CN207211084U - The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum - Google Patents

The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum Download PDF

Info

Publication number
CN207211084U
CN207211084U CN201721038483.XU CN201721038483U CN207211084U CN 207211084 U CN207211084 U CN 207211084U CN 201721038483 U CN201721038483 U CN 201721038483U CN 207211084 U CN207211084 U CN 207211084U
Authority
CN
China
Prior art keywords
dam
overflow section
monolith
rock
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721038483.XU
Other languages
Chinese (zh)
Inventor
杨启贵
胡进华
颜家军
崔玉柱
杜华冬
刘晖
吴效红
周良景
王辉
张英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201721038483.XU priority Critical patent/CN207211084U/en
Application granted granted Critical
Publication of CN207211084U publication Critical patent/CN207211084U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum, belongs to concrete gravity dam technical field.The axis of dam of concrete gravity dam is arranged as being convex to the arc line shaped of upstream by the utility model, the toe of high monolith in concrete gravity dam is set upstream to retract, fall on hard rock, and the dam heel bottom of high monolith uses " bridge " formula Extended chemotherapy in concrete gravity dam, the dam of high monolith is called in person across soft rock, fall on hard rock.The utility model passes through planar arc arrangement and " bridge " formula Extended chemotherapy, so that the toe of riverbed Overflow Section that is mainly pressurized of dam runtime and dam heel are seated on the good hard rock of condition, avoid dam discontinuity, deform the problem of big, and the utility model saves the excavated volume and amount of concrete of dam foundation, construction cost is greatly reduced, shortens the duration.

Description

The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum
Technical field
The utility model is related to concrete gravity dam technical field, and in particular to be on a kind of soft and hard alternation steep dip rock stratum The arrangement of concrete gravity dam.
Background technology
Concrete gravity dam is mainly conducted oneself with dignity, upstream and downstream water pressure, substrate uplift pressure as a kind of water retaining structure by dam body Deng load action.In the presence of these loads, gravity dam substrate will produce compression.In the normal impounding and operation phase, maximum pressure Stress generally occurs in toe;When having constructed the phase of building or low water level, maximum crushing stress is likely to occur in dam heel.
For the homogeneous dam foundation, by foundation excavation to after meeting the basement rock of stress condition, each portion of dam heel, toe and substrate Position, all falls within identical rock mass, the stress condition of each monolith, is not influenceed by position distribution.For the heterogeneous dam foundation, dam Heel, the position that is fallen of toe are different, and stress condition is by difference, dam foundation discontinuity.Steep dip for from Yokogawa to soft and hard alternation Rock stratum, this case are especially notable.Because toe following current to position it is different, the toe of some monoliths will fall on soft rock, this Larger harm will be brought to this larger position that is pressurized of the heel of the dam of concrete gravity dam and toe, especially toe, such as held Stress concentration, the decline of Against Sliding Stability performance at load power deficiency, the soft or hard change of the dam foundation etc..
For improve it is uneven on the basis of dam stress condition, in traditional design, generally use is excavated weak part and carried out The mode of concrete replacement, in the case of soft rock mass accounting is larger, excavated volume and concrete backfill amount are all larger;Also adopt Fold-line-shaped dam line arrangement is taken to avoid the gravity dam engineering such as soft rock mass, Ru Longtan, Burner zone, Baise, Ankang.
Longtan hydropower station, it is host layer that river bed dam section, which is located at the higher sandstone of intensity, and relatively weak argillite rock stratum only exists The higher left bank hillside of foundation plane by, for avoid the influence of the creep rock mass of left bank upstream and right bank coombe and reduce excavate and Concrete works amount, the two sides axis of dam are upstream turned back 27 ° and 30 ° respectively, ultimately form a fold-line-shaped gravity dam dam axle Line.
The Burner zone gravity axis of dam is upstream transferred in two sides with 54 ° of angle, and the dam foundation is seated lithology as huge thickness to thickness In the T33 rock groups of layer sandstone, bad terrene is avoided, is simplified dam foundation treatment work.
Baise RCC dam, influenceed by right bank topographic and geologic, the big axis of dam is orthogonal with river in riverbed part, the right bank axis of dam It is arranged to be folded to upstream along diabase spread, left bank is slightly folded to downstream.
Safe and comfortable concrete gravity dam, employs broken line type dam line, the substantially vertical downstream river course of overflow segment axis, left bank in order to Downstream turn 35 ° not across F3 tomographies axis, in order to adjust dam foundation stress state, right bank dam line has also downstream turned 10 ° of angles, It preferably make use of river topography feature.The dam line of use makes the dam foundation fall on harder, complete rock mass, avoids regionality Tomography F3 and the F10 fault belts in intrusive body downstream, avoid downstream sheet landslide distribution area and riverbed pool landform.
Above-mentioned engineering, its weak or broken basement rock local distribution in the range of the dam foundation, for Yokogawa to steep dip, run through The rock stratum of the soft and hard alternation of the whole dam foundation, it is that can not ensure all monolith dams of whole gravity dam only by the local deflection of dam line Heel, toe are fallen within harder, complete rock mass, though and prior art also has Yokogawa is mixed on soft and hard alternation steep dip rock stratum The arrangement for coagulating native gravity dam is studied, but the toe of riverbed Overflow Section that is mainly pressurized of dam runtime and dam heel are fallen within Soft stratum, and be to improve dam heel, toe stress condition, dam heel, toe soft rock need to be deep-cut and use concrete to change and filled out, Excavate rock and fill concrete amount is huge, construction period length.
The content of the invention
The purpose of this utility model be in view of the above-mentioned problems of the prior art, provide a kind of stability under loading, deformation it is small, Excavated volume is few, on the soft and hard alternation steep dip rock stratum of short time limit concrete gravity dam arrangement.
To achieve the above object, the utility model adopts the following technical scheme that:
The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum, including left bank non-overflow section of dam, riverbed overflow Monolith and right bank non-overflow section of dam;The riverbed Overflow Section is between left bank non-overflow section of dam and right bank non-overflow section of dam; The axis of dam of each monolith is arranged as camber line in the left bank non-overflow section of dam, riverbed Overflow Section and right bank non-overflow section of dam, And the toe of each monolith is respectively positioned on hard rock in left bank non-overflow section of dam, riverbed Overflow Section and right bank non-overflow section of dam;Institute The dam heel bottom for stating high monolith in left bank non-overflow section of dam, riverbed Overflow Section and right bank non-overflow section of dam is provided with the expansion of " bridge " formula Big basis, and the dam heel of high monolith is located on hard rock in left bank non-overflow section of dam, riverbed Overflow Section and right bank non-overflow section of dam.
Further, the upstream of described " bridge " formula Extended chemotherapy rise slope and left bank non-overflow section of dam, riverbed Overflow Section and The upstream folded slope linking of high monolith in right bank non-overflow section of dam.
Further, the slope ratio that slope is played in the upstream of described " bridge " formula Extended chemotherapy is 1:1.
The utility model has the advantages that:
The utility model passes through planar arc arrangement and " bridge " formula Extended chemotherapy so that the river that the dam runtime is mainly pressurized The toe of bed Overflow Section and dam heel are seated on the good hard rock of condition, avoid Yokogawa to concrete on steep dip soft and hard alternation rock stratum The dam heel of gravity dam falls on soft rock, caused by stress and problem on deformation, and the utility model saves concrete gravity The excavated volume and amount of concrete of dam foundation rock, greatly reduce construction cost, shorten the duration.
Brief description of the drawings
Fig. 1 is schematic diagram of the Yokogawa to concrete gravity dam arrangement on soft and hard alternation steep dip rock stratum in the prior art;
Fig. 2 is Yokogawa concrete weight into concrete gravity dam arrangement on soft and hard alternation steep dip rock stratum in the prior art The diagrammatic cross-section on power dam;
Fig. 3 is the schematic diagram of concrete gravity dam arrangement on the utility model soft and hard alternation steep dip rock stratum;
Fig. 4 is concrete gravity dam in concrete gravity dam arrangement on the utility model soft and hard alternation steep dip rock stratum Diagrammatic cross-section.
In figure:Left bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow section of dam 3, toe 4, hard rock 5, " bridge " Slope 8, soft rock 9, upstream folded slope 10, downstream dam slope 11 are played in formula Extended chemotherapy 6, dam heel 7, upstream.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Mu Ruo Hydropower Projects are located at Malaysian tropical rain forest area, the place rock mass rock stratum category Eocene epoch in Palaeogene shore Marine facies, the 3rd be Bei Lajia (Belaga) group Pelagus sections stratum, as shown in Figures 1 to 4, the rock stratum steep dip, the He of hard rock 5 Soft rock 9 is alternate, the thickness of middle part thicker position hard rock 5 about 110m.
As depicted in figs. 1 and 2, prior art is entered using the straight line axis of dam to concrete gravity dam in Mu Ruo Hydropower Projects Row arrangement, on soft rock 9, it is excessive that this will produce the concrete gravity dam dam foundation for toe 4 and the dam heel 7 of riverbed Overflow Section 2 Deformation, and then causes dam body bottom tension excessive, or even by concrete gravity dam drawing crack, destroys the globality of dam body, and then 7 seepage prevention systems of dam heel are destroyed, the contact area of concrete gravity dam and basement rock is reduced, jeopardizes Stability of Sliding Resistance of Concrete peace Quan Xing.
Cloth of the utility model aiming at Yokogawa in the prior art to concrete gravity dam on soft and hard alternation steep dip rock stratum Put the improvement that structure stress is uneven, deformation is big, excavated volume is big, construction period length is made.
As shown in Figure 3 and Figure 4, on the utility model soft and hard alternation steep dip rock stratum concrete gravity dam arrangement, bag Include left bank non-overflow section of dam 1 (including 8 monoliths), riverbed Overflow Section 2 (including 3 monoliths) and (bag of right bank non-overflow section of dam 3 Include 10 monoliths);The riverbed Overflow Section 2 is between left bank non-overflow section of dam 1 and right bank non-overflow section of dam 3;The left side The axis of dam of each monolith is arranged as camber line, camber line in bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow section of dam 3 Radius is 893m, and axis of dam overall length is 430.23m, wherein, each monolith is along a length of 20.26m of the axis of dam, phase in riverbed Overflow Section Adjacent monolith transverse joint central angle is 1.3 °, and each in left bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow section of dam 3 The toe 4 of monolith is respectively positioned on hard rock 5;The left bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow section of dam 3 Dam 7 bottoms of heel of middle high monolith are provided with " bridge " formula Extended chemotherapy 6, wherein, the slope on slope 8 is played in the upstream of " bridge " formula Extended chemotherapy 6 Than being 1: 0.2 for the slope ratio of high monolith in 1: 1, with left bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow section of dam 3 Upstream folded slope 10 be connected so that high monolith in left bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow section of dam 3 Each foundation upstream expands 5m~10m, ensures left bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow dam The dam heel 7 of high monolith is on hard rock 5 in section 3, in addition, left bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow The slope ratio of the downstream dam slope 11 of each monolith of high monolith is 1: 0.8 in monolith 3.
Construct the method for the arrangement of concrete gravity dam on above-mentioned soft and hard alternation steep dip rock stratum, comprise the following steps:
1) according to the lithological characteristic of soft and hard alternation steep dip rock stratum, soft and hard alternation steep dip rock stratum is subjected to soft rock 9 and hard rock 5 Rock section divides;
2) the rock section divided according to step 1) selects left bank non-overflow section of dam 1, riverbed Overflow Section 2 in concrete gravity dam With the arrangement rock section of each monolith of right bank non-overflow section of dam 3;
3) by each of left bank non-overflow section of dam 1 in concrete gravity dam, riverbed Overflow Section 2 and right bank non-overflow section of dam 3 Monolith arrangement rock section selected along step 2) is arranged, wherein, the axis of dam of concrete gravity dam is arranged as being convex to upstream Arc line shaped, the toe 4 of high monolith in concrete gravity dam is upstream retracted, fall on hard rock 5;
4) in concrete gravity dam left bank non-overflow section of dam 1, riverbed Overflow Section 2 and right bank non-overflow section of dam 3 height 7 bottoms are called in person using " bridge " formula Extended chemotherapy 6 in the dam of monolith, the dam of high monolith is called in person 7 across soft rock 9, fall on hard rock 5.
Other parts not being described in detail belong to prior art.

Claims (3)

1. the arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum, including left bank non-overflow section of dam (1), riverbed overflow Monolith (2) and right bank non-overflow section of dam (3);The riverbed Overflow Section (2) is located at left bank non-overflow section of dam (1) and right bank is non-excessive Between stream monolith (3), it is characterised in that:The left bank non-overflow section of dam (1), riverbed Overflow Section (2) and right bank non-overflow dam The axis of dam of each monolith is arranged as camber line in section (3), and left bank non-overflow section of dam (1), riverbed Overflow Section (2) and right bank are non- The toe (4) of each monolith is respectively positioned on hard rock (5) in Overflow Section (3);The left bank non-overflow section of dam (1), riverbed overflow Dam heel (7) bottom of high monolith is provided with " bridge " formula Extended chemotherapy (6), and left bank in monolith (2) and right bank non-overflow section of dam (3) The dam heel (7) of high monolith is located at hard rock (5) in non-overflow section of dam (1), riverbed Overflow Section (2) and right bank non-overflow section of dam (3) On.
2. the arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum according to claim 1, it is characterised in that: Slope (8) are played in the upstream of " bridge " the formula Extended chemotherapy (6) and left bank non-overflow section of dam (1), riverbed Overflow Section (2) and right bank are non- Upstream folded slope (10) linking of high monolith in Overflow Section (3).
3. the arrangement of concrete gravity dam, its feature exist on soft and hard alternation steep dip rock stratum according to claim 1 or 2 In:The slope ratio that slope (8) are played in the upstream of " bridge " the formula Extended chemotherapy (6) is 1: 1.
CN201721038483.XU 2017-08-18 2017-08-18 The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum Active CN207211084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721038483.XU CN207211084U (en) 2017-08-18 2017-08-18 The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721038483.XU CN207211084U (en) 2017-08-18 2017-08-18 The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum

Publications (1)

Publication Number Publication Date
CN207211084U true CN207211084U (en) 2018-04-10

Family

ID=61815722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721038483.XU Active CN207211084U (en) 2017-08-18 2017-08-18 The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum

Country Status (1)

Country Link
CN (1) CN207211084U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326873A (en) * 2017-08-18 2017-11-07 长江勘测规划设计研究有限责任公司 The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326873A (en) * 2017-08-18 2017-11-07 长江勘测规划设计研究有限责任公司 The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum

Similar Documents

Publication Publication Date Title
Rajendran et al. Mechanism of triggered seismicity at Koyna: An evaluation based on relocated earthquakes
CN107988925A (en) Landslide or the stake net and its design method of rockfall hazards protection
CN107326873A (en) The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum
CN207211084U (en) The arrangement of concrete gravity dam on soft and hard alternation steep dip rock stratum
Jiang et al. Stability analysis and treatment of a reservoir landslide under impounding conditions: a case study
CN108166509A (en) A kind of longitudinally spaced excavation of slope construction and protection construction method stage by stage
Song et al. Safety monitoring and stability analysis of left abutment slope of Jinping I hydropower station
Ormann et al. Numerical analysis of curved embankment of an upstream tailings dam
Fang et al. Stress-strain analysis of Aikou rockfill dam with asphalt-concrete core
Cheng et al. Stability analysis regarding underground cavern group of Songyang pumped storage power station
CN202543858U (en) Gravitational flexible shore-reinforcing retaining wall
Liang et al. Controlling the effect of a distant extremely thick igneous rock in overlying strata on coal mine disasters
CN102619196A (en) Connector of concrete dam and earth dam in coastal wide river valley region
Yan et al. The uplift mechanism of the rock masses around the Jiangya dam after reservoir inundation, China
CN107313406B (en) Rock front concrete gravity dam arrangement structure and arrangement method thereof
Xu et al. Stress and Deformation Analysis for the Concrete Face Rockfill Dam of Wuyue Pumped Storage Power Station
CN206015619U (en) A kind of rock for reducing panel stress strain level
CN215289983U (en) Arch dam structure suitable for deep cutting river valley
Dunfu The Engineering Geology Conditions and the Designs Features---an Example of Dam Construction on Active Fault
CN104074168B (en) A kind of closure method of coastal cofferdam
Taoxiao et al. 3d numerical simulation of sea-cross bridge pier wave current force considering local scour effect
Wang et al. Nonlinear Finite Element Analysis of CSGR Dyke Engineering on Soft Foundation
Shahkarami et al. Numerical analysis of static behavior of embankment dam under changes in the core inclination (Case Study: Azad Dam)
Tai et al. Characterization of surface rupture and structural damage in Hongkou town during Wenchuan earthquake
Xu et al. Valley deformation and slope seismic analysis near tail water outlet of a hydropower station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant