CN207176764U - End head formwork fixes rubber water-proof band structure - Google Patents

End head formwork fixes rubber water-proof band structure Download PDF

Info

Publication number
CN207176764U
CN207176764U CN201721124295.9U CN201721124295U CN207176764U CN 207176764 U CN207176764 U CN 207176764U CN 201721124295 U CN201721124295 U CN 201721124295U CN 207176764 U CN207176764 U CN 207176764U
Authority
CN
China
Prior art keywords
cope plate
reinforcing bars
end head
lower template
head formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721124295.9U
Other languages
Chinese (zh)
Inventor
梁红彦
张振东
林自明
王福至
杨启升
曹承伟
马悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHUZONG GROUP Co Ltd
Original Assignee
BEIJING ZHUZONG GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHUZONG GROUP Co Ltd filed Critical BEIJING ZHUZONG GROUP Co Ltd
Priority to CN201721124295.9U priority Critical patent/CN207176764U/en
Application granted granted Critical
Publication of CN207176764U publication Critical patent/CN207176764U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of end head formwork to fix rubber water-proof band structure, including multiple first reinforcing bars and small cushion block, the same side of multiple first reinforcing bars is installed with two the second reinforcing bars be arrangeding in parallel, the same side of two the second reinforcing bars is equidistantly installed with multiple 3rd reinforcing bars, three the 3rd reinforcing bars in multiple 3rd reinforcing bars of the same side are installed with same stirrup, the side of stirrup is provided with cope plate and the lower template positioned at cope plate side, the side of cope plate and lower template away from the second reinforcing bar is provided with same double vertical rods, and the side of double vertical rods is installed with two end head formworks be arrangeding in parallel between cope plate and lower template respectively.Not only fixed form is simple for rubber fastening band in the utility model, and operating efficiency is high, can also avoid misplacing when carrying out concreting, all parts are common in addition so that cost is low.

Description

End head formwork fixes rubber water-proof band structure
Technical field
It the utility model is related to a kind of end head formwork and fix rubber water-proof band structure, belong to construction engineering technical field.
Background technology
As Development of China's Urbanization quickly promotes, high buildings and large mansions stack the development for having driven urban construction, urban construction Development be unable to do without the construction of the municipal pipeline such as city water, heating power, combustion gas, plumbing, communication, electric power, these municipal pipelines The traditional form of construction work of construction be broken road direct burial, this causes urban road constantly to excavate, and can cause subterranean resource surely Waste and there can be certain influence to underground primary tube line in digging process;Second, the excavation of large area can influence urban road friendship It is logical, in turn result in traffic congestion;Third, the life-span of direct-buried pipeline is shorter, need to change after a period of time.It follows that city Underground utilities laying turns into one of the problem of urban construction and development is urgently to be resolved.Therefore, underground pipe gallery is as collection middle berth If the public tunnel of the municipal pipelines such as electric power, communication, feedwater, draining, heating power, combustion gas, it is to be dedicated for various pipelines from now on The tunnel of " walking ", it is referred to as the pipe gallery of " road slide fastener terminator ", the main artery of following smart city.Urban Underground is comprehensive It is one of urban construction modernization, technicalization, intensive important symbol to close piping lane, and urban public pipeline construction synthesis Change, the new development trend of gallery.Compared with conventional line is laid, underground pipe gallery has the following advantages:One be that of avoiding by Road is excavated everywhere in laying and repairing underground utilities, is impacted and is disturbed to traffic and resident trip;Two are reduction of road The maintenance cost with utilities pipeline is reprocessed in face, adds the durability of utilities pipeline;Three layings for being easy for various utilities pipelines, Set up, repair and manage concentratedly;Fourth, being effectively utilized the space of Urban Underground, urban land has been saved;Fifth, underground integrates Piping lane lasts a long time, general up to more than 50 years, or even what is had can reach century-old engineering.And pushing away with BIM application technologies Extensively, integrated by each professional BIM moulds shape, import in Navisworks softwares and carry out collision detection, according to collision detection knot Fruit is adjusted, it is ensured that the feasibility and reasonability of pipeline and can be directed to pipeline arrange complex region carry out it is excellent Change, it is ensured that optimal layout scheme, and each pipeline intuitively can be carried out very by 3D displayings by the visual design.Many institute's weeks Know, waterproof is heavy heavy in the process of construction of underground pipe gallery, and underground pipe gallery movement joint, construction joint and subsiding crack The problems such as construction in detailed problem, for the fixed form of traditional movement joint, domestic construction engineering field closure frame at present Malformation seam position waterstop uses destructive fixed form more, that is, penetrates rubber fastening band and be fixed on template or structure reinforcing bars On, or be directly fixedly clamped rubber fastening band with template or flitch.
Easily there is the phenomenon for misplacing and coming off in fixed form used by existing rubber fastening band, and cost is higher.
Utility model content
In view of the deficienciess of the prior art, the utility model purpose, which is to provide end head formwork, fixes rubber fastening band knot Structure, to solve the problems mentioned in the above background technology, the utility model are easy to use, easy to operation, and stability is good, reliability It is high.
To achieve these goals, the utility model provides a kind of end head formwork and fixes rubber water-proof band structure, including more Individual first reinforcing bar and small cushion block, the same sides of multiple first reinforcing bars are installed with two the second reinforcing bars be arrangeding in parallel, two The same side of second reinforcing bar is equidistantly installed with multiple 3rd reinforcing bars, three in multiple 3rd reinforcing bars of the same side 3rd reinforcing bar is installed with same stirrup, and the side of stirrup is provided with cope plate and the lower template positioned at cope plate side, on The side of template and lower template away from the second reinforcing bar is provided with same double vertical rods, and the side of double vertical rods respectively with cope plate and under Two end head formworks be arrangeding in parallel are installed between template, respectively on cope plate and lower template termination mould Plate is provided with same U-shaped card, and an end head formwork on cope plate and lower template is fixedly mounted by U-shaped card respectively In double vertical rods, rubber fastening band is installed between cope plate and lower template, one end of rubber fastening band is fixed by small cushion block On first reinforcing bar, and rubber fastening band and corresponding end head formwork are in contact.
In one embodiment, multiple 4th reinforcing bars are also installed with the stirrup, and multiple 4th reinforcing bars are respectively positioned on Between two adjacent the second reinforcing bars.
In one embodiment, the cope plate and lower template are on same facade, and cope plate and lower template are mutually leaned on Near side is arranged to angled section and forms a through hole, and the side wall and rubber fastening band of through hole are in close contact.
In one embodiment, Screw arbor with nut at both-ends is equipped with the cope plate and lower template, and cope plate and lower template are logical Cross corresponding Screw arbor with nut at both-ends with double vertical rods to be connected, butterfly card is also equipped with Screw arbor with nut at both-ends, and Screw arbor with nut at both-ends is blocked by butterfly It is fixedly installed in double vertical rods, two Screw arbor with nut at both-ends mutually weld with corresponding 3rd reinforcing bar or the 4th reinforcing bar respectively.
In one embodiment, an end head formwork side close to each other respectively on cope plate and lower template is opened Provided with deep-slotted chip breaker, and two deep-slotted chip breakers collectively form an annulus standing groove, and the inside of annulus standing groove, which is placed with, is arranged on rubber Hollow ring on glue waterstop.
In one embodiment, multiple first reinforcing bars equidistantly be arranged in parallel.
The beneficial effects of the utility model:Pass through cope plate, lower template, stirrup, double vertical rods, Screw arbor with nut at both-ends, butterfly card and U Shape card is engaged, and Screw arbor with nut at both-ends is welded on corresponding 3rd reinforcing bar or the 4th reinforcing bar, and two Screw arbor with nut at both-ends pass through butterfly Cope plate or lower template can be fixed in double vertical rods by card, and U-shaped card can be to the termination mould on cope plate or lower template Plate is locked, and rubber fastening band is fixed the two end head formworks so that the fixed form of rubber fastening band is simple, separately Outer above all parts are common, and then cost is low, and two deep-slotted chip breaker institutes are placed on by the hollow ring on rubber water-proof band In the annulus standing groove of composition, rubber fastening band avoids to misplace when carrying out concreting, in the utility model Not only fixed form is simple for rubber fastening band so that operating efficiency is high, can also avoid that mistake occurs when carrying out concreting Position, all parts are common in addition so that cost is low.
Brief description of the drawings
By reading the detailed description made with reference to the following drawings to non-limiting example, other spies of the present utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is the structural representation that the utility model end head formwork fixes rubber water-proof band structure;
Fig. 2 is the mounting structure signal that the utility model end head formwork fixes rubber fastening band in rubber water-proof band structure Figure;
Fig. 3 is that the mounting structure of rubber fastening band in the utility model end head formwork fixation rubber water-proof band structure is locally put Big figure;
Fig. 4 is the structural representation that the utility model end head formwork fixes stirrup in rubber water-proof band structure;
In figure:1- rubber fastening bands, 2- cope plates, 3- lower templates, 4- end head formworks, 5- double vertical rod, 6- Screw arbor with nut at both-ends, 7- U-shaped card, the reinforcing bars of 8- first, 9- butterflies card, 10- stirrups, 11- small cushion blocks, the reinforcing bars of 12- the 3rd, the reinforcing bars of 13- second, the steel of 14- the 4th Muscle.
Embodiment
Before describing the embodiments in more detail, it should be understood that the utility model is not limited in the application hereafter or accompanying drawing Described in detailed construction or arrangement of elements.The utility model can be the embodiment that other manner is realized.Moreover, it should manage Solution, wording used herein and term are solely for describing purposes, should not the explanation of being construed as limiting property." bag used herein Include ", "comprising", the similar wording such as " having " meant comprising items listed thereafter, its equivalent and other additional things.It is special It is not that, when describing " certain element ", the utility model does not limit the quantity of the element as one, can also include more It is individual.
Fig. 1-Fig. 4 is referred to, the utility model provides a kind of technical scheme:End head formwork fixes rubber water-proof band structure, Including multiple first reinforcing bars 8 and small cushion block 11, the same sides of multiple first reinforcing bars 8 be installed with two be arranged in parallel second Reinforcing bar 13, the same side of two the second reinforcing bars 13 is equidistantly installed with multiple 3rd reinforcing bars 12, positioned at the multiple of the same side Three the 3rd reinforcing bars 12 in 3rd reinforcing bar 12 are installed with same stirrup 10, and the side of stirrup 10 is provided with the He of cope plate 2 The side of lower template 3 positioned at the side of cope plate 2, cope plate 2 and lower template 3 away from the second reinforcing bar 13 is provided with same double vertical Bar 5, and the side of double vertical rods 5 is installed with two end head formworks be arrangeding in parallel between cope plate 2 and lower template 3 respectively 4, on cope plate 2 and lower template 3 a end head formwork 4 is provided with same U-shaped card 7 respectively, and is located at upper mould respectively An end head formwork 4 on plate 2 and lower template 3 is fixedly mounted in double vertical rods 5 by U-shaped card 7, cope plate 2 and lower template 3 it Between be installed with rubber fastening band 1, one end of rubber fastening band 1 is fixed on first reinforcing bar 8 and extended by small cushion block 11 To stirrup 10, and rubber fastening band 1 and corresponding end head formwork 4 are in contact, and multiple four are also installed with stirrup 10 Reinforcing bar 14, and multiple 4th reinforcing bars 14 are respectively positioned between two adjacent the second reinforcing bars 13, cope plate 2 and lower template 3 are in same On one facade, and cope plate 2 and the side close to each other of lower template 3 are arranged to angled section and form a through hole, through hole Side wall and rubber fastening band 1 are in close contact, and now the gradient corresponding to the angled section of cope plate 2 and lower template 3 is set For 15 °, be equipped with Screw arbor with nut at both-ends 6 on cope plate 2 and lower template 3, and cope plate 2 and lower template 3 by corresponding to drawing Screw rod 6 is connected with double vertical rods 5, butterfly card 9 is also equipped with Screw arbor with nut at both-ends 6, and Screw arbor with nut at both-ends 6 is fixed by butterfly card 9 and pacified Loaded in double vertical rods 5, two Screw arbor with nut at both-ends 6 weld with corresponding 3rd reinforcing bar 12 or the phase of the 4th reinforcing bar 14 respectively, are located at respectively A side close to each other of end head formwork 4 on cope plate 2 and lower template 3 offers deep-slotted chip breaker, and two deep-slotted chip breakers are total to With an annulus standing groove is formed, the inside of annulus standing groove is placed with the hollow ring being arranged on rubber fastening band 1, multiple First reinforcing bar 8 equidistantly be arranged in parallel, passes through cope plate 2, lower template 3, stirrup 10, double vertical rods 5, Screw arbor with nut at both-ends 6, butterfly card 9 It is engaged with U-shaped card 7, and Screw arbor with nut at both-ends 6 is welded on corresponding 3rd reinforcing bar 12 or the 4th reinforcing bar 14, two Screw arbor with nut at both-ends 6 can be fixed on cope plate 2 or lower template 3 in double vertical rods 5 by butterfly card 9, U-shaped card 7 can to cope plate 2 or under End head formwork 4 in template 3 is locked, and rubber fastening band 1 is fixed the two end head formworks 4 so that rubber water-proof Simple with 1 fixed form, above all parts are common in addition, and then cost is low, pass through the open circles on rubber fastening band 1 Ring is placed in the annulus standing groove that two deep-slotted chip breakers are formed, and rubber fastening band 1 avoids the hair when carrying out concreting Raw to misplace, not only fixed form is simple for the rubber fastening band 1 in the utility model so that operating efficiency is high, can also avoid Misplace during concreting, all parts are common in addition so that cost is low.
This end head formwork is fixed rubber water-proof band structure and constructed according to the following steps:
S1:First to pre-buried first reinforcing bar 8 of bottom plate and side wall, the second reinforcing bar 13, the 3rd reinforcing bar 12 and the 4th reinforcing bar 14 Carry out colligation;
S2:Side wall external mold is installed, side wall external mold includes cope plate 2 and lower template 3 so that cope plate 2 and lower template 3 are in In same vertical elevation, the junction docking smooth-going of cope plate 2 and lower template 3, there is faulting of slab ends after preventing concreting;
S3:In workbench over-assemble cope plate 2 and lower template 3, template 2, lower template 3 and end head formwork 4 is set to form one Individual entirety;
S4:Take interim fixation that lower template 3 to be installed, the seam crossings of adjacent two pieces of side wall external molds is with two-sided Glue sticking, ensure good seal, spillage when preventing casting concrete;
S5:Rubber fastening band 1 is installed, the inner side of rubber fastening band 1 is located at the centre position of stirrup 10, rubber fastening band 1 On hollow ring be placed in annulus standing groove;
S6:Cope plate 2 is installed, because the hollow ring of rubber fastening band 1 is located in annulus standing groove, cope plate 2 and end Head mould plate 4 aligns;
S7:U-shaped card 7 is installed, U-shaped card 7 allows cope plate 2 and lower template 3 by the clamping of rubber fastening band 1;
S8:The double vertical rods 5 of installation and Screw arbor with nut at both-ends 6, the inner side of split bolt 6 be welded to corresponding to the 3rd reinforcing bar 12 or the On four reinforcing bars 14, the outside of split bolt 6 is fixed in double vertical rods 5 using butterfly card 9, is twisted inside and outside Screw arbor with nut at both-ends 6 Tight screw, clamping side wall external mold, end head formwork 4 and double vertical rods 5, clamping process should can not be carried out several times disposably in place, be pressed from both sides It is tight to adjust side wall template simultaneously, ensure two pieces of side wall templates in same facade;
S9:One end of rubber fastening band 1 is effectively fixed by stirrup 10 and two pieces of small cushion blocks 11, wherein the energy of stirrup 10 Enough effectively protection rubber fastening bands 1 are in the range of stirrup 10, second, rubber fastening band 1 is by padding two pieces of small cushion blocks 11 so that The morning of rubber fastening band 1 fix it is more firm, in this work progress first by the both ends of rubber fastening band 1 slightly tilt and with it is right Then the hollow ring answered is poured on the bottom plate on the one side of rubber fastening band 11 into 15 ° of horizontal sextant angles, treats concreting to rubber Glue waterstop 1 is filled Bituminous hemp fiber close to after half below rubber fastening band 1, then by the another of rubber fastening band 1 While fix, then by the remainder of rubber fastening band 1 pour to bottom plate second half in, finally by Bituminous hemp fiber fill to In the upper groove of rubber fastening band 1.
Concepts described herein may be embodied to other forms in the case of without departing from its spirit and characteristic.It is disclosed Specific embodiment should be considered as exemplary rather than restricted.Therefore, the scope of the utility model is by appended right It is required that rather than it is determined according to these descriptions before.It is any in the letter of claim and equivalency range The scope of these claims should all be belonged to by changing.

Claims (6)

1. end head formwork fixes rubber water-proof band structure, it is characterised in that including multiple first reinforcing bars and small cushion block, multiple first The same side of reinforcing bar is installed with two the second reinforcing bars be arrangeding in parallel, and the same side of two the second reinforcing bars is equidistantly fixed to pacify Equipped with multiple 3rd reinforcing bars, three the 3rd reinforcing bars in multiple 3rd reinforcing bars of the same side are installed with same hoop Muscle, the side of stirrup are provided with cope plate and the lower template positioned at cope plate side, and cope plate and lower template are away from the second reinforcing bar Side is provided with same double vertical rods, and the side of double vertical rods be installed with respectively between cope plate and lower template two it is parallel The end head formwork of setting, on cope plate and lower template a end head formwork is provided with same U-shaped card respectively, and distinguishes An end head formwork on cope plate and lower template is fixedly mounted in double vertical rods by U-shaped card, cope plate and lower template Between be installed with rubber fastening band, one end of rubber fastening band is fixed on first reinforcing bar by small cushion block, and rubber stops Water band and corresponding end head formwork are in contact.
2. end head formwork according to claim 1 fixes rubber water-proof band structure, it is characterised in that also solid on the stirrup Dingan County is equipped with multiple 4th reinforcing bars, and multiple 4th reinforcing bars are respectively positioned between two adjacent the second reinforcing bars.
3. end head formwork according to claim 1 fixes rubber water-proof band structure, it is characterised in that the cope plate is with Template is on same facade, and cope plate and lower template side close to each other be arranged to angled section and form one it is logical Hole, the side wall and rubber fastening band of through hole are in close contact.
4. end head formwork according to claim 1 fixes rubber water-proof band structure, it is characterised in that the cope plate is with Screw arbor with nut at both-ends is equipped with template, and cope plate is connected with lower template by corresponding Screw arbor with nut at both-ends with double vertical rods, to drawing Butterfly card is also equipped with screw rod, and Screw arbor with nut at both-ends is fixedly installed in double vertical rods by butterfly card, two Screw arbor with nut at both-ends difference Mutually welded with corresponding 3rd reinforcing bar or the 4th reinforcing bar.
5. end head formwork according to claim 1 fixes rubber water-proof band structure, it is characterised in that respectively positioned at cope plate Deep-slotted chip breaker is offered with an end head formwork side close to each other in lower template, and two deep-slotted chip breakers collectively form one Annulus standing groove, the inside of annulus standing groove are placed with the hollow ring being arranged on rubber water-proof band.
6. end head formwork according to claim 1 fixes rubber water-proof band structure, it is characterised in that multiple first reinforcing bars etc. Spacing be arranged in parallel.
CN201721124295.9U 2017-09-04 2017-09-04 End head formwork fixes rubber water-proof band structure Active CN207176764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721124295.9U CN207176764U (en) 2017-09-04 2017-09-04 End head formwork fixes rubber water-proof band structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721124295.9U CN207176764U (en) 2017-09-04 2017-09-04 End head formwork fixes rubber water-proof band structure

Publications (1)

Publication Number Publication Date
CN207176764U true CN207176764U (en) 2018-04-03

Family

ID=61742392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721124295.9U Active CN207176764U (en) 2017-09-04 2017-09-04 End head formwork fixes rubber water-proof band structure

Country Status (1)

Country Link
CN (1) CN207176764U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503382A (en) * 2017-09-04 2017-12-22 北京住总集团有限责任公司 End head formwork fixes rubber water-proof band structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503382A (en) * 2017-09-04 2017-12-22 北京住总集团有限责任公司 End head formwork fixes rubber water-proof band structure and its construction method

Similar Documents

Publication Publication Date Title
CN107503382A (en) End head formwork fixes rubber water-proof band structure and its construction method
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN106854873B (en) Engineering method of prefabricated spliced open caisson type parking garage and parking garage
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN206376276U (en) A kind of prefabricated pipe gallery
WO2016058275A1 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall thereof and manufacturing method thereof
CN203729322U (en) Precast concrete pipeline foundation
CN205530344U (en) Utility tunnel is pour to split type no mould
CN105971007A (en) Split type non-formwork pouring underground comprehensive pipe gallery
CN107806101A (en) Construction method of the bar shaped foundation ditch cast-in-place concrete to the prefabricated linking beam of support
CN207176764U (en) End head formwork fixes rubber water-proof band structure
CN106245654A (en) Deposited reinforced concrete pile exempts from inter-pile soil excavation construction method
CN105065040B (en) A kind of prefabricated underground space tunneling construction method of top plate
CN105041348B (en) A kind of underground space tunneling construction method of use compound roof
CN106245688A (en) A kind of prevention basement water leakage of floor constructing structure and construction technology thereof
CN106400838B (en) A kind of city integrated Pipe rack of prefabricated assembled concrete and construction method
CN206279561U (en) A kind of poured band of outer wall of basement prefab-form system
CN208346838U (en) Viaduct beam bridge pier structure and grade separation bridge above subway
CN207846471U (en) Partly inverse for road tunnel makees underground structure
CN106368211B (en) Rectangular concrete pile for building piping lane side wall
CN110080292A (en) A kind of assembled integral vault is greatly across no column underground structure
CN104727275B (en) Method for application of concrete work expansion joint vertical water sealing structure fixing element
CN204781426U (en) Joint node structure on prefabricated coincide wall of underground structure and floor
CN211646467U (en) Transverse pipeline fixing device under transverse structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant