CN206640244U - A kind of Novel cable bridge - Google Patents

A kind of Novel cable bridge Download PDF

Info

Publication number
CN206640244U
CN206640244U CN201720445168.2U CN201720445168U CN206640244U CN 206640244 U CN206640244 U CN 206640244U CN 201720445168 U CN201720445168 U CN 201720445168U CN 206640244 U CN206640244 U CN 206640244U
Authority
CN
China
Prior art keywords
screw
side plate
page board
crane span
span structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720445168.2U
Other languages
Chinese (zh)
Inventor
薛秀萍
薛翔天
李顺雨
权金峰
吕鹏峰
李先坤
丁常春
王云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yutong Electric Group Kun Power Engineering Co Ltd
Original Assignee
Shandong Yutong Electric Group Kun Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yutong Electric Group Kun Power Engineering Co Ltd filed Critical Shandong Yutong Electric Group Kun Power Engineering Co Ltd
Priority to CN201720445168.2U priority Critical patent/CN206640244U/en
Application granted granted Critical
Publication of CN206640244U publication Critical patent/CN206640244U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Novel cable bridge, and in particular to technical field of electrotechnical equipment.It is poor to which solve existing crane span structure stability, caducous deficiency.The Novel cable bridge, including crane span structure body and multiple crane span structure pulleys, crane span structure body includes the symmetrically arranged side plate of bottom plate and both sides, bottom plate is provided with the first screw, the middle part of side plate is provided with the second screw, wheel shaft is provided with crane span structure pulley center axis, take turns axis connection micro-driving motor, micro-driving motor connects same controller, one end of wheel shaft is through the first screw and the outside of bottom plate is fixed on by nut, the other end of wheel shaft is fixed with triangle page board, it is hinged between adjacent triangle page board, activity page board is connected with triangle page board, activity page board is parallel with side plate, the middle part of activity page board is provided with the 3rd screw, activity page board passes through screw, the cooperation of second screw and the 3rd screw is fixed on the side plate of side.

Description

A kind of Novel cable bridge
Technical field
It the utility model is related to technical field of electrotechnical equipment, and in particular to a kind of Novel cable bridge.
Background technology
Crane span structure is the support of a support and payout, and cable testing bridge is divided into slot type, pellet type and ladder-type, grid type etc. Structure, it is made up of support, trailing arm and installation annex etc..It can independently set up, various buildings or structures and pipe can also be attached to On corridor support, embody the features such as simple in construction, handsome in appearance, configuration is flexible and easy to maintenance, whole parts are both needed to carry out zinc-plated Processing, the outdoor crane span structure outside building, if in neighbouring seashore or belong to corrosion region, then material must have anti- Rotten, resistance to moisture, adhesive force are good, the high physical property feature of impact strength.
It is when cable testing bridge is installed, it is necessary to fixed, it is impossible to be suspended in midair.A fixing point is looked for support and fix, cable bridge Frame is from being just cable testing bridge fixing point spacing with a distance from fixing point.Crane span structure is normally at more than two meters of high-altitude, during cable laying Mostly being pulled at interval of a segment distance manpower, the hidden danger that falls from high altitude be present, specific position be present, crane span structure is smaller with the roof space, Personnel are caused not have an effect.
Crane span structure cable is applied to support by fixing point and fixed, and stability difference, which exists in cabling process, frequently to come off not Foot, easily causes cable fault and personal security problem.
Utility model content
The purpose of this utility model is to be directed to above-mentioned deficiency, it is proposed that one kind is by setting up fixing point, further fixed bridge Frame, improve crane span structure stability Novel cable bridge.
The utility model specifically adopts the following technical scheme that:
A kind of Novel cable bridge, including crane span structure body and multiple crane span structure pulleys, crane span structure body include bottom plate and both sides pair Claim the side plate set, bottom plate is provided with the first screw, and the middle part of side plate is provided with the second screw, set at crane span structure pulley center axis There is wheel shaft, take turns axis connection micro-driving motor, micro-driving motor connects same controller, and one end of wheel shaft passes through the first screw And the outside of bottom plate is fixed on by nut, the other end of wheel shaft is fixed with triangle page board, is hinged between adjacent triangle page board, Activity page board is connected with triangle page board, activity page board is parallel with side plate, and the middle part of activity page board is provided with the 3rd screw, active page Plate is fixed on the side plate of side by the cooperation of screw, the second screw and the 3rd screw.
Preferably, the crane span structure pulley is made of aluminium or nylon material.
Preferably, the top of the side plate is provided with the neck to bend inwards.
Preferably, the bottom plate and side plate are provided with reinforcement, the section of reinforcement be it is trapezoidal or oval, inwardly Protrude in portion.
Preferably, the surface of the bottom plate, side plate and neck scribbles fire prevention enamelled coating, and ventilation is equipped with bottom plate and side plate Mouthful, ventilating opening is circular or rectangle.
Preferably, multiple heat emission holes are evenly distributed with the bottom plate.
The utility model has the advantages that:
Pass through the one activity page board of extension setting on crane span structure pulley so that crane span structure pulley can be directly clamped among crane span structure side plate On, reuse bolt and fixed, solve consolidating for cable testing bridge by side plate and the construction further clamping cable testing bridge of object Determine problem;
Axis connection micro-driving motor is taken turns, micro-driving motor connects same controller, can controlled by controller micro- Type motor rotates realization and automatically delivers cable, improves the transmission efficiency of cable, time saving and energy saving;
Brief description of the drawings
Fig. 1 is Novel cable bridge structural representation;
Fig. 2 is crane span structure pulley structure schematic diagram.
Wherein, 1 is crane span structure body, and 2 be crane span structure pulley, and 3 be reinforcement, and 4 be wheel shaft, and 5 be triangle page board, and 6 be active page Plate, 7 be the second screw, and 8 be neck.
Embodiment
Specific embodiment of the present utility model is described further with specific embodiment below in conjunction with the accompanying drawings:
As shown in Figure 1-2, a kind of Novel cable bridge, including crane span structure body 1 and multiple crane span structure pulleys 2, crane span structure body 1 wrap The symmetrically arranged side plate of bottom plate and both sides is included, bottom plate is provided with the first screw, and the middle part of side plate is provided with the second screw 7, and crane span structure is slided Take turns and wheel shaft 4 is provided with 2 central axis, wheel shaft 4 connects micro-driving motor, and micro-driving motor connects same controller, wheel One end of axle 4 is through the first screw and the outside of bottom plate is fixed on by nut, and the other end of wheel shaft is fixed with triangle page board 5, It is hinged between adjacent triangle page board 5, activity page board 6 is connected with triangle page board 5, activity page board 6 is parallel with side plate, active page The middle part of plate 6 is provided with the 3rd screw, and activity page board 6 is fixed on side by the cooperation of screw, the second screw and the 3rd screw On side plate.
Crane span structure pulley 2 is made of aluminium or nylon material.Crane span structure pulley is improved wearability, improve overall use Life-span.
The top of side plate is provided with the neck 8 to bend inwards.Neck 8 can be used for the whole crane span structure body of further clamping.
Bottom plate and side plate are provided with reinforcement 3, and the section of reinforcement 3 is trapezoidal or oval, is internally protruded.
The surface of bottom plate, side plate and neck scribbles fire prevention enamelled coating, and ventilating opening is equipped with bottom plate and side plate, and ventilating opening is Circular or rectangle, multiple heat emission holes are evenly distributed with bottom plate.Overall air permeability and thermal diffusivity are improved, avoids fire Etc. potential safety hazard.
The operation principle of the Novel cable bridge is:Crane span structure body is installed, passes through the extension setting one on crane span structure pulley Activity page board so that crane span structure pulley can be directly clamped among on crane span structure side plate, reused bolt and fixed, improve installation Steadiness, cable is sequentially passed through into crane span structure pulley afterwards, control micro-driving motor to rotate realization by controller and automatically deliver Cable.
Certainly, it is to be also not limited to the example above to limitation of the present utility model, the utility model that described above, which is not, The variations, modifications, additions or substitutions that those skilled in the art are made in essential scope of the present utility model, also should Belong to the scope of protection of the utility model.

Claims (6)

1. a kind of Novel cable bridge, it is characterised in that including crane span structure body and multiple crane span structure pulleys, crane span structure body includes bottom plate With the symmetrically arranged side plate in both sides, bottom plate is provided with the first screw, and the middle part of side plate is provided with the second screw, crane span structure pulley center axle Wheel shaft is provided with line, takes turns axis connection micro-driving motor, micro-driving motor connects same controller, and one end of wheel shaft passes through First screw and the outside that bottom plate is fixed on by nut, the other end of wheel shaft are fixed with triangle page board, adjacent triangle page board it Between be hinged, activity page board is connected with triangle page board, activity page board is parallel with side plate, and the middle part of activity page board is provided with the 3rd spiral shell Hole, activity page board are fixed on the side plate of side by the cooperation of screw, the second screw and the 3rd screw.
2. a kind of Novel cable bridge as claimed in claim 1, it is characterised in that the crane span structure pulley uses aluminium or nylon material Material is made.
3. a kind of Novel cable bridge as claimed in claim 1, it is characterised in that the top of the side plate is provided with and bent inwards Neck.
4. a kind of Novel cable bridge as claimed in claim 1, it is characterised in that the bottom plate and side plate are provided with reinforcement Muscle, the section of reinforcement is trapezoidal or oval, is internally protruded.
A kind of 5. Novel cable bridge as claimed in claim 1, it is characterised in that the surface of the bottom plate, side plate and neck Fire prevention enamelled coating is scribbled, ventilating opening is equipped with bottom plate and side plate, ventilating opening is circular or rectangle.
6. a kind of Novel cable bridge as claimed in claim 1, it is characterised in that multiple dissipate is evenly distributed with the bottom plate Hot hole.
CN201720445168.2U 2017-04-26 2017-04-26 A kind of Novel cable bridge Expired - Fee Related CN206640244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720445168.2U CN206640244U (en) 2017-04-26 2017-04-26 A kind of Novel cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720445168.2U CN206640244U (en) 2017-04-26 2017-04-26 A kind of Novel cable bridge

Publications (1)

Publication Number Publication Date
CN206640244U true CN206640244U (en) 2017-11-14

Family

ID=60246906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720445168.2U Expired - Fee Related CN206640244U (en) 2017-04-26 2017-04-26 A kind of Novel cable bridge

Country Status (1)

Country Link
CN (1) CN206640244U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112688252A (en) * 2020-11-19 2021-04-20 安徽华希电力科技有限公司 Anti-scratch high-strength aluminum alloy cable bridge connecting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112688252A (en) * 2020-11-19 2021-04-20 安徽华希电力科技有限公司 Anti-scratch high-strength aluminum alloy cable bridge connecting device

Similar Documents

Publication Publication Date Title
CN206640244U (en) A kind of Novel cable bridge
CN103673263A (en) Support for outdoor unit of air conditioner
CN206958390U (en) A kind of suspension bracket
CN107508213A (en) A kind of aluminium-magnesium alloy cable bridge-support
CN107681573A (en) A kind of special extension type cable testing bridge of power equipment
CN105024305A (en) Tension tower drain wire fracture-free construction method
CN208226492U (en) A kind of plugging cable bridge
CN107492848B (en) A kind of cable testing bridge of almag lifting installation
CN109162466A (en) Room level units formula curtain wall installing structure and method
CN203663277U (en) Falling-prevention safety device for high-attitude air conditioner repair
CN202474763U (en) Novel suspension type cable fixture
CN205509365U (en) Transmission line composite insulator overhauls support
CN212292702U (en) High altitude construction abrasionproof corner device
CN206727473U (en) A kind of casing of new transmission line of electricity monitoring server
CN207967833U (en) A kind of wind power equipment cable trunking crane span structure
CN208352907U (en) A kind of cable testing bridge structure facilitating installation
CN109707084B (en) Flexible curtain wall elastic support and external ribbon system
CN207815540U (en) A kind of central air conditioner external machine fixed support device that stability is high
CN202990386U (en) Externally-suspended scaffold
CN205933005U (en) Novel intelligent lifting device of super high -rise building core section of thick bamboo component
CN204964850U (en) Some gold utensils are hung to cable
CN206099592U (en) Become oar motor fan cover
CN206220999U (en) Down-hole pipe mounting assembly
CN209001488U (en) Cable installs anti-toy structure
CN203240734U (en) Support for outdoor unit of household air conditioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171114

Termination date: 20190426