- Publication number
- CN207177133U CN207177133U CN201720869482.3U CN201720869482U CN207177133U CN 207177133 U CN207177133 U CN 207177133U CN 201720869482 U CN201720869482 U CN 201720869482U CN 207177133 U CN207177133 U CN 207177133U
- Authority
- CN
- China
- Prior art keywords
- aluminium sheet
- connecting portion
- cylindrical surface
- roller bearing
- surface high
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Gates (AREA)
Abstract
The utility model provides a kind of seamless aluminium sheet wall cylindrical surface high-altitude assembling structure, it includes some blocks of aluminium sheets, aluminium sheet is arc aluminum plate, aluminium sheet is installed on metope by connector, connector includes the first roller bearing, first roller bearing is arranged in axle sleeve, at least two first connecting portions are connected with first roller bearing, first connecting portion connects aluminium sheet simultaneously, at least two second connecting portions are also associated with first roller bearing, second connecting portion connects elastic portion simultaneously, and elastic portion is fixedly installed on metope, is attached between two adjacent aluminium sheets by receiving edge.The utility model can solve aluminium sheet in the prior art and install yielding and big adjustment difficulty technical problem.
Description
Technical field
A kind of aluminium sheet wall column SMT is the utility model is related to, in particular to a kind of seamless aluminium sheet wall cylindrical surface
High-altitude assembling structure.
Background technology
Large space aluminium sheet wall cylindrical surface has special decorative effect, in attractive in appearance, color, aberration, durable, planarization, makes
A brand-new level, overall air and the aesthetic with uniqueness are all reached in type.In exhibition center, bank, station, business
All kinds of place public domains such as field are widely used.
At present, the installation of aluminium sheet wall cylindrical surface is more using traditional aluminum facade preparation method in domestic construction decorative engineering:
Unwrapping wire, the connector of fixed skeleton, fixed skeleton, installation aluminium sheet, closing in Construction treatment, inspection.The method was installed in aluminium sheet
Whether Cheng Zhong, each block of aluminium sheet are required in facade the position at four angles of each block of aluminium sheet and same when installing fixed
Plane is corrected, if one of aluminium sheet is problematic all to have influence on follow-up aluminium sheet installation, especially the close joint aluminium sheet in curved surface
During installation, radian control is not in place will to directly affect monolithic floor surface radian.
Thus, at present, in some wall column body aluminium sheets in work progress, because aluminium sheet is processed, amplitude is larger to be caused to transport
Scene and produce certain deformation, often because buckling deformation easily occurs in piece problem in installation process, radian is not of uniform size,
High-altitude mounting and adjusting difficulty is larger.
Utility model content
In consideration of it, the utility model provides a kind of seamless aluminium sheet wall cylindrical surface high-altitude assembling structure, it is intended to solves existing skill
Aluminium sheet installs yielding and big adjustment difficulty technical problem in art.
Therefore, the utility model provides a kind of seamless aluminium sheet wall cylindrical surface high-altitude assembling structure, it includes some blocks of aluminium sheets,
Aluminium sheet is arc aluminum plate, and aluminium sheet is installed on metope by connector, and connector includes the first roller bearing, and the first roller bearing is arranged in axle
In set, at least two first connecting portions are connected with the first roller bearing, first connecting portion connects aluminium sheet, is also connected with the first roller bearing simultaneously
There are at least two second connecting portions, second connecting portion connects elastic portion simultaneously, and elastic portion is fixedly installed on metope, two adjacent aluminium
It is attached between plate by receiving edge.
Further, offer multiple grooves on above-mentioned first roller bearing, first connecting portion insertion groove, first connecting portion with
There is the first gap between the cell wall of groove, second connecting portion insertion groove, have between second connecting portion and the cell wall of groove
Second gap.
Further, above-mentioned groove is cone tank, and the end of first connecting portion and the end of second connecting portion are all taper.
Further, there is circumferential cavity between above-mentioned first roller bearing and axle sleeve, multiple second rollings are provided with cavity
Axle.
Further, Access Division, first connecting portion clamping Access Division are provided with above-mentioned aluminium sheet.
Further, above-mentioned Access Division includes two boss, and taper neck, first connecting portion clamping are provided between two boss
Taper neck.
Further, the first receipts that above-mentioned receipts edge includes being oppositely arranged unit when unit and second are received.
Further, above-mentioned first receipts side unit has the first L-shaped muscle body, and the first L-shaped muscle body connects the end of aluminium sheet, the
Two receipts side units have the second L-shaped muscle body, and the second L-shaped muscle body connects the end of aluminium sheet.
Further, above-mentioned first L-shaped muscle body has the first arc, and the free end of the first arc has the first circle
Close up, the second L-shaped muscle body has the second arc, and the free end of the second arc has the second circular closing in, and the second circle is received
Mouth is oppositely arranged with the first circular close up, and the second circular closing in is closed up with the first circle to be connected by contiguous block.
Further, above-mentioned contiguous block is wedge.
A kind of seamless aluminium sheet wall cylindrical surface high-altitude assembling structure provided by the utility model, mainly there is provided some pieces of arcs
Aluminium sheet, aluminium sheet are installed on metope by connector, and connector includes the first roller bearing, and the first roller bearing is arranged in axle sleeve, and first
At least two first connecting portions are connected with roller bearing, first connecting portion connects aluminium sheet, at least two are also associated with the first roller bearing simultaneously
Second connecting portion, second connecting portion connect elastic portion simultaneously, and elastic portion is fixedly installed on metope, lead between two adjacent aluminium sheets
Receipts edge is crossed to be attached;By above-mentioned setting, using the effect of the first roller bearing, first connecting portion and second connecting portion, effectively
Realize the adjustment of polylith arc aluminum plate in ground so that entirely docked between arc aluminum plate, while utilize the first roller bearing, first
The installation and adjustment effect of connecting portion and second connecting portion, efficiently against the problem on deformation of aluminium sheet when installing.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this area
Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to this practicality
New limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the structural representation for the seamless aluminium sheet wall cylindrical surface high-altitude assembling structure that the utility model embodiment provides;
Fig. 2 is the first roller bearing of the seamless aluminium sheet wall cylindrical surface high-altitude assembling structure that the utility model embodiment provides, first
The connection diagram of connecting portion and second connecting portion;
Fig. 3 is the enlarged drawing in A portions in Fig. 1;
Fig. 4 is the enlarged drawing in B portions in Fig. 1.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in accompanying drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Completely it is communicated to those skilled in the art.
Referring to Fig. 1 to Fig. 4, the seamless aluminium sheet wall cylindrical surface high-altitude assembling knot that the utility model embodiment provides is shown in figure
Structure.Aluminium sheet wall cylindrical surface high-altitude assembling structure that this is seamless includes some blocks of aluminium sheets 1, and aluminium sheet 1 is arc aluminum plate, and aluminium sheet 1 passes through connection
Part 3 is installed on metope 2, and connector 3 includes the first roller bearing 31, and the first roller bearing 31 is arranged in axle sleeve 32, on the first roller bearing 31
Two first connecting portions 33 (can also be more) are connected with, first connecting portion 33 connects aluminium sheet 1, gone back on the first roller bearing 31 simultaneously
Two second connecting portions 34 (can also be more) are connected with, second connecting portion 34 connects elastic portion 35 simultaneously and (is specifically as follows
Spring etc.), elastic portion 35 is fixedly installed on metope 2, is attached between two adjacent aluminium sheets 1 by receiving edge 4.
A kind of seamless aluminium sheet wall cylindrical surface high-altitude assembling structure that the present embodiment is provided, mainly there is provided some pieces of arc-shaped aluminums
Plate, aluminium sheet are installed on metope by connector, and connector includes the first roller bearing, and the first roller bearing is arranged in axle sleeve, the first rolling
At least two first connecting portions are connected with axle, first connecting portion connects aluminium sheet simultaneously, and at least two are also associated with the first roller bearing
Two connecting portions, second connecting portion connect elastic portion simultaneously, and elastic portion is fixedly installed on metope, pass through between two adjacent aluminium sheets
Edge is received to be attached;By above-mentioned setting, using the effect of the first roller bearing, first connecting portion and second connecting portion, effectively
Realize the adjustment of polylith arc aluminum plate so that entirely docked between arc aluminum plate, while connected using the first roller bearing, first
The installation and adjustment effect of socket part and second connecting portion, efficiently against the problem on deformation of aluminium sheet when installing.
Referring to Fig. 1 to Fig. 2, multiple grooves 311 are offered on the first roller bearing 31, first connecting portion 33 inserts groove 311, the
There is the first gap 331, second connecting portion 34 inserts groove 311, the second connection between one connecting portion 33 and the cell wall of groove 311
There is the second gap 341 between the cell wall of portion 34 and groove 311., can be with shape using the setting in gap by the setting of the structure
Stroke into the first roller bearing circumference, and position-limiting action is formed, ensure steadiness of the overall structure in adjustment.And in order that
Structure is more firm, also make it that Adjustment precision is higher, and groove 311 is cone tank, the end of first connecting portion 33 and the second connection
The end in portion 34 is all taper, utilizes the effect of taper so that aluminium sheet ensures the balance at both ends in adjustment, when ensureing adjustment
Arc aluminum plate will not influence integrated regulation precision because both ends are uneven.
With continued reference to Fig. 1 to Fig. 2, there is circumferential cavity 36 between the first roller bearing 31 and axle sleeve 32, set in cavity 36
There are multiple second roller bearings 361.Pass through the setting of the structure, it is ensured that the smoothness that the first roller bearing rolls.
Referring to Fig. 1 and Fig. 4, Access Division 11, the clamping Access Division 11 of first connecting portion 33 are provided with aluminium sheet 1;Access Division 11
Including two boss 12, taper neck 13, the clamping taper neck 13 of first connecting portion 33 are provided between two boss 12.Pass through the knot
The setting of structure, it is ensured that the steadiness of aluminium sheet installation, while utilize the structure of boss, it is also ensured that the balance at aluminium sheet both ends
Property, ensure the precision adjusted.
Referring to Fig. 1 and Fig. 3, first receipts unit 42 when unit 41 and second is received that edge 4 includes being oppositely arranged is received;First
Receiving side unit 41 has the first L-shaped muscle body 411, and the first L-shaped muscle body 411 connects the end of aluminium sheet 1, and the second receipts side unit 42 has
Second L-shaped muscle body 421, the second L-shaped muscle body 421 connect the end of aluminium sheet 1;First L-shaped muscle body 411 has the first arc 412,
The free end of first arc 412 have first it is circular close up 413, the second L-shaped muscle body 421 has the second arc 422, second
The free end of arc 422 has the second circle closing in 423, and the second circular closing in 423 is set relatively with the first circular closing in 413
Put, the second circular closing in 423 is connected with the first circular closing in 413 by contiguous block 5;Contiguous block 5 is wedge.Pass through above-mentioned knot
The setting of structure, the special construction for receiving edge can be utilized so that piece is reduced, and utilizes the effect of arc so that
The overall structure of aluminium sheet is more firm.
Obviously, those skilled in the art can carry out various changes and modification without departing from this practicality to the utility model
New spirit and scope.So, if these modifications and variations of the present utility model belong to the utility model claims and
Within the scope of its equivalent technologies, then the utility model is also intended to comprising including these changes and modification.
Claims (10)
1. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure, it is characterised in that including some pieces of aluminium sheets (1), the aluminium sheet (1) is arc
Shape aluminium sheet, the aluminium sheet (1) are installed on metope (2) by connector (3), and the connector (3) includes the first roller bearing (31),
First roller bearing (31) is arranged in axle sleeve (32), and at least two first connecting portions are connected with first roller bearing (31)
(33), the first connecting portion (33) while the aluminium sheet (1) is connected, at least two is also associated with first roller bearing (31)
Two connecting portions (34), the second connecting portion (34) while connect elastic portion (35), and the elastic portion (35) is fixedly installed in institute
State on metope (2), be attached between adjacent two aluminium sheets (1) by receiving edge (4).
2. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure according to claim 1, it is characterised in that first roller bearing
(31) multiple grooves (311) are offered on, the first connecting portion (33) inserts the groove (311), the first connecting portion
(33) there are the first gap (331) between the cell wall of the groove (311), the second connecting portion (34) inserts the groove
(311), there are the second gap (341) between the second connecting portion (34) and the cell wall of the groove (311).
3. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure according to claim 2, it is characterised in that the groove (311)
For cone tank, the end of the first connecting portion (33) and the end of the second connecting portion (34) are all taper.
4. according to any described seamless aluminium sheet wall cylindrical surface high-altitude assembling structures of claim 1-3, it is characterised in that described first
There is circumferential cavity (36) between roller bearing (31) and the axle sleeve (32), multiple second roller bearings are provided with the cavity (36)
(361)。
5. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure according to claim 1, it is characterised in that on the aluminium sheet (1)
It is provided with Access Division (11), Access Division (11) described in first connecting portion (33) clamping.
6. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure according to claim 5, it is characterised in that the Access Division (11)
Including two boss (12), taper neck (13), first connecting portion (33) the clamping institute are provided between two boss (12)
State taper neck (13).
7. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure according to claim 1, it is characterised in that the receipts edge (4)
First including being oppositely arranged receives the unit (42) when unit (41) and second are received.
8. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure according to claim 7, it is characterised in that described first receives side list
First (41) have the first L-shaped muscle body (411), the end of the first L-shaped muscle body (411) connection aluminium sheet (1), and described second
Receiving side unit (42) has the second L-shaped muscle body (421), and the second L-shaped muscle body (421) connects the end of the aluminium sheet (1).
9. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure according to claim 8, it is characterised in that the first L-shaped muscle
Body (411) has the first arc (412), and the free end of first arc (412) has the first circular closing in (413),
The second L-shaped muscle body (421) has the second arc (422), and the free end of second arc (422) has the second circle
Shape is closed up (423), and the described second circular close up (423) are oppositely arranged with the described first circular close up (413), and described second is circular
Closing in (423) is connected with the described first circular close up (413) by contiguous block (5).
10. seamless aluminium sheet wall cylindrical surface high-altitude assembling structure according to claim 9, it is characterised in that the contiguous block (5)
For wedge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720869482.3U CN207177133U (en) | 2017-07-18 | 2017-07-18 | Seamless aluminium sheet wall cylindrical surface high-altitude assembling structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720869482.3U CN207177133U (en) | 2017-07-18 | 2017-07-18 | Seamless aluminium sheet wall cylindrical surface high-altitude assembling structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207177133U true CN207177133U (en) | 2018-04-03 |
Family
ID=61736975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720869482.3U Active CN207177133U (en) | 2017-07-18 | 2017-07-18 | Seamless aluminium sheet wall cylindrical surface high-altitude assembling structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207177133U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268911A (en) * | 2017-07-18 | 2017-10-20 | 苏州美瑞德建筑装饰有限公司 | Seamless aluminium sheet wall cylindrical surface high-altitude assembling structure |
-
2017
- 2017-07-18 CN CN201720869482.3U patent/CN207177133U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268911A (en) * | 2017-07-18 | 2017-10-20 | 苏州美瑞德建筑装饰有限公司 | Seamless aluminium sheet wall cylindrical surface high-altitude assembling structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207177133U (en) | Seamless aluminium sheet wall cylindrical surface high-altitude assembling structure | |
CN107268911A (en) | Seamless aluminium sheet wall cylindrical surface high-altitude assembling structure | |
CN205775317U (en) | A kind of overlength guide roller structure | |
CN210563113U (en) | Rectangular stone dry-hanging installation structure based on cylindrical base layer | |
CN206512859U (en) | A kind of prefabricated buildings wall panel assembly | |
CN206286363U (en) | A kind of section bar rolls circular arc clamp | |
CN202045132U (en) | Mill roller for pipe welding rolling mill | |
CN210947284U (en) | Leveling support member for assembly type keel partition wall ground | |
CN208545949U (en) | A kind of all steel frame of portable fast and easy assembly | |
CN204664152U (en) | Adjustable bearing | |
CN206530019U (en) | A kind of trellis system | |
CN207812910U (en) | Indoor large space curved surface wood facing moulding mounting structure | |
CN206344505U (en) | A kind of green technology for making paper technology embossing rubber roll | |
CN204239463U (en) | A kind of external aligning bearing being convenient to install | |
CN206694449U (en) | A kind of main shaft connection structure being used in flat single-shaft tracking system | |
CN105952085B (en) | Large space cylinder wood facing piece structure | |
CN204866914U (en) | Evener | |
CN206903243U (en) | A kind of composite steel sleeve frame keel partition wall mounting structure | |
CN206693446U (en) | A kind of curtain wall structure of sports dancing training | |
CN204664144U (en) | A kind of adjustable bearing | |
CN106149931B (en) | Combined type is without shadow frame curtain wall installing structure | |
CN106853501A (en) | Pivoted arm supporting and regulating device | |
CN203711482U (en) | Driving roller structure with driving roller flat head and shaft sleeve sectional type matching | |
CN213733986U (en) | Printing roller for chromatography printing of aluminum plate | |
CN207541411U (en) | A kind of printer used in copy machines electrification development roller assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |