CN207174295U - A kind of energy-conserving and environment-protective material brick conveying arrangement - Google Patents
A kind of energy-conserving and environment-protective material brick conveying arrangement Download PDFInfo
- Publication number
- CN207174295U CN207174295U CN201721228568.4U CN201721228568U CN207174295U CN 207174295 U CN207174295 U CN 207174295U CN 201721228568 U CN201721228568 U CN 201721228568U CN 207174295 U CN207174295 U CN 207174295U
- Authority
- CN
- China
- Prior art keywords
- brick
- connecting rod
- chain
- shaped
- sliding block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a kind of energy-conserving and environment-protective material brick conveying arrangement,Including base,Protect brick frame and chain,Upper strata shield brick frame is made up of four fix bars,Lower floor's shield brick frame is made up of four channel-shaped bars,The inside of the groove at channel-shaped bar both ends is provided with sliding block,The corner of shield brick frame is mounted on chain guide sleeve,Chain guide sleeve side is installed with locating rod,The middle part of base side is connected with first connecting rod and second connecting rod respectively by hinge,First connecting rod and second connecting rod pass through sliding block and third connecting rod,Fourth link connects,Third connecting rod,The one end of fourth link away from sliding block is met at a bit,And connected by the middle part of hinge and fix bar,One end of chain is fixedly connected with the one of base jiao,The other end is met at a bit through chain guide sleeve,And it is fixedly connected with hook,The utility model is simple in construction,It is practical,Avoid protecting the skew of brick outer cover and the situation that fragment of brick drops occurring,It is and simple to operate,Conevying efficiency is high.
Description
Technical field
It the utility model is related to technical field of building construction, more particularly to a kind of energy-conserving and environment-protective material brick conveying arrangement.
Background technology
With the progress in epoch, ordinary fired brick do not met it is green require that, therefore by energy-saving ring
Protect material brick to replace, it should be pointed out that the clay brick in ordinary fired brick, ruin field because of it and fetch earth, energy consumption is big, block
Small, low construction efficiency, masonry is from great, the shortcomings of shock resistance difference, has been prohibited to make in the main big or middle city in China and area
With in the work progress of masonry structure building, it is necessary to the energy-conserving and environment-protective material brick on ground is transported to and builds place by laying bricks or stones, by
The transport of this and occurred level or vertical transport, and transported mostly using brick cage during building engineering construction at present,
Brick cage be exactly with ironware surround above be opening, have bottom plate below, can that surrounding is surrounded, when being transported with brick cage, by
Fixed in the height of brick cage, workmen often throws brick in brick cage, and brick is collided with brick, and brick is collided with brick cage, it will is made
Brick damages, again can be by brick cage bottom upward when unloading brick, and such one, which removes one, falls, energy-conserving and environment-protective material brick substantially all can the few angle of truncation,
Engineering requirement is not met.
In Chinese patent application the prospectus, (Authorization Notice No. of documents 1:In CN204645675U, one is disclosed
Kind transport ordinary sinter brick device), when it fills brick, shield brick outer cover is taken out into Sheng brick main body, brick is placed on and contained on brick plinth, then will
Shield brick outer cover, which tips upside down on, to be contained in brick main body, makes shield brick housing opening downward, and the openend of the method shell is collided with containing brick plinth
But do not consolidate, in the case where horizontal transport has horizontal acceleration, brick applies horizontal force to shield brick outer cover, easily makes shield brick
Outer cover shifts, and the hidden danger that fragment of brick drops be present.
In Chinese patent application the prospectus, (Authorization Notice No. of documents 2:In CN204876592U, disclose point
Section fortune brick case), the height of every layer of its merogenesis fortune brick case is fixed, and is not suitable for the transport of various sizes of energy-conserving and environment-protective material brick,
In addition, the method for merogenesis transport extremely influences the efficiency of construction transport, the generalization without reality.
Utility model content
The purpose of this utility model is and a kind of energy-conserving and environment-protective material proposed in order to solve shortcoming present in prior art
Expect brick conveying arrangement.
To achieve these goals, the utility model employs following technical scheme:
A kind of energy-conserving and environment-protective material brick conveying arrangement, including base, shield brick frame and chain, the shield brick frame are divided into two layers,
Upper strata shield brick frame is made up of four fix bars, and by being welded and fixed between each fix bar, lower floor protects brick frame by four channel-shaped bars
Composition, and by being welded and fixed between each channel-shaped bar, the inside of the groove at the channel-shaped bar both ends is provided with sliding block, the shield brick
The corner of frame is mounted on chain guide sleeve, and side of the chain guide sleeve away from shield brick frame is installed with locating rod, institute
The middle part for stating base side is connected with first connecting rod and second connecting rod respectively by hinge, and the first connecting rod and second connecting rod lead to
Cross sliding block of the hinge respectively with channel-shaped bar both ends to be connected, the sliding block being connected with first connecting rod is connected by hinge and third connecting rod
Connect, the sliding block being connected with second connecting rod is connected by hinge with fourth link, and the third connecting rod, fourth link are away from sliding
One end of block is met at a bit, and is connected by the middle part of hinge and fix bar, and the quantity of the chain is four, the chain
One jiao of one end and base is fixedly connected, and the other end is met at a bit through chain guide sleeve, and is fixedly connected with hook.
Preferably, the base is shaped as square tabular, and protects the pros for being shaped as matching with base of brick frame
Shape frame-shaped.
Preferably, the locating rod is shaped as " u "-shaped, and one end away from chain guide sleeve may be inserted into the chain of chain
Ring.
Preferably, alignment pin is installed between the sliding block and channel-shaped bar.
Preferably, iron wire catch net is installed between the outside of the shield brick frame and base.
The beneficial effects of the utility model are:
1st, with the (Authorization Notice No. of documents 1:In CN204645675U, one kind transport ordinary sinter brick device) compare,
The utility model shield brick frame can adjust height as needed, realize the protection to energy-conserving and environment-protective material brick in the handling process,
Workmen is avoided to be damaged caused by the too high throwing brick of transport height and to brick body, the iron wire catch net in shield brick outer frame face and bottom
Seat is fixed, avoids in the case where horizontal transport has horizontal acceleration, and brick applies horizontal force to shield brick outer cover, easily makes
Shield brick outer cover shifts and the situation that fragment of brick drops occurs.
2nd, with the (Authorization Notice No. of documents 2:In CN204876592U, merogenesis fortune brick case is disclosed) compare, this practicality
New structure is simple, practical, the related tedious steps such as handling process need not be dismantled, installing component, goes for not
Simple to operate with the transport of the energy-conserving and environment-protective material brick of size, conevying efficiency is high.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of energy-conserving and environment-protective material brick conveying arrangement structural representation;
Fig. 2 be the utility model proposes a kind of energy-conserving and environment-protective material brick conveying arrangement structural front view.
In figure:1 base, 2 shield brick frames, 3 chains, 4 fix bars, 5 channel-shaped bars, 6 sliding blocks, 7 chain guide sleeves, 8 locating rods, 9
First connecting rod, 10 second connecting rods, 11 third connecting rods, 12 fourth links, 13 hooks.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-2, a kind of energy-conserving and environment-protective material brick conveying arrangement, including base 1, shield brick frame 2 and chain 3, its feature
It is, shield brick frame 2 divides for two layers, and upper strata shield brick frame 2 is made up of four fix bars 4, and solid by welding between each fix bar 4
Fixed, lower floor's shield brick frame 2 is made up of four channel-shaped bars 5, and by being welded and fixed between each channel-shaped bar 5, the groove at the both ends of channel-shaped bar 5
Inside is provided with sliding block 6, and the corner of shield brick frame 2 is mounted on chain guide sleeve 7, and chain guide sleeve 7 is remote to protect the one of brick frame 2
Side is installed with locating rod 8, and the middle part of the side of base 1 is connected with first connecting rod 9 and second connecting rod 10 respectively by hinge, the
One connecting rod 9 and second connecting rod 10 are connected by sliding block 6 of the hinge respectively with the both ends of channel-shaped bar 5, the sliding block being connected with first connecting rod 9
6 are connected by hinge with third connecting rod 11, and the sliding block 6 being connected with second connecting rod 10 is connected by hinge with fourth link 12, the
Three connecting rods 11, the one end of fourth link 12 away from sliding block 6 are met at a bit, and are connected by hinge with the middle part of fix bar 4, chain
3 quantity is four, and one end of chain 3 is fixedly connected with one jiao of base 1, and the other end is met at a bit through chain guide sleeve 7,
And 13 be fixedly connected with hook, base 1 is shaped as square tabular, and protects brick frame 2 and be shaped as matching just with base 1
Square frame-like, locating rod 8 is shaped as " u "-shaped, and one end away from chain guide sleeve 7 may be inserted into the chain link of chain 3, sliding block
Alignment pin is installed between 6 and channel-shaped bar 5, iron wire catch net is installed between the outside of shield brick frame 2 and base 1.With contrast text
(the Authorization Notice No. of part 1:In CN204645675U, one kind transport ordinary sinter brick device) to compare, the utility model shield brick frame 2 can
To adjust height as needed, the protection to energy-conserving and environment-protective material brick in the handling process is realized, avoids workmen because of transport
Device excessive height throws brick and brick body is caused to damage, and the iron wire catch net of the outside of shield brick frame 2 is fixed with base, is avoided in water
In the case that flat transport has horizontal acceleration, brick applies horizontal force to shield brick outer cover, shield brick outer cover is shifted
And the situation that fragment of brick drops occurs;With (the Authorization Notice No. of documents 2:In CN204876592U, merogenesis fortune brick case is disclosed)
Compare, the utility model is simple in construction, practical, the related tedious steps such as handling process need not be dismantled, installing component, can
Simple to operate with the transport suitable for various sizes of energy-conserving and environment-protective material brick, conevying efficiency is high.
Operation principle
The utility model when filling brick, can by the sliding block 6 in channel-shaped bar 5, adjust first connecting rod 9, second connecting rod 10,
Angles and positions between third connecting rod 11, fourth link 12, the height of shield brick frame 2 is adjusted with this, by energy-conserving and environment-protective material brick
Pile up to base 1, after piling up, according to before, then the height of shield brick frame 2 is adjusted, until brick body is all blocked in iron
In silk screen protective cover, inserted by the alignment pin between sliding block 6 and channel-shaped bar 5, by the one end of locating rod 8 away from chain guide sleeve 7
Enter the chain link of chain 3, to reach the purpose of the fixed height of shield brick frame 2, by hook 13, energy-conserving and environment-protective material brick is transported to phase
Answer position.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (5)
1. a kind of energy-conserving and environment-protective material brick conveying arrangement, including base (1), shield brick frame (2) and chain (3), it is characterised in that institute
State shield brick frame (2) to be divided into two layers, upper strata shield brick frame (2) is made up of four fix bars (4), and passes through weldering between each fix bar (4)
Fixation is connect, lower floor's shield brick frame (2) is made up of four channel-shaped bars (5), and by being welded and fixed between each channel-shaped bar (5), the groove
The inside of the groove at shape bar (5) both ends is provided with sliding block (6), and the corner of the shield brick frame (2) is mounted on chain guide sleeve
(7), side of the chain guide sleeve (7) away from shield brick frame (2) is installed with locating rod (8), base (1) side
Middle part is connected with first connecting rod (9) and second connecting rod (10) respectively by hinge, the first connecting rod (9) and second connecting rod (10)
It is connected by sliding block (6) of the hinge respectively with channel-shaped bar (5) both ends, the sliding block (6) being connected with first connecting rod (9) passes through hinge
Chain is connected with third connecting rod (11), and the sliding block (6) being connected with second connecting rod (10) is connected by hinge and fourth link (12)
Connect, the one end of the third connecting rod (11), fourth link (12) away from sliding block (6) is met at a bit, and passes through hinge and fix bar
(4) middle part connection, the quantity of the chain (3) is four, one end of the chain (3) and one jiao of base (1) company of fixation
Connect, the other end is met at a bit through chain guide sleeve (7), and is fixedly connected with hook (13).
2. a kind of energy-conserving and environment-protective material brick conveying arrangement according to claim 1, it is characterised in that the base (1)
Square tabular is shaped as, and protects the square box-shaped for being shaped as matching with base (1) of brick frame (2).
A kind of 3. energy-conserving and environment-protective material brick conveying arrangement according to claim 1, it is characterised in that the locating rod (8)
Be shaped as " u "-shaped, and one end away from chain guide sleeve (7) may be inserted into the chain link of chain (3).
A kind of 4. energy-conserving and environment-protective material brick conveying arrangement according to claim 1, it is characterised in that the sliding block (6) with
Channel-shaped bar is provided with alignment pin between (5).
A kind of 5. energy-conserving and environment-protective material brick conveying arrangement according to claim 1, it is characterised in that the shield brick frame (2)
Outside and base (1) between iron wire catch net is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721228568.4U CN207174295U (en) | 2017-09-24 | 2017-09-24 | A kind of energy-conserving and environment-protective material brick conveying arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721228568.4U CN207174295U (en) | 2017-09-24 | 2017-09-24 | A kind of energy-conserving and environment-protective material brick conveying arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207174295U true CN207174295U (en) | 2018-04-03 |
Family
ID=61749103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721228568.4U Active CN207174295U (en) | 2017-09-24 | 2017-09-24 | A kind of energy-conserving and environment-protective material brick conveying arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207174295U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107628338A (en) * | 2017-09-24 | 2018-01-26 | 贵州老福节能环保工程材料科技有限公司 | A kind of energy-conserving and environment-protective material brick conveying arrangement |
-
2017
- 2017-09-24 CN CN201721228568.4U patent/CN207174295U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107628338A (en) * | 2017-09-24 | 2018-01-26 | 贵州老福节能环保工程材料科技有限公司 | A kind of energy-conserving and environment-protective material brick conveying arrangement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102777208B (en) | Method for constructing mining impact-resisting sealed wall | |
CN101988388A (en) | Filling and supporting hydraulic support with compaction mechanism | |
CN207174295U (en) | A kind of energy-conserving and environment-protective material brick conveying arrangement | |
CN110344862A (en) | A kind of foundation pit support device for tunnel drainage engineering | |
CN203007958U (en) | Protection system for eliminating sliding mass | |
CN201460939U (en) | Filling and timbering hydraulic support with a tamping mechanism | |
CN103821559B (en) | The airtight barricade of mould pocket type rapid shaping | |
CN104131124B (en) | Blast furnace cooling stave laid on end edge brick construction method | |
CN206694052U (en) | A kind of coal mine roadway visits beam supporting construction | |
CN107628338A (en) | A kind of energy-conserving and environment-protective material brick conveying arrangement | |
CN207538854U (en) | A kind of coal mine miner's safety device | |
CN206360720U (en) | A kind of novel flexible filling isolation barricade | |
CN107419733A (en) | A kind of side slope down-the-hole drill drilling operation platform | |
EP2581499B1 (en) | Gabion | |
CN108797353A (en) | A kind of bridge construction protective device | |
CN205154168U (en) | Huge perpendicular shield constructs machine | |
KR102307192B1 (en) | Shooting range protective structure and construction and maintenance method of shooting range protective structure | |
CN108677970A (en) | The method of the narrow foundation pit backfill construction of ultra-deep | |
CN108869983A (en) | A kind of fixation device for engineering detecting | |
CN203846517U (en) | Vertical anchor bolt supporting structure | |
CN110525883B (en) | Supporting frame of buried scraper conveyor for mine | |
CN210238536U (en) | Hydropower engineering topples over type danger rock mass and unites protective structure | |
CN102020197A (en) | Vertical transportation hanger | |
CN102392456A (en) | Greening structure of stone masonry or dry rubble retaining wall and construction method thereof | |
CN207078900U (en) | The quick handling apparatus of girder brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |