CN207193731U - A kind of modularization steel bridge main bridge structure - Google Patents

A kind of modularization steel bridge main bridge structure Download PDF

Info

Publication number
CN207193731U
CN207193731U CN201721082859.7U CN201721082859U CN207193731U CN 207193731 U CN207193731 U CN 207193731U CN 201721082859 U CN201721082859 U CN 201721082859U CN 207193731 U CN207193731 U CN 207193731U
Authority
CN
China
Prior art keywords
girder
square steel
partition panel
bridge
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721082859.7U
Other languages
Chinese (zh)
Inventor
张升华
邓春年
张毅
周雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Yuqian Mechanical Equipment Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721082859.7U priority Critical patent/CN207193731U/en
Application granted granted Critical
Publication of CN207193731U publication Critical patent/CN207193731U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of modularization steel bridge main bridge structure, the modularization steel bridge main bridge structure includes girder(1), expansion joint(2), anti-fall girder apparatus(3)And rubber support(4);The girder(1)Mainly it is formed by connecting by more square steel tube side-by-sides;The girder(1)Also include high-strength bolt(5), crossbeam(6)And partition panel(7);Pass through high-strength bolt between the more square steel tubes(5)It is fixedly connected;The partition panel(7)Two blocks of steel plates are connected for two small rod iron to be made.The utility model is simple in construction, and design science is reasonable, can effectively solve existing main beam structure complexity, assembles the engineering time length of cost, and complex procedures are cumbersome;The problem of being inconvenient to transport and lifting.

Description

A kind of modularization steel bridge main bridge structure
Technical field
It the utility model is related to steel bridge construction field, and in particular to a kind of modularization steel bridge main bridge structure.
Background technology
Paving steel bridge deck is the important component of bridge driving system, and its quality directly influences the safety of driving Property, comfortableness, bridge durability and returns of investment and social benefit.The appearance of orthotropic deck system, is greatly reduced The weight of bridge, makes the across footpath of bridge longer, promotes the construction of large span bridge, paving steel bridge deck technology is accompanied by The construction of large span bridge and the special pavement technique of a high-tech difficulty to grow up.Due to orthotropic steel bridge deck The stiffness of system is small, and deformation is big, and the requirement to paving steel bridge deck is very harsh, thus turns into a global problem.Steel bridge Face, which is mated formation, to be laid immediately on orthotropic plate, in factors such as traffic load, wind load, temperature change and Steel Bridge Deck local deformations Under the influence of, its stress and deformation are complicated far beyond highway pavement or airfield runway, thus to its high-temperature stability, antifatigue cracking Property, retinue's property to steel plate deformed, deformation characteristic, layers cementing and perfect guarded drainage system etc. have high requirement. Simultaneously as residing specific position of mating formation, there is that in light weight, caking property is high, the particular/special requirement such as waterproof again in performance.
China's paving steel bridge deck successively used asphalt concrete, modified asphalt concrete, SMA, bituminous epoxy to mix There is individual layer, double in solidifying soil, cast asphalt concrete, retinasphal combined system (ERS) etc., the structure of paving steel bridge deck The forms such as layer, multilayer.The characteristics of due to this body structure of Steel Bridge Deck, Steel Bridge Deck Pavement stress and deformation ratio highway pavement are answered Miscellaneous is more, and the rigidity of Steel Bridge Deck is smaller, and deformation is larger, in the utilization of Practical Project, compared with prevailing roadway structure sheaf, and steel bridge Face pave-load layer is more easy to the multiple diseases such as rut, cracking, delamination occur.
In recent ten years, in many Large Span Bridges of China's construction, Orthotropic Steel Bridge Deck system is due to from heavy and light And good economy performance and more and more applied.But the problem of mating formation of orthotropic steel bridge deck, not yet obtain at home very Good solution, it is mostly de- in the presence of the bottom (i.e. floorings) of different degrees of rut, cracking, asphalt concrete pavement and Steel Bridge Deck The disease such as layer and sliding.China is completed the Large Span Bridges used at present, because the technical scheme of use is unreliable, deposits mostly In the disease such as different degrees of rut, cracking, asphalt concrete pavement and floorings delamination and sliding.
Existing main beam structure is complicated, and the engineering time that general assembling is spent is very long, and complex procedures, cumbersome;No Convenience in transport and lifting.
Utility model content
In order to solve the above problems, the utility model proposes a kind of modularization steel bridge main bridge structure, the utility model knot Structure is simple, and design science is reasonable, can effectively solve existing main beam structure complexity, assembles the engineering time length of cost, work Sequence is complicated, cumbersome;The problem of being inconvenient to transport and lifting.
The technical solution of the utility model is as follows:
It is proposed a kind of modularization steel bridge main bridge structure, including girder, expansion joint, shock mount, anti-fall girder apparatus and rubber Glue bearing;The girder is mainly formed by connecting by more square steel tube side-by-sides;The girder also includes high-strength bolt, crossbeam and cut-off Plate;It is fixedly connected between the more square steel tubes by high-strength bolt;The partition panel is that two small rod iron connects two pieces Steel plate is made;The partition panel is filled in specified location from one end of square steel tube, and will by the connected mode of spot welding Partition panel and square steel tube are fixedly connected;The square steel tube is additionally provided with for installing horizontal stroke in the specified location side wall of partition panel The through hole of beam;The crossbeam is formed for round steel pipe, and the slip for strengthening round steel pipe direction across bridge is provided with round steel pipe The shear bar of power;The crossbeam is concatenated more square steel tubes by through hole;Specified location of the square steel tube in partition panel Place top is additionally provided with the plug hole for pouring into a mould concrete;The square steel tube both ends bottom in two outsides is provided with and prevented in the girder Fall girder apparatus supports the use pre-manufactured hole;The expansion joint is arranged on girder and the both ends of abutment junction;The rubber support is set Put the bottom of the pre-manufactured hole in girder;Installation is fixed in the concrete of the anti-fall girder apparatus through pre-manufactured hole and abutment.
General plotting of the present utility model:The pontic of steel bridge is subjected to sub-module, girder with square steel tube mainly by entering more Row combines, and is fixed between each square steel tube by bolt, be able to can be assembled without operations such as welding; And girder can split into multiple units, the building materials transport of installation in advance and the lifting of building materials are carried out, can greatly be saved Save the time of construction, the efficiency of construction improved, without large-scale auxiliary equipment, it is only necessary to using common steam crane can carry out handling and Installation.Anti-fall girder apparatus by pre-manufactured hole and girder install so that whole process is easier, more efficient.Cut-off Plate is pre-installed in inside square steel tube in workshop, is fixedly mounted in workshop by spot welding, when reaching job location, is avoided Because the reasons such as environment, landform, weather influence to caused by construction, the operating efficiency of engineering is further lifted.
Further, the distance that partition panel is installed on the every square steel tube is 2-4m.
Further, the bottom of the girder is additionally provided with stress control point.
Further, the surface of the girder is additionally provided with high-durability aqueous coating and high Al-Zn base coating.
A kind of construction method of modularization steel bridge main bridge structure, comprises the following steps:
Step 1: more square steel tubes are carried out to meet general-utility car transport cutting processing and perforate operation, and use Normal screws carry out the prepackage of partition panel, crossbeam;
Step 2: the good girder of preparatory processing is transported to job location;
Step 3: the part normal screws on the good girder of preparatory processing are substituted for into high-strength bolt, and reclaim The normal screws replaced;
Step 4: installing rubber support in advance on the bridge pier of job location, girder is then lifted using steam crane block-by-block On group to bridge pier rubber support;
Step 5: after rigging out, the plain bolt for connecting each girder is changed one by one, is replaced with high-strength bolt pair and is checked Whether tighten;
Step 6: anti-fall girder apparatus is installed in specified location, threaded rod iron concreting in specified location On, after concrete setting, locking nut is tightened, and cover protective cover;
Step 7: checking the sealing of partition panel, the position of crossbeam and shear bar is adjusted, and simultaneously in multiple partition panels Interior casting concrete;
Step 8: after concrete setting, with the gap between each main spandrel girder of fluid sealant polishing;
Step 9: installation settings assembles the guardrail and auxiliary equipment on bridge in the expansion joint at girder both ends.
Further, in the step 7 partition panel carry out concrete cast speed for 20-80 cubes per hour.
Further, the model m20 square head bolts that the high-strength bolt uses.
Further, the rubber support using benzvalene form tetrafluoroethene teflon slider bearing.
Further, square steel tube can be replaced the forms such as rectangular steel pipe, channel-section steel, H profile steel, the combination of girder in the step 1 Quantity is odd number.
The beneficial effects of the utility model:
1st, main beam structure it is simple, using modularized design, production, construction.
2nd, truss depth is small, saves space.
3rd, erected on site is without the operation such as welding.
4th, the detachable multiple units of girder, convenience in transport and lifting.
5th, it can be loaded and unloaded and be installed using common steam crane, without large-scale auxiliary equipment.
6th, it is fast to set up speed, the erection of girder, short construction period can be completed in one day.
7th, the utility model is simple in construction, and design science is reasonable, can effectively solve existing main beam structure complexity, group The engineering time length that dress is spent, complex procedures are cumbersome;The problem of being inconvenient to transport and lifting.
Brief description of the drawings
Fig. 1 is a kind of structural representation of modularization steel bridge main bridge structure middle girder;
Fig. 2 is a kind of structural representation of anti-fall girder apparatus in modularization steel bridge main bridge structure;
Fig. 3 is a kind of structural representation of modularization steel bridge main bridge structure middle cross beam;
Title and sequence number in figure:
Girder 1, expansion joint 2, anti-fall girder apparatus 3, rubber support 4, high-strength bolt 5, crossbeam 6, partition panel 7, shear bar 8.
Embodiment
The utility model is further illustrated below in conjunction with the accompanying drawings.
Embodiment 1:
As shown in Figure 1, Figure 2 and Figure 3, there is provided a kind of modularization steel bridge main bridge structure, including girder 1, expansion joint 2, subtract Shake bearing, anti-fall girder apparatus 3 and rubber support 4;The girder 1 is mainly formed by connecting by more square steel tube side-by-sides;The girder 1 Also include high-strength bolt 5, crossbeam 6 and partition panel 7;It is fixedly connected between the more square steel tubes by high-strength bolt 5;Institute Partition panel 7 is stated to be made for two small rod iron, two blocks of steel plates of connection;The partition panel 7 is filled in specified from one end of square steel tube Position, and be fixedly connected partition panel 7 and square steel tube by the connected mode of spot welding;The square steel tube is in partition panel 7 Specified location side wall be additionally provided with through hole for installing crossbeam 6;The crossbeam 6 forms for round steel pipe, and in round steel pipe On be provided with the shear bar 8 of sliding force for strengthening round steel pipe direction across bridge;The crossbeam 6 is entered more square steel tubes by through hole Row concatenation;The square steel tube is additionally provided with the plug hole for pouring into a mould concrete on the specified location top of partition panel 7;The master The square steel tube both ends bottom in two outsides is provided with beam 1 supports the use pre-manufactured hole with anti-fall girder apparatus 3;Install at the expansion joint 2 At the both ends of girder 1 Yu abutment junction;The rubber support 4 is arranged on the bottom of pre-manufactured hole in girder 1;The girder falling dress Putting 3 passes through the concrete of pre-manufactured hole and abutment that installation is fixed.
The distance that partition panel 7 is installed on the every square steel tube is 2m.
The bottom of the girder 1 is additionally provided with stress control point.
The surface of the girder 1 is additionally provided with high-durability aqueous coating and high Al-Zn base coating.
A kind of construction method of modularization steel bridge main bridge structure is proposed, is comprised the following steps:
Step 1: more square steel tubes are carried out to meet general-utility car transport cutting processing and perforate operation, and use Normal screws carry out the prepackage of partition panel 7, crossbeam 6;
Step 2: the good girder 1 of preparatory processing is transported to job location;
Step 3: the part normal screws on the good girder 1 of preparatory processing are substituted for into high-strength bolt 5, and return Receive the normal screws replaced;
Step 4: installing rubber support 4 in advance on the bridge pier of job location, girder is then lifted using steam crane block-by-block 1 group on bridge pier rubber support 4;
Step 5: after rigging out, the plain bolt for connecting each girder 1 is changed one by one, is replaced with the pair of high-strength bolt 5 and is examined Look into and whether tighten;
Step 6: anti-fall girder apparatus 3 is installed in specified location, threaded rod iron concreting in specified location On, after concrete setting, locking nut is tightened, and cover protective cover;
Step 7: check the sealing of partition panel 7, adjust the position of crossbeam 6 and shear bar 8, and simultaneously it is multiple every Casting concrete in disconnected plate 7;
Step 8: after concrete setting, with the gap between each main spandrel girder of fluid sealant polishing;
Step 9: installation settings assembles the guardrail and auxiliary equipment on bridge in the expansion joint 2 at the both ends of girder 1.
In the step 7 partition panel carry out concrete cast speed for 20 cubes per hour.
The model m20 square head bolts that the high-strength bolt uses.
The rubber support using benzvalene form tetrafluoroethene teflon slider bearing.
Square steel tube can be replaced the forms such as rectangular steel pipe, channel-section steel, H profile steel in the step 1, and the number of combinations of girder 1 is Odd number.
Embodiment 2:
As shown in Figure 1, Figure 2 and Figure 3, the present embodiment and the difference of embodiment 1 are:On the every square steel tube every The distance installed on disconnected plate 7 is 4m;The speed for carrying out concrete cast in the step 7 in partition panel is every for 80 cubes Hour.
It is pointed out that above-described embodiment is only to illustrate technical concepts and features of the present utility model, its object is to Allow person skilled in the art to understand content of the present utility model and implement according to this, it is new that this practicality can not be limited with this The protection domain of type.All equivalent change or modifications made according to the utility model Spirit Essence, it should all cover new in this practicality Within the protection domain of type.

Claims (4)

  1. A kind of 1. modularization steel bridge main bridge structure, it is characterised in that:The modularization steel bridge main bridge structure includes girder (1), expansion joint(2), anti-fall girder apparatus(3)And rubber support(4);
    The girder(1)Mainly it is formed by connecting by more square steel tube side-by-sides;The girder(1)Also include high-strength bolt(5), crossbeam (6)And partition panel(7);Pass through high-strength bolt between the more square steel tubes(5)It is fixedly connected;The partition panel(7)For Two small rod iron connects two blocks of steel plates and is made;The partition panel(7)Filled in from one end of square steel tube to specified location, and By the connected mode of spot welding by partition panel(7)It is fixedly connected with square steel tube;The square steel tube is in partition panel(7)Specify Opening position side wall is additionally provided with for installing crossbeam(6)Through hole;The crossbeam(6)Formed for round steel pipe, and in round steel pipe It is provided with the shear bar of the sliding force for strengthening round steel pipe direction across bridge(8);The crossbeam(6)By through hole by more square steel tubes Concatenated;The square steel tube is in partition panel(7)Specified location top be additionally provided with plug hole for pouring into a mould concrete;Institute State girder(1)In the square steel tube both ends bottom in two outsides be provided with and anti-fall girder apparatus(3)Support the use pre-manufactured hole;
    The expansion joint(2)Installed in girder(1)With the both ends of abutment junction;
    The rubber support(4)It is arranged on girder(1)The bottom of middle pre-manufactured hole;
    The anti-fall girder apparatus(3)Installation is fixed in concrete through pre-manufactured hole and bridge pier.
  2. 2. modularization steel bridge main bridge structure according to claim 1, it is characterised in that:Separate on the every square steel tube Plate(7)The distance of installation is 2-4m.
  3. 3. modularization steel bridge main bridge structure according to claim 1, it is characterised in that:The girder(1)Bottom also Provided with stress control point.
  4. 4. modularization steel bridge main bridge structure according to claim 1, it is characterised in that:The girder(1)Surface also Provided with high-durability aqueous coating and high Al-Zn base coating.
CN201721082859.7U 2017-08-28 2017-08-28 A kind of modularization steel bridge main bridge structure Expired - Fee Related CN207193731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721082859.7U CN207193731U (en) 2017-08-28 2017-08-28 A kind of modularization steel bridge main bridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721082859.7U CN207193731U (en) 2017-08-28 2017-08-28 A kind of modularization steel bridge main bridge structure

Publications (1)

Publication Number Publication Date
CN207193731U true CN207193731U (en) 2018-04-06

Family

ID=61795220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721082859.7U Expired - Fee Related CN207193731U (en) 2017-08-28 2017-08-28 A kind of modularization steel bridge main bridge structure

Country Status (1)

Country Link
CN (1) CN207193731U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326792A (en) * 2017-08-28 2017-11-07 周雷 A kind of modularization steel bridge main bridge structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326792A (en) * 2017-08-28 2017-11-07 周雷 A kind of modularization steel bridge main bridge structure and its construction method

Similar Documents

Publication Publication Date Title
CN102758499B (en) Precast prestressed steel girder with post-seismic restorable function
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN106760110B (en) Based on BIM profiled sheet-armored concrete hollow sandwich floor construction engineering method
CN104727227B (en) A kind of whole segmental erection method of uncovered lattice girder steel of half-through steel box tied arch bridge
CN202899015U (en) Modular highway steel truss bridge
CN206397251U (en) The steel structure platform that steel structure platform frame unit and assembling are built
CN108867310A (en) The short rib T beam bridge of pretensioning prestressed concrete and its construction method
CN108374319A (en) A kind of through tied arch bridge structural unit and arch bridge structure and its construction method
CN104131652A (en) Fabricated RPC-steel-concrete hybrid beam structure
CN106978777A (en) A kind of make-shift bridge device
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN102877411A (en) Assembled-type aluminum alloy bridge deck slab-steel girder combined structure
CN108643429B (en) But height-adjusting's assembled coincide floor
CN203684108U (en) Fully-precast assembly type reinforced concrete bridge assembling structure
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN104018427B (en) A kind of full welding case purlin combined segments method of construction
WO2023060783A1 (en) Stretchable road bridge and manufacturing and construction method therefor
CN107386246B (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN210395128U (en) Hollow core plate beam connection structure in bridge widening
CN107268417A (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN207193731U (en) A kind of modularization steel bridge main bridge structure
CN107313628A (en) A kind of basic digging-free assembled tower-type space garage and its construction method
CN107326792A (en) A kind of modularization steel bridge main bridge structure and its construction method
CN205874944U (en) Double T type wave form steel web profiled steel sheet combination beam
CN104612063A (en) Concrete box beam first-aid repair method with prefabricated part on-site assembling combination beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210811

Address after: 545000 plot a-07-2, Luowei industrial concentration zone, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Liuzhou Yuqian mechanical equipment Co.,Ltd.

Address before: 545000 plot a-07-2, Luowei industrial concentration zone, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: Zhou Lei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406