CN207169122U - A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness - Google Patents

A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness Download PDF

Info

Publication number
CN207169122U
CN207169122U CN201720966874.1U CN201720966874U CN207169122U CN 207169122 U CN207169122 U CN 207169122U CN 201720966874 U CN201720966874 U CN 201720966874U CN 207169122 U CN207169122 U CN 207169122U
Authority
CN
China
Prior art keywords
mud
sump
pipe
cleaning shoe
sedimentation basin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720966874.1U
Other languages
Chinese (zh)
Inventor
彭艳芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Standard Environmental Protection Technology Co Ltd
Original Assignee
Guangxi Standard Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Standard Environmental Protection Technology Co Ltd filed Critical Guangxi Standard Environmental Protection Technology Co Ltd
Priority to CN201720966874.1U priority Critical patent/CN207169122U/en
Application granted granted Critical
Publication of CN207169122U publication Critical patent/CN207169122U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness, including sedimentation basin, the bottom of the sedimentation basin is provided with leakage mud sump, the right side of leakage mud sump is provided with dredge pump, sludge-tank is located on the right side of dredge pump, the center of the sedimentation basin is lived provided with central supported, the top that central supported is lived is provided with electric rotating machine, mud crossbeam platform is scraped in fixation above electric rotating machine, the epitaxy support post for scraping mud measurement platform left end is supported on the pool wall of sedimentation basin by introduction, scrape and be hung with multiple connecting rods on mud crossbeam platform, the bottom of connecting rod is fixed on cleaning shoe, mud branch pipe is taken out to be set in inside connecting rod, take out muddy water pump and be fixed on the top for scraping mud crossbeam platform, sump is fixed on the outer wall of sedimentation basin, the bottom of the sump is provided with sump discharge pipeline;Mud operation can be cleared up mud and taken out to the utility model while by cleaning shoe with mud branch pipe is taken out, it is therefore prevented that the agitation of bottom of pond mud is muddy in scale removal process, high-efficiency cleaning.

Description

A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness
Technical field
A kind of sewage-treatment plant is the utility model is related to, specifically a kind of advection with the anti-self-priming cleaning shoe of muddiness Formula sedimentation basin.
Background technology
Rectangular sedimentation tank uses concrete and built, it is also possible to masonry masonry structure, rectangular sedimentation tank simple structure, sinks Shallow lake effect is good, stable work in work, using extensive, typically all sets mud scraper using mechanical dredge method to improve sedimentation basin work Efficiency, mud scraper are a kind of soil discharging facilities, in the circular settling tank that is relatively large in diameter in Treatment of Sludge, exclusion to be deposited in bottom of pond Sludge and exclude the scum silica frost in pond face, mud scraper drives mud scraper to rotate the deposited pond of raw water around sedimentation basin base by drive device Supernatant is heavy from overflow weir discharge after deposition, is deposited in the sludge of bottom of pond, under the promotion of logarithmic spiral curve scraper plate, slowly Ground is flowed in central mud-collecting slot along bottom of pond, is discharged by discharge pipeline.
Current mud scraper is typically all directly directly to be scraped bottom sludge into bottom of pond, Ran Houzai with cleaning shoe in job type Sludge is extracted out with water pump, but during this cleaning operation, the mud of bottom of pond can be shone into substantial amounts of agitation, stirred Sludge can cause the water turbidity in sedimentation basin, and the clear water precipitated to the top of sedimentation basin causes secondary pollution, if taken Precipitation or the manner of cleaning up of draining, clearance time can be lengthened significantly, reduce cleaning efficiency.
Utility model content
The purpose of this utility model is to provide a kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness, with solution The problem of being proposed in certainly above-mentioned background technology.
To achieve the above object, the utility model provides following technical scheme:
A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness, including leakage mud sump, sedimentation basin, cleaning shoe, take out Mud branch pipe, connecting rod, sump, mud sewage draining exit, the first blow-off pipe are taken out, guide wheel, epitaxy support post, muddy water pump is taken out, first takes out mud Pipe, isocon, connecting rod fixed mount, scrape mud crossbeam platform, crossbeam rotating disk, electric rotating machine, central support posts, sump discharge pipeline, Sludge-tank, the second blow-off pipe, dredge pump, the second extraction mud pipe, mud shovel is scraped, the bottom of the sedimentation basin is provided with leakage mud sump, leakage The bottom of mud sump is provided with the second extraction mud pipe, and the second extraction mud pipe is connected to the end of drawing water of dredge pump, the water outlet of the dredge pump End is connected to the second blow-off pipe, and the mouth of pipe of the second blow-off pipe is arranged on sludge-tank left upper end, and the sludge-tank is located at dredge pump Right side, the center of the sedimentation basin are provided with central support posts, and the bottom of central support posts is fixed on the center of Lou mud sump Position, is provided with electric rotating machine at the top of central support posts, fixed crossbeam rotating disk above the rotating shaft of electric rotating machine, scrapes mud crossbeam The right-hand member of platform is fixed on crossbeam rotating disk, scrapes the fixed epitaxy support post of left end of mud crossbeam platform, epitaxy support post is positioned at precipitation On the pool wall in pond, the bottom of epitaxy support post is provided with guide wheel, and described scrape is hung with multiple connecting rods, connecting rod on mud crossbeam platform Middle part be provided with connecting rod fixed mount, the bottom of connecting rod is fixed on cleaning shoe, and cleaning shoe left bottom, which is provided with, scrapes mud Shovel, take out mud branch pipe and be located at and scrape the upper right side of mud shovel, the mud branch pipe of taking out is set in inside connecting rod, it is multiple take out mud branch pipe upper end with Isocon is connected, and the middle part of isocon is connected with the first extraction mud pipe, and the first extraction mud pipe is connected to the end of drawing water for taking out muddy water pump, described Take out muddy water pump and be fixed on the top for scraping mud crossbeam platform, the water side for taking out muddy water pump is connected to the first blow-off pipe, the first blow-off pipe End, which is provided with, takes out mud sewage draining exit, and positioned at taking out below mud sewage draining exit, the sump is fixed on the outer wall of sedimentation basin sump, The bottom of the sump is provided with sump discharge pipeline, and sump discharge pipeline is located at the top of sludge-tank.
As further program of the utility model:The sedimentation basin is cylindrical cement pit, and sedimentation basin bottom is in funnel Type.
As the utility model further scheme:The guide wheel is universal guide wheel.
As the utility model further scheme:The connecting rod is hollow stainless steel tube.
As the utility model further scheme:The cleaning shoe is the long iron block of arc.
As the utility model further scheme:The sump is the annular water set along sedimentation basin outer wall Groove.
Compared with prior art, the beneficial effects of the utility model are:Without being carried out to sedimentation basin in whole scale removal process Precipitation or draining, and clear up during base sludge, take out mud branch pipe and directly directly take the sludge scooped up away, will not So that sedimentation basin is polluted because of seething for base sludge by muddiness, cleaning efficiency is improved, without the operation that stops doing business, without artificial Cleaning, whole-process high-efficiency clean, and provide the efficiency of production significantly.
Brief description of the drawings
Fig. 1 is the structural representation of the rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness.
Fig. 2 is the structural representation of A in the rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness.
In figure:Leakage mud sump 1, sedimentation basin 2, cleaning shoe 3, take out mud branch pipe 4, connecting rod 5, sump 6, take out mud sewage draining exit 7, the One blow-off pipe 8, guide wheel 9, epitaxy support post 10, take out muddy water pump 11, the first extraction mud pipe 12, isocon 13, connecting rod fixed mount 14, Scrape mud crossbeam platform 15, crossbeam rotating disk 16, electric rotating machine 17, central support posts 18, sump discharge pipeline 19, sludge-tank 20, second Blow-off pipe 21, dredge pump 22, the second extraction mud pipe 23, scrape mud shovel 24.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1~2, in the utility model embodiment, a kind of flat flow with the anti-self-priming cleaning shoe of muddiness sinks Shallow lake pond, including leakage mud sump 1, sedimentation basin 2, cleaning shoe 3, take out mud branch pipe 4, connecting rod 5, sump 6, take out mud sewage draining exit 7, first row Dirty pipe 8, guide wheel 9, epitaxy support post 10, take out muddy water pump 11, the first extraction mud pipe 12, isocon 13, connecting rod fixed mount 14, scrape mud Crossbeam platform 15, crossbeam rotating disk 16, electric rotating machine 17, central support posts 18, sump discharge pipeline 19, sludge-tank 20, the second blowdown Pipe 21, dredge pump 22, the second extraction mud pipe 23, mud shovel 24 is scraped, the sedimentation basin 2 is cylindrical cement pit, and the bottom of sedimentation basin 2 is in Funnel type, the bottom of sedimentation basin 2 are provided with Lou mud sump 1, and the bottom of leakage mud sump 1 is provided with the second extraction mud pipe 23, the second extraction mud pipe 23 The end of drawing water of dredge pump 22 is connected to, the water side of the dredge pump 22 is connected to the second blow-off pipe 21, the second blow-off pipe 21 mouth of pipe is arranged on the left upper end of sludge-tank 20, and the sludge-tank 20 is located at the right side of dredge pump 22, the center of the sedimentation basin 2 Position is provided with central support posts 18, and the bottom of central support posts 18 is fixed on the center of Lou mud sump 1, central support posts 18 Top be provided with electric rotating machine 17, fixed crossbeam rotating disk 16 above the rotating shaft of electric rotating machine 17, scrape the right side of mud crossbeam platform 15 End is fixed on crossbeam rotating disk 16, scrapes the fixed epitaxy support post 10 of left end of mud crossbeam platform 15, epitaxy support post 10 is positioned at heavy On the pool wall in shallow lake pond 2, the bottom of epitaxy support post 10 is provided with guide wheel 9, and the guide wheel 9 is universal guide wheel, described to scrape mud crossbeam Multiple connecting rods 5 are hung with platform 15, the connecting rod 5 is hollow stainless steel tube, and the middle part of connecting rod 5 is provided with connecting rod and consolidated Determine frame 14, the bottom of connecting rod 5 is fixed on cleaning shoe 3, the cleaning shoe 3 be arc long iron block, the left bottom of cleaning shoe 3 It is provided with and scrapes mud shovel 24, takes out mud branch pipe 4 and be located at the upper right side for scraping mud shovel 24, the mud branch pipe 4 of taking out is set in inside connecting rod 5, Multiple upper ends of mud branch pipe 4 of taking out are connected with isocon 13, and the middle part of isocon 13 is connected with the first extraction mud pipe 12, the first extraction mud pipe 12 The end of drawing water for taking out muddy water pump 11 is connected to, the muddy water pump 11 of taking out is fixed on the top for scraping mud crossbeam platform 15, smokes muddy water pump 11 Water side is connected to the first blow-off pipe 8, and the end of the first blow-off pipe 8, which is provided with, takes out mud sewage draining exit 7, and sump 6 is arranged positioned at mud is taken out The dirty lower section of mouth 7, the sump 6 are fixed on the outer wall of sedimentation basin 2, and the sump 6 is the annular along sedimentation basin outer wall Tank, the bottom of the sump 6 are provided with sump discharge pipeline 19, and sump discharge pipeline 19 is located at the top of sludge-tank 20.
Operation principle of the present utility model is:When needing to clear up the bottom of pond of sedimentation basin 2, without draining, electric rotating Machine 17 rotates, and the drive of crossbeam rotating disk 16 is scraped mud crossbeam platform 15 and rotated around central support posts 18, and guide wheel 9 can be in the pond of sedimentation basin 2 Moved in a circle on wall, cleaning shoe 3 will rotate around central support posts 18, scrape mud shovel 24 and just start to carry out the mud of bottom of pond Cleaning, the mud that mud shovel 24 scoops up is scraped, can be dug in the arc shaped inside of cleaning shoe 3, the mud branch pipe 4 of taking out in inner side is taking out muddy water pump Under 11 drive, the sludge dug is extracted out, the sludge of extraction is discharged in sump 6 by taking out mud sewage draining exit 7, the dirt of sump 6 Mud is discharged in sludge-tank 20 by sump discharge pipeline 19, and the dredge pump 22 of the bottom of sedimentation basin 2 will can be deposited in Lou in mud sump 1 Sludge be pumped into sludge-tank 20, without carrying out precipitation or draining to sedimentation basin 2 in whole scale removal process, and clear up During base sludge, take out mud branch pipe 4 and directly directly take the sludge scooped up away, sedimentation basin 2 will not be caused because base sludge Seethe and polluted by muddiness, improve cleaning efficiency, without the operation that stops doing business, without manual cleaning, whole-process high-efficiency cleaning, significantly Provide the efficiency of production.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (6)

1. a kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness, including leakage mud sump (1), sedimentation basin (2), cleaning shoe (3) mud branch pipe (4), connecting rod (5), are taken out, sump (6), takes out mud sewage draining exit (7), the first blow-off pipe (8), guide wheel (9), extension Support column (10), take out muddy water pump (11), the first extraction mud pipe (12), isocon (13), connecting rod fixed mount (14), scrape mud crossbeam platform (15), crossbeam rotating disk (16), electric rotating machine (17), central support posts (18), sump discharge pipeline (19), sludge-tank (20), Two blow-off pipes (21), dredge pump (22), the second extraction mud pipe (23), scrape mud shovel (24), it is characterised in that the sedimentation basin (2) Bottom be provided with Lou mud sump (1), the bottom of leakage mud sump (1) is provided with the second extraction mud pipe (23), and the second extraction mud pipe (23) is connected to The end of drawing water of dredge pump (22), the water side of the dredge pump (22) are connected to the second blow-off pipe (21), the second blow-off pipe (21) the mouth of pipe is arranged on sludge-tank (20) left upper end, and the sludge-tank (20) is located on the right side of dredge pump (22), the precipitation The center in pond (2) is provided with central support posts (18), and the bottom of central support posts (18) is fixed on the center of Lou mud sump (1) Position, is provided with electric rotating machine (17) at the top of central support posts (18), fixed crossbeam above the rotating shaft of electric rotating machine (17) Rotating disk (16), the right-hand member for scraping mud crossbeam platform (15) are fixed on crossbeam rotating disk (16), and the left end for scraping mud crossbeam platform (15) is fixed Epitaxy support post (10), epitaxy support post (10) are located on the pool wall of sedimentation basin (2), and the bottom of epitaxy support post (10) is provided with Guide wheel (9), described scrape are hung with multiple connecting rods (5) on mud crossbeam platform (15), being provided with connecting rod in the middle part of connecting rod (5) consolidates Determine frame (14), the bottom of connecting rod (5) is fixed on cleaning shoe (3), and cleaning shoe (3) left bottom, which is provided with, scrapes mud shovel (24), Take out mud branch pipe (4) and be located at the upper right side for scraping mud shovel (24), the mud branch pipe (4) of taking out is set in connecting rod (5) inside, multiple to take out mud Branch pipe (4) upper end is connected with isocon (13), and the middle part of isocon (13) is connected with the first extraction mud pipe (12), the first extraction mud pipe (12) end of drawing water for taking out muddy water pump (11) is connected to, the muddy water pump (11) of taking out is fixed on the top for scraping mud crossbeam platform (15), taken out The water side of muddy water pump (11) is connected to the first blow-off pipe (8), and the end of the first blow-off pipe (8), which is provided with, takes out mud sewage draining exit (7), Sump (6) is positioned at taking out below mud sewage draining exit (7), and the sump (6) is fixed on the outer wall of sedimentation basin (2), the sewage The bottom of groove (6) is provided with sump discharge pipeline (19), and sump discharge pipeline (19) is located at the top of sludge-tank (20).
2. the rectangular sedimentation tank according to claim 1 with the anti-self-priming cleaning shoe of muddiness, it is characterised in that described Sedimentation basin (2) is cylindrical cement pit, and sedimentation basin (2) bottom is in funnel type.
3. the rectangular sedimentation tank according to claim 1 with the anti-self-priming cleaning shoe of muddiness, it is characterised in that described Guide wheel (9) is universal guide wheel.
4. the rectangular sedimentation tank according to claim 1 with the anti-self-priming cleaning shoe of muddiness, it is characterised in that described Connecting rod (5) is hollow stainless steel tube.
5. the rectangular sedimentation tank according to claim 1 with the anti-self-priming cleaning shoe of muddiness, it is characterised in that described Cleaning shoe (3) is the long iron block of arc.
6. the rectangular sedimentation tank according to claim 1 with the anti-self-priming cleaning shoe of muddiness, it is characterised in that described Sump (6) is the annular water tank set along sedimentation basin outer wall.
CN201720966874.1U 2017-08-04 2017-08-04 A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness Expired - Fee Related CN207169122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720966874.1U CN207169122U (en) 2017-08-04 2017-08-04 A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720966874.1U CN207169122U (en) 2017-08-04 2017-08-04 A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness

Publications (1)

Publication Number Publication Date
CN207169122U true CN207169122U (en) 2018-04-03

Family

ID=61745206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720966874.1U Expired - Fee Related CN207169122U (en) 2017-08-04 2017-08-04 A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness

Country Status (1)

Country Link
CN (1) CN207169122U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108479128A (en) * 2018-05-18 2018-09-04 中国电建集团贵阳勘测设计研究院有限公司 A kind of secondary sedimentation tank of the engineering with deslagging function
CN108671591A (en) * 2018-05-23 2018-10-19 黎剑鸣 A kind of new-type inclined tube detention tank
CN109650645A (en) * 2018-06-15 2019-04-19 兴源环境科技股份有限公司 Integrated rural domestic sewage treatment device and sewage water treatment method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108479128A (en) * 2018-05-18 2018-09-04 中国电建集团贵阳勘测设计研究院有限公司 A kind of secondary sedimentation tank of the engineering with deslagging function
CN108479128B (en) * 2018-05-18 2024-02-06 中国电建集团贵阳勘测设计研究院有限公司 Secondary sedimentation tank with slag discharging function for engineering
CN108671591A (en) * 2018-05-23 2018-10-19 黎剑鸣 A kind of new-type inclined tube detention tank
CN109650645A (en) * 2018-06-15 2019-04-19 兴源环境科技股份有限公司 Integrated rural domestic sewage treatment device and sewage water treatment method
CN109650645B (en) * 2018-06-15 2024-03-19 兴源环境科技股份有限公司 Integrated rural domestic sewage treatment equipment and sewage treatment method

Similar Documents

Publication Publication Date Title
CN205323300U (en) Hydraulic engineering multibuchet advection formula sedimentation tank
CN207169122U (en) A kind of rectangular sedimentation tank with the anti-self-priming cleaning shoe of muddiness
CN203735275U (en) Device for cleaning pool
CN211189223U (en) Center transmission mud scraping device
CN107399850A (en) A kind of method of wastewater treatment containing coal
CN107364929A (en) A kind of oilfield sewage oil removal sand removal sedimentation device
CN213771454U (en) Self-rotating collecting and cleaning device for scum on sewage water surface
CN215962270U (en) Horizontal sedimentation tank with nonmetal mud scraper
CN203060904U (en) Improved advection setting device
CN204219845U (en) Peripheral-traction suction dredge
CN209076119U (en) The detention tank of lift mud scraper is installed
CN204767639U (en) Peripheral transmission mud scraper
CN105836844B (en) One kind scraping oil sump
CN202942690U (en) Automatic oblique-plate sludge scraping equipment
CN203803164U (en) Efficient mud-water separation precipitation system
CN210528528U (en) Sewage treatment pond mud scum collection device
CN209718127U (en) A kind of outdoor large water circulation precast beam curing system
CN103182203B (en) A kind of slag-draining device for setting pot and Slagoff method thereof
CN211226650U (en) Sedimentation tank for sewage treatment plant
CN205412340U (en) Prevent blockking up radial flow formula waste water sedimentation pond
CN211752730U (en) Peripheral transmission mud scraper with high mud scraping efficiency
CN204723824U (en) Circular arc scraper plate lifting center drive mud-scraper
CN205287747U (en) Clean ditch pool wall system is washed in two heavy ponds
CN103073116A (en) Oil production plant waste fluid separating and slagging integrated device
CN220812026U (en) Waste water purifying treatment equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403

Termination date: 20190804

CF01 Termination of patent right due to non-payment of annual fee