and construction is existing
, staff can be made to understand construction speed and the completeness constructed according to model.
In this specific embodiment, the power module 7 includes main power source and stand-by power supply.The main power source and institute are set
The effect that stand-by power supply is power supply is stated, the stand-by power supply is used to prevent to cause the important text such as construction information, model when having a power failure
Part is damaged or lost, and is made troubles to project under construction.
When carrying out Specific construction, carry out check of drawings for project drawing, build BIM models;According to drawing, to basement
Pipeline, equipment build BIM models;Equipment according to selected by mechanical drawing carries out full size to equipment in model and is accurately positioned;Root
According to floor absolute altitude, the equipment & piping layout of basement is reasonably adjusted;Outdoor scene is carried out for the model completed
Roaming simulation;Adjustment determines model, corrects change of location in time;Model exports optimal BIM models construction drawing.
The beneficial effects of the utility model are:Integrate each professional drawing, reduce job site and do over again phenomenon, saving is done over again
Caused financial cost;3-D technology tell somebody what one's real intentions are told somebody what one's real intentions are than two dimensional technique it is more precisely directly perceived;Construction simulation resource allocation is carried out,
It is accurate to obtain mechanical material dosage needed for scene, improve construction speed.
The utility model can be used for the technical field of construction.
Claims (3)
- A kind of 1. basement construction system based on BIM, it is characterised in that:It includes processor(1)With the equal and processor (1)The BIM modeling modules of electrical connection(2), model storage contrast module(3), guidance panel module(4), cloud server(5)、 Display apparatus module(6)With power module(7), the guidance panel module(4)With the BIM modeling modules(2)Electrical connection, it is described Model stores contrast module(3)With the BIM modeling modules(2)Electrical connection.
- A kind of 2. basement construction system based on BIM according to claim 1, it is characterised in that:The display mould Block(6)Including the first display(8), second display(9)With live camera(10), first display(8)With it is described BIM modeling modules(2)Electrical connection, the live camera(10)The job site of the basement is arranged on, described second is aobvious Show device(9)Pass through the cloud server(5)With the live camera(10)Signal coordinates.
- A kind of 3. basement construction system based on BIM according to claim 1, it is characterised in that:The power module (7)Including main power source and stand-by power supply.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720836252.7U CN207216681U (en) | 2017-07-11 | 2017-07-11 | A kind of basement construction system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720836252.7U CN207216681U (en) | 2017-07-11 | 2017-07-11 | A kind of basement construction system based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207216681U true CN207216681U (en) | 2018-04-10 |
Family
ID=61813071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720836252.7U Expired - Fee Related CN207216681U (en) | 2017-07-11 | 2017-07-11 | A kind of basement construction system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207216681U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109271685A (en) * | 2018-08-30 | 2019-01-25 | 深圳市赛为智能股份有限公司 | A kind of Urban renewal date storage method and device based on BIM |
-
2017
- 2017-07-11 CN CN201720836252.7U patent/CN207216681U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109271685A (en) * | 2018-08-30 | 2019-01-25 | 深圳市赛为智能股份有限公司 | A kind of Urban renewal date storage method and device based on BIM |
CN109271685B (en) * | 2018-08-30 | 2023-05-02 | 深圳市赛为智能股份有限公司 | BIM-based urban updating and reconstruction data storage method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102819861B (en) | Electric system three dimensional device scene modeling method | |
CN103473412B (en) | Subway station roaming method based on virtual and real scenes | |
CN106595565A (en) | BIM-based intelligent monitoring system | |
CN107610238B (en) | AR dynamic model system of power equipment and working method thereof | |
CN104700962B (en) | Method for manufacturing wirning harness | |
CN107527143A (en) | Job site data-pushing, management method and management system based on BIM models | |
CN105894576A (en) | 3D substation panoramic real-time control system based on virtual simulation technology | |
CN109215432A (en) | A kind of power plant's operation training system based on VR virtual technology | |
CN113516742A (en) | Model special effect manufacturing method and device, storage medium and electronic equipment | |
CN103279897B (en) | Power scheduling monitoring information methods of exhibiting and system | |
CN207022043U (en) | A kind of architectural design management system based on BIM and VR | |
CN207216681U (en) | A kind of basement construction system based on BIM | |
CN205721989U (en) | A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system | |
CN206021354U (en) | One kind is based on BIM and VR smart cities pipeline coordination platform | |
CN204695673U (en) | A kind of for the three-dimensional digital sand table in urban planning and construction | |
CN104361781A (en) | Analogue simulation system for tower crane | |
CN104007723A (en) | Simple multimedia classroom control system based on intelligent campus environment | |
CN213932506U (en) | Oblique photography unmanned aerial vehicle surveying and mapping system and device | |
CN203466628U (en) | Intelligent electric power monitoring system having three-dimensional view | |
CN105825272A (en) | Transformer substation management system and management method | |
CN116244778A (en) | Hydropower engineering simulation cloud picture display method and device, electronic equipment and storage medium | |
CN104504960A (en) | Method for simulating application of head-up display in flight training device EPX visual system | |
CN208224816U (en) | A kind of remote control detection system based on BIM model | |
CN203167137U (en) | Digital film projector monitoring terminal | |
CN114266849A (en) | Model automatic generation method and device, computer equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180410 |