CN207158595U - A kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing - Google Patents
A kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing Download PDFInfo
- Publication number
- CN207158595U CN207158595U CN201721083578.3U CN201721083578U CN207158595U CN 207158595 U CN207158595 U CN 207158595U CN 201721083578 U CN201721083578 U CN 201721083578U CN 207158595 U CN207158595 U CN 207158595U
- Authority
- CN
- China
- Prior art keywords
- hanging beam
- prefabricated
- chute
- superimposed sheet
- ribbing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing, including main hanging beam, main hanging beam is provided with the first suspension ring, main hanging beam is uniformly provided with four points of hanging beams along horizontal circumferencial direction, divide hanging beam front end to be hinged with a pole by kinge-joint knot, divide hanging beam lower surface to be provided with a pin-and-hole, pin-and-hole is provided with a latch, hanging beam one side is divided to be provided with the first chute, pole is with dividing the same side of hanging beam to be provided with the second chute;First chute is provided with a sliding block, and sliding block is provided with a bolt, and a lifting chain is provided with below sliding block, is provided with a fixed plate below lifting chain, fixed plate is provided with a clamping plate.The setting and sliding block lower end that the utility model is hinged on point hanging beam by pole are provided with lifting steel chain and hook so that the utility model is adapted to the lifting of various sizes of prefabricated underplate concrete superimposed sheet with ribbing;The setting of four pieces points of hanging beams, energy uniform stressed extend service life of the present utility model, and lifting is more steady.
Description
Technical field
The utility model belongs to building instrument field, a kind of prefabricated underplate concrete superimposed sheet with ribbing of design, and specifically one
The boom hoisting of the prefabricated underplate concrete superimposed sheet with ribbing of kind.
Background technology
Prefabricated underplate concrete superimposed sheet with ribbing, it is a kind of raw material often used in current building field, but
One problem when being the lifting for prefabricated underplate concrete superimposed sheet with ribbing, what is used instantly is typically all to be caught on directly with hook
Pick up and hang, but the stability deficiency so lifted by crane, and prefabricated underplate concrete superimposed sheet with ribbing can be caused certain
Destroy, be all to use same suspender for various sizes of prefabricated underplate concrete superimposed sheet with ribbing, be not easy to lift by crane.In order to
Solve drawbacks described above, a kind of scheme is now provided.
Utility model content
The purpose of this utility model is to provide a kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing, including main hanging beam, main hanging beam are hung provided with first
Ring, main hanging beam are uniformly provided with four points of hanging beams along horizontal circumferencial direction, divide hanging beam front end to be hinged with a pole by kinge-joint knot, point
Hanging beam lower surface is provided with a pin-and-hole, and pin-and-hole is provided with a latch, divides hanging beam one side to be provided with the first chute, pole is with dividing hanging beam
Same side be provided with the second chute;
First chute is provided with a sliding block, and sliding block is provided with a bolt, a lifting chain is provided with below sliding block, plays chain sling
A fixed plate is provided with below bar, fixed plate is provided with a clamping plate.
Further, the kinge-joint knot is arranged on a point hanging beam upper surface.
Further, the pin-and-hole coordinates with latch gap, and latch both ends are provided with limited block.
Further, first chute and the second chute are located at same level and size is consistent.
Further, the second suspension ring are provided with above the fixed plate, fixed plate is connected by the second suspension ring with lifting chain.
The beneficial effects of the utility model:Under setting that the utility model is hinged on point hanging beam by pole and sliding block
End is provided with lifting steel chain and hook so that the utility model is adapted to various sizes of prefabricated underplate concrete superimposed sheet with ribbing
Lifting, and the foldable support when that need not use, save space;The setting of four pieces points of hanging beams, energy uniform stressed, extends
Service life of the present utility model, lifting are more steady.
Brief description of the drawings
For the ease of it will be appreciated by those skilled in the art that being further described below in conjunction with the accompanying drawings to the utility model.
Fig. 1 is the utility model structure chart;
Fig. 2 be the utility model without lifting chain when upward view;
Embodiment
As shown in Figure 1-2, a kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing, including main hanging beam 1, main hanging beam
1 is provided with the first suspension ring 2, and main hanging beam 1 is uniformly provided with four points of hanging beams 3 along horizontal circumferencial direction, divides the front end of hanging beam 3 to pass through be hinged
Button 4 is hinged with a pole 5, and kinge-joint knot 4 is arranged on the upper surface of point hanging beam 3, and pole 5 can turn to and divides the same level of hanging beam 3,
Play lengthening point and hang beam action, divide the lower surface of hanging beam 3 to be provided with a pin-and-hole 6, pin-and-hole 6 is provided with a latch 7, pin-and-hole 6 and latch 7
Gap coordinates, and the both ends of latch 7 are provided with limited block 8, prevent latch 7 deviate from pin-and-hole 6, latch 7 and pin-and-hole 6 turn in pole 5 and
Play a part of Auxiliary support when dividing 3 same level of hanging beam and limitation pole 5 is rotated further.The one side of hanging beam 3 is divided to be provided with
First chute 9, with dividing the same side of hanging beam 3 to be provided with the second chute 10, the first chute 9 and the second chute 10 are located at pole 5
Same level and size is consistent, a chute can be overlapped into when pole 5 is turned to dividing 3 same level of hanging beam.
First chute 9 is provided with a sliding block 11, and sliding block 11 is provided with a bolt 16, needed for sliding block 11 is fixed on
Position, the lower section of sliding block 11 is provided with a lifting chain 12, and the lower section of lifting chain 12 is provided with a fixed plate 13, set above fixed plate 13
There are the second suspension ring 14, fixed plate 13 is connected by the second suspension ring 14 with lifting chain 12, and fixed plate 13 is provided with a clamping plate 15, is led to
Clamping plate 15 is crossed to clamp prefabricated underplate concrete superimposed sheet with ribbing.
A kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing at work, according to prefabricated underplate concrete with ribbing
The size adjustment slide of superimposed sheet and rotation pole so that size adapts to its lifting, and prefabricated bottom plate with ribbing is clamped with clamping plate
Concrete folding plate, directly lift by crane, when not needed, foldable pole;The utility model is hinged on point by pole
Setting and sliding block lower end on hanging beam are provided with lifting steel chain and hook so that the utility model is adapted to various sizes of pre-
The lifting of underplate concrete superimposed sheet with ribbing, and the foldable support when that need not use are made, saves space;Four pieces points of hanging beams
Setting, can uniform stressed, extend service life of the present utility model, lifting is more steady.
Above content is only to the utility model structure example and explanation, the technology people of affiliated the art
Member is made various modifications or supplement to described specific embodiment or substituted using similar mode, without departing from reality
With new structure or surmount scope defined in the claims, the scope of protection of the utility model all should be belonged to.
Claims (5)
1. a kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing, it is characterised in that including main hanging beam (1), main hanging beam
(1) the first suspension ring (2) are provided with, main hanging beam (1) is uniformly provided with four points of hanging beams (3) along horizontal circumferencial direction, before dividing hanging beam (3)
End is hinged with a pole (5) by kinge-joint knot (4), divides hanging beam (3) lower surface to be provided with a pin-and-hole (6), and pin-and-hole (6) is provided with one and inserted
Sell (7), divide hanging beam (3) one side to be provided with the first chute (9), pole (5) is with dividing the same side of hanging beam (3) to be provided with second
Chute (10);
First chute (9) is provided with a sliding block (11), and sliding block (11) is provided with a bolt (16), one is provided with below sliding block (11)
Lifting chain (12), lifting chain (12) lower section are provided with a fixed plate (13), and fixed plate (13) is provided with a clamping plate (15).
A kind of 2. boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing according to claim 1, it is characterised in that, institute
State kinge-joint knot (4) and be arranged on a point hanging beam (3) upper surface.
A kind of 3. boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing according to claim 1, it is characterised in that, institute
State pin-and-hole (6) with latch (7) gap to coordinate, latch (7) both ends are provided with limited block (8).
A kind of 4. boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing according to claim 1, it is characterised in that, institute
State the first chute (9) and the second chute (10) is located at same level and size is consistent.
A kind of 5. boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing according to claim 1, it is characterised in that, institute
State and the second suspension ring (14) are provided with above fixed plate (13), fixed plate (13) is connected by the second suspension ring (14) and lifting chain (12)
Connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721083578.3U CN207158595U (en) | 2017-08-28 | 2017-08-28 | A kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721083578.3U CN207158595U (en) | 2017-08-28 | 2017-08-28 | A kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207158595U true CN207158595U (en) | 2018-03-30 |
Family
ID=61719333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721083578.3U Expired - Fee Related CN207158595U (en) | 2017-08-28 | 2017-08-28 | A kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207158595U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108545593A (en) * | 2018-05-14 | 2018-09-18 | 合肥智慧龙图腾知识产权股份有限公司 | A kind of tower crane handling plank shackle member |
CN108675112A (en) * | 2018-05-16 | 2018-10-19 | 许继集团有限公司 | Hoisting structure and boom hoisting |
CN109319652A (en) * | 2018-12-10 | 2019-02-12 | 中国五冶集团有限公司 | A kind of superimposed sheet hoisting fixture and superimposed sheet hanging method |
CN109823959A (en) * | 2019-04-04 | 2019-05-31 | 秦皇岛信能能源设备有限公司 | One kind can clamp polyhedral stone tongs |
CN113526327A (en) * | 2021-06-30 | 2021-10-22 | 北京建工建筑产业化投资建设发展有限公司 | Assembled concrete laminated slab floor hoisting structure and construction process |
CN113879947A (en) * | 2020-07-01 | 2022-01-04 | 广东博智林机器人有限公司 | Self-adaptive universal hoisting equipment |
CN113942924A (en) * | 2021-10-15 | 2022-01-18 | 中铁上海工程局集团第五工程有限公司 | Circulation steel reinforcement cage hoist |
-
2017
- 2017-08-28 CN CN201721083578.3U patent/CN207158595U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108545593A (en) * | 2018-05-14 | 2018-09-18 | 合肥智慧龙图腾知识产权股份有限公司 | A kind of tower crane handling plank shackle member |
CN108545593B (en) * | 2018-05-14 | 2019-10-29 | 江苏易明昌建设工程有限公司 | A kind of tower crane handling plate shackle member |
CN108675112A (en) * | 2018-05-16 | 2018-10-19 | 许继集团有限公司 | Hoisting structure and boom hoisting |
CN109319652A (en) * | 2018-12-10 | 2019-02-12 | 中国五冶集团有限公司 | A kind of superimposed sheet hoisting fixture and superimposed sheet hanging method |
CN109823959A (en) * | 2019-04-04 | 2019-05-31 | 秦皇岛信能能源设备有限公司 | One kind can clamp polyhedral stone tongs |
CN113879947A (en) * | 2020-07-01 | 2022-01-04 | 广东博智林机器人有限公司 | Self-adaptive universal hoisting equipment |
CN113526327A (en) * | 2021-06-30 | 2021-10-22 | 北京建工建筑产业化投资建设发展有限公司 | Assembled concrete laminated slab floor hoisting structure and construction process |
CN113942924A (en) * | 2021-10-15 | 2022-01-18 | 中铁上海工程局集团第五工程有限公司 | Circulation steel reinforcement cage hoist |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207158595U (en) | A kind of boom hoisting of prefabricated underplate concrete superimposed sheet with ribbing | |
CN209651700U (en) | Efficient hoisting board tool | |
CN109095343A (en) | Assembled hanger | |
CN204096898U (en) | A kind of steel reinforcement cage integral hoisting suspender | |
CN207748770U (en) | A kind of Auxiliary arm system suitable for mixing arm connection | |
CN207973403U (en) | Cover board suspender | |
CN106629376B (en) | A kind of angle regulation method of Electromagnetic slings for lifting loads | |
CN207030735U (en) | Prefabricated balcony lifts servicing unit | |
CN205419488U (en) | Cement hanging flower basket | |
CN205973449U (en) | Jack -up handling rigging of buffering pulley | |
CN207061641U (en) | One kind classification reinforcing bar hoisting tool | |
CN208814490U (en) | A kind of novel drainage ditch cover plate hanging apparatus | |
CN208948679U (en) | Assembled hanger | |
CN208120544U (en) | A kind of suspender of more suspension centre automatic adjustments | |
CN207108269U (en) | A kind of crane jib structure | |
CN205932979U (en) | Auxiliary fixtures of stand hoist and mount | |
CN211769767U (en) | Angle-adjustable inclined hoisting device | |
CN211920620U (en) | Anti-swing device for crane hook | |
CN208327131U (en) | A kind of single hook lifting device for vertical fluted disc | |
CN205061355U (en) | Shaped steel stone tongs | |
CN212503628U (en) | Marble hoisting and carrying device | |
CN208716685U (en) | Hoisting steel plate fixture | |
CN211338516U (en) | Chemical equipment lifting beam | |
CN209758822U (en) | Hoist of categorised hoist and mount stirrup | |
CN203754378U (en) | Fast overturning device for stacked products |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180330 |
|
CF01 | Termination of patent right due to non-payment of annual fee |