CN207168992U - A kind of free skiing Aerials summer training place - Google Patents
A kind of free skiing Aerials summer training place Download PDFInfo
- Publication number
- CN207168992U CN207168992U CN201721056661.1U CN201721056661U CN207168992U CN 207168992 U CN207168992 U CN 207168992U CN 201721056661 U CN201721056661 U CN 201721056661U CN 207168992 U CN207168992 U CN 207168992U
- Authority
- CN
- China
- Prior art keywords
- aerials
- buffering
- summer
- training place
- pond
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of free skiing Aerials summer training place, including positioned at the zone of departure at top and the in-run being connected with zone of departure, the bottom of the in-run is also connected with diving tower in a manner of seamlessly transitting, side of the diving tower away from in-run is additionally provided with pond, it is characterized in that, also include the buffering landing slope being arranged between diving tower and pond, the buffering landing slope includes support frame and the buffering suface being laid on support frame.The buffering landing slope improves the similitude in summer training place and true place, avoids sportsman from falling directly into water.As shown from the above technical solution, a kind of free skiing Aerials summer training place provided by the utility model, whether south and the north or winter and summer can use, buffering landing slope is provided between pond and diving tower, simulate real skifield environment, grid graticule is additionally provided with buffering landing slope, can be adjusted with training of the synkinesia person to oneself.
Description
Technical field
It the utility model is related to field, and in particular to a kind of free skiing Aerials summer training place.
Background technology
Beijing in 2022 will hold Winter Olympic Games, and ice and snow project is in China's Efforts To Develop.Free skiing Aerials item
Mesh is that the strong event of China's Winter Olympic Games match once obtained the good result of Olympic champion, is paid close attention to by everybody.
Generally more than 30 degree, the temperature that winter only has the north is adapted to train the temperature in China's summer in subzero.And
Sportsman's summer train only existing summer training place carry out, freestyle aerials place by zone of departure, help
Landslide, transition region one, diving tower, transition region two, landing slope and terminal district's groups into.
There was only zone of departure, in-run, transition region one, jump in existing free skiing sky skill project summer training court
Platform, pond etc. form.Summer training place and winter regulation game place differ greatly the buffering area particularly landed, free skiing
The buffering area in Aerials project summer place is swimming pool, and sportsman is fallen in pool water within.But regular free skiing is empty
The angle in middle skill project match buffer area is 37 degree of slopes for having snow cover, therefore summer training place and winter regular place
There is huge otherness in touch-down zone, so as to influence training quality.Regulation game buffering area is angled, and existing place is flat
Face (water surface), summer training are inconsistent with regulation game.
Utility model content
For in the prior art the defects of, the utility model provides a kind of free skiing Aerials summer training place, carries
High summer training court is advantageous to the simulated training of sportsman to the fidelity of true ski slide.
A kind of free skiing Aerials summer training place provided by the utility model, including positioned at the zone of departure at top with
And the in-run being connected with zone of departure, the bottom of the in-run are also connected with diving tower, the diving tower in a manner of seamlessly transitting
Side away from in-run is additionally provided with pond, it is characterised in that the buffering for also including being arranged between diving tower and pond is landed
Slope, the buffering landing slope include support frame and the buffering suface being laid on support frame, and the end of the buffering suface extends to
In pond.The buffering landing slope improves the similitude in summer training place and true place, avoids sportsman from falling directly into water.
Alternatively, the buffering suface includes hard floor and the sponge being covered on hard floor, the sponge surface
Cover smooth surface or artificial leather.The smooth surface or artificial leather reduce frictional force, more press close to real trail,
The sponge of covering provides buffer time to sportsman's landing, enhances security.
Alternatively, the thickness of the sponge is arranged to 0.8m-1.5m, and the surface of the surface or artificial leather is provided with waterproof
Layer.The waterproof layer is used to prevent the water in pond from immersing in sponge.
Alternatively, the buffering suface is horizontal by 37 ° of angles.In real competition area, landing slope and horizontal plane
Angle be 37 °, buffering suface horizontal by 37 ° of angles be used for simulate real racing track situation.
Alternatively, the support frame on the buffering landing slope includes steel column stand and the steel truss being arranged in steel column stand
Frame.The steel column stand and steel truss overlap joint are firm, are spliced by multiple separate units, convenient overlap joint and dismounting.
Alternatively, the buffering suface surface has the grid graticule of mark sportsman's drop point.The grid graticule can be square
Just sportsman is recorded and analyzed to the drop point of oneself, and reference is provided for sportsman's adjustment action.
As shown from the above technical solution, a kind of free skiing Aerials summer training place provided by the utility model, no
Influenceed by temperature, whether south and the north or winter and summer can use, and be provided between pond and diving tower
Landing slope is buffered, simulates real skifield environment so that the training of sportsman is more efficient, is also set on buffering landing slope
Grid graticule is equipped with, can be adjusted with training of the synkinesia person to oneself.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
The required accompanying drawing used is briefly described in embodiment or description of the prior art.In all of the figs, it is similar
Element or part are typically identified by similar reference.In accompanying drawing, each element or part might not be according to the ratios of reality
Draw.
Fig. 1 is structural representation of the present utility model.
Reference:Zone of departure 1, in-run 2, diving tower 3, pond 6, support frame 5, buffering suface 4.
Embodiment
The embodiment of technical solutions of the utility model is described in detail below in conjunction with accompanying drawing.Following examples are only
For clearly illustrating the technical solution of the utility model, therefore example is only used as, and this practicality can not be limited with this
New protection domain.
It should be noted that unless otherwise indicated, technical term or scientific terminology used in this application should be this reality
The ordinary meaning understood with new one of ordinary skill in the art.
In the description of the present application, it is to be understood that the instruction such as term " thickness ", " on ", " under ", " level ", " bottom "
Orientation or position relationship be based on orientation shown in the drawings or position relationship, be for only for ease of description the utility model and letter
Change description, rather than instruction or imply signified device or element must have specific orientation, with specific azimuth configuration and
Operation, therefore it is not intended that to limitation of the present utility model.
In this application, unless otherwise clearly defined and limited, the term such as term " connected ", " connection " should do broad sense reason
Solution, for example, it may be fixedly connected or be detachably connected, or integrally;Can be mechanical connection or electricity
Connection;Can be joined directly together, can also be indirectly connected by intermediary, can be two element internals connection or two
The interaction relationship of element.For the ordinary skill in the art, above-mentioned term can be understood as the case may be
Concrete meaning in the utility model.
In this application, unless otherwise clearly defined and limited, fisrt feature can be with "above" or "below" second feature
It is that the first and second features directly contact, or the first and second features pass through intermediary mediate contact.
Fig. 1 is structural representation of the present utility model;As shown in figure 1, the present embodiment provides a kind of free skiing sky
Middle skill summer training place, including positioned at the zone of departure 1 at top and the in-run 2 being connected with zone of departure 1, the in-run 2
Bottom is also connected with diving tower 3 in a manner of seamlessly transitting, and the side of the diving tower 3 away from in-run 2 is additionally provided with pond 6, its
Be characterised by, in addition to the buffering landing slope being arranged between diving tower 3 and pond 6, the buffering landing slope include support frame 5 with
And the buffering suface 4 on support frame 5 is laid on, the end of the buffering suface 4 is extended in pond 6.Improve on the buffering landing slope
The similitude in summer training place and true place, avoids sportsman from falling directly into water.
The buffering suface 4 includes hard floor and the sponge being covered on hard floor, and the sponge surface covers light
Sliding surface or artificial leather.The smooth surface or artificial leather reduce frictional force, more press close to real trail, covering
Sponge provides buffer time to sportsman's landing, enhances security.
The thickness of the sponge is arranged to 0.8m-1.5m, and the surface of the surface or artificial leather is provided with waterproof layer.It is described
Waterproof layer is used to prevent the water in pond 6 from immersing in sponge.
The buffering suface 4 is horizontal by 37 ° of angles.In real competition area, the angle of landing slope and horizontal plane
For 37 °, buffering suface 4 is used to simulate real racing track situation horizontal by 37 ° of angles.
The support frame 5 on the buffering landing slope includes steel column stand and the steel truss being arranged in steel column stand.It is described
Steel column stand and steel truss overlap joint are firm, are spliced by multiple separate units, convenient overlap joint and dismounting.
The surface of buffering suface 4 has the grid graticule of mark sportsman's drop point.The grid graticule can be moved conveniently
Member is recorded and analyzed to the drop point of oneself, and reference is provided for sportsman's adjustment action.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited
System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should
Understand:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole
Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly
The scope of each embodiment technical scheme of type, it all should cover among claim of the present utility model and the scope of specification.
Claims (6)
1. a kind of free skiing Aerials summer training place, including what is be connected positioned at the zone of departure at top and with zone of departure are helped
Landslide, the bottom of the in-run are also connected with diving tower in a manner of seamlessly transitting, and side of the diving tower away from in-run is also
It is provided with pond, it is characterised in that also include the buffering landing slope being arranged between diving tower and pond, buffering landing slope bag
Support frame and the buffering suface being laid on support frame are included, the end of the buffering suface is extended in pond.
A kind of 2. free skiing Aerials summer training place according to claim 1, it is characterised in that the buffering suface
Including hard floor and the sponge being covered on hard floor, the sponge surface covers smooth surface or artificial leather.
3. a kind of free skiing Aerials summer training place according to claim 2, it is characterised in that the sponge
Thickness is arranged to 0.8m-1.5m, and the surface of the surface or artificial leather is provided with waterproof layer.
A kind of 4. free skiing Aerials summer training place according to claim 1, it is characterised in that the buffering suface
Horizontal by 37 ° of angles.
5. a kind of free skiing Aerials summer training place according to claim 1, it is characterised in that described to buffer
Lu Po support frame includes steel column stand and the steel truss being arranged in steel column stand.
A kind of 6. free skiing Aerials summer training place according to claim 1, it is characterised in that the buffering suface
Surface has the grid graticule of mark sportsman's drop point.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721056661.1U CN207168992U (en) | 2017-08-22 | 2017-08-22 | A kind of free skiing Aerials summer training place |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721056661.1U CN207168992U (en) | 2017-08-22 | 2017-08-22 | A kind of free skiing Aerials summer training place |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207168992U true CN207168992U (en) | 2018-04-03 |
Family
ID=61737793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721056661.1U Expired - Fee Related CN207168992U (en) | 2017-08-22 | 2017-08-22 | A kind of free skiing Aerials summer training place |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207168992U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560360A (en) * | 2018-04-11 | 2018-09-21 | 西安健坤游乐设施有限公司 | A kind of split type dry skiing floor tile and dry skiing road |
CN110152269A (en) * | 2019-06-21 | 2019-08-23 | 泰山体育产业集团有限公司 | A kind of ski jump assembly for simulating ski jumping campaign |
CN110917595A (en) * | 2019-12-09 | 2020-03-27 | 吉林体育学院 | Ice and snow motion technical action and psychological diathesis trainer |
-
2017
- 2017-08-22 CN CN201721056661.1U patent/CN207168992U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560360A (en) * | 2018-04-11 | 2018-09-21 | 西安健坤游乐设施有限公司 | A kind of split type dry skiing floor tile and dry skiing road |
CN110152269A (en) * | 2019-06-21 | 2019-08-23 | 泰山体育产业集团有限公司 | A kind of ski jump assembly for simulating ski jumping campaign |
CN110152269B (en) * | 2019-06-21 | 2024-04-16 | 泰山体育产业集团有限公司 | Skiing bench assembly for simulating skiing sport |
CN110917595A (en) * | 2019-12-09 | 2020-03-27 | 吉林体育学院 | Ice and snow motion technical action and psychological diathesis trainer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207168992U (en) | A kind of free skiing Aerials summer training place | |
CN206167845U (en) | A intelligent system for skiing sport | |
CN205182148U (en) | Simulation skiing machine | |
CN204840891U (en) | Drought snowslide support frame | |
US7998566B2 (en) | Artificial snow and artificial ski areas | |
CN103405902B (en) | Dry land simulation skiing board | |
CN208569913U (en) | A kind of skiing technology and skull session apparatus for demonstrating | |
CN221014436U (en) | Inclined skiing U-shaped pond four seasons drought snow training field | |
WO2020135895A1 (en) | Moguled piste | |
CN210186406U (en) | Sliding-assisting track for simulating real platform-jumping skiing | |
Zubkova et al. | Theoretical and practical support service for sports elite: foreign experience | |
Wolfsperger et al. | Slope preparation and grooming | |
CN220572636U (en) | Skiing U type pond four seasons drought snow training ground | |
CN117018578A (en) | Inclined skiing U-shaped pond four seasons drought snow training field | |
CN110187074A (en) | A kind of cross-country skiing racing track quality of snow prediction technique | |
CN209828221U (en) | Imitative snow blanket top layer bump device | |
CN209679468U (en) | Slide plate | |
CN211986989U (en) | Intelligent skiing machine | |
CN207980362U (en) | A kind of land ski-running training device | |
CN107185197A (en) | A kind of curling stone used on level land | |
CN201632015U (en) | Wavy slope skating track | |
CN210341544U (en) | Slippery salt field | |
CN116889720A (en) | Skiing U type pond four seasons drought snow training ground | |
Zhao | RETRACTED ARTICLE: Sea level height and swimmer’s physical training based on the detection of actors | |
CN206052497U (en) | A kind of non-irrigated snowslide support meanss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180403 Termination date: 20180822 |