CN207212366U - A kind of tunnel main tunnel, which is caunched, excavates temporary support structures - Google Patents

A kind of tunnel main tunnel, which is caunched, excavates temporary support structures Download PDF

Info

Publication number
CN207212366U
CN207212366U CN201721290695.7U CN201721290695U CN207212366U CN 207212366 U CN207212366 U CN 207212366U CN 201721290695 U CN201721290695 U CN 201721290695U CN 207212366 U CN207212366 U CN 207212366U
Authority
CN
China
Prior art keywords
tunnel
protection structure
steel frame
main tunnel
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721290695.7U
Other languages
Chinese (zh)
Inventor
樊晓勇
刘晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Original Assignee
China Railway 20th Bureau Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp filed Critical China Railway 20th Bureau Group Corp
Priority to CN201721290695.7U priority Critical patent/CN207212366U/en
Application granted granted Critical
Publication of CN207212366U publication Critical patent/CN207212366U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Caunched the utility model discloses a kind of tunnel main tunnel and excavate temporary support structures, the front side rigid protection structure and rear side rigid protection structure caunched including supporting in main tunnel in section, the front side rigid protection structure and rear side rigid protection structure are on symmetrical before and after main tunnel center line, the front side rigid protection structure and rear side rigid protection structure include multiple steel frames, the both sides of each steel frame are provided with multiple long lock foot anchoring stocks from the bottom to top, and the caunch arch of section of the main tunnel is injected with concrete layer.The utility model is designed reasonably, it is simple in construction, weak broken wall rock during by setting multiple steel frames to tunnel excavation carries out timely sectional supporting, and per 0.5~1.0m of cyclic advance during excavation, supporting is soon carried out after the excavation of a circulation is completed, the distance between two neighboring steel frame is 0.5m~1.0m, in construction, supporting is more beneficial for ensureing the safety of construction, prevents from caving in during tunnel excavation, and reliability is high, it is practical, it is easy to promote the use of.

Description

A kind of tunnel main tunnel, which is caunched, excavates temporary support structures
Technical field
The utility model belongs to technical field of tunnel construction, and in particular to a kind of tunnel main tunnel, which is caunched, excavates gib knot Structure.
Background technology
Nowadays during tunnel construction, carry out tunnel excavation during, for control surrouding rock stress in right amount release and Deformation, increase strcture safety and facilitates the safety of subsequent construction, and tunnel excavation process should apply that rigidity is less to face immediately When bearing structure, referred to as gib.To weak broken wall rock location, deformed before Tunnel often occurs, its Main cause may have:1st, tunnel excavation section is too big, and excavating makes the relaxation circle of country rock become big;2nd, gib is come to nothing behind Problem, gib do not play one's part to the full, area's country rock relaxation of coming to nothing, and influence peripheral rock relaxation deformation;3rd, interim branch Shield can not meet to be actually needed;4th, because above-mentioned synthesis and other factorses cause tunnel deformation.
Therefore, a kind of reasonable in design, weak broken during by setting multiple steel frames to tunnel excavation is nowadays lacked Country rock carries out timely sectional supporting, per 0.5~1.0m of cyclic advance during excavation, after the excavation of a circulation is completed soon Progress the distance between supporting, two neighboring steel frame is 0.5m~1.0m, while construction while supporting be more beneficial for ensure construction Safety, prevents from caving in during tunnel excavation;, can by setting multiple connection reinforcing bars between two neighboring steel frame Multiple steel frames are connected as an entirety, add the stability of steel frame, at the same connect reinforcing bar can be to adjacent steel frame Between tunnel surrounding carry out supporting, avoid and falling rocks occur between adjacent steel frame or caves in.
Utility model content
Technical problem to be solved in the utility model is to be directed to above-mentioned deficiency of the prior art, there is provided a kind of tunnel Main tunnel, which is caunched, excavates temporary support structures, and its is reasonable in design, simple in construction, during by setting multiple steel frames to tunnel excavation Weak broken wall rock carries out timely sectional supporting, per 0.5~1.0m of cyclic advance during excavation, completes the excavation of a circulation It is 0.5m~1.0m soon to carry out the distance between supporting, two neighboring steel frame afterwards, while construction while supporting be more beneficial for protecting The safety of construction is demonstrate,proved, prevents from caving in during tunnel excavation;By setting multiple connections between two neighboring steel frame Reinforcing bar, multiple steel frames can be connected as an entirety, add the stability of steel frame, at the same connect reinforcing bar can be to phase Tunnel surrounding between adjacent steel frame carries out supporting, avoids and falling rocks occurs between adjacent steel frame or caves in, and reliability is high, It is practical, it is easy to promote the use of.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of tunnel main tunnel excavation that caunches faces When supporting construction, it is characterised in that:Front side rigid protection structure and the rear side rigid protection to be caunched including supporting in main tunnel in section Structure, the main tunnel caunch section for tunnel intersect section upper hole body section, the tunnel intersect section be main tunnel in intersect with horizontal hole Tunnel construction sections, the tunnel intersect section width be equal to horizontal hole width, the tunnel intersect section vault be higher than horizontal hole vault, The front side rigid protection structure and the rear side rigid protection structure are on symmetrical before and after main tunnel center line, the front side rigidity Supporting construction and the rear side rigid protection structure include multiple steel frames, and each steel frame is along main tunnel bearing of trend cloth If the parallel laying of multiple steel frames, in the bottoms of multiple steel frames is generally aligned in the same plane, the two neighboring steel canopy The spacing of frame is 0.5m~1.0m, and multiple steel frames of the front side rigid protection structure gradually increase from front to back, after described Multiple steel frames of side rigid protection structure are gradually reduced from front to back, and multiple tracks is connected between the top of the adjacent steel frame Reinforcing bar is connected, connecting parallel reinforced steel bar described in multiple tracks is laid, and connection reinforcing bar is uniformly laid along main tunnel length direction described in multiple tracks, each The both sides of the steel frame are provided with multiple long lock foot anchoring stocks from the bottom to top, and the rear end of the long lock foot anchoring stock is anchored at steel canopy On frame, the long lock foot anchoring stock is tilted down by anchor pole rear end to anchor pole front end, and the caunch arch of section of the main tunnel is injected with mixing Solidifying soil layer, the steel frame are covered in the concrete layer.
A kind of above-mentioned tunnel main tunnel, which is caunched, excavates temporary support structures, it is characterized in that:The steel frame is i-beam frame, institute It is door cabinet frame to state steel frame.
A kind of above-mentioned tunnel main tunnel, which is caunched, excavates temporary support structures, it is characterized in that:The long lock foot anchoring stock is symmetrical arranged In the left and right sides of each steel frame, the long lock foot anchoring stock is in each side setting two of each steel frame, the length The length of lock foot anchoring stock is 3m.
A kind of above-mentioned tunnel main tunnel, which is caunched, excavates temporary support structures, it is characterized in that:The caunch bottom surface of section of the main tunnel is Rectangular horizontal.
The utility model has advantages below compared with prior art:
1st, weak broken wall rock when the utility model is by setting multiple steel frames to tunnel excavation is timely divided Section supporting, per 0.5~1.0m of cyclic advance during excavation, soon carry out supporting after the excavation of a circulation is completed, adjacent two The distance between individual steel frame is 0.5m~1.0m, while construction while supporting be more beneficial for ensure construction safety, prevent tunnel from opening Caved in during digging, be easy to promote the use of.
2nd, the utility model is on steel frame by setting multiple long lock foot anchoring stocks, by long lock foot anchoring stock by steel frame anchor Gu on the side that the main tunnel caunches section both sides, the stability of steel frame is ensure that, further ensures the steady of supporting construction Qualitative and security, reliable and stable, using effect is good.
4th, the utility model, can be by multiple steel frames by setting multiple connection reinforcing bars between two neighboring steel frame An entirety is connected as, adds the stability of steel frame, while connects reinforcing bar to enclose the tunnel between adjacent steel frame Rock carries out supporting, avoids and falling rocks occurs between adjacent steel frame or caves in.
5th, the utility model by main tunnel caunch section vault spray strength grade be C20 concrete layer, can be right Vault is reinforced, while weak broken wall rock is solidified as into overall structure, is avoided work progress medium stone and is dropped and jeopardizes people Member's safety.
In summary, the utility model is designed reasonably, it is simple in construction, during by setting multiple steel frames to tunnel excavation Weak broken wall rock carries out timely sectional supporting, per 0.5~1.0m of cyclic advance during excavation, completes the excavation of a circulation It is 0.5m~1.0m soon to carry out the distance between supporting, two neighboring steel frame afterwards, while construction while supporting be more beneficial for protecting The safety of construction is demonstrate,proved, prevents from caving in during tunnel excavation;By setting multiple connections between two neighboring steel frame Reinforcing bar, multiple steel frames can be connected as an entirety, add the stability of steel frame, at the same connect reinforcing bar can be to phase Tunnel surrounding between adjacent steel frame carries out supporting, avoids and falling rocks occurs between adjacent steel frame or caves in, and reliability is high, It is practical, it is easy to promote the use of.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 A-A sectional views.
Description of reference numerals:
1-horizontal hole;2-main tunnel;3-steel frame;
4-long lock foot anchoring stock;5-connection reinforcing bar.
Embodiment
As depicted in figs. 1 and 2, the utility model include supporting front side rigid protection structure that main tunnel is caunched in section and after Side rigid protection structure, the main tunnel caunch section for tunnel intersect section upper hole body section, the tunnel intersect section be main tunnel 2 in The tunnel construction sections intersected with horizontal hole 1, the tunnel intersect width of the width equal to horizontal hole 1 of section, and the tunnel intersects the vault of section Higher than the horizontal vault of hole 1, the front side rigid protection structure and the rear side rigid protection structure are on right before and after the center line of main tunnel 2 Claim, the front side rigid protection structure and the rear side rigid protection structure include multiple steel frames 3, each steel frame 3 lay along the bearing of trend of main tunnel 2, multiple 3 parallel layings of steel frame, and the bottom of multiple steel frames 3 is positioned at same flat In face, the spacing of the two neighboring steel frame 3 is 0.5m~1.0m, multiple steel frames 3 of the front side rigid protection structure Gradually increase from front to back, multiple steel frames 3 of the rear side rigid protection structure gradually reduce from front to back, the adjacent steel Multiple tracks connection reinforcing bar 5 is connected between the top of frame 3,5 parallel laying of reinforcing bar is connected described in multiple tracks, reinforcing bar is connected described in multiple tracks 5 uniformly lay along the length direction of main tunnel 2, and the both sides of each steel frame 3 are provided with multiple long lock foot anchoring stocks from the bottom to top 4, the rear end of the long lock foot anchoring stock 4 is anchored on steel frame 3, the long lock foot anchoring stock 4 from anchor pole rear end to anchor pole front end to Lower inclination, the caunch arch of section of the main tunnel are injected with concrete layer, and the steel frame 3 is covered in the concrete layer.
Weak broken wall rock when in actual use, by setting multiple steel frames 3 to tunnel excavation is carried out Timely sectional supporting, per 0.5~1.0m of cyclic advance during excavation, soon propped up after the excavation of a circulation is completed Shield, the distance between two neighboring steel frame 3 be 0.5m~1.0m, in construction supporting be more beneficial for ensureing the safety constructed, Prevent from caving in during tunnel excavation;By setting multiple long lock foot anchoring stocks 4 on the steel frame 3, pass through the length Lock foot anchoring stock 4 by steel frame 3 be anchored at the main tunnel caunch section both sides side on, ensure that the stability of steel frame 3, enter one Step ensure that the stability and security of supporting construction;By setting multiple connection reinforcing bars 5 between two neighboring steel frame 3, Multiple steel frames 3 can be connected as an entirety, add the stability of steel frame 3, at the same connect reinforcing bar 5 can be to adjacent Tunnel surrounding between steel frame 3 carries out supporting, avoids and falling rocks occurs between adjacent steel frame 3 or caves in;By institute State main tunnel caunch section vault injection strength grade be C20 concrete layer, vault can be reinforced, while will be weak broken Broken country rock is solidified as overall structure, avoids work progress medium stone and drops and jeopardizes personal security.
As depicted in figs. 1 and 2, in the present embodiment, the steel frame 3 is i-beam frame, and the steel frame 3 is door cabinet frame.
In actual use, the i-beam frame disclosure satisfy that section of being caunched to the main tunnel carries out the intensity of gib Demand, the security that the main tunnel is caunched in section work progress is ensure that, prevent main tunnel section of caunching to cave in.
As depicted in figs. 1 and 2, in the present embodiment, the long lock foot anchoring stock 4 is symmetricly set on the left and right of each steel frame 3 Both sides, in each side setting two of each steel frame 3, the length of the long lock foot anchoring stock 4 is the long lock foot anchoring stock 4 3m。
In actual use, two long lock foot anchoring stock 4 is respectively set on the both sides of each steel frame 3, can be to steel frame 3 Play good anchorage effect, ensure that steel frame 3 main tunnel is caunched section carry out supporting stability, avoid steel frame 3 collapse.
As depicted in figs. 1 and 2, in the present embodiment, the caunch bottom surface of section of the main tunnel is rectangular horizontal.
In actual use, the caunch bottom surface of section of the main tunnel is rectangular horizontal, is more beneficial for carrying out the main tunnel The excavation for section of caunching, while enough spaces can be provided for follow-up constructing tunnel.
It is described above, only it is preferred embodiment of the present utility model, not the utility model is imposed any restrictions, every Any simple modification, change and the equivalent structure change made according to the utility model technical spirit to above example, still Belong in the protection domain of technical solutions of the utility model.

Claims (4)

1. a kind of tunnel main tunnel, which is caunched, excavates temporary support structures, it is characterised in that:Including supporting before main tunnel is caunched in section Side rigid protection structure and rear side rigid protection structure, the main tunnel caunch section for tunnel intersect section upper hole body section, it is described It is the tunnel construction sections intersected in main tunnel (2) with horizontal hole (1) that tunnel, which intersects section, and the width that the tunnel intersects section is equal to horizontal hole (1) Width, the vault that the tunnel intersects section are higher than horizontal hole (1) vault, and the front side rigid protection structure and the rear side rigidly prop up For protection structure on symmetrical before and after main tunnel (2) center line, the front side rigid protection structure and the rear side rigid protection structure are equal Including multiple steel frames (3), each steel frame (3) is laid along main tunnel (2) bearing of trend, and multiple steel frames (3) are flat Row is laid, and in the bottoms of multiple steel frames (3) is generally aligned in the same plane, the spacing of the two neighboring steel frame (3) is 0.5m~1.0m, multiple steel frames (3) of the front side rigid protection structure are gradually increased from front to back, and the rear side rigidly props up Multiple steel frames (3) of protection structure are gradually reduced from front to back, and multiple tracks company is connected between the top of the adjacent steel frame (3) Reinforcing bar (5) is connect, the parallel laying of reinforcing bar (5) is connected described in multiple tracks, it is equal along main tunnel (2) length direction to connect reinforcing bar (5) described in multiple tracks Even laying, the both sides of each steel frame (3) are provided with multiple long lock foot anchoring stocks (4), the long lock pin anchor from the bottom to top The rear end of bar (4) is anchored on steel frame (3), and the long lock foot anchoring stock (4) is tilted down by anchor pole rear end to anchor pole front end, institute State the caunch arch of section of main tunnel and be injected with concrete layer, the steel frame (3) is covered in the concrete layer.
2. being caunched according to a kind of tunnel main tunnel described in claim 1 excavates temporary support structures, it is characterised in that:The steel canopy Frame (3) is i-beam frame, and the steel frame (3) is door cabinet frame.
3. being caunched according to a kind of tunnel main tunnel described in claim 1 or 2 excavates temporary support structures, it is characterised in that:It is described Long lock foot anchoring stock (4) is symmetricly set on the left and right sides of each steel frame (3), and the long lock foot anchoring stock (4) is in each steel frame (3) each side setting two, the length of the long lock foot anchoring stock (4) is 3m.
4. being caunched according to a kind of tunnel main tunnel described in claim 1 or 2 excavates temporary support structures, it is characterised in that:It is described The caunch bottom surface of section of main tunnel is rectangular horizontal.
CN201721290695.7U 2017-09-30 2017-09-30 A kind of tunnel main tunnel, which is caunched, excavates temporary support structures Active CN207212366U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721290695.7U CN207212366U (en) 2017-09-30 2017-09-30 A kind of tunnel main tunnel, which is caunched, excavates temporary support structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721290695.7U CN207212366U (en) 2017-09-30 2017-09-30 A kind of tunnel main tunnel, which is caunched, excavates temporary support structures

Publications (1)

Publication Number Publication Date
CN207212366U true CN207212366U (en) 2018-04-10

Family

ID=61820726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721290695.7U Active CN207212366U (en) 2017-09-30 2017-09-30 A kind of tunnel main tunnel, which is caunched, excavates temporary support structures

Country Status (1)

Country Link
CN (1) CN207212366U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403985A (en) * 2018-10-18 2019-03-01 中铁十二局集团有限公司 The gate-type of pole weak broken wall rock layer is caunched engineering method
CN109812270A (en) * 2019-03-22 2019-05-28 贵州智华建设工程有限责任公司 A kind of supporting construction and its construction method of Tunnel Passing rich water filled-type solution cavity

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403985A (en) * 2018-10-18 2019-03-01 中铁十二局集团有限公司 The gate-type of pole weak broken wall rock layer is caunched engineering method
CN109812270A (en) * 2019-03-22 2019-05-28 贵州智华建设工程有限责任公司 A kind of supporting construction and its construction method of Tunnel Passing rich water filled-type solution cavity

Similar Documents

Publication Publication Date Title
JP7125550B2 (en) SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH
CN107605489B (en) Three line Large span tunnel inclined shafts are into positive cavity construction method
CN102226403B (en) Construction method of large-span subway station main body by using arched cover method and station main body structure
CN105041353B (en) Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN106499397A (en) A kind of soft rock tunnel deformation control method that is analyzed based on rockbolt stress
CN109209398B (en) Pass through that high angle is inverse to rush rich water richness sand tomography tunnel excavation method
CN107288653A (en) A kind of the benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three and construction method
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN108487911A (en) The compound crossing method construction method of longspan tunnel bilateral wall under complex geological condition
CN201991017U (en) Subway large-span station body structure based on arch cover method construction forming
CN107762529B (en) Lateral Hole and tunnel main tunnel infall construction method based on gib system
CN104329095B (en) A kind of existing tunnel Widening Construction method
CN206174963U (en) Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN106677189A (en) Inclined pile wall bearing type foundation pit support structure and construction method thereof
CN204877493U (en) Soft rock tunnel supporting construction
CN108678771A (en) Pass through fault belt Tunnel and median septum strengthening supporting system
CN105134269A (en) Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN207212366U (en) A kind of tunnel main tunnel, which is caunched, excavates temporary support structures
CN109026024A (en) A kind of great horizontal stress effect back deformation control method
CN110159298A (en) A kind of first branch button arch construction method of Underground Subway Station
CN108798723A (en) A kind of superelevation stope drift active workings method for protecting support of the coal containing jacking applied to high seam
CN208236427U (en) Large deformation weak broken wall rock outsized section tunnel excavation supporting structure
CN107676103A (en) A kind of construction method of super-large span cave depot grillage supporting
CN205895242U (en) Low -angle crossing tunnel structure
CN109630168A (en) Comprehensive extracting and caving face tunnel is arranged along floor strata and support pattern

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant