CN207211374U - A kind of connecting node of greenhouse post beam and tank - Google Patents

A kind of connecting node of greenhouse post beam and tank Download PDF

Info

Publication number
CN207211374U
CN207211374U CN201721215527.1U CN201721215527U CN207211374U CN 207211374 U CN207211374 U CN 207211374U CN 201721215527 U CN201721215527 U CN 201721215527U CN 207211374 U CN207211374 U CN 207211374U
Authority
CN
China
Prior art keywords
tank
ears
cup
connecting node
prop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721215527.1U
Other languages
Chinese (zh)
Inventor
田建平
沈顺生
黄鲁平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taining Shun Fu Agricultural Development Co Ltd
Original Assignee
Taining Shun Fu Agricultural Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taining Shun Fu Agricultural Development Co Ltd filed Critical Taining Shun Fu Agricultural Development Co Ltd
Priority to CN201721215527.1U priority Critical patent/CN207211374U/en
Application granted granted Critical
Publication of CN207211374U publication Critical patent/CN207211374U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

It the utility model is related to a kind of connecting node of greenhouse post beam and tank, upper prop is realized by cup flange and U-shaped connector, lower prop, quick and firm connection between crossbeam and tank, in connection procedure, the groove portion of U-shaped connector is first bolted to the side surface on lower prop top, tank support is laminated on to the top picked up the ears on U-shaped connector again, tank is laminated on tank support top again, the ring flange of cup flange is laminated on tank top again, by the first bolt hole, second bolt hole, 3rd bolt hole aligns one by one, and locked by bolt, upper prop is socketed among the cup of cup flange again, locked by bolt;Again beam erection is picked up the ears top, to lock by bolt under;Above-mentioned connected mode more convenient operation, connection is more firm, can arbitrarily be dismantled between upper prop, lower prop, crossbeam and tank, and without second time electroplating, has the advantages of low cost, quality is high, green, environmentally friendly.

Description

A kind of connecting node of greenhouse post beam and tank
Technical field
It the utility model is related to steelframe attachment structure technical field, the connection section of more particularly to a kind of greenhouse post beam and tank Point.
Background technology
Connecting node between existing greenhouse post beam and tank is typically using the connected mode of welding, or needs prior Weld and installed again after electroplating.In-site installation easily causes Steel Rigid Frame Node corrosion, and it is big to weld operation difficulty using welding; On the other hand, the post beam after welding and tank can not be dismantled, and if necessary to reequip greenhouse, can not re-assembly use, if needed Change the structure of greenhouse, then need to reconfigure the components such as post beam and tank, expend great amount of cost;Another kind first welds again electric Plating, then install, then hot dip steel pipe raw material can not be made full use of, the cost for building greenhouse certainly will be improved, and supporting build is answered in locality If galvanizing factory, increase environmentally friendly risk.
Utility model content
Technical problem to be solved in the utility model is:A kind of connecting node of greenhouse post beam and tank is provided, solved The corrosion problem of existing greenhouse node and the problem of hot galvanized steel pipe can not be made full use of.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:A kind of greenhouse post beam and water are provided The connecting node of groove, including upper prop, lower prop, crossbeam, cup flange, tank, tank support and U-shaped connector;
The cup flange includes cup and the ring flange being connected to below cup, and the upper prop is socketed on inside cup; The ring flange is uniformly provided with multiple first bolts hole;
The bottom of gullet is provided with tank support, and the tank support is provided with multiple corresponding with the first bolt hole position the Two bolts hole;
The U-shaped connector includes groove portion and is symmetricly set on picking up the ears for groove portion both sides, it is described pick up the ears to include picking up the ears with Under pick up the ears, the groove portion is vertical with picking up the ears, and the groove portion is bolted to the side surface on lower prop top, the U-shaped connection Pick up the ears to be generally aligned in the same plane with the upper end of lower prop on part, it is described on pick up the ears to be provided with threeth spiral shell corresponding with the first bolt hole Keyhole;Pick up the ears to be connected to the tank support bottom of tank on described, the ring flange is connected to tank top;
The beam erection picks up the ears top, to pick up the ears to be bolted with crossbeam under described under.
The beneficial effects of the utility model are:The greenhouse post beam and the connecting joint structure of tank that the utility model is related to In, the quick and firm connection between upper prop, lower prop, crossbeam and tank is realized by cup flange and U-shaped connector, In connection procedure, the groove portion of U-shaped connector is first bolted to the side surface on lower prop top, then tank support is laminated on The top picked up the ears on U-shaped connector, then tank is laminated on tank support top, then the ring flange of cup flange is laminated on tank Portion, the first bolt hole, the second bolt hole, the 3rd bolt hole are alignd, and locked by bolt, then upper prop is socketed on into cup one by one Among the cup of shape flange, locked by bolt;Again beam erection is picked up the ears top, to lock by bolt under;Above-mentioned connection Mode compares traditional welding manner, or the connecting node of other constructions, and more convenient operation, connection is more firm, upper prop, lower prop, It can arbitrarily dismantle, reuse between crossbeam and tank, and without second time electroplating, there is high low cost, quality, green, environmental protection The advantages of.
Brief description of the drawings
Fig. 1 is that the positive facade of connecting joint structure of a kind of the greenhouse post beam and tank of the utility model embodiment shows It is intended to;
Fig. 2 is that the connecting joint structure side elevation of a kind of the greenhouse post beam and tank of the utility model embodiment shows It is intended to;
Fig. 3 is the top view of the connecting node of a kind of the greenhouse post beam and tank of the utility model embodiment;
Label declaration:
1st, upper prop;2nd, lower prop;3rd, crossbeam;4th, cup flange;41st, cup;42nd, ring flange;
43rd, the first bolt hole;5th, tank;6th, tank support;61st, the second bolt hole;7th, U-shaped connector;71st, groove portion;72nd, on Pick up the ears;73rd, picked up the ears under.
Embodiment
For detailed description technology contents of the present utility model, the objects and the effects, below in conjunction with embodiment and match somebody with somebody Accompanying drawing is closed to be explained.
The design of the utility model most critical is:Upper prop, lower prop, horizontal stroke are realized by cup flange and U-shaped connector Quick and firm connection between beam, tank and tank support.
Refer to Fig. 1 to Fig. 3, the utility model discloses a kind of connecting node of greenhouse post beam and tank, including upper prop 1, Lower prop 2, crossbeam 3, cup flange 4, tank 5, tank support 6 and U-shaped connector 7;
The cup flange 4 includes cup 41 and is connected to the ring flange 42 of the lower section of cup 41, and the upper prop 1 is socketed on cup Inside body 41;The ring flange 42 is uniformly provided with multiple first bolts hole 43;
The bottom of tank 5 is provided with tank support 6, and the tank support 6 is provided with multiple relative with the position of the first bolt hole 43 The second bolt hole 61 answered;
The U-shaped connector 7 includes groove portion 71 and is symmetricly set on picking up the ears for the both sides of groove portion 71, described to pick up the ears to include upside Ear 72 and under pick up the ears 73, the groove portion 71 is vertical with picking up the ears, and the groove portion 71 is bolted to the side table on the top of lower prop 2 Face, pick up the ears on the U-shaped connector 7 72 to be generally aligned in the same plane with the upper end of lower prop 2, it is described on pick up the ears 72 to be provided with and first The 3rd corresponding bolt hole of bolt hole 43;Picked up the ears on described 72 bottoms of tank support 6 for being connected to tank 5, the ring flange 42 It is connected to the top of tank 5;
The crossbeam 3 is erected at down 73 tops of picking up the ears, and picks up the ears 73 to be bolted with crossbeam 3 under described.
In the connecting node of above-mentioned greenhouse post beam and tank, by cup flange 4 and U-shaped connector 7 realize upper prop 1, Quick and firm connection between lower prop 2, crossbeam 3 and tank 5, in connection procedure, first by the groove portion of U-shaped connector 7 71 are bolted to the side surface on the top of lower prop 2, then tank support 6 is laminated on picking up the ears on U-shaped connector 7 72 top, then Tank 5 is laminated on the top of tank support 6, then the ring flange 42 of cup flange 4 is laminated on the top of tank support 6, by the first bolt hole 43, Second bolt hole 61, the 3rd bolt hole are alignd, and locked by bolt one by one, then upper prop 1 is socketed on to the cup of cup flange 4 Among 41, locked by bolt;Crossbeam 3 is erected at down 73 tops of picking up the ears again, locked by bolt;Above-mentioned connected mode is compared Traditional welding manner, or the connecting node of other constructions, more convenient operation, connect more firm, upper prop 1, lower prop 2, the and of crossbeam 3 It can arbitrarily dismantle, reuse between tank 5, and without second time electroplating, have low cost, quality high, green, environmental protection excellent Point.
Further, in the connecting node of above-mentioned greenhouse post beam and tank, the upper prop 1 is square steel, and the lower prop 2 is side Steel, the crossbeam 3 are square steel or round steel, and the cross section of the cup 41 is rectangle.
Further, in the connecting node of above-mentioned greenhouse post beam and tank, the side wall of the cup 41 is provided with vertical side To strip through-hole.
Further, in the connecting node of above-mentioned greenhouse post beam and tank, the sidepiece of cup 41 is provided with bolt hole, uses In bolt connection upper prop 1 and cup 41.
Further, in the connecting node of above-mentioned greenhouse post beam and tank, the ring flange 42 is shaped as rectangle.
Further, in the connecting node of above-mentioned greenhouse post beam and tank, the quantity of first bolt hole 43 is 4.
Embodiment 1
A kind of connecting node of greenhouse post beam and tank, including upper prop 1, lower prop 2, crossbeam 3, cup flange 4, tank 5, water Groove support 6 and U-shaped connector 7;The cup flange 4 includes cup 41 and is connected to the ring flange 42 of the lower section of cup 41, it is described on Post 1 is socketed on inside cup 41;The ring flange 42 is uniformly provided with multiple first bolts hole 43;The bottom of tank 5 is provided with water Groove support 6, the tank support 6 are provided with 4 second bolts hole 61 corresponding with the position of the first bolt hole 43;The U-shaped connection Part 7 includes groove portion 71 and is symmetricly set on picking up the ears for the both sides of groove portion 71, described to pick up the ears to include to pick up the ears 72 to pick up the ears 73 with, described Groove portion 71 is vertical with picking up the ears, and the groove portion 71 is bolted to the side surface on the top of lower prop 2, the U-shaped connector 7 it is upper Pick up the ears 72 to be generally aligned in the same plane with the upper end of lower prop 2, it is described on pick up the ears 72 to be provided with threeth corresponding with the first bolt hole 43 Bolt hole;Picked up the ears on described 72 bottoms of tank support 6 for being connected to tank 5, the ring flange 42 is connected to the top of tank 5;It is described Crossbeam 3 is erected at down 73 tops of picking up the ears, and picks up the ears 73 to be bolted with crossbeam 3 under described.The upper prop 1 is square steel, described Lower prop 2 is square steel, and the crossbeam 3 is square steel or round steel, and the cross section of the cup 41 is rectangle.The side wall of the cup 41 is set It is equipped with the strip through-hole of vertical direction.The sidepiece of cup 41 is provided with bolt hole, for bolt connection upper prop 1 and cup 41. The ring flange 42 is shaped as rectangle.
In summary, in the connecting joint structure of greenhouse post beam and tank provided by the utility model, cup flange is passed through And U-shaped connector realizes the quick and firm connection between upper prop, lower prop, crossbeam and tank, in connection procedure, first The groove portion of U-shaped connector is bolted to the side surface on lower prop top, then tank support is laminated on picking up the ears on U-shaped connector Top, then tank is laminated on tank support top, then the ring flange of cup flange is laminated on tank top, by the first bolt hole, Second bolt hole, the 3rd bolt hole align, and locked by bolt one by one, then by upper prop be socketed on cup flange cup it In, locked by bolt;Again beam erection is picked up the ears top, to lock by bolt under;Above-mentioned connected mode is compared to traditional Welding side
Formula, or other construction connecting node, more convenient operation, connection it is more firm, upper prop, lower prop, crossbeam and tank it Between can arbitrarily dismantle, reuse, and without second time electroplating, there is the advantages of low cost, quality is high, green, environmentally friendly.
Embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, it is every The equivalents made using the utility model specification and accompanying drawing content, or directly or indirectly it is used in the technology neck of correlation Domain, similarly it is included in scope of patent protection of the present utility model.

Claims (6)

1. the connecting node of a kind of greenhouse post beam and tank, it is characterised in that including upper prop, lower prop, crossbeam, cup flange, water Groove, tank support and U-shaped connector;
The cup flange includes cup and the ring flange being connected to below cup, and the upper prop is socketed on inside cup;It is described Ring flange is uniformly provided with multiple first bolts hole;
The bottom of gullet is provided with tank support, and the tank support is provided with multiple second spiral shells corresponding with the first bolt hole position Keyhole;
The U-shaped connector includes groove portion and is symmetricly set on picking up the ears for groove portion both sides, described to pick up the ears to include picking up the ears and downside Ear, the groove portion is vertical with picking up the ears, and the groove portion is bolted to the side surface on lower prop top, the U-shaped connector On pick up the ears to be generally aligned in the same plane with the upper end of lower prop, it is described on pick up the ears to be provided with threeth bolt corresponding with the first bolt hole Hole;Pick up the ears to be connected to the tank support bottom of tank on described, the ring flange is connected to tank top;
The beam erection picks up the ears top, to pick up the ears to be bolted with crossbeam under described under.
2. the connecting node of greenhouse post beam according to claim 1 and tank, it is characterised in that the upper prop is square steel, The lower prop is square steel, and the crossbeam is square steel or round steel, and the cross section of the cup is rectangle.
3. the connecting node of greenhouse post beam according to claim 2 and tank, it is characterised in that the side wall of the cup is set It is equipped with the strip through-hole of vertical direction.
4. the connecting node of greenhouse post beam according to claim 1 and tank, it is characterised in that the cup sidepiece is set There is bolt hole, for bolt connection upper prop 1 and cup 41.
5. the connecting node of greenhouse post beam according to claim 1 and tank, it is characterised in that the ring flange is shaped as Rectangle.
6. the connecting node of greenhouse post beam according to claim 1 and tank, it is characterised in that first bolt hole Quantity is 4.
CN201721215527.1U 2017-09-21 2017-09-21 A kind of connecting node of greenhouse post beam and tank Expired - Fee Related CN207211374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721215527.1U CN207211374U (en) 2017-09-21 2017-09-21 A kind of connecting node of greenhouse post beam and tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721215527.1U CN207211374U (en) 2017-09-21 2017-09-21 A kind of connecting node of greenhouse post beam and tank

Publications (1)

Publication Number Publication Date
CN207211374U true CN207211374U (en) 2018-04-10

Family

ID=61822274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721215527.1U Expired - Fee Related CN207211374U (en) 2017-09-21 2017-09-21 A kind of connecting node of greenhouse post beam and tank

Country Status (1)

Country Link
CN (1) CN207211374U (en)

Similar Documents

Publication Publication Date Title
CN104074267B (en) Dismantled and assembled sledge steel loading structure mobile field camp
CN203613647U (en) Detachable light steel structure box-type house
CN203808589U (en) Reinforced principal-material joint structure of angle-steel communication tower of power transmission line
CN105805112A (en) Universal joint device for rod piece space structure connection
CN106150924A (en) A kind of mixed steel tower and wind power generating set
CN207211374U (en) A kind of connecting node of greenhouse post beam and tank
CN207686133U (en) A kind of assembling truss purlin system
CN209329609U (en) A kind of cell power cable laying PVC power pipe
CN104294921A (en) Connecting joint of concrete column and steel beam
CN206545627U (en) A kind of universal joint assembly connected for rod member space structure
CN209854937U (en) Modular assembly type building structure capable of being spliced
CN211548254U (en) Corner curtain wall upright post-free connecting structure
CN209837427U (en) Novel bottom die for steel bar truss floor support plate
CN212104532U (en) Steel structure node connecting component
CN208718346U (en) Building engineering outer scaffold wall connector
CN203947637U (en) A kind of syndeton of Glass Rib
CN207660104U (en) A kind of dismountable moveable house
CN106013414A (en) Solar balcony heat collection plate connecting structure and installation method thereof
CN201214782Y (en) Steel combination water transmission and drain aqueduct
CN215407039U (en) Roof metal railing telescopic joint node assembly
CN216616591U (en) High-performance color steel plate
CN219840158U (en) Assembled large-module plastic spraying anti-corrosion water tank
CN217995453U (en) Pin-connected panel powder storage jar structure
CN212389962U (en) Foundation bolt for fixing street lamp
CN211898969U (en) Groove type embedded part with high supporting performance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20190921

CF01 Termination of patent right due to non-payment of annual fee