CN207176725U - A kind of pump foundation secondary grout layer anti-drop structure - Google Patents

A kind of pump foundation secondary grout layer anti-drop structure Download PDF

Info

Publication number
CN207176725U
CN207176725U CN201720900790.8U CN201720900790U CN207176725U CN 207176725 U CN207176725 U CN 207176725U CN 201720900790 U CN201720900790 U CN 201720900790U CN 207176725 U CN207176725 U CN 207176725U
Authority
CN
China
Prior art keywords
pump
secondary grout
grout layer
once
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720900790.8U
Other languages
Chinese (zh)
Inventor
吴海军
王列
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Petrochemical Engineering Co Ltd
Original Assignee
Wuhan Petrochemical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Petrochemical Engineering Co Ltd filed Critical Wuhan Petrochemical Engineering Co Ltd
Priority to CN201720900790.8U priority Critical patent/CN207176725U/en
Application granted granted Critical
Publication of CN207176725U publication Critical patent/CN207176725U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

It the utility model is related to petrochemical industry console mode centrifugal pump basic field, and in particular to a kind of pump foundation secondary grout layer anti-drop structure, it is sequentially provided with from the bottom to top once pours pump foundation, secondary grout layer and the centrifugal pump bottom plate for disposing centrifugal pump body;Described once to pour the default reinforcing bar for being provided between pump foundation and secondary grout layer and being used for reinforcement connection, default reinforcing bar one end embedment is once poured below pump foundation top surface, and the other end stretches out once pouring pump foundation top surface and is embedded in the secondary grout layer;The centrifugal pump bottom plate is used for once pouring pump foundation leveling, and the centrifugal pump body bottom portion is fastened on secondary grout layer by connector through centrifugal pump bottom plate.The utility model can prevent final grouting layer from coming off, and ensure the operation of centrifugal pump superstructure.

Description

A kind of pump foundation secondary grout layer anti-drop structure
Technical field
It the utility model is related to petrochemical industry console mode centrifugal pump basic field, and in particular to a kind of pump foundation back-grouting Layer anti-drop structure.
Background technology
Console mode centrifugal pump once pours as the common refining equipment in petroleum chemical industry, general take in its basis Shaping, reserves anchor (bolt) hole and screed-coat uses the form of construction work of final grouting.
Specification《Petrochemical industry console mode centrifugal pump foundation design code》(SH/T 3057-2007)5.1 regulations:Basis The final grouting layer of top surface, thickness are preferably 30mm ~ 50mm, and material preferably uses high strength and no shrinting back-grouting material.In China's oil The High Strength Non-shrinking Filling Material that the general all code requirement of console mode centrifugation pump foundation final grouting layer is recommended in chemical industry, thickness For 30mm ~ 50mm.Final grouting is carried out using this mode and pours basis, can meet that centrifugal pump is wanted for basic flatness Ask.The form of construction work of final grouting has the characteristics of construction is simple, easy to operate, short construction period.But because centrifugal pump is grown The vibrations of phase so that this final grouting layer will come off in about 2 years ~ 3 years pump operation later stage of centrifugation, final grouting layer and basis Often occur that entirety comes off, so as to influence the operation of centrifugal pump superstructure.Such as:Wuhan Branch Company SINOPEC device Newly-built dredge pump, this pump put into operation in July, 2014, but the pump foundation final grouting layer of in August, 2016 integrally comes off, and makes Into dredge pump bottom plate lower floor, pump operation safety is influenceed.
The content of the invention
The purpose of this utility model is the drawbacks described above for prior art, there is provided a kind of pump foundation secondary grout layer is prevented Dropping structure, prevent final grouting layer from coming off, ensure the operation of centrifugal pump superstructure.
To solve above technical problem, the technical solution of the utility model is:A kind of pump foundation secondary grout layer anti-dropout Structure, its difference are:It is sequentially provided with from the bottom to top once pours pump foundation, secondary grout layer and is centrifuged for disposing The centrifugal pump bottom plate of pump body;It is described once to pour the default steel for being provided between pump foundation and secondary grout layer and being used for strengthening connection Muscle, default reinforcing bar one end embedment are once poured below pump foundation top surface, and it is embedding that the other end stretches out once pouring pump foundation top surface Enter the secondary grout layer;The centrifugal pump bottom plate is used for once pouring pump foundation leveling, and the centrifugal pump body bottom portion leads to Connector is crossed to be fastened on secondary grout layer through centrifugal pump bottom plate.
By above technical scheme, the pump foundation top surface that once pours is handled using dabbing.
By above technical scheme, the default reinforcing bar uses HPB300 level reinforcing bars, a diameter of 5 ~ 7mm, and length is 160 ~ 200mm。
By above technical scheme, the default bar diameter is 6mm, length 180mm.
By above technical scheme, the default reinforcing bar presses spacing 350 ~ 450mm arranged in squares.
By above technical scheme, the default reinforcing bar presses spacing 400mm arranged in squares.
By above technical scheme, 140 ~ 160mm below the top surface of layer basis is once poured in default reinforcing bar one end embedment, separately One end, which is stretched out, once pours layer basis 20 ~ 40mm of top surface.
By above technical scheme, 150mm below the top surface of layer basis, the other end are once poured in default reinforcing bar one end embedment Stretch out and once pour layer basis top surface 30mm.
By above technical scheme, the secondary grout layer uses high strength and no shrinting grouting material to pour thickness as 30 ~ 50mm.
By above technical scheme, its intensity of the secondary grout layer is:It is not less than within 1 day 20MPa, is not less than 40MPa within 3 days, It is not less than 50MPa within 28 days.
Prior art is contrasted, beneficial features of the present utility model are:The utility model can meet simultaneously centrifugal pump for The requirement of basic top surface flatness, while can prevent that phase final grouting layer comes off after operation;A kind of pump of the present utility model There is easy for construction, material to be easily obtained basic secondary grout layer anti-drop structure and its pouring technology, low cost, short time limit Feature.
Brief description of the drawings
Fig. 1 is the pump foundation back-grouting structure sheaf diagrammatic cross-section of the utility model embodiment.
Fig. 2 is the pump foundation secondary grout layer structural plan schematic diagram of the utility model embodiment.
Fig. 3 is prior art pump foundation secondary grout layer structural profile illustration.
Fig. 4 is prior art pump foundation secondary grout layer structural plan schematic diagram.
Wherein:1- once pours pump foundation, 2- connectors, 3- centrifugal pumps body, 4- centrifugal pumps bottom plate, 5- back-groutings Layer, 6- once pour pump foundation top surface, 7- presets reinforcing bar.
Embodiment
The utility model is described in further detail below by embodiment combination the drawings and specific embodiments.
With reference to figure 1 and Fig. 2, the utility model is a kind of pump foundation secondary grout layer anti-drop structure, and its difference exists In:A kind of pump foundation secondary grout layer anti-drop structure, its difference are:It is sequentially provided with once pours pump from the bottom to top Basis 1, secondary grout layer 5 and the centrifugal pump bottom plate 4 for disposing centrifugal pump body 3;It is described once to pour pump foundation 1 and secondary The default reinforcing bar 7 for being used for strengthening connection is provided between grout blanket 5, pump foundation top is once poured in the default one end of reinforcing bar 7 embedment Below face 6, the other end stretches out once pouring pump foundation top surface 6 and is embedded in the secondary grout layer 5;The centrifugal pump bottom plate 4 is used for With once pouring the leveling of pump foundation 1, the bottom of centrifugal pump body 3 is fastened on secondary by connector through centrifugal pump bottom plate 4 On grout blanket 5.
Specifically, the pump foundation top surface 6 that once pours is handled using dabbing.
Specifically, the default reinforcing bar 7 uses HPB300 level reinforcing bars, a diameter of 5 ~ 7mm, length is 160 ~ 200mm.
Preferably, 7 a diameter of 6mm of default reinforcing bar, length 180mm.
Specifically, the default reinforcing bar 7 presses spacing 350 ~ 450mm arranged in squares.
Preferably, the default reinforcing bar 7 presses spacing 400mm arranged in squares.
Stretched specifically, layer basis top surface 140 ~ 160mm, other end below 6 are once poured in the one end of default reinforcing bar 7 embedment Go out and once pour layer basis 20 ~ 40mm of top surface.
Preferably, layer basis top surface 150mm below 6 is once poured in the one end of default reinforcing bar 7 embedment, and the other end stretches out one Secondary pouring layer basis top surface 30mm.
Specifically, the secondary grout layer 5 uses high strength and no shrinting grouting material to pour thickness as 30 ~ 50mm.
Specifically, described its intensity of secondary grout layer 5 is:It is not less than within 1 day 20MPa, is not less than 40MPa within 3 days, it is 28 days not small In 50MPa.
A kind of pump foundation secondary grout layer anti-drop structure casting process, comprises the following steps successively:
(1)Foundation trench, which excavates and once pours pump foundation 1, to vibrate;
(2)Some reinforcing bars 7 first are preset in basic top surface before concrete initial set, pump foundation top is once poured in one end embedment Below face, the other end, which stretches out, once pours pump foundation top surface;
(3)Before treating to carry out final grouting after pump foundation maintenance, the dabbing of pump foundation top surface 6 will be once poured;
(4)Centrifugal pump bottom plate 4 is subjected to leveling on basic top surface 6 is once poured;
(5)After the completion of leveling, then carry out pouring for secondary grout layer 5;
(6)After the completion for the treatment of that final grouting layer 5 conserves, centrifugal pump is fastened, completes pump installation.
Specifically, the default reinforcing bar 7 uses HPB300 level reinforcing bars, a diameter of 5 ~ 7mm, length is 160 ~ 200mm.
Preferably, the default reinforcing bar 7 presses spacing 350 ~ 450mm arranged in squares, and the default one end of reinforcing bar 7 embedment is once poured 140 ~ 160mm below the top surface of layer basis is filled, the other end, which stretches out, once pours layer basis 20 ~ 40mm of top surface.
Specifically, the secondary grout layer 5 uses high strength and no shrinting grouting material to pour thickness as 30 ~ 50mm.
Embodiment 1:
A kind of pump foundation secondary grout layer anti-drop structure is present embodiments provided, for preventing final grouting layer from coming off.
Refer to shown in Fig. 1 and Fig. 2, the pump foundation secondary grout layer anti-drop structure and its casting process preferred scheme bag Include:
First, it is first pre- in basic top surface before concrete initial set after the completion of in foundation trench excavation and once, pouring basis is vibrated If some a diameter of 6mm, length are 180mm reinforcing bar, bar-mat reinforcement uses spacing 400mm arranged in squares, one end embedment one Below the top surface of secondary pouring layer basis, the other end, which stretches out, once pours layer basis top surface 30mm, and pump foundation uses one-shot forming.
Secondly, after once pouring basic top surface and presetting reinforcing bar, treat once pour base after pump foundation maintenance Plinth top surface dabbing.
Then, after centrifugal pump arrival, pump bottom plate is placed on pump foundation and carries out leveling, after the completion of leveling, using height Strong shrinkage-void grouting material pours 50mm thickness secondary grout layers.
Finally, after the completion for the treatment of that final grouting layer is conserved, the foundation bolt nut for connection is tightened, completes pump peace Dress.
Above content is to combine specific embodiment further detailed description of the utility model, it is impossible to is assert Specific implementation of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field For, without departing from the concept of the premise utility, some simple deduction or replace can also be made, should all be considered as category In the scope of protection of the utility model.

Claims (10)

  1. A kind of 1. pump foundation secondary grout layer anti-drop structure, it is characterised in that:It is sequentially provided with once pours pump from the bottom to top Basis, secondary grout layer and the centrifugal pump bottom plate for disposing centrifugal pump body;It is described once to pour pump foundation and back-grouting The default reinforcing bar for being used for strengthening connection is provided between layer, default reinforcing bar one end embedment is once poured below pump foundation top surface, The other end, which stretches out, once pours the pump foundation top surface insertion secondary grout layer;The centrifugal pump bottom plate is used for once pouring pump Basic leveling, the centrifugal pump body bottom portion are fastened on secondary grout layer by connector through centrifugal pump bottom plate.
  2. 2. pump foundation secondary grout layer anti-drop structure according to claim 1, it is characterised in that:It is described once to pour pump Basic top surface is handled using dabbing.
  3. 3. pump foundation secondary grout layer anti-drop structure according to claim 1, it is characterised in that:The default reinforcing bar is adopted With HPB300 level reinforcing bars, a diameter of 5 ~ 7mm, length is 160 ~ 200mm.
  4. 4. pump foundation secondary grout layer anti-drop structure according to claim 1, it is characterised in that:The default reinforcing bar is straight Footpath is 6mm, length 180mm.
  5. 5. pump foundation secondary grout layer anti-drop structure according to claim 3, it is characterised in that:The default reinforcing bar is pressed Spacing 350 ~ 450mm arranged in squares.
  6. 6. pump foundation secondary grout layer anti-drop structure according to claim 3, it is characterised in that:The default reinforcing bar is pressed Spacing 400mm arranged in squares.
  7. 7. pump foundation secondary grout layer anti-drop structure according to claim 3, it is characterised in that:The default reinforcing bar one 140 ~ 160mm below the top surface of layer basis is once poured in end embedment, and the other end, which stretches out, once pours layer basis 20 ~ 40mm of top surface.
  8. 8. pump foundation secondary grout layer anti-drop structure according to claim 3, it is characterised in that:The default reinforcing bar one 150mm below the top surface of layer basis is once poured in end embedment, and the other end, which stretches out, once pours layer basis top surface 30mm.
  9. 9. pump foundation secondary grout layer anti-drop structure according to claim 1, it is characterised in that:The secondary grout layer High strength and no shrinting grouting material is used to pour thickness as 30 ~ 50mm.
  10. 10. pump foundation secondary grout layer anti-drop structure according to claim 9, it is characterised in that:The back-grouting Layer its intensity be:It is not less than within 1 day 20MPa, is not less than within 3 days 40MPa, is not less than 50MPa within 28 days.
CN201720900790.8U 2017-07-24 2017-07-24 A kind of pump foundation secondary grout layer anti-drop structure Active CN207176725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720900790.8U CN207176725U (en) 2017-07-24 2017-07-24 A kind of pump foundation secondary grout layer anti-drop structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720900790.8U CN207176725U (en) 2017-07-24 2017-07-24 A kind of pump foundation secondary grout layer anti-drop structure

Publications (1)

Publication Number Publication Date
CN207176725U true CN207176725U (en) 2018-04-03

Family

ID=61737597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720900790.8U Active CN207176725U (en) 2017-07-24 2017-07-24 A kind of pump foundation secondary grout layer anti-drop structure

Country Status (1)

Country Link
CN (1) CN207176725U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867686A (en) * 2017-07-24 2018-11-23 武汉炼化工程设计有限责任公司 A kind of pump foundation secondary grout layer anti-drop structure and its casting process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867686A (en) * 2017-07-24 2018-11-23 武汉炼化工程设计有限责任公司 A kind of pump foundation secondary grout layer anti-drop structure and its casting process

Similar Documents

Publication Publication Date Title
CN106640126B (en) A kind of processing method that highly stress soft rock stress tunnel arch wall Lining cracks destroy
CN108019076A (en) Large-size rebar concrete silo construction method and the device for conical shell construction
CN108343257A (en) A kind of existing multi-storey building installs the construction method of elevator additional
CN205976410U (en) Shaped steel is encorbelmented scaffold frame and can be dismantled type of falling U screw vacuum pump
CN105133487B (en) Construction method for using combined type bridge temporary support to rapidly build continuous beams
CN101487293A (en) Concreting method with different intensity grades for beam column nodes
CN106988436A (en) A kind of method of reserving hole closure
CN105926667A (en) Retaining wall
CN207863507U (en) A kind of vertical member displacement apparatus for skyscraper floor
CN108004925A (en) Prestress reinforced concrete circular arch tower construction method
CN107299773B (en) Load bearing wall reinforcing construction method
CN106337391A (en) Long piled wharf panel bottom large-area damage repairing construction method
CN207176725U (en) A kind of pump foundation secondary grout layer anti-drop structure
CN108214837A (en) Precast prestressed floor production mould, production equipment and production technology
CN107964874A (en) A kind of assembly concrete guardrail construction method
CN108316513A (en) A kind of rapid construction assembly of shear wall structure and its construction method
CN106917359A (en) Road and bridge crack bracing means and reinforcement means
CN205936608U (en) Vertical shaft concrete and quick slip form construction device of rock mass grout
CN106917469A (en) Steel plate concrete composite reinforcement reinforced beam anti-fatigue performance structure and method
CN205557349U (en) Device is changed to jib
CN205954675U (en) Prefabricated pipeline concrete buttress
CN108867686A (en) A kind of pump foundation secondary grout layer anti-drop structure and its casting process
CN107130519B (en) The production and handling method of concrete prefabricated plate
CN207176527U (en) Bridge Crack bracing means
CN205772789U (en) A kind of transporting and hoisting device of prefabricated pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant