CN207156069U - A kind of crack board forming die - Google Patents
A kind of crack board forming die Download PDFInfo
- Publication number
- CN207156069U CN207156069U CN201721159737.3U CN201721159737U CN207156069U CN 207156069 U CN207156069 U CN 207156069U CN 201721159737 U CN201721159737 U CN 201721159737U CN 207156069 U CN207156069 U CN 207156069U
- Authority
- CN
- China
- Prior art keywords
- bar
- locating rod
- mold slots
- mat reinforcement
- forming die
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model discloses a kind of crack board forming die, and crack board forming die includes mold slots, and some groups of raised lines have been arranged side by side in the mold slots;Also include locating rod, offered in the groove sidewall of mold slots for locating rod horizontal location with the positioning hole group to making flying shore for being molded the bar-mat reinforcement of crevice board.During shaping crevice board is made, bar-mat reinforcement built in crevice board makees steady flying shore by locating rod, the groove sidewall of bar-mat reinforcement and mold slots can leave appropriate gap, locating rod can be detached flexibly in the opportune moment of forming process, detach rear bar-mat reinforcement still keep level overhead positions under the effect of half-formed material, final obtained crevice board by bar-mat reinforcement built-in reinforcement, with excellent pressure resistance performance, and bar-mat reinforcement is coated in plate completely, avoid corrosion of the adverse circumstances such as soda acid humidity to bar-mat reinforcement, ensure long-term use of intensity of crevice board, entirety substantially prolongs the service life of crevice board.
Description
Technical field
It the utility model is related to a kind of crevice board manufacture technology field, in particular to a kind of crack board forming die.
Background technology
The pollution discharge structure on pig farm is particularly significant, and traditional pig farm is all to be directly provided with slurry gutte, by manually being determined
Shi Qingli, excrement is pushed into ground furrow with light instrument, labor intensity is big, clearance time length.Economic betterment therewith, it is currently used for
The pollution discharge structure on ground largely all changes using crevice board to carry out blowdown in animal husbandry livestock house, using set on crevice board
The excrement that livestock is drained in livestock house is discharged to space under plate by crack hole, holding in livestock house is dried, is clean.
Crevice board mainly has cement crevice board, plastics crevice board, cast-iron slatted plate etc. at present, and wherein cement slatted floor is given birth to
Efficiency high is produced, it is durable in use, it is widely adopted.Existing cement crevice board, for the intensity of reinforcing plate, strengthen in that can be provided with plate
Reinforcing bar.Yet with the limitation of production method, the end of stiffener can be exposed in cement crack plate face (outer) in usual plate, or
Person is wrapped by state in incomplete, but crevice board is long-term use of under acid, alkalescence, wet environment, and stiffener is easy
By rust corrosion, eventually largely effect on the intensity of crevice board and shorten the service life of crevice board.
Utility model content
The purpose of this utility model is to provide a kind of crack board forming die, and mold design is succinctly flexible, obtained leakage
Bar-mat reinforcement of the seam plate in it can be coated wherein completely, avoided bar-mat reinforcement rust corrosion and influenceed crevice board intensity and using the longevity
Life.
In order to reach above-mentioned purpose, solution of the present utility model is:
A kind of crack board forming die, includes mold slots, and some groups of raised lines have been arranged side by side in the mold slots;Also include
There is locating rod, offered in the groove sidewall of mold slots for locating rod horizontal location to be hanged to the bar-mat reinforcement for being molded crevice board
The positioning hole group of sky support.
The positioning hole group includes two be located in two relative groove sidewalls, and two positioning holes are in through hole knot
Structure;Or one of positioning hole, in being stretched into through pore structure for locating rod outside mold slots, another is opened in groove sidewall
Inner side and remained silent in outside, positioning is planted for the end hidden of the inserting end of locating rod.
The positioning hole group is provided with least two groups of horizontal Tile, and locating rod is provided with mutually one-to-one at least two groups.
The horizontal Tile direction of at least two groups positioning hole groups is the length direction of mold slots.
The positioning hole group is provided with two layers be distributed up and down.
Also the raised line hole position run through for locating rod level is offered on the raised line.
Some groups of raised lines are divided into two groups along mold slots length direction side by side, and every group is included along mold slots width
Side by side some.
The cross section of the raised line width is in up-narrow and down-wide trapezoidal faces structure.
After such scheme, a kind of crack board forming die of the utility model, relative to the beneficial effect of prior art
It is:Crack board forming die is innovatively coordinated using positional lever structure, so during shaping crevice board is made, crevice board
Built-in bar-mat reinforcement makees steady flying shore by locating rod in mold slots, and the groove sidewall of bar-mat reinforcement and mold slots can leave
Controllable appropriate gap, locating rod can be detached flexibly in the opportune moment of forming process, detach rear bar-mat reinforcement half-formed
Still keep level overhead positions, final obtained crevice board have excellent by the built-in reinforcement of bar-mat reinforcement under material effect
Pressure resistance performance, and bar-mat reinforcement is coated in plate completely, avoids corrosion of the adverse circumstances such as soda acid humidity to bar-mat reinforcement, really
Long-term use of intensity of crevice board is protected, integrally substantially prolongs the service life of crevice board.
Brief description of the drawings
Fig. 1 is the front view of this new crack board forming die;
Fig. 2 is the sectional view of the length direction of this new crack board forming die;
Fig. 3 is the groove inwall schematic diagram of the mold slots of this new crack board forming die;
Fig. 4 is the front view of the crevice board of this new crack board forming die shaping;
Fig. 5 is the side view of the crevice board of this new crack board forming die shaping.
Label declaration
Mold slots 1, vallecular cavity 10, groove sidewall 11, raised line 12, raised line hole position 121, positioning hole group 13,
Locating rod 2, bar-mat reinforcement 3, cross reinforcement bar 31, longitudinal bar bar 32;
Cement plate body 4, slit aperture 41.
Embodiment
This case is described in further detail with reference to embodiment.
This case is related to a kind of crack board forming die, as Figure 1-3, includes mold slots 1 and locating rod 2.
The mold slots 1 have the vallecular cavity 10 surrounded by trench bottom and groove sidewall 11.If it has been arranged side by side in the vallecular cavity 10
Dry group raised line 12.The raised line 12 is the structure to the slit aperture applied to shaping crevice board.The moulding of vallecular cavity 10 of mold slots 1 and chi
The size of the crevice board of shaping needed for very little basis and corresponding design.Such as shaping strip crevice board (size 1.2m*2.5m), seam
Gap opening's edge length direction has two groups side by side, every group of three be provided with the width direction side by side;The vallecular cavity 10 of corresponding mold slots 1
In the rectangular slot structure of corresponding size, some groups of raised lines are divided to 12 for two groups along the length direction of mold slots 12 side by side, every group of bag
Include along the width of mold slots 12 some (corresponding specific embodiments three) side by side.Preferably, raised line 12 is designed as, it is wide
The cross section for spending direction is in up-narrow and down-wide trapezoidal faces structure, and trapezoidal formula knot is corresponded in the slit aperture of the crevice board of this composition
Structure, so it is beneficial to slit aperture and plays timely and effective blowdown effect.
Positioning hole group 13 is offered in the groove sidewall 11 of the mold slots 1, the positioning hole group 13 is used for horizontal for locating rod 2
Positioning is set, so as to realize that locating rod 2 makees flying shore work to the bar-mat reinforcement 3 for being molded crevice board (before crack sheet metal forming)
With.The design of positioning hole group 13 is applied not only to horizontal location locating rod 2, while also preferably detaches operation beneficial to locating rod 2.
According to the difference for detaching mode of locating rod 2, positioning hole group 13 can have no design.Preferred embodiment is provided, is positioned
Hole group 13 includes two be located in two relative groove sidewalls 11, and two positioning holes can be in pore structure be run through, for fixed
Position bar 2 is completely through setting;Particular preferred embodiment, in two positioning holes, one of positioning hole is in pore structure run through, for calmly
Position bar 2 stretches into outside mold slots 1, and another is opened in the inner side of groove sidewall 11 and is in outside closed configuration, for locating rod 2
The end hidden of inserting end plants positioning.In order to which beneficial to the operation to locating rod 2, the locating rod 2 includes bar portion and located at bar
The grip part at size end, grip part design are beneficial to pull and push operation to locating rod 2.
Bar-mat reinforcement 3 specifically includes transverse and longitudinal cross reinforcement bar 31 and longitudinal bar bar 32 arranged in a crossed manner, had in tiling web frame
Body surrounds each raised line 12 with transverse and longitudinal and is preferred (referring to Fig. 1).Preferably, for the steady branch beneficial to locating rod 2 to bar-mat reinforcement 3
Support, is particularly in the gentle support of the bar-mat reinforcement 3 with certain length, and positioning hole group 13 is provided with least the two of horizontal Tile
Group, locating rod 2 are provided with mutually one-to-one at least two groups.It is optimal using two groups, in this way, determining a plane original according to two straight lines
Reason, two groups of supports ensure enough stationarities, while as far as possible few locating rod 2 designs, corresponding to reduce the operation pulled and pushed to it
Number, it is also beneficial to the reliable and stable shaping of product.Further, the horizontal Tile direction of at least two groups positioning hole groups 13 is
The length direction of mold slots 1, i.e. locating rod 2 set the width that bearing of trend is mold slots 1, so lift locating rod
2 support stability, while also can as far as possible shorten locating rod 2 length, lifting locating rod 2 pull and push action simplification, can
By property.
Preferably, positioning hole group 13 can be also designed with two layers be distributed up and down, certain locating rod 2 has corresponding number
Radical.Two layers of bar-mat reinforcement 3 supports the i.e. corresponding confession of double-layer structure up and down, and the crevice board that respective value obtains is built-in with double-deck cold group of reinforcing bar
Web frame.
Preferably, according to the extending design of the positioning hole group 13 and locating rod 2, correspond to and also offered on raised line 12 for fixed
The raised line hole position 121 that the position level of bar 2 runs through.So it is beneficial to strengthen the stability of locating rod 2, beneficial to spacer bar net 3, is beneficial to simultaneously
Locating rod 2 detaches effect, thus lifts the position holding effect that locating rod 2 detaches rear bar-mat reinforcement 3.
A kind of crack board forming die, corresponding crevice board its shaping process, it comprises the following steps:
1) by crack board forming die, locating rod 2 is horizontally inserted positioning hole group 13, so that the horizontal location of locating rod 2
In the groove sidewall 11 of mold slots 1;
2) bar-mat reinforcement 3 is corresponded to and inserted in mold slots 1, and horizontal stable flying shore is made by locating rod 2;
3) by ready material tripping in mold slots 1, the material in mold slots 1 is suitably vibrated;
4) before closing on vibration and terminating, locating rod 2 is extracted out out of mold slots 1, corresponding now material in mold slots 1 gradually
Coagulation forming;And bar-mat reinforcement 3 holding position under the encapsulation of the material vibrated is constant (when being supported by locating rod 2
Position);
5) the product table face pressure mill to shaping in mold slots 1, leveling again, is finally stripped and conserves.
The step 1) -2) in, when the crevice board of double-deck cold group of bar-mat reinforcement built in preparation, the positioning hole prior to next layer
Level is planted into next layer of locating rod 2 in group 13, and the corresponding next layer inserted in mold slots 1 of next layer of bar-mat reinforcement 3 is determined
On the bar 2 of position;Level is planted into last layer locating rod 2 in the positioning hole group 13 of last layer afterwards, and last layer bar-mat reinforcement 3 is right
It should insert in the last layer locating rod 2 in mold slots 1.
In the step 3), the time control vibrated to material is preferred in 2-3 minutes;Further, in the step 4),
The extraction opportunity out of mold slots 1 of locating rod 2 is before the 5-10 seconds that vibration terminates are closed on.The time control, is particularly positioned
The restriction that bar 2 extracts opportunity out is very crucial, that is, ensures that locating rod 2 simply and can be detached reliably, while ensure to detach rear steel
Muscle net 3 can holding position it is constant.
The utility model crack board forming die innovatively uses the respective outer side edges of locating rod 2, is so making shaping crack
During plate, bar-mat reinforcement 3 built in crevice board makees steady flying shore by locating rod 2 in mold slots 1, and the four of bar-mat reinforcement 3
Week and the groove sidewall 11 of mold slots 1 can leave controllable appropriate gap, and locating rod 2 is flexible in the opportune moment of forming process
Detach, detach rear bar-mat reinforcement 3 still keep level overhead positions under the effect of half-formed material, final obtained crevice board is by steel
The built-in reinforcement of muscle net 3, there is excellent pressure resistance performance, and bar-mat reinforcement 3 is coated in plate completely, is avoided well
Corrosion of the adverse circumstances such as soda acid humidity to bar-mat reinforcement 3, it is ensured that long-term use of intensity of crevice board, integrally substantially prolongs crack
The service life of plate.
This case is also corresponding to be related to a kind of new crevice board, as illustrated in figures 4-5, has cement plate body 4, the cement plate body
The multiple tracks slit aperture 41 being arranged side by side is offered on 4.Cement plate body 4 is built-in with two layers of bar-mat reinforcement 3 up and down, every layer of bar-mat reinforcement 3
Include cross reinforcement bar 31 and longitudinal bar bar 32, the cross reinforcement bar 31 and the transverse and longitudinal of longitudinal bar bar 32 intersection surround each gap entirely
Mouth 41 is set;The respective both ends of cross reinforcement bar 31 and longitudinal bar bar 32 are completely hidden in cement plate body 4.
Every layer of bar-mat reinforcement 3 is completely hidden in cement plate body 4, then states the respective of each cross reinforcement bar 31 and longitudinal bar bar 32
The cement plate body of both ends and correspondence position leaves spacing 5 in 4 weeks between.Preferably, the spacing 5 controls is preferred in 1-3cm, i.e.,
Entirety effective support reinforcing of the bar-mat reinforcement 3 to cement plate body 4 is ensure that, also ensures that the disguise of bar-mat reinforcement 3, avoids soda acid damp
Etching problem of the adverse circumstances such as wet to bar-mat reinforcement 3, it is ensured that long-term use of intensity of crevice board, integrally substantially prolongs crevice board
Service life.
The design of two layers of bar-mat reinforcement 3 is also one of main innovation design of this new crevice board, cold by the bilayer
Bar-mat reinforcement design is dialled, then coordinates the full encirclement of slit aperture to rationally design, obtained crevice board intensity is fabulous, and (at least C35 is strong
Degree), there is excellent pressure resistance ability.In specific design, crevice board gross thickness is that 10cm is a preferred embodiment.Two layers of reinforcing bar
Net 3 is top mat and lower floor's bar-mat reinforcement, wherein referring to Fig. 2, the spacing between top mat and cement plate body top surface is
L1, the spacing between top mat and lower floor's bar-mat reinforcement are L2, and the spacing between lower floor's bar-mat reinforcement and cement plate body bottom surface is L3,
Preferably, L1:L2:L3 is 1.15-1.25:1.4-1.5:1, so further optimize the pressure resistance performance of crevice board.
Cross reinforcement bar 31 and longitudinal bar bar 32 the transverse and longitudinal intersection is surrounded each slit aperture 41 and set entirely, full bag herein
Setting is enclosed, refers to that the surrounding of each slit aperture 41 at least makees transverse and longitudinal intersection by two cross reinforcement bars 31 and two longitudinal bar bars 32
Surround.In specific embodiment, slit aperture 41 is divided to for two groups along the length direction of cement plate body 4 side by side, and every group is included along cement
Some (3) of the width of plate body 4 side by side;It is vertical including four cross reinforcement bars 31 and three then to correspond to every layer of bar-mat reinforcement 3
Reinforcing rod 32, three longitudinal bar bars 32 are in be staggered one by one with two groups of slit apertures 41, four cross reinforcement bars 31 and every group of gap
3 of mouth 41 are in be staggered one by one.
Preferably, the slit aperture 41 is in up-narrow and down-wide trapezoidal slit aperture, is so played in time beneficial to slit aperture 41
Effective blowdown effect again.The slit width of slit aperture 41 can be typically set at 2.5cm according to being actually needed in setting, such as practice
And/or 3.8cm, the width of the solid bars of the composition slit aperture of cement plate body 4 are set to 15cm.This is new especially suitable for super
Elongated crevice board, such as 1.2m (width) * 2.5m (length), or 1.2m (width) * 3.0m (length).Crevice board also may be designed as half tool
There is slit aperture, second half is solid structure.
The foregoing is only preferred embodiment of the present utility model, it is all done with the utility model claims scope it is equal
Deng change and modify, the scope of the utility model claims all should be belonged to.
Claims (6)
- A kind of 1. crack board forming die, it is characterised in that:Include mold slots, be arranged side by side in the mold slots some groups it is convex Bar;Also include locating rod, offered in the groove sidewall of mold slots for locating rod horizontal location with to for being molded crevice board Bar-mat reinforcement makees the positioning hole group of flying shore.
- A kind of 2. crack board forming die as claimed in claim 1, it is characterised in that:The positioning hole group includes being located at relatively Two groove sidewalls on two, two positioning holes are in running through pore structure;Or one of positioning hole is in run through pore structure Stretched into for locating rod outside mold slots, another is opened in the inner side of groove sidewall and remained silent in outside, for stretching into for locating rod The end hidden at end plants positioning.
- A kind of 3. crack board forming die as claimed in claim 1, it is characterised in that:The positioning hole group is provided with horizontal Tile At least two groups, locating rod is provided with mutually one-to-one at least two groups.
- A kind of 4. crack board forming die as claimed in claim 3, it is characterised in that:The water of at least two groups positioning hole groups Flat direction side by side is the length direction of mold slots.
- A kind of 5. crack board forming die as claimed in claim 1, it is characterised in that:The positioning hole group is provided with upper and lower point Two layers of cloth.
- A kind of 6. crack board forming die as claimed in claim 1, it is characterised in that:Also offered for positioning on the raised line The raised line hole position that bar level runs through.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721159737.3U CN207156069U (en) | 2017-09-09 | 2017-09-09 | A kind of crack board forming die |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721159737.3U CN207156069U (en) | 2017-09-09 | 2017-09-09 | A kind of crack board forming die |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207156069U true CN207156069U (en) | 2018-03-30 |
Family
ID=61721122
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721159737.3U Expired - Fee Related CN207156069U (en) | 2017-09-09 | 2017-09-09 | A kind of crack board forming die |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207156069U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107457886A (en) * | 2017-09-09 | 2017-12-12 | 福建省东方水泥制品有限公司 | A kind of crack board forming die and its its shaping process |
-
2017
- 2017-09-09 CN CN201721159737.3U patent/CN207156069U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107457886A (en) * | 2017-09-09 | 2017-12-12 | 福建省东方水泥制品有限公司 | A kind of crack board forming die and its its shaping process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203369154U (en) | Flue-cured tobacco floating breeding facility | |
CN207156069U (en) | A kind of crack board forming die | |
CN208509698U (en) | A kind of dismountable modular plant wall | |
CN107457886A (en) | A kind of crack board forming die and its its shaping process | |
CN205180114U (en) | A shine back of body platform device and rice soft -shelled turtle intergrowth field for intergrowth of rice soft -shelled turtle | |
CN105952255A (en) | Vertical greening wall and building method | |
CN214338891U (en) | Balcony vegetable planting insulation construction | |
CN102939945B (en) | Horizontal-grate barrier-free matured silkworm mounting device | |
CN106759136B (en) | Bottom formula emptying gate and application method are inhaled in a kind of pond culturing system | |
CN206324058U (en) | It is a kind of to collect the breeding apparatus of type lepidopterous insects pupa, adult and ovum of pupating that buries | |
CN108642779A (en) | A kind of mixing apparatus of synthetic leather production base fabric and solution | |
CN205557893U (en) | Afforestation building | |
CN108144909A (en) | A kind of Poria cocos processing cleaning device | |
CN208490620U (en) | A kind of aquaculture pond | |
CN205756704U (en) | A kind of striped rice borer trapper | |
CN203219846U (en) | Venlo-type frame insect-prevention net chamber for pollution-free paddy rice cultivation | |
CN207720905U (en) | A kind of sheep hurdle dedicated cleaning apparatus | |
CN215074156U (en) | Three-dimensional comprehensive greening system for building outer wall | |
CN106172252A (en) | A kind of high-survival rate Hirudo hatching, cultivating pond | |
CN205839816U (en) | Water collecting and drainage system under a kind of basement bottom board | |
CN210641941U (en) | Gosling breeding device convenient to wash and ventilate | |
CN208173706U (en) | Lead carbon battery grid with flat cast gate | |
CN203257146U (en) | Preserving pond for aquatic plant resources | |
CN220088092U (en) | Seedling device is tempered in amygdalus pedunculata tissue culture | |
CN115448572B (en) | Beef cattle raising cowshed excrement and urine environmental protection processing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180330 Termination date: 20190909 |