CN207144954U - Constructing tunnel integrates chassis - Google Patents

Constructing tunnel integrates chassis Download PDF

Info

Publication number
CN207144954U
CN207144954U CN201720916429.4U CN201720916429U CN207144954U CN 207144954 U CN207144954 U CN 207144954U CN 201720916429 U CN201720916429 U CN 201720916429U CN 207144954 U CN207144954 U CN 207144954U
Authority
CN
China
Prior art keywords
chassis
walking
self
trestle
constructing tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720916429.4U
Other languages
Chinese (zh)
Inventor
龚岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720916429.4U priority Critical patent/CN207144954U/en
Application granted granted Critical
Publication of CN207144954U publication Critical patent/CN207144954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to constructing tunnel facility field, specifically disclose a kind of constructing tunnel synthesis chassis, including controlling organization, also include the track for being laid on tunnel internal, and controlled by the controlling organization, and the constructing tunnel synthesis chassis body that walking is in orbit, constructing tunnel synthesis chassis body includes the two lining reinforcement trolleys set gradually from tunnel face to face and earth water-proof plate chassis, self-propelled trestle is provided with inside two lining reinforcement trolleys and earth water-proof plate chassis and is provided from the first walking rail of line trestle walking, self-propelled trestle front lower portion is provided with the first pedrail bearing, self-propelled trestle and the first pedrail bearing control by controlling organization.Self-propelled trestle is put into inside two lining reinforcement trolleys and earth water-proof plate platform by this programme, and it is self-propelled trestle counterweight to allow it, is avoided self-propelled trestle and is deliberately lengthened and caused deformation and unsafe phenomenon of constructing to reach full-length.

Description

Constructing tunnel integrates chassis
Technical field
The utility model belongs to constructing tunnel facility technology field.
Background technology
The constructing tunnel engineering of China is generally all to carry out in the following order when being constructed, 1, the side entered before hole, Inverted arch is constructed;2nd, the construction of super-front large pipe shed;3rd, measurement and positioning unwrapping wire;4th, drill, blow out;5th, slag tap, beat anchor pole, peace bow member (Supporting), concrete ejection(Including just spraying and filling spray);6th, advance anchor bolt(After pipe canopy section);7th, surveying setting-out;And V level country rocks It is that two lining concrete linings must not be more than 90 meters away from face that safe distance is required during excavation, and two linings are required when V levels country rock excavates Concrete lining must not be more than 70 meters away from face, and two lining concrete linings need to use the lined steel of equipment two respectively away from face Muscle chassis, earth water-proof plate chassis, trestle, excavation and bow member installation chassis, face is because of construction process requirement such as three steps Excavate or two bench excavations have excavation platform to occupy, or original construction method is because of suppression arch, earth water-proof plate, two lined steels Muscle, two lining concrete lining speed not as a rate of advance it is fast, working procedure linking degree is weak, so cause safe distance exceeded, Construction safety cannot be guaranteed, tunnel structure deforms because can not form closed loop in time, cause not being inconsistent the safety such as quality requirement and matter Amount accident.
And it is that trestle length will reach 3 12 meters in inverted arch construction process requirement(12 meters are a mould two lining concrete lining The adjoining rock of chassis)First 12 meters are suppression arch maintenances, and second 12 meters are to pacify bow member, tie up reinforcing bar, formwork erection, lining cutting, the 3rd Individual 12 meters are that digging is plowed in suppression.So existing equipment length is unable to reach technological requirement length, and if simply lengthening trestle, trestle One length, walking is just very inconvenient, and the phenomenon bent easily occurs, causes construction technology, construction quality and progress can not The problem of guarantee.
Utility model content
The purpose of this utility model is to solve existing trestle when carrying out inverted arch construction, construction technology, construction quality The problem of can not ensureing with progress.
In order to achieve the above object, base case of the present utility model provides a kind of constructing tunnel synthesis chassis, including control Mechanism processed, in addition to the track of tunnel internal is laid on, and by controlling organization control and tunnel in orbit of walking The comprehensive chassis body of construction, the constructing tunnel synthesis chassis body include two lined steels set gradually from tunnel face to face Muscle chassis and earth water-proof plate chassis, two lining reinforcement trolleys and earth water-proof plate chassis inside are provided with self-propelled trestle and confession First walking rail of self-propelled trestle walking, the self-propelled trestle front lower portion are provided with the first pedrail bearing, it is described oneself Line trestle and the first pedrail bearing control by controlling organization.
The principle of this base case is, when carrying out constructing tunnel operation, installation combines constructing tunnel synthesis chassis, It is to be punctured, blow out, excavate slagging-off after first by controlling organization control self-propelled trestle from two lining reinforcement trolleys, geotextiles waterproof Pallet in-car portion moves along the first walking rail toward tunnel tunnel face direction, after particular location is advanced to, controlling organization control the One pedrail bearing is stretched out, and self-propelled trestle is supported on tunnel ground, carries out the construction working of inverted arch, and is applied in inverted arch After the completion of work splash guard geotextiles and two linings and then can be carried out successively using earth water-proof plate platform, two lining reinforcement trolleys The laying of reinforcing bar.
The beneficial effect of this base case is,
1st, because inverted arch construction process requirement is, trestle length will reach 3 12 meters, and first 12 meters are suppression arch maintenances, Second 12 meters are to pacify bow member, tie up reinforcing bar, formwork erection, lining cutting, and the 3rd 12 meters are that digging is plowed in suppression, if so simple reinforcement stack The length of bridge can make its walking very inconvenient, and the phenomenon bent easily occur, can not ensure technique and construction safety, this Self-propelled trestle is put into inside two lining reinforcement trolleys and earth water-proof plate platform by scheme, it is matched somebody with somebody for self-propelled trestle Weight, avoid self-propelled trestle and deliberately lengthened and caused deformation and unsafe phenomenon of constructing to reach full-length.
2nd, due to original construction method because suppression arch, earth water-proof plate, two lined steel muscle, two serve as a contrast concrete lining speed due to The diversity of constructing device, need to be changed between constructing device, make it be not as fast as a rate of advance, so causing safe distance It is exceeded, construction safety cannot be guaranteed, tunnel structure because the deflection that can not form closed loop in time greatly caused by be not inconsistent quality requirement Etc. safety and quality accident, and present apparatus constructing tunnel integrates the setting of chassis, and construction safety is ensure that from trolley structure design Distance and working procedure linking, mechanization degree, which improves, further improves speed of application, reduces labor strength, reduces Requirement to quality of workers.
Scheme two, scheme is preferred based on this, in addition at least one translation for walking on self-propelled trestle is small Car, the self-propelled trestle are provided with the second walking rail for translating trolleys walking, and the translating trolleys bottom is provided with rail wheel, The translating trolleys are provided with by the lifting working platform of controlling organization control, self balancing device, drilling-hole positioning device, anchor Bar positioner, impact gun positioner and manipulator.Lifting working platform in translating trolleys, jacking apparatus and manipulator are set Put, be manually entered lifting and bow member of the lifting working platform according to the construction demand modeling lifting working platform of reality Jacking, complete to drilling, to beat anchor pole and the accurate operation of bow member is installed, the setting of manipulator can be front and rear to bow member progress, left The action such as right, upper and lower, rotation, inclination, so that bow member is accurately in place.
Scheme three, this is preferred for scheme two, in addition to excavation and the bow member installation inside self-propelled trestle of walking Trolley track, the self-propelled trestle inside is provided with the second track for excavating and bow member installation trolley track slides, described to open Dig and bow member installation trolley track is provided with the third line walked for translating trolleys and walks rail, the translating trolleys can walk the 3rd Walk on rail, excavation and bow member the installation trolley track front lower portion is provided with the second pedrail bearing, the excavation and arch Frame installs trolley track and the second pedrail bearing controls by controlling organization.Self-propelled trestle and excavation and bow member erecting bed Track road carries out controllable traveling by the actual progress of construction, after then carrying out its traveling by the second pedrail bearing Support, the setting flexibility of the present apparatus is strong, and controllability is strong, can be very good to construct to the tunnel of various distances, and Trolley track can be installed to excavation and bow member by self-propelled trestle and carry out counterweight.
Scheme four, scheme is preferred to any one of scheme three based on this, in addition to can walk outside self-propelled trestle, And the monoblock type inverted arch template controlled by controlling organization, the self-propelled trestle are provided with for the walking of monoblock type inverted arch template Four walking rails.Because existing inverted arch template typically only has side mould, the inverted arch after being molded only has both ends curved, and interposition is mixed Solidifying soil gravity flow plane, it is the combination of diverse location inverted arch, it is impossible to inverted arch, arch wall and abutment wall is formed a complete arc and closes Ring, and wasted time and energy when installation inverted arch template and side mould, the setting of the present apparatus can realize the disposable lining cutting shaping of inverted arch, make It forms complete arc closed loop, thoroughly realizes the construction requirement in tunnel, makes its mechanical property splendid, and because monoblock type is faced upward It is big to encircle template weight, so the setting of this programme makes it from walking on self-propelled trestle, it is laborsaving and improve processing technology And efficiency.
Scheme five, this is the preferred of base scheme two or scheme three, and the translating trolleys profile is that imitative tunnel vault arc is set The arc of meter.Translating trolleys imitate the design of tunnel vault arcuate profile, are easy to translating trolleys to be walked in tunnel, space utilization By force.
Scheme six, this is preferred for scheme four, and the monoblock type inverted arch masterplate also includes upset end mould and contraction type center Ditch mould.Monoblock type inverted arch template can realize that full mould is encircleed in suppression by coordinating with upset end mould, contraction type Central drain mould Pour work.
Scheme seven, this is preferred for scheme four, and the self-propelled trestle and monoblock type inverted arch masterplate are detachably connected.It is overall Formula inverted arch template freely loads and unloads the flexibility for adding the present apparatus with self-propelled trestle.
Scheme eight, scheme is preferred based on this, and the earth water-proof plate chassis includes the arc that imitative arched tunnel is set The electronic capstan of the bitubular of the walking dolly and driving walking dolly of shape walking track, walking on arc walking track, it is described The electronic capstan connection control mechanism of the bitubular, the walking dolly bottom are provided with road wheel.After concreting, work as tunnel arch The laying of earth water-proof plate is carried out after installing, the walking dolly of earth water-proof plate chassis, is driven in the electronic capstan of the bitubular Under moving, earth water-proof plate is plated in container movement by walking on arc walking track, so as to by its built-in geotextiles or prevent Water plate is plated in along Tunnel wall.
Scheme nine, scheme is preferred based on this, and the road wheel is three-dimensional wheel, and the walking track is arc pipe. The design of three-dimensional wheel, by using the three-dimensional wheel principle of roller-coaster, effectively avoid carrier loader in the process of running inclined Move, carrier loader is operated steadily the matching design at no dead point, pipe and three-dimensional wheel, ensure that carrier loader in the process of running Fluency, stability and smoothness.
Scheme ten, scheme is preferred based on this, and the two linings reinforcement trolley includes hoist engine, is arranged on two lined steel muscle platforms Arch steel container, the neck and circumferential reinforcement lifting body that are located at reinforcing bar container in of the car close to tunnel face one end.Complete Geotextiles waterproof version be plated in work after, carry out two lined steel muscle laying, two lining reinforcement trolleys can realize two lining circumferential reinforcements Automation carries paving top., will by hoisting mechanism if the suitable length of the Heavenly Stems and Earthly Branches is pre-bent into circumferential reinforcement to be fitted into the neck in reinforcing bar container Reinforcing bar container is overturn to chassis end face by ground, then is dialed out to one by one circumferentially uniformly, and and tunnel from neck by circumferential reinforcement By some groups of parallel longitudinal reinforcing bar knock-pins, the circumferential reinforcement of one-to-one setting is buckled in translation transmission device and obtained in locating slot And it is fixed, rotate once, be repeated in two lining circumferential reinforcements being distributed on into two lined steel muscle trolley surfaces, start circumferential reinforcement Reinforcing bar can be risen to and require position by lifting body.
Brief description of the drawings
Fig. 1 is the front view that the utility model constructing tunnel integrates chassis embodiment one;
Fig. 2 is the left view that the utility model constructing tunnel integrates chassis embodiment one;
Fig. 3 is the front view that the utility model constructing tunnel integrates chassis embodiment two;
Fig. 4 is the left view that the utility model constructing tunnel integrates chassis embodiment two;
Fig. 5 is the front view that the utility model constructing tunnel integrates chassis embodiment three;
Fig. 6 is the left view that the utility model constructing tunnel integrates chassis embodiment three;
Fig. 7 is the front view that the utility model constructing tunnel integrates chassis example IV;
Fig. 8 is the left view that the utility model constructing tunnel integrates chassis example IV;
Fig. 9 is the front view that the utility model constructing tunnel integrates chassis embodiment five;
Figure 10 is the left view that the utility model constructing tunnel integrates chassis embodiment five;
Figure 11 is the front view that the utility model constructing tunnel integrates chassis embodiment six;
Figure 12 is the left view that the utility model constructing tunnel integrates chassis embodiment six.
Embodiment
The utility model is described in further detail below by embodiment,
Reference in Figure of description includes, two lining reinforcement trolleys 1, earth water-proof plate chassis 2, self-propelled trestle 3rd, the first pedrail bearing 4, the second pedrail bearing 5, translating trolleys 6, excavation and bow member installation trolley track 7, entirety Formula inverted arch template 8.
Constructing tunnel integrates chassis, and embodiment one substantially as shown in Figures 1 and 2, including controlling organization, includes spreading It is located at the track of tunnel internal and is controlled by the controlling organization, and the constructing tunnel synthesis chassis body for walking in orbit, Constructing tunnel synthesis chassis body includes the two lining reinforcement trolleys 1 set gradually from tunnel face to face and earth water-proof plate Chassis 2, earth water-proof plate chassis 2 include the arc that imitative arched tunnel is set and walk track, walking on arc walking track Walking dolly and drive walking dolly the electronic capstan of the bitubular, the electronic capstan connection control mechanism of the bitubular, walking dolly bottom Portion is provided with road wheel.
Road wheel is three-dimensional wheel, and walking track is arc pipe, and two lining reinforcement trolleys 1 include hoist engine, are arranged on two linings Arch steel container, the neck and circumferential reinforcement lifting body that are located at reinforcing bar container in of the reinforcement trolley 1 close to tunnel face one end, Two lining reinforcement trolleys 1 and the inside of earth water-proof plate chassis 2 are provided with self-propelled trestle 3 and are provided from the first of the walking of line trestle 3 Walking rail, the front lower portion of self-propelled trestle 3 are provided with the first pedrail bearing 4, the pedrail bearing of self-propelled trestle 3 and first 4 control by controlling organization.
It is to be punctured, blow out, excavate slagging-off when carrying out tunnel excavation work, when entrance construction preparation finishes, hole It is outer or interior when having enough installation sites, from tunnel face to face successively by two serve as a contrast reinforcement trolleys 1, earth water-proof plate chassis 2, Self-propelled trestle 3, in order from front to back, installation is carried out from outside to inside and is combined, first by controlling organization by self-propelled stack Bridge 3 is inside two lining reinforcement trolleys 1, earth water-proof plate chassis 2 along the first walking rail automatic moving, particular location to be advanced to Afterwards, controlling organization controls the first pedrail bearing 4 to stretch out, and self-propelled trestle 3 is supported on tunnel ground, carries out inverted arch Construction working, and and then can be carried out successively using earth water-proof plate platform, two lining reinforcement trolleys 1 after the completion of inverted arch construction The laying of splash guard geotextiles and two lined steel muscle, the three-dimensional wheel walking dolly on earth water-proof plate chassis 2 are electronic in the bitubular Under capstan driving, walk on track of arcuately walking, so as to deploy its built-in geotextiles along Tunnel wall, be plated in, complete After the installation of one mould geotextiles, repeat above-mentioned action and carry out being plated in for splash guard.
After completing mould earth water-proof plate installation, the laying of two lined steel muscle is carried out, two lining reinforcement trolleys 1 can realize two linings The automation of circumferential reinforcement carries paving top, is fitted into if the Heavenly Stems and Earthly Branches are fitted into long circumferential reinforcement in the neck in reinforcing bar container, passes through hoist engine Arch steel container is overturn 90 ° to chassis end face by structure by ground, and being repeated in above-mentioned action can be equal by two lining circumferential reinforcements Cloth serves as a contrast the surfaces of reinforcement trolley 1 two, starts circumferential reinforcement lifting body, circumferential reinforcement is jacked to two lined steel muscle and leans on hole wall end position Put, after the laying of the lined steel muscle of ring two is completed, vertical ring steel is manually carried out in the case where the positioning of longitudinal reinforcement positioning fixture helps Muscle colligation, after the completion of this layer of reinforcing bar binding work, above-mentioned work is repeated, realize that two lined steel muscle connect by hole medial extremity colligation and interlayer Muscle colligation is connect, after the completion of a die worker makees completely, the traveling one in orbit of controlling organization control tunnel integrated construction chassis body Mould, circulating repetition carry out the work of next mould, two lining concrete lining trolley follow-ups, carry out lining cutting work.
Self-propelled trestle 3 is put into inside two lining reinforcement trolleys 1 and earth water-proof plate platform by this programme, and it is certainly to allow it The counterweight of line trestle 3, avoid self-propelled trestle 3 in order to reach full-length deliberately lengthen and it is caused deformation and construct dangerous Phenomenon.And it ensure that construction safety distance and working procedure linking, mechanization degree are improved into one from trolley structure design Step improves speed of application, reduces labor strength, reduces the requirement to quality of workers.
Embodiment two is basic as shown in accompanying drawing 3 and accompanying drawing 4, and differing only in for embodiment one, in addition at least one Can be walked the translating trolleys 6 on self-propelled trestle 3, and self-propelled trestle 3 is provided with the second walking walked for translating trolleys 6 Rail, the profile of translating trolleys 6 are the arc of imitative tunnel vault cambered design, and the bottom of translating trolleys 6 is provided with rail wheel, translating trolleys 6 Be provided with by controlling organization control lifting working platform, self balancing device, drilling-hole positioning device, anchor rod locating device, Impact gun positioner and manipulator.
After self-propelled trestle 3 is walked out, translating trolleys 6 are walked on the second walking rail and constructed, and worker enters translation On the lifting working platform of dolly 6, the materials such as anchor pole, bow member are placed on translating trolleys 6, according to the construction demand of reality Lifting and the manipulator of lifting working platform are controlled, completes drilling, anchor pole is beaten and the accurate operation of vault bow member, machine is installed Tool hand can to bow member carry out around, up and down, rotation, tilt etc. action so that bow member is accurately in place.
Embodiment three, substantially as shown in accompanying drawing 5 and accompanying drawing 6, and differing only in for embodiment two, include walking at oneself Excavation and bow member installation trolley track 7, the inside of self-propelled trestle 3 inside line trestle 3 are provided with for excavation and bow member erecting bed The second track that track road 7 slides, is excavated and bow member installation trolley track 7 is provided with the third line walked for translating trolleys 6 and walked Rail, translating trolleys 6 can walk to walk on rail in the third line, excavate and the bow member installation front lower portion of trolley track 7 is provided with the second crawler belt Dolly bearing 5, is excavated and the bow member installation pedrail bearing 5 of trolley track 7 and second controls by controlling organization.
Excavate and bow member installation trolley track 7 is advanced to after face, its row is carried out by the second pedrail bearing 5 Support after entering, controlling organization control translating trolleys 6 walk track in the third line and longitudinally move to tunnel tunnel face, to face Constructed, the actual progress that self-propelled trestle 3 and excavation and bow member installation trolley track 7 pass through construction carries out controllable row Enter.The setting flexibility of the present apparatus is strong, and controllability is strong, can be very good to construct to the tunnel of various distances, and can be with Trolley track 7 is installed to excavation and bow member by self-propelled trestle 3 and carries out counterweight.
Example IV, substantially as shown in accompanying drawing 7 and accompanying drawing 8, and differing only in for embodiment one, in addition to can walk Outside self-propelled trestle 3, and the monoblock type inverted arch template 8 controlled by controlling organization, monoblock type inverted arch masterplate also include upset end Mould and contraction type Central drain mould, self-propelled trestle 3 are provided with the fourth line walked for monoblock type inverted arch template 8 and walk rail, voluntarily Formula trestle 3 and monoblock type inverted arch masterplate are detachably connected.
Because existing inverted arch template typically only has side mould, the inverted arch after being molded only has both ends curved, and interposition is mixed Solidifying soil gravity flow plane, it is the combination of diverse location inverted arch, it is impossible to inverted arch, arch wall and abutment wall is formed a complete arc and closes Ring, and wasted time and energy when installation inverted arch template and side mould, the setting of the present apparatus can realize the disposable lining cutting shaping of inverted arch, whole Body formula inverted arch template 8 can realize that suppression encircles full mould and pours work by coordinating with upset end mould, contraction type Central drain mould, Complete arc closed loop is formed it into, thoroughly realizes the construction requirement in tunnel, makes its mechanical property splendid, and due to monoblock type The weight of inverted arch template 8 is big, and in construction, it is walked in fourth line by controlling organization control walking and constructed on rail, and this programme saves Power and the construction technology and efficiency for improving inverted arch.
Embodiment five, substantially as shown in accompanying drawing 9 and accompanying drawing 10, and differing only in for embodiment two, in addition to can walk Outside self-propelled trestle 3, and the monoblock type inverted arch template 8 controlled by controlling organization, monoblock type inverted arch masterplate also include upset Mould and contraction type Central drain mould are held, self-propelled trestle 3 is provided with the fourth line walked for monoblock type inverted arch template 8 and walks rail, from Line trestle 3 and monoblock type inverted arch masterplate are detachably connected.
Because existing inverted arch template typically only has side mould, the inverted arch after being molded only has both ends curved, and interposition is mixed Solidifying soil gravity flow plane, it is the combination of diverse location inverted arch, it is impossible to inverted arch, arch wall and abutment wall is formed a complete arc and closes Ring, and wasted time and energy when installation inverted arch template and side mould, the setting of the present apparatus can realize the disposable lining cutting shaping of inverted arch, whole Body formula inverted arch template 8 can realize that suppression encircles full mould and pours work by coordinating with upset end mould, contraction type Central drain mould, Complete arc closed loop is formed it into, thoroughly realizes the construction requirement in tunnel, makes its mechanical property splendid, and due to monoblock type The weight of inverted arch template 8 is big, and in construction, it is walked in fourth line by controlling organization control walking and constructed on rail, and this programme saves Power and the construction technology and efficiency for improving inverted arch.
Embodiment six, substantially as shown in accompanying drawing 11 and accompanying drawing 12, and differing only in for embodiment three, in addition to can walk Outside self-propelled trestle 3, and the monoblock type inverted arch template 8 controlled by controlling organization, monoblock type inverted arch masterplate also include upset Mould and contraction type Central drain mould are held, self-propelled trestle 3 is provided with the fourth line walked for monoblock type inverted arch template 8 and walks rail, from Line trestle 3 and monoblock type inverted arch masterplate are detachably connected.
Because existing inverted arch template typically only has side mould, the inverted arch after being molded only has both ends curved, and interposition is mixed Solidifying soil gravity flow plane, it is the combination of diverse location inverted arch, it is impossible to inverted arch, arch wall and abutment wall is formed a complete arc and closes Ring, and wasted time and energy when installation inverted arch template and side mould, the setting of the present apparatus can realize the disposable lining cutting shaping of inverted arch, whole Body formula inverted arch template 8 can realize that suppression encircles full mould and pours work by coordinating with upset end mould, contraction type Central drain mould, Complete arc closed loop is formed it into, thoroughly realizes the construction requirement in tunnel, makes its mechanical property splendid, and due to monoblock type The weight of inverted arch template 8 is big, and in construction, it is walked in fourth line by controlling organization control walking and constructed on rail, and this programme saves Power and the construction technology and efficiency for improving inverted arch.
In the utility model, face and two lined steel muscle and the distance of face and inverted arch are all in accordance with constructing tunnel standard Carry out, size of the present utility model is specifically set according to different condition of construction.
The setting of this programme, when carrying out track construction, fitness is strong, and can be carried out on same comprehensive stand Tunnel excavation, bow member installation, two lined steel muscle colligations and splash guard are plated in the construction working of integration, and process operation is simple, process Between cooperate it is close, after the completion of previous item process, it is not necessary to which disassembly and assembly is constructed apparatus, is and then directly carried out down The construction working of one process, dramatically saves on the time, improve efficiency.
The general knowledge such as known concrete structure and characteristic does not describe excessively herein in scheme.It should be pointed out that for this area Technical staff for, on the premise of the utility model structure is not departed from, several modifications and improvements can also be made, these The scope of protection of the utility model should be considered as, these are all without the practicality for influenceing effect and patent that the utility model is implemented Property.The scope of protection required by this application should be based on the content of the claims, the note such as embodiment in specification Carry the content that can be used for explaining claim.

Claims (10)

1. constructing tunnel integrates chassis, including controlling organization, it is characterised in that the track that also includes being laid on tunnel internal and by The controlling organization control, and the constructing tunnel synthesis chassis body for walking in orbit, the constructing tunnel integrate chassis sheet Body includes the two lining reinforcement trolleys and earth water-proof plate chassis set gradually from tunnel face to face, two lining reinforcement trolleys and Self-propelled trestle is provided with inside earth water-proof plate chassis and is provided from the first walking rail of line trestle walking, the self-propelled stack Bridge front lower portion is provided with the first pedrail bearing, and the self-propelled trestle and the first pedrail bearing are by controlling organization control System.
2. constructing tunnel according to claim 1 integrates chassis, it is characterised in that is also walked including at least one certainly Translating trolleys on line trestle, the self-propelled trestle are provided with the second walking rail for translating trolleys walking, the translation Small car bottom is provided with rail wheel, and the translating trolleys are provided with the lifting working platform by controlling organization control, self-balancing Device, drilling-hole positioning device, anchor rod locating device, impact gun positioner and manipulator.
3. constructing tunnel according to claim 2 integrates chassis, it is characterised in that also includes walking in self-propelled trestle Excavation and bow member the installation trolley track in portion, the self-propelled trestle inside is provided with slides for excavation and bow member installation trolley track The second track, the third line that excavation and bow member the installation trolley track is provided with for translating trolleys walking walks rail, described flat Moving dolly can walk to walk on rail in the third line, and excavation and bow member the installation trolley track front lower portion is provided with the second pedrail Bearing, excavation and bow member the installation trolley track and the second pedrail bearing control by controlling organization.
4. the constructing tunnel synthesis chassis according to claim any one of 1-3, it is characterised in that also include to walk certainly Outside line trestle, and the monoblock type inverted arch template controlled by controlling organization, the self-propelled trestle are provided with and faced upward for monoblock type The fourth line of arch template walking walks rail.
5. the constructing tunnel synthesis chassis according to Claims 2 or 3, it is characterised in that the translating trolleys profile is imitative The arc of tunnel vault cambered design.
6. constructing tunnel according to claim 4 integrates chassis, it is characterised in that the monoblock type inverted arch masterplate also includes Upset end mould and contraction type Central drain mould.
7. constructing tunnel according to claim 4 integrates chassis, it is characterised in that the self-propelled trestle and monoblock type are faced upward Arch masterplate is detachably connected.
8. constructing tunnel according to claim 1 integrates chassis, it is characterised in that the earth water-proof plate chassis includes Walking dolly and driving walking dolly of the arc walking track, walking that imitative arched tunnel is set on arc walking track The electronic capstan of the bitubular, the electronic capstan connection control mechanism of the bitubular, the walking dolly bottom is provided with road wheel.
9. constructing tunnel according to claim 1 integrates chassis, it is characterised in that the road wheel is three-dimensional wheel, described Walking track is arc pipe.
10. constructing tunnel according to claim 1 integrates chassis, it is characterised in that the two linings reinforcement trolley includes volume Raise machine, be arranged on arch steel container, the neck and ring that are located at reinforcing bar container in of the two lining reinforcement trolleys close to tunnel face one end To reinforcing bar lifting body.
CN201720916429.4U 2017-07-26 2017-07-26 Constructing tunnel integrates chassis Active CN207144954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720916429.4U CN207144954U (en) 2017-07-26 2017-07-26 Constructing tunnel integrates chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720916429.4U CN207144954U (en) 2017-07-26 2017-07-26 Constructing tunnel integrates chassis

Publications (1)

Publication Number Publication Date
CN207144954U true CN207144954U (en) 2018-03-27

Family

ID=61672765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720916429.4U Active CN207144954U (en) 2017-07-26 2017-07-26 Constructing tunnel integrates chassis

Country Status (1)

Country Link
CN (1) CN207144954U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269299A (en) * 2017-07-26 2017-10-20 龚岗 Constructing tunnel integrates chassis

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269299A (en) * 2017-07-26 2017-10-20 龚岗 Constructing tunnel integrates chassis

Similar Documents

Publication Publication Date Title
CN107269299A (en) Constructing tunnel integrates chassis
CN105952474B (en) A kind of large cross-section tunnel confined concrete preliminary bracing rapid constructing method
CN106703814B (en) Tunneling subway station hole pile construction method
CN108412501B (en) Under wear oil pipeline shallow depth loess tunnels construction method
CN108952763B (en) Equipment and construction method for supporting construction of highway tunnel and railway tunnel
CN104612162A (en) Subway station deep foundation pit excavation construction method
CN104533449B (en) A kind of tunnel excavation stand and apply the adit construction method of this stand
CN108868778A (en) A kind of Large Underground Structure no-dig technique construction method
CN105256812B (en) Foundation ditch prefabricated assembled concrete supporting construction and its construction method
CN106703828A (en) The construction method of building subway station with fabricated lining combination PBA
CN108193608A (en) The cast-in-place road gully of mobile moldbase and construction method
CN203334300U (en) Root pile supporting structure
CN110374633A (en) The Portal Section Construction method of Tunnel Passing loose media
CN110043269A (en) A kind of excavation construction process of freeway tunnel barrel
CN105625425A (en) Construction method for carrying out pile sinking based on floating walking platform
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN104831733A (en) Arch bridge abutment tunnel type large-angle inclined pile construction method
CN109488347B (en) Excavation construction method for special stratum chamber
CN109706945A (en) Come down fracture belt tunnel construction method
CN108149696B (en) A kind of construction method for the composite supporting construction that gib soil nail wall is combined with permanent anti-float anchor rod
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN106437048A (en) Folding truss type full-automatic telescopic canopy and operation method thereof
CN207144954U (en) Constructing tunnel integrates chassis
CN106567391B (en) A kind of flat building enclosure of rocky stratum subway entrance sectional type molten steel and construction method
CN206888994U (en) A kind of inclined shaft two serves as a contrast and pilot tunnel caunches device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant