CN207211151U CN201720903859.2U CN201720903859U CN207211151U CN 207211151 U CN207211151 U CN 207211151U CN 201720903859 U CN201720903859 U CN 201720903859U CN 207211151 U CN207211151 U CN 207211151U
Authority
CN
China
Prior art keywords
pipe
fetches earth
chamber structure
frequency vibration
novel high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720903859.2U
Other languages
Chinese (zh)
Inventor
许万文
孔秋平
罗承浩
许万鑫
李丽虹
邱建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN YONGQIANG GEOTECHNICAL Co Ltd
Original Assignee
FUJIAN YONGQIANG GEOTECHNICAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN YONGQIANG GEOTECHNICAL Co Ltd filed Critical FUJIAN YONGQIANG GEOTECHNICAL Co Ltd
Priority to CN201720903859.2U priority Critical patent/CN207211151U/en
Application granted granted Critical
Publication of CN207211151U publication Critical patent/CN207211151U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of novel high-frequency vibration hammer and fetched earth chamber structure, by the structure for improving high-frequency vibratory hammer, the pipe that will fetch earth is designed as monolithic construction with digging cage, digging cage is provided with several movable doors, it is movable, the switch of door is controlled by steel wire rope, is on the one hand avoided using latch limitation door;On the other hand, soil is drawn off from digging cage door, avoids being retained on digging cage, unloads soil thoroughly, is reduced manually, is improved percent of automatization, raising efficiency of construction, is reduced cost.

Description

A kind of novel high-frequency vibration hammer fetches earth chamber structure
Technical field
The construction field in Construction of Civil Engineering field, more particularly to pouring pile hole is the utility model is related to, specifically A kind of novel high-frequency vibration hammer fetches earth chamber structure.
Background technology
At present, during pouring pile hole, unloading soil is the key in work progress, conventional unloading earthwork formula Have:1st, mud off punching (brill) hole, realized using mud circulation outside native slag tap, but a large amount of mud need to be prepared, mud be present Pollution;2nd, long auger, though not having to mud off pore-forming, soil rises when being discharged to ground in helical blade, and part soil is viscous Between helical blade, blade must propose special cleaning outside hole, and work efficiency is low, and conventional expanded diameter is small, can not realize big straight Footpath pile foundation;3rd, full circle swinging drilling, pipe rubbing machine pore-forming, are not required to mud, can do operation, but corollary equipment is more large-scale, and invest greatly, Involve great expense;4th, high-frequency hydraulic hammer stake machine inner tube fetches earth, and disposably the amount of fetching earth is big, mud-less pollution, but the pipe that fetches earth unloads Door is tightly pressed against on latch before soil, and latch is difficult to transfer to, even if transfering to, is also easy to the soil burial drawn off, is caused a machine Stand-by period is grown, and substantially reduces and unloads native efficiency;5th, the vibration pile hammer of separate type unloads indigenous method, and the pipe that fetches earth is point with digging cage From soil is drawn off from the space fetched earth between pipe and digging cage, but because door is to close, is also retained in and is fetched earth in the presence of part soil , it is necessary to which excavated by manual work removes on storehouse, it is still desirable to part manual operation.
The content of the invention
The purpose of this utility model is to overcome drawbacks described above, there is provided a kind of novel high-frequency vibration hammer fetches earth chamber structure, passes through The structure of high-frequency vibratory hammer is improved, the pipe that will fetch earth is designed as monolithic construction with digging cage, and digging cage is provided with several activities Door, it is movable, the switch of door is controlled by steel wire rope, is on the one hand avoided using latch limitation door;On the other hand, it is native Drawn off from digging cage door, avoid being retained on digging cage, unload it is native thoroughly, and can semiautomation operation, ultrahigh in efficiency.
The utility model solves the following technical scheme that above-mentioned technical problem uses:
A kind of novel high-frequency vibration hammer fetches earth chamber structure, it is characterised in that:In the top of high-frequency vibratory hammer (1), installation is set There is hoist engine (3), set in the lower section of high-frequency vibratory hammer (1) and clamper (2) is installed, the pipe that fetches earth is clamped by clamper (2) (5), hoist engine (3) hangs with steel wire rope (4), and at the lower section internal wall of pipe orifice of the pipe that fetches earth (5), articulated manner is provided with 4 piece one The hinged place of internal wall of pipe orifice is diagonally upper below the movable sheet (6) of sample size, movable sheet (6) and the pipe (5) that fetches earth sets perforation (7) 4 steel wire ropes (4), are hung under hoist engine (3), it is fixed on eyelet (7) position on 4 pieces of movable sheets (6) respectively.
Preferably, movable sheet (6) if setting can be dry plate;
Preferably, the shape of movable sheet (6) can be square, rectangle, sector etc..
The beneficial effects of the utility model are:
A kind of novel high-frequency vibration hammer is provided to fetch earth chamber structure, by improving the structure of high-frequency vibratory hammer, will fetch earth pipe with Digging cage is designed as monolithic construction, and digging cage is provided with several movable doors, movable, and door is controlled by steel wire rope Switch, on the one hand avoid using latch limitation door;On the other hand, soil is drawn off from digging cage door, is avoided being retained in and is fetched earth On storehouse, soil is unloaded thoroughly, reduced manually, improve percent of automatization, raising efficiency of construction, reduce cost.
Brief description of the drawings
The utility model is described further with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is that a kind of novel high-frequency vibration hammer of the present utility model fetches earth structural representation when tightening up steel wire rope of chamber structure Figure;
Fig. 2 is that a kind of novel high-frequency vibration hammer of the present utility model fetches earth structural representation when loosening steel wire rope of chamber structure Figure;
Fig. 3 is that a kind of novel high-frequency vibration hammer of the present utility model fetches earth structure when loosening steel wire rope completely of chamber structure Schematic diagram;
Fig. 4 is that a kind of fetch earth structure when loosening steel wire rope of chamber structure of novel high-frequency vibration hammer of the present utility model is looked up Figure;
Fig. 5 is that a kind of fetch earth structure when tightening up steel wire rope of chamber structure of novel high-frequency vibration hammer of the present utility model is looked up Figure.
Embodiment
The chamber structure that fetched earth below in conjunction with the accompanying drawings with specific embodiment to a kind of novel high-frequency vibration hammer of the present utility model is made Further description.
First by improving the structure of high-frequency vibratory hammer, the pipe that will fetch earth is designed as monolithic construction with digging cage;
Then, underground is sunk to first by outer steel sleeve pipe using high-frequency vibratory hammer (1), the monoblock type knot of fetch earth pipe and digging cage The working range of structure is arranged on the inside of outer steel sleeve pipe, and high-frequency vibratory hammer (1) clamps the pipe (5) that fetches earth by clamper (2), and leads to The steel wire rope (4) that hoist engine (3) tightens up the pipe that fetches earth (5) is crossed, pipe (5) the mouth movable sheet that makes to fetch earth is tightened up close to the pipe (5) that fetches earth upwards Inwall, high-frequency vibratory hammer (1) will fetch earth inside pipe (5) press-in outer steel sleeve pipe, the soil in outer steel sleeve pipe is entered the pipe (5) that fetches earth It is interior;
3rd, when the soil in the pipe that fetches earth (5) reaches absolute altitude, the working dynamics of adjustment hoist engine (3), loosen steel wire rope;
4th, lift the pipe that fetches earth (5), loosen steel wire rope (4), using the gravity that soil in the pipe that fetches earth (5) is downward, make the pipe that fetches earth (5) closure state is just presented in the loose-leaf system door of mouth automatically, and the grave in the pipe that fetches earth (5) is present in the pipe (5) that fetches earth;
5th, the pipe that fetches earth (5) lifted leaves outer steel sleeve pipe completely, and by the soil in outer steel sleeve pipe, is transferred to side The soil that unloads on ground goes out top;
6th, by the work of hoist engine (3), continue to loosen steel wire rope, using the downward gravity of soil in the pipe that fetches earth (5), Pipe (5) the interior movable sheet that makes to fetch earth in opened condition, draws off the soil of the pipe that fetches earth (5), so as to complete work of once fetching earth downwards.
One kind of embodiment described above, simply the utility model more preferably embodiment, the skill of this area The usual variations and alternatives that art personnel are carried out in the range of technical solutions of the utility model should all be included in guarantor of the present utility model In the range of shield.

Claims (3)

  1. The chamber structure 1. a kind of novel high-frequency vibration hammer fetches earth, it is characterised in that:Set and be provided with the top of high-frequency vibratory hammer (1) Hoist engine (3), set in the lower section of high-frequency vibratory hammer (1) and clamper (2) is installed, the pipe that fetches earth is clamped by clamper (2) (5), hoist engine (3) hangs with steel wire rope (4), and at the lower section internal wall of pipe orifice of the pipe that fetches earth (5), articulated manner is provided with 4 piece one The hinged place of internal wall of pipe orifice is diagonally upper below the movable sheet (6) of sample size, movable sheet (6) and the pipe (5) that fetches earth sets perforation (7) 4 steel wire ropes (4), are hung under hoist engine (3), it is fixed on eyelet (7) position on 4 pieces of movable sheets (6) respectively.
  2. 2. a kind of novel high-frequency vibration hammer fetches earth chamber structure according to claim 1, it is characterised in that:The movable sheet (6) If setting can be dry plate.
  3. 3. a kind of novel high-frequency vibration hammer fetches earth chamber structure according to claim 1, it is characterised in that:The movable sheet (6) Shape can be square, rectangle, sector.
CN201720903859.2U 2017-07-25 2017-07-25 A kind of novel high-frequency vibration hammer fetches earth chamber structure Active CN207211151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720903859.2U CN207211151U (en) 2017-07-25 2017-07-25 A kind of novel high-frequency vibration hammer fetches earth chamber structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720903859.2U CN207211151U (en) 2017-07-25 2017-07-25 A kind of novel high-frequency vibration hammer fetches earth chamber structure

Publications (1)

Publication Number Publication Date
CN207211151U true CN207211151U (en) 2018-04-10

Family

ID=61813832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720903859.2U Active CN207211151U (en) 2017-07-25 2017-07-25 A kind of novel high-frequency vibration hammer fetches earth chamber structure

Country Status (1)

Country Link
CN (1) CN207211151U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379249A (en) * 2020-03-19 2020-07-07 彭江涛 Static sounding equipment and static sounding method for geotechnical geological exploration
CN115045279A (en) * 2022-06-07 2022-09-13 山东中铁路桥工程有限公司 Soil sampler for cleaning sundries in steel casing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379249A (en) * 2020-03-19 2020-07-07 彭江涛 Static sounding equipment and static sounding method for geotechnical geological exploration
CN115045279A (en) * 2022-06-07 2022-09-13 山东中铁路桥工程有限公司 Soil sampler for cleaning sundries in steel casing
CN115045279B (en) * 2022-06-07 2024-01-30 山东中铁路桥工程有限公司 Soil sampler for cleaning sundries in steel protective cylinder

Similar Documents

Publication Publication Date Title
CN102966128B (en) Anchor rod static pressure steel pile casting aqueous vapor syzygies method for correcting error
CN207211151U (en) A kind of novel high-frequency vibration hammer fetches earth chamber structure
CN100491650C (en) Precipitation construction method for double-bushing vacuum deep well point
CN107386353A (en) A kind of construction method that loose-leaf system unloading soil is used by improving high-frequency vibratory hammer
CN206429211U (en) Heavy caliber tunneling boring hole drilling deslagging system
CN106498963A (en) A kind of tube well dewatering system that is drawn water using air compressor machine and water pump concentration
CN107130582B (en) High-frequency vibration disturbs drainage arrangement and its construction method
CN105421457B (en) Spiral pile tube fetches earth machine
CN105544551B (en) A kind of super-long filling pile quickly transfers the construction method of steel reinforcement cage
CN100487204C (en) Composite pile shoe structured device
CN103711119A (en) Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof
CN106320400A (en) Compaction pile sampling device
CN203978270U (en) A kind of rotary drilling rig that adopts qi of chong channel ascending adversely pressure control
CN204311440U (en) Two high pressure multipurpose rotary churning pile device
CN203238627U (en) Multi-functional drilling barrel
CN203701079U (en) Pneumatic anti-settling circulating system for drilled pile slurry
CN202265830U (en) Sleeve secant pile water fetching bucket
CN207073185U (en) The equipped inspection shaft for carrying mud basket
CN108951625A (en) The split type platform of jacket pile pipe piling
CN207314372U (en) The foundation structure of wind-driven generator of basic annular type with pre-buried madjack pipe
CN205823163U (en) A kind of sand gravel geology bored concrete pile pore-creating apparatus
CN108951627A (en) Jacket pile pipe piling technique
CN204780850U (en) High -efficient intubate of precipitation well point pipe machine
CN104711985B (en) A kind of long-spiral drilling machine soil sampler
CN204982845U (en) Can get device that weak soil again can pore -forming

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant