CN207211704U - A kind of seamless steel pipe attachment structure - Google Patents

A kind of seamless steel pipe attachment structure Download PDF

Info

Publication number
CN207211704U
CN207211704U CN201721042296.9U CN201721042296U CN207211704U CN 207211704 U CN207211704 U CN 207211704U CN 201721042296 U CN201721042296 U CN 201721042296U CN 207211704 U CN207211704 U CN 207211704U
Authority
CN
China
Prior art keywords
steel pipe
threaded sleeve
seamless steel
shank
attachment structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721042296.9U
Other languages
Chinese (zh)
Inventor
裘成
裘一成
吴国庆
吴叶青
朱根男
朱晓民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Bao Xin Seamless Steel Pipe Co Ltd
Original Assignee
Suzhou Bao Xin Seamless Steel Pipe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Bao Xin Seamless Steel Pipe Co Ltd filed Critical Suzhou Bao Xin Seamless Steel Pipe Co Ltd
Priority to CN201721042296.9U priority Critical patent/CN207211704U/en
Application granted granted Critical
Publication of CN207211704U publication Critical patent/CN207211704U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

It the utility model is related to a kind of seamless steel pipe attachment structure, including body, the body end is provided with screw thread, including No.1 threaded sleeve and No. two threaded sleeves, the No.1 threaded sleeve towards being provided with shank on one end of No. two threaded sleeves along its length, and No. two threaded sleeves are towards being provided with the spliced eye that can coordinate with shank on the face of No.1 threaded sleeve.No.1 threaded sleeve and No. two threaded sleeve screw threads are screwed in the end of two bodys to be spliced respectively;Spin after finishing, the shank on No.1 threaded sleeve is coordinated on the spliced eye being plugged on No. two threaded sleeves, to complete the fixation of No.1 threaded sleeve and No. two threaded sleeves;Shank and spliced eye interference fit, after shank is inserted into spliced eye, will not be dropped out from spliced eye;Using this connected mode, both can be fixed in the case of both sides body to be fixed is not rotated.

Description

A kind of seamless steel pipe attachment structure
Technical field
A kind of pipe connecting device is the utility model is related to, more particularly to a kind of seamless steel pipe attachment structure.
Background technology
On the construction building site in modern times, steel frame construction is interconnected together by more seamless steel pipes, and mainly One of building construction types.The characteristics of seamless steel pipe is intensity height, steel big from heavy and light, rigidity, therefore being formed with seamless steel pipe It is particularly suitable that frame builds higher, heavier building;And in the engineering of construction, people, which also taste, to build steelframe and supplies people high-altitude Walked during operation;When building steelframe using seamless steel pipe, it is necessary to be connected more seamless steel pipes using seamless steel pipe connection fastener It is connected together and forms steelframe.
As shown in figure 1, generally during the overlap joint of steelframe, by using two, the threaded sleeve 41 of three or bull It is attached, the end of seamless steel pipe 42 is extended through into screw thread from the end of threaded sleeve is tightened.So fixed Feature is sequentially to fix from left to right from top to bottom;If necessary to the steel spliced by somewhere left and right ends When frame carries out splicing fixed, because needing the seamless steel pipe overall co-ordination threads turn on wherein one side, so operation is more difficult.
Utility model content
The purpose of this utility model is to provide a kind of seamless steel pipe attachment structure, and two steel pipes can be relatively easy to connect by it It is connected together.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of seamless steel pipe connection Structure, including body, the body end are provided with screw thread, including No.1 threaded sleeve and No. two threaded sleeves, the No.1 Shank, No. two threaded sleeve directions are provided with along its length on one end of threaded sleeve No. two threaded sleeves of direction The spliced eye that can coordinate with shank is provided with the face of No.1 threaded sleeve.
By using above-mentioned technical proposal, No.1 threaded sleeve and No. two threaded sleeve screw threads are screwed in two respectively and treated The end of the body of splicing;Spin after finishing, the shank on No.1 threaded sleeve is coordinated and is plugged on No. two threaded sleeves On spliced eye on, to complete the fixation of No.1 threaded sleeve and No. two threaded sleeves;Shank and spliced eye interference fit, will After shank is inserted into spliced eye, it will not be dropped out from spliced eye;Using this connected mode, can be treated not rotating both sides Both are fixed in the case of fixed body.
Preferably, the shank is prism.
By using above-mentioned technical proposal, shank is prism, and spliced eye is the shape that can coordinate with shank, prismatic Shank insert into spliced eye after, can not be rotated in spliced eye, afterwards limit two bodys between position relationship, Two bodys are avoided to be rotated dislocation with axle where shank.
Preferably, screw thread, the No.1 threaded sleeve are provided with the No.1 threaded sleeve and No. two threaded sleeves Fixed sleeving is connected with screw thread on No. two threaded sleeves.
By using above-mentioned technical proposal, fixed sleeving screw thread is spun, make its be also secured to No.1 threaded sleeve and On No. two threaded sleeves, it will be located at shank among fixed sleeving;Structural strength at further enhancing shank.
Preferably, the body end is provided with forms phosphor strip by fluorescent solutions coating.
By using above-mentioned technical proposal, phosphor strip is coated on body using fluorescent paint, in fixation procedure is installed, No.1 threaded sleeve and No. two threaded sleeves are screwed in one end of phosphor strip on body, and operating personnel sentence by mark post of phosphor strip Disconnected No.1 threaded sleeve, No. two sleeve pipes are screwed in the position on body, and adjusting makes it as far as possible identical, after ensureing to splice The degree of balance of steelframe.
Preferably, the body end is provided with fixture block.
By using above-mentioned technical proposal, fixture block, which is arranged on body end, can limit No.1 threaded sleeve and No. two thread bush Pipe is screwed in the position on body, and secondly in placement process, the fixture block on body abuts on the ground body, avoids body from existing Arbitrarily rolled on placed side.
Preferably, the fixture block prolongs the setting of body tangential direction.
By using above-mentioned technical proposal, fixture block is fixed on body along the tangential direction of body, under this configuration, When body is placed on placed side, the bottom surface of fixture block is fitted on placed side, increases the contact between body and placed side Face, and the force of rolling friction between body and placed side is changed into stiction or force of sliding friction, due to force of rolling friction Less than stiction and force of sliding friction, so body can be avoided to be rolled on placed side.
Preferably, length mark chi is provided with the tube wall.
By using above-mentioned technical proposal, length mark chi is set outside body, and installation personnel can be according to length mark chi Judge the degree of balance of steelframe being spliced into;The steel pipe observed on the steel pipe or short transverse direction of steelframe both sides length direction, dew Whether the partial-length gone out is consistent, if phase margin is lower, the degree of balance of steelframe is higher.
Preferably, the body is sequentially arranged corrosion-resistant coating, the thermal insulation layer formed by heat-barrier material coating, hydrophobicity The self-cleaning layer that material coating forms.
By using above-mentioned technical proposal, the environment that seamless steel pipe or steelframe use is more severe, and coating is on the outer surface Corrosion-resistant coating certain protective effect is played to steel pipe;Secondly, the specific heat capacity of steel is smaller, in summer operation, steel pipe or steel The extreme temperatures of frame influence operation, and thermal insulation layer is coated thereon, slows down external heat to steel pipe transmission;Finally applied in steel tube surface Self-cleaning layer is covered, self-cleaning layer is applied as using nano-sized hydrophobic material, it has more special property, surface contact angle (contact angle)About 150 °, most material can not all rest on its surface, and such as water, impurity is dirty, ensure steel The cleanliness factor of pipe surface.
In summary, the utility model has the advantages that:
1. being provided with screw thread on body end, No.1 threaded sleeve and No. two threaded sleeves are screwed in two companies for the treatment of respectively On the body connect, the shank on No.1 threaded sleeve is plugged in the spliced eye on No. two threaded sleeves afterwards, so as to complete Splicing into two bodys is fixed;
2. being provided with length mark chi on tube wall, operator can be judged by the length on observed length making ruler Whether the steelframe being spliced into balances;If the length or height phase of each section of steel pipe exposed on steelframe height or length direction Together, then the steelframe degree of balance being spliced is higher;
3. fixture block is provided with body tangential direction, for limiting No.1 threaded sleeve or No. two threaded sleeves in body Rotation distance;Secondly in placement process, fixture block abuts on the ground body, avoids body from arbitrarily being rolled on placed side.
Brief description of the drawings
Fig. 1 is the isometric side schematic diagram of overall structure in background technology;
Fig. 2 is the isometric side schematic diagram of overall structure in embodiment 1;
Fig. 3 is part A structure enlargement diagram in Fig. 2;
Fig. 4 is part B structure enlargement diagram in Fig. 2;
Fig. 5 is part-structure sectional view in embodiment 1;
Fig. 6 is part-structure enlarged diagram in embodiment 2.
In figure, 1, body;11st, No.1 threaded sleeve;12nd, No. two threaded sleeves;13rd, shank;14th, spliced eye;15th, it is solid Determine sleeve pipe;21st, phosphor strip;22nd, fixture block;23rd, length mark chi;31st, corrosion-resistant coating;32nd, thermal insulation layer;33rd, self-cleaning layer;41、 Threaded sleeve;42nd, seamless steel pipe.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.
Embodiment 1:A kind of seamless steel pipe attachment structure, as shown in Figures 2 and 3, including body 1, set on the end of body 1 Screw thread is equipped with, and avoids on body 1 being disposed with corrosion-resistant coating 31, thermal insulation layer 32 and self-cleaning layer on the position of screw thread 33;Corrosion-resistant coating 31 is formed by anticorrosive coating coating, is cost-effective, can be formed using varnish application;Thermal insulation layer 32 Formed by heat-barrier material coating, the material used may be referred to publication No. as a kind of septum pellucidum disclosed in " CN104341894A " Hot coating;Self-cleaning layer 33 can use the coating of nano-sized hydrophobic material to form, and the material used refers to publication No. and is A kind of super-hydrophobic nano coating disclosed in the Chinese patent of " CN103360942A ".
As shown in Fig. 2 it is provided with length mark chi 23 on the outer wall of body 1;Length mark chi 23 in the present embodiment is profit Applied and be drawn on the outer wall of body 1 with white paint.
As shown in Figure 2 and Figure 4, screw thread is provided with the end of body 1, and terminates place in screw thread and is provided with fixture block 22, is blocked Block 22 is set along the tangential direction of body 1, and fixture block 22 can be welded on the surface of body 1 by metal derby.
As shown in Figure 2 and Figure 5, when two bodys 1 are spliced into a complete steelframe, in advance on left and right both sides Screw thread spins No.1 threaded sleeve 11 and No. two threaded sleeves 12 respectively on body 1, and in No.1 threaded sleeve 11 towards No. two It is provided with shank 13 on the end face of threaded sleeve 12, shank 13 is shaped as prism, the shape of shank 13 in the present embodiment Shape is cuboid, and the spliced eye 14 coordinated with shank 13 is provided with the end face of No. two threaded sleeves 12, and shank 13 is matched somebody with somebody Conjunction is plugged in spliced eye 14;Shank 13 and spliced eye 14 are interference fitted, and weight can be utilized during grafting to No. two threaded sleeves 12 direction taps No.1 threaded sleeve 11 or taps No. two threaded sleeves 12 to the direction of No.1 threaded sleeve 11, promotes grafting Bar 13 is inserted into spliced eye 14.
As shown in Figure 2 and Figure 5, screw thread is provided with the surface of No.1 threaded sleeve 11 and No. two threaded sleeves 12, afterwards Screw thread is connected with fixed sleeving 15 on No.1 threaded sleeve 11 and No. two threaded sleeves 12.
Application method:First fixed sleeving 15 is set on body 1, afterwards by No.1 threaded sleeve 11 and No. two thread bush Pipe 12, which is screwed in, to be needed to splice on integral body 1, is afterwards plugged on the shank 13 on No.1 threaded sleeve 11 slotting Connect in hole 14, because shank 13 and spliced eye 14 are interference fits, so weight can be utilized to hammer in grafting, so as to by two Individual body 1 is simply fixed integral;Fixed sleeving 15 will be rotated afterwards, be made fixed sleeving 15 while be located at No.1 thread bush Pipe 11 and No. two surfaces of threaded sleeve 12, so as to further strengthen its structural strength, in the process, the He of No.1 threaded sleeve 11 No. two threaded sleeves 12 are connected on the fixture block 22 on body 1, are avoided its endless and are rotated to the direction of body 1.
Embodiment 2:The structure of the structure of embodiment 2 and embodiment 1 is essentially identical, a kind of seamless steel pipe, as shown in fig. 6, The opening position provided with fixture block 22 is coated with phosphor strip 21 using fluorescent solutions in embodiment 1.
Application method:The application method of the application method of embodiment 2 and embodiment 1 is essentially identical.

Claims (8)

1. a kind of seamless steel pipe attachment structure, including body(1), it is characterised in that:The body(1)End set has screw thread, Including No.1 threaded sleeve(11)With No. two threaded sleeves(12), the No.1 threaded sleeve(11)Towards No. two threaded sleeves (12)One end on be provided with shank along its length(13), No. two threaded sleeves(12)Towards No.1 threaded sleeve (11)Face on be provided with can and shank(13)The spliced eye of cooperation(14).
A kind of 2. seamless steel pipe attachment structure according to claim 1, it is characterised in that:The shank(13)For rib Post.
A kind of 3. seamless steel pipe attachment structure according to claim 2, it is characterised in that:The No.1 threaded sleeve(11) With No. two threaded sleeves(12)On be provided with screw thread, the No.1 threaded sleeve(11)With No. two threaded sleeves(12)Upper screw thread rotation It is connected to fixed sleeving(15).
A kind of 4. seamless steel pipe attachment structure according to claim 3, it is characterised in that:The body(1)End set Have and phosphor strip is formed by fluorescent solutions coating(21).
A kind of 5. seamless steel pipe attachment structure according to claim 3, it is characterised in that:The body(1)End set There is fixture block(22).
A kind of 6. seamless steel pipe attachment structure according to claim 5, it is characterised in that:The fixture block(22)Prolong body (1)Tangential direction is set.
A kind of 7. seamless steel pipe attachment structure according to claim 6, it is characterised in that:The body(1)Set on outer wall It is equipped with length mark chi(23).
A kind of 8. seamless steel pipe attachment structure according to claim 7, it is characterised in that:The body(1)It is sequentially arranged There is corrosion-resistant coating(31), by the thermal insulation layer that forms of heat-barrier material coating(32), the self-cleaning layer that forms of hydrophobic material coating (33).
CN201721042296.9U 2017-08-18 2017-08-18 A kind of seamless steel pipe attachment structure Expired - Fee Related CN207211704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721042296.9U CN207211704U (en) 2017-08-18 2017-08-18 A kind of seamless steel pipe attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721042296.9U CN207211704U (en) 2017-08-18 2017-08-18 A kind of seamless steel pipe attachment structure

Publications (1)

Publication Number Publication Date
CN207211704U true CN207211704U (en) 2018-04-10

Family

ID=61815835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721042296.9U Expired - Fee Related CN207211704U (en) 2017-08-18 2017-08-18 A kind of seamless steel pipe attachment structure

Country Status (1)

Country Link
CN (1) CN207211704U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914221A (en) * 2021-09-22 2022-01-11 山东高速工程建设集团有限公司 Modular support for rapid installation of urban viaduct and construction method
CN113982245A (en) * 2021-11-17 2022-01-28 中国建筑第二工程局有限公司 Quick detach formula scaffold frame stabilizer bar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914221A (en) * 2021-09-22 2022-01-11 山东高速工程建设集团有限公司 Modular support for rapid installation of urban viaduct and construction method
CN113982245A (en) * 2021-11-17 2022-01-28 中国建筑第二工程局有限公司 Quick detach formula scaffold frame stabilizer bar

Similar Documents

Publication Publication Date Title
CN207211704U (en) A kind of seamless steel pipe attachment structure
CN101375011A (en) Wind turbine tower, wind turbine and method for assembling wind turbine tower
CN201801963U (en) Penetration node structure of space intersection circular tube truss
CN111152241B (en) Climbing mechanism for comprehensive pipeline inspection robot
CN111255950B (en) Pipe connection structure and antidetonation support that antidetonation support was used
CN207211400U (en) Suitable for the outer wall of basement seal plate of tape frame post
CN207110064U (en) A kind of attachment structure of cant beam and rear wall
CN105443031A (en) Detachable cat ladder for hydraulic engineering
CN207376827U (en) A kind of vertical connection structure and light gauge cold-formed steel shape
CN209195011U (en) A kind of draining waterstop joint fixed device under the construction system based on aluminum alloy mould plate
CN206442086U (en) Hanging type cable hank stays frame
CN208618906U (en) A kind of electric power steel pole being easily installed
CN206640244U (en) A kind of Novel cable bridge
CN204511283U (en) The detachable U-shaped cat ladder of a kind of hydraulic engineering
CN207332030U (en) Carrying wall between the incomparable steel column of pin-connected panel
CN204609753U (en) A kind of hydraulic engineering maintenance cat ladder
CN204457408U (en) A kind of fast dismounting hydraulic engineering maintenance cat ladder
CN109506045B (en) Train water hose strutting arrangement that goes up
CN205976145U (en) Side fascia installation node
CN104879053A (en) Decorative louver
CN106159806A (en) Tractor for cable
CN219119964U (en) Pipeline laying auxiliary device for hydraulic and hydroelectric engineering construction
CN116239029B (en) Assembled crane for installing large building pipeline
CN210916998U (en) Road bridge expansion joint connecting device
CN215445379U (en) Lining type prestressed steel cylinder concrete pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20210818