CN207212400U CN201721151740.0U CN201721151740U CN207212400U CN 207212400 U CN207212400 U CN 207212400U CN 201721151740 U CN201721151740 U CN 201721151740U CN 207212400 U CN207212400 U CN 207212400U
Authority
CN
China
Prior art keywords
ball
type
dungeon
war
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721151740.0U
Other languages
Chinese (zh)
Inventor
吴献
刘叶
张延年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201721151740.0U priority Critical patent/CN207212400U/en
Application granted granted Critical
Publication of CN207212400U publication Critical patent/CN207212400U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

It the utility model is related to a kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities, including ball-type concrete main body, lift, concrete diaphragm, living guarantee area, anthropic zone, traffic pipeline and line tube.Nowadays people greatly develop the underground space, and our utilization rate of the space of ground has reached very high.China traffic, lifeline engineering etc. all toward underground develop, then believe have one day we can completely underground live nor unreachable.People can be in underground inhabitation, office, amusement etc., that is, so-called " Dungeon ".Nowadays the state of the earth is nor very stable, and weather etc. is varied, and major disaster once occurs for people, such as snow disaster, storm wind, tsunami, high temperature low temperature, war etc., very heavy harm will be brought, when people can not survive on the ground, can be gone underground.The construction of Dungeon is highly beneficial and is also highly important.

Description

A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities
Technical field
The utility model belongs to underground space field, more particularly to a kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities.
Background technology
The city underground space is built like a raging fire at present, as country is pushed further into pipe gallery, sponge city strategy, China Big-and-middle city will start the new round climax of underground engineering construction, due to the scarcity of the underground space, to collecting " city underground integrated pipe The demand of corridor, city underground expressway, city underground construction space " is huge.
The exploitation and construction of the Japanese and American-European underground space maintain the leading position, and advocates at first and proposes Dungeon and city The synthesization in lower space and three-dimensional utility strategies, nineteen ninety propose Tokyo Declaration:The Devoting Major Efforts To Developing underground space, it is new to start the mankind Cave period, International Tunnelling Association in 2010 expands to tunnel and underground space association and declares:21 century is the underground space Century.
Nowadays people greatly develop the underground space, and our utilization rate of the space of ground has reached very high.China is just Traffic, lifeline engineering etc. all toward underground develop, then believe have one day we can completely underground live It is nor unreachable.People can be in underground inhabitation, office, amusement etc., that is, so-called " Dungeon ".Nowadays For the state of the earth nor very stable, weather etc. is varied, and major disaster, such as snow disaster, storm wind, sea once occur for people Howl, high temperature low temperature, war etc., can should all come very heavy harm, when people can not survive on the ground, Ke Yizhuan to people Enter underground.The construction of Dungeon is highly beneficial and is also highly important.
Utility model content
In order to solve above-mentioned technical problem, the utility model provides a kind of buried large-scale anti-war ball-type underground of taking precautions against natural calamities City, mainly for providing a kind of Dungeon, people can be lived when having large-scale disaster war to occur in underground.
The technical solution adopted in the utility model is as follows:
A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities includes:Ball-type concrete main body, lift, concrete diaphragm, Living guarantee area, anthropic zone, traffic pipeline and line tube;Its main body is made up of multiple ball-type concrete main bodies, each Ball-type concrete main body is a unit;Ball-type concrete main body is the concrete wall of ball-type, inside be it is hollow, from it is lower to On set gradually living guarantee area and anthropic zone;Between each region with concrete diaphragm in ball-type concrete main body Portion separates successively;Extended at the center of ball-type concrete main body from bottom and lift is provided with ground;Each two is adjacent Ball-type concrete main body between be connected by traffic pipeline with line tube;Bottommost connects each two ball-type concrete main body In the pipeline in living guarantee area be line tube;Connected pipeline on line tube is all traffic pipeline.
Further, described ball-type concrete main body, concrete diaphragm, traffic pipeline and line tube use waterproof Concrete.
Further, it is provided with waterproof layer inside described ball-type concrete main body, traffic pipeline and line tube.
Further, described anthropic zone is internally provided with simulation sunlight.
Further, described living guarantee area is internally provided with water, electricity consumption, communication, heating, ventilation equipment to ensure The operation of Dungeon.
Further, described ball-type concrete main body is prefabricated components, is divided into multiple structures according to the height of each subregion The component on part, bottom and top is dome type, and the component at middle part is circular ring type, is further spelled during construction Dress.
Further, the regional inside ball-type Dungeon can each ball-type unit needs, freely set It is fixed;Free combination and arrangement can be carried out between each ball-type unit that ball-type Dungeon is formed, can single also may be used To be many.
The beneficial effects of the utility model:
The beneficial effects of the utility model be it is buried it is large-scale take precautions against natural calamities it is anti-war each unit of ball-type Dungeon between be connected with friendship Thread a pipe and line tube, be free to combination and do not limited by others such as regions, the activity space of people is very free;Each The traffic pipeline connected between ball-type unit can significantly facilitate the trip of people, and line tube can be by various pipelines one Change, unified management, it is very convenient with it is efficient.
Ball-type concrete main body uses prefabricated concrete component, makes simply, is advantageous to the promotion of industrial integration.Ball The state of ball-type is presented in type concrete main body, and stress is fine, and this structure can disperse away external force, and the safety to people provides It is further to ensure, people can be allowed preferably to build " Dungeon ";Dungeon can be allowed to be embedded in the especially deep ground of underground buried depth Side, even especially deep place can also ensure integrally-built safety, preferably people's offer one can preferably it take refuge Place, Dungeon the inside can voluntarily be run.When destructive disaster occurs, people can survive king-sized to buried depth Place, it can not be influenceed by disaster on ground, and modern war is all based on the weapons such as nuclear bomb, and and the utility model can Injury caused by keep out the weapons such as nuclear bomb.
Brief description of the drawings
Fig. 1 is the overall schematic of the buried large-scale adjacent ball-type unit connection of anti-war ball-type Dungeon two of taking precautions against natural calamities.
Fig. 2 is the diagrammatic cross-section of the buried large-scale adjacent ball-type unit connection of anti-war ball-type Dungeon two of taking precautions against natural calamities.
Fig. 3 is the overall schematic of the buried large-scale anti-war single ball-type unit of ball-type Dungeon of taking precautions against natural calamities.
Fig. 4 is the diagrammatic cross-section of the buried large-scale anti-war single ball-type unit of ball-type Dungeon of taking precautions against natural calamities.
Fig. 5 is the top view of a-quadrant in Fig. 4.
In figure, 1 it is ball-type concrete main body, 2 is lift, 3 is concrete diaphragm, 4 is living guarantee area, 5 is the mankind Behaviour area, 6 be traffic pipeline, 7 be line tube.
Embodiment:
In order to further illustrate the utility model, below in conjunction with the accompanying drawings and embodiment is retouched in detail to the utility model State, but they can not be interpreted as to the restriction to scope of protection of the utility model.
A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities, including ball-type concrete main body 1, lift 2, concrete diaphragm 3rd, living guarantee area 4, anthropic zone 5, traffic pipeline 6 and line tube 7;It is characterized in that:Buried large-scale anti-war ball of taking precautions against natural calamities The main body of type Dungeon is made up of multiple ball-type concrete main bodies 1, and each ball-type concrete main body 1 is a unit;Ball-type mixes The concrete wall that native main body 1 is a ball-type is coagulated, inside is hollow, sets gradually living guarantee area 4 from bottom to up and the mankind live Dynamic area 5;Separated successively in the inside of ball-type concrete main body 1 with concrete diaphragm 3 between each region;In ball-type concrete master The center of body 1 extends on ground from bottom and is provided with lift 2;Between the adjacent ball-type concrete main body 1 of each two by Traffic pipeline 6 is connected with line tube 7;The pipe in the living guarantee area 4 in bottommost connection each two ball-type concrete main body 1 Road is line tube 7;Connected pipeline on line tube 7 is all traffic pipeline 6;It is described ball-type concrete main body 1, mixed Solidifying native dividing plate 3, traffic pipeline 6 and line tube 7 use water-proof concrete;Described ball-type concrete main body 1, traffic pipeline 6 and line tube 7 inside be provided with waterproof layer;Described anthropic zone 5 is internally provided with simulation sunlight;Described life Ensure that area 4 is internally provided with water, electricity consumption, communication, heating, ventilation equipment to ensure the operation of Dungeon;Described ball-type mixes It is prefabricated components to coagulate native main body 1, is divided into multiple components according to the height of each subregion, and the component on bottom and top is dome type, The component at middle part is circular ring type, is carried out during construction further assembled;Regional inside ball-type Dungeon can With the needs of each ball-type unit, freely set;It can enter between each ball-type unit that ball-type Dungeon is formed The free combination of row and arrangement, can be it is single can also be many.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as the scope of protection of the utility model.

Claims (7)

1. a kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities, including:Ball-type concrete main body(1), lift(2), concrete Dividing plate(3), living guarantee area(4), anthropic zone(5), traffic pipeline(6)And line tube(7);It is characterized in that:It is buried The main body of large-scale anti-war ball-type Dungeon of taking precautions against natural calamities is by multiple ball-type concrete main bodies(1)Composition, each ball-type concrete main body(1) For a unit;Ball-type concrete main body(1)For the concrete wall of a ball-type, inside is hollow, is set gradually from bottom to up Living guarantee area(4)And anthropic zone(5);Concrete diaphragm is used between each region(3)In ball-type concrete main body(1)'s Inside separates successively;In ball-type concrete main body(1)Center extended to from bottom lift be provided with ground(2);Often Two adjacent ball-type concrete main bodies(1)Between by traffic pipeline(6)And line tube(7)It is connected;Bottommost connection is every Two ball-type concrete main bodies(1)In living guarantee area(4)Pipeline be line tube(7);Line tube(7)On phase Pipeline be all traffic pipeline(6).
2. buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities according to claim 1, it is characterised in that:Described ball-type coagulation Native main body(1), concrete diaphragm(3), traffic pipeline(6)And line tube(7)Use water-proof concrete.
3. buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities according to claim 1, it is characterised in that:Described ball-type coagulation Native main body(1), traffic pipeline(6)And line tube(7)Inside is provided with waterproof layer.
4. buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities according to claim 1, it is characterised in that:Described mankind's activity Area(5)It is internally provided with simulation sunlight.
5. buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities according to claim 1, it is characterised in that:Described living guarantee Area(4)It is internally provided with water, electricity consumption, communication, heating, ventilation equipment to ensure the operation of Dungeon.
6. buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities according to claim 1, it is characterised in that:Described ball-type coagulation Native main body(1)For prefabricated components, it is divided into multiple components according to the height of each subregion, the component on bottom and top is dome type, The component at middle part is circular ring type, is carried out during construction further assembled.
7. buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities according to claim 1, it is characterised in that:Inside ball-type Dungeon Regional can each ball-type unit needs, freely set;Each ball-type list that ball-type Dungeon is formed Free combination and arrangement can be carried out between member, can be it is single can also be many.
CN201721151740.0U 2017-09-10 2017-09-10 A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities Expired - Fee Related CN207212400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721151740.0U CN207212400U (en) 2017-09-10 2017-09-10 A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721151740.0U CN207212400U (en) 2017-09-10 2017-09-10 A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities

Publications (1)

Publication Number Publication Date
CN207212400U true CN207212400U (en) 2018-04-10

Family

ID=61823930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721151740.0U Expired - Fee Related CN207212400U (en) 2017-09-10 2017-09-10 A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities

Country Status (1)

Country Link
CN (1) CN207212400U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387157A (en) * 2017-09-10 2017-11-24 沈阳建筑大学 A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387157A (en) * 2017-09-10 2017-11-24 沈阳建筑大学 A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities

Similar Documents

Publication Publication Date Title
CN202164660U (en) Layered water intake gallery for earth surface reservoir
CN207212400U (en) A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities
CN113832905A (en) Flood control wall structure capable of comprehensively lifting
CN102926486A (en) Grass-wood-soil wall
CN107476928A (en) A kind of method of Pumped Storage Power Stations and energy storage power generation
CN107387157A (en) A kind of buried large-scale anti-war ball-type Dungeon of taking precautions against natural calamities
CN209277275U (en) A kind of administration structure of soil erosion
CN106869959A (en) The interflow of semicircle shield machine construction regulate and store moldeed depth layer tunnel
CN207212387U (en) A kind of deep layer Tunnel Ventilation System for having escaping function concurrently
CN209555894U (en) A kind of ecoscape weir for taking into account fish pass
CN208268556U (en) Construct the composite pipe in sponge city
CN203393982U (en) Vertical shaft adopting underground powerhouse cable outlet and air exhausting system which are arranged combinedly
CN207092034U (en) A kind of Pumped Storage Power Stations
CN107059775A (en) Ecological wetland channel revetment
CN203145025U (en) Soft soil deep foundation pit supporting cat anchor structure
CN106812155A (en) Underground traffic flood drainage system
CN206800232U (en) A kind of city river solid combined type box culvert structure
CN207828733U (en) A kind of novel water permeable concrete road
CN207362973U (en) A kind of rainwater slow release device
CN107604942A (en) Collect gateway and the parking lot of the connection underground pipe gallery of emergency escape function
CN109372021A (en) Assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node
CN207469294U (en) A kind of fixed system for protecting underground pipe gallery deformation
CN207700328U (en) Underground power house lower layer collector drain structure
CN203466770U (en) Integrated utilization of natural resources on buildings
CN207211193U (en) Collect gateway and the parking lot of the connection underground pipe gallery of emergency escape function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20210910