CN207194007U - A kind of steel construction dual composite pipe gallery - Google Patents

A kind of steel construction dual composite pipe gallery Download PDF

Info

Publication number
CN207194007U
CN207194007U CN201720766145.1U CN201720766145U CN207194007U CN 207194007 U CN207194007 U CN 207194007U CN 201720766145 U CN201720766145 U CN 201720766145U CN 207194007 U CN207194007 U CN 207194007U
Authority
CN
China
Prior art keywords
steel
pipe gallery
steel construction
pipe
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720766145.1U
Other languages
Chinese (zh)
Inventor
刘洪�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sun Haorui
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720766145.1U priority Critical patent/CN207194007U/en
Application granted granted Critical
Publication of CN207194007U publication Critical patent/CN207194007U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

Utility model provides a kind of steel construction dual composite pipe gallery, and the lower base of the steel construction dual composite pipe gallery is made up of concrete layer one, and erects support frame on concrete layer one, and channel-section steel is built on support frame and forms horizontal platform;Pole structure is built on horizontal platform; steel plate is the outer layer of pole structure; gusset is welded on steel plate; ultimately form piping lane entirety; two groups and lateral connection more than two just form two storehouses and multi-compartment tube corridor; and around casting concrete outside steel plate and gusset, the inside has also poured cement mortar composite protective layer in steel plate, and quadrilateral structure formation Shuan Cang more than two and more storehouse pipe galleries are built by pole structure and horizontal platform.Pipe gallery extending direction is connected with flange.The compound pipe gallery is that internal production cement mortar protective course, the rigidity of structure is strong, double composite constructions, anti-corrosion and waterproof superior performance, easy for construction, short time limit, good combination property by the way of the outer integral loop pouring concrete of steel construction.

Description

A kind of steel construction dual composite pipe gallery
Technical field
A kind of pipe gallery is the utility model is related to, specially a kind of steel construction dual composite pipe gallery.
Background technology
The steel construction piping lane anti-corrosion and waterproof effect of prior art is poor, and combination property is poor, and piping lane maintenance, maintenance cost are high.Reach Less than century-old life requirements.
Utility model content
In order to solve the above problems, the utility model provides a kind of steel construction dual composite pipe gallery.
The utility model adopts the following technical scheme that:A kind of steel construction dual composite pipe gallery, including concrete layer one, Channel-section steel, steel plate, cement mortar composite protective layer, gusset, concrete layer two, I-steel, adiabator layer, support frame, in It is water pipe, feed pipe, thermal pipe, power cables frame, personal port, COM1, vibrating grid, V-type rivet clasp hook, steel mesh, inner flange, outer Flange and steel construction;The lower base of the steel construction dual composite pipe gallery is made up of concrete layer one, and on concrete layer one Support frame is erected, channel-section steel is built on support frame and forms horizontal platform;Pole structure is built on horizontal platform, steel plate is pillar The outer layer of structure, gusset are laterally erected, and I-steel is longitudinally erected, and form steel bracket, and in steel bracket around casting concrete, muscle For plate weld on steel plate, steel plate internal layer has I-steel as support, and a steel construction is integrally formed, is also poured inside steel construction Cement mortar composite protective layer, quadrilateral structure is built by pole structure and horizontal platform and forms pipe gallery;Steel knot Structure dual composite pipe gallery has multiple storehouses, water pipe, feedwater in being set gradually in steel construction dual composite pipe gallery lower left Pipe, middle water pipe, the top of feed pipe set power cables frame, comunication area port and personal port;On the right side of piping lane, heating power is set Pipe, and insulation material is surrounded around thermal pipe;Steel construction is by V-type rivet clasp hook inside cement mortar composite protective layer Formed with steel mesh, V-type rivet clasp hook is arranged in order, and pole structure with being connected for horizontal platform is entered by inner flange and outward flange Row connection.
Steel bracket has two kinds of production methods around casting concrete:First, completed in factory, be that steel bracket is placed into vibrating grid On carry out vibration and pour, steel construction is transported to in-site installation in factory's manufacture, factory's prepackage, numbered packets, dismounting into monolithic. 2nd, complete at the scene, be that one-piece casting is completed, concrete seamless.The thickness of concrete layer one is 150-200mm.Cement is husky The thickness for starching composite protective layer is 30-50mm.The structure of steel product form that steel construction dual composite pipe gallery is used is:Side Shape, circle or the shape of a hoof;The steel that steel construction dual composite pipe gallery is used are straight carbon steel, steel alloy, straight carbon steel, steel alloy Clad steel or cold rolling corrugated steel.Do preservative treatment in steel construction piping lane steel construction part.Steel construction steel sections doing without composite bed Anti-corrosion, fire resistant coating, steel construction do cathodic protection facility.
Operation principle of the present utility model:The steel construction dual composite pipe gallery mainly passes through steel plate 3, gusset 5, type The steel construction that steel is built, and outer integral loop pouring concrete, internal production cement mortar mixing material are formed on steel construction.Steel Structure is manufactured in factory and completed, and interior external composite layer can manufacture in factory, in-site installation, can also composite bed pour at the construction field (site) Build completion.And several storehouses are distributed, each storehouse is used to put gas pipeline or electric power telecommunication apparatus storehouse or water supply, heat supply storehouse.Such as Fig. 1 institutes Show, water pipe, feed pipe in being set gradually in the compound pipe gallery lower left of steel construction, middle water pipe, the top of feed pipe are set Power cables frame, comunication area port and personal port;Thermal pipe is set on the right side of piping lane, and around insulation around thermal pipe Material, the layout and structure design play anti-corrosion and waterproof to piping lane, improve the piping lane life-span, shorten the construction period, reduce synthesis and make Valency etc. acts on.
The utility model advantageous effects:The compound pipe gallery is using steel construction, integral loop pouring concrete Mode, the rigidity of structure is strong, composite construction, good combination property.The protective effects such as anti-corrosion are played to the underground cable inside piping lane.
Brief description of the drawings
Fig. 1 is the structure chart of the compound pipe gallery of steel construction.
Fig. 2 is the exterior pre-cast armored concrete method schematic diagram of the compound pipe gallery of steel construction.
Fig. 3 is the composite protective layer detail view of the compound pipe gallery of steel construction.
Fig. 4 is the tube frame installation diagram of the compound pipe gallery of steel construction.
Description of reference numerals
1. concrete layer one, 2. channel-section steels, 3. steel plates, 4 cement mortar composite protective layers, 5 gussets, 6 concrete layers 2nd, water pipe in 7. I-steel, 8. adiabator layers, 9. support frames, 10,11. feed pipes, 12. thermal pipes, 13. power cables framves, 14. personal port, 15, COM1,16. vibrating grids, the solid hook of 17.V snap rivetings, 18. steel meshes, 19. inner flanges, 20. outward flanges, 21. steel construction.
Embodiment
Below in conjunction with the accompanying drawings the utility model is further illustrated with preferred embodiment of the present utility model.
Embodiment
Such as Fig. 1-4, a kind of steel construction dual composite pipe gallery, including concrete layer 1, channel-section steel 2, steel plate 3, cement Mortar composite protective layer 4, gusset 5, concrete layer 26, I-steel 7, adiabator layer 8, support frame 9, middle water pipe 10, Feed pipe 11, thermal pipe 12, power cables frame 13, personal port 14, COM1 15, vibrating grid 16, V-type rivet clasp hook 17, steel mesh 18th, inner flange 19, outward flange 20 and steel construction 21;The lower base of the steel construction dual composite pipe gallery is by the structure of concrete layer 1 Into, and support frame 9 is erected on concrete layer 1, channel-section steel 2 is built on support frame 9 and forms horizontal platform;On horizontal platform Pole structure is built, steel plate 3 is the outer layer of pole structure, and gusset 5 is laterally erected, and the longitudinal direction of I-steel 7 is erected, and forms steel bracket, And be welded in steel bracket around casting concrete, gusset 5 on steel plate, steel plate internal layer has I-steel 7 as support, is integrally formed One steel construction 21, cement mortar composite protective layer 4 is also poured in the inside of steel construction 21, it is by pole structure and laterally flat Platform builds quadrilateral structure and forms pipe gallery;Steel construction dual composite pipe gallery has multiple storehouses, in steel construction dual composite Pipe gallery lower left sets gradually middle water pipe 10, feed pipe 11, and middle water pipe 10, the top of feed pipe 11 set power cables frame 13rd, comunication area port 15 and personal port 14;Thermal pipe 12 is set on the right side of piping lane, and surrounded around thermal pipe 12 Insulation material 8;The inside steel construction of cement mortar composite protective layer 4 is to be made up of V-type rivet clasp hook 17 with steel mesh 18, V-type riveting Gu hook 17 is arranged in order, pole structure with being connected for horizontal platform is attached by inner flange 19 and outward flange 20.
Steel bracket is that will carry out vibration on steel bracket placement vibrating grid 16 to pour around casting concrete.Concrete layer 1 Thickness be 150-200mm.The thickness of cement mortar composite protective layer 4 is 30-50mm.
The structure of steel product form that steel construction dual composite pipe gallery is used is:Square, the circular or shape of a hoof;Steel construction is double The steel that compound pipe gallery is used are straight carbon steel, steel alloy, straight carbon steel, steel alloy clad steel or cold rolling corrugated steel.
Operation principle of the present utility model:The steel construction dual composite pipe gallery mainly passes through steel plate 3, gusset 5, type The steel construction that steel is built, and outer integral loop pouring concrete, internal production cement mortar mixing material are formed on steel construction.Steel Structure is manufactured in factory and completed, and interior external composite layer can manufacture in factory, in-site installation, can also composite bed pour at the construction field (site) Build completion.And several storehouses are distributed, each storehouse is used to put gas pipeline or electric power telecommunication apparatus storehouse or water supply, heat supply storehouse.Such as Fig. 1 institutes Show, water pipe 10, feed pipe 11 in being set gradually in the compound pipe gallery lower left of steel construction, middle water pipe 10, feed pipe 11 Top sets power cables frame 13, comunication area port 15 and personal port 14;On the right side of piping lane, thermal pipe 12 is set, and in heat Anti-corrosion and waterproof is played to piping lane around insulation material 8, office and structure design around solenoid 12, improves the piping lane life-span, is shortened Construction period, reduce the effect such as comprehensive cost.
The compound pipe gallery is that the rigidity of structure is strong, composite junction by the way of steel construction, integral loop pouring concrete Structure, good combination property.The protective effects such as anti-corrosion are played to the underground cable inside piping lane.
The utility model preferred embodiment, therefore the scope of the utility model implementation can not be limited according to this, i.e., according to this reality The equivalent changes and modifications made with new patent scope and description, in the range of all should still belonging to the utility model lid.

Claims (4)

  1. A kind of 1. steel construction dual composite pipe gallery, it is characterised in that:Including concrete layer one, channel-section steel, steel plate, cement mortar Composite protective layer, gusset, concrete layer two, I-steel, adiabator layer, support frame, middle water pipe, feed pipe, thermal pipe, Power cables frame, personal port, COM1, vibrating grid, V-type rivet clasp hook, steel mesh, inner flange, outward flange and steel construction;The steel knot The lower base of structure dual composite pipe gallery is made up of concrete layer one, and erects support frame on concrete layer one, in support frame On build channel-section steel formed horizontal platform;Pole structure is built on horizontal platform, steel plate is the outer layer of pole structure, and gusset is horizontal Erect, I-steel is longitudinally erected, and forms steel bracket, and be welded in steel bracket around casting concrete, gusset on steel plate, steel plate Internal layer has I-steel as support, and a steel construction is integrally formed, cement mortar composite guarantor has also been poured inside steel construction Sheath, quadrilateral structure is built by pole structure and horizontal platform and forms pipe gallery;Steel construction dual composite pipe gallery There are multiple storehouses, water pipe, feed pipe in being set gradually in steel construction dual composite pipe gallery lower left, middle water pipe, feed pipe Top sets power cables frame, comunication area port and personal port;On the right side of piping lane, thermal pipe is set, and around thermal pipe Around insulation material;Steel construction is to be made up of V-type rivet clasp hook with steel mesh inside cement mortar composite protective layer, V-type rivet clasp Hook is arranged in order, and pole structure with being connected for horizontal platform is attached by inner flange and outward flange.
  2. 2. steel construction dual composite pipe gallery according to claim 1, it is characterised in that:The thickness of concrete layer one is 150-200mm。
  3. 3. steel construction dual composite pipe gallery according to claim 1, it is characterised in that:Cement mortar composite is protected The thickness of sheath is 30-50mm.
  4. 4. steel construction dual composite pipe gallery according to claim 1, it is characterised in that:Steel construction dual composite integrates The structure of steel product form that piping lane is used is:Square, the circular or shape of a hoof;The steel that steel construction dual composite pipe gallery is used are Straight carbon steel, steel alloy, straight carbon steel, steel alloy clad steel or cold rolling corrugated steel.
CN201720766145.1U 2017-06-28 2017-06-28 A kind of steel construction dual composite pipe gallery Expired - Fee Related CN207194007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720766145.1U CN207194007U (en) 2017-06-28 2017-06-28 A kind of steel construction dual composite pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720766145.1U CN207194007U (en) 2017-06-28 2017-06-28 A kind of steel construction dual composite pipe gallery

Publications (1)

Publication Number Publication Date
CN207194007U true CN207194007U (en) 2018-04-06

Family

ID=61785134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720766145.1U Expired - Fee Related CN207194007U (en) 2017-06-28 2017-06-28 A kind of steel construction dual composite pipe gallery

Country Status (1)

Country Link
CN (1) CN207194007U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506401A (en) * 2021-06-07 2022-12-23 北京京投城市管廊投资有限公司 Energy-saving comprehensive pipe gallery enclosure structure and waste heat recycling method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506401A (en) * 2021-06-07 2022-12-23 北京京投城市管廊投资有限公司 Energy-saving comprehensive pipe gallery enclosure structure and waste heat recycling method thereof
CN115506401B (en) * 2021-06-07 2024-07-26 北京京投城市管廊投资有限公司 Energy-saving comprehensive pipe rack enclosure structure and waste heat recycling method thereof

Similar Documents

Publication Publication Date Title
CN107893496A (en) A kind of assembly concrete integrated floor and its manufacture method
CN107435338A (en) Overhead transmission line concrete precast pipe pile cushion cap attachment means
CN109812620A (en) Primary concreting large-diameter steel pipe concrete pack method
CN103174293A (en) Self-stabilizing type internal mold installation method for hollow floor slab
CN207194007U (en) A kind of steel construction dual composite pipe gallery
CN105064612A (en) Steel-concrete combined special-shaped column with thermal insulating and load bearing integrated and preparation method thereof
CN203347203U (en) Multi-functional super-thick bulked concrete steel tube support system
CN208039543U (en) Thread alternating formula monolithic prefabricated panel
CN108331225A (en) A kind of Z-type joint steel pipe concrete profiled pile-stealth beam floor assembly system
CN104818784B (en) Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof
CN202117320U (en) Circular mold anti-floating device in circulating water pipe ditch
CN209397712U (en) The connection structure of antidetonation steel pipe in a kind of shear wall
CN209555972U (en) A kind of side's arch piping lane erection support and piping lane system
CN208415679U (en) A kind of prefabricated light-steel light-concrete combined wall board
CN203559505U (en) Cast-in-place light steel bar truss wall
CN203174882U (en) Shock resistant composite beam for housing building
CN206646722U (en) A kind of reinforced concrete composite structure overlaps beam slab
CN204753977U (en) Cement concrete pillar
CN204919989U (en) Collect steel - concrete combination special -shaped post of heat preservation bearing in an organic whole
CN107605101A (en) A kind of heat-preserving load-bearing one steel concrete combined special-shaped column and its construction method
CN211395747U (en) Light prefabricated formula steel-concrete combination cable tunnel
CN209482822U (en) Assembling type fence in concrete
CN1884752A (en) Anchoring plate type steel pipe concrete column-cap type combined beam connection node
CN209293262U (en) Prefabricated hollow round pipe cast-in-place concrete building floor
CN208039895U (en) Steel reinforced concrete support underpins frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180509

Address after: 117000 No. 7, 11 Story 1 unit, Zhiyuan street, Mingshan District, Benxi, Liaoning, China.

Patentee after: LIAONING YIERJU RESIDENTIAL INDUSTRIAL TECHNOLOGY CO.,LTD.

Address before: 117000 1-3-8, 104-4 Guangyu Road, Pingshan District, Benxi, Liaoning

Patentee before: Liu Hong

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201223

Address after: 116000 1-2-2, No. 11, songyuli, economic and Technological Development Zone, Jinzhou District, Dalian City, Liaoning Province

Patentee after: Sun Haorui

Address before: 117000 No. 7, 11 Story 1 unit, Zhiyuan street, Mingshan District, Benxi, Liaoning, China.

Patentee before: LIAONING YIERJU RESIDENTIAL INDUSTRIAL TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406