CN207144941U - A kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility - Google Patents

A kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility Download PDF

Info

Publication number
CN207144941U
CN207144941U CN201721077930.2U CN201721077930U CN207144941U CN 207144941 U CN207144941 U CN 207144941U CN 201721077930 U CN201721077930 U CN 201721077930U CN 207144941 U CN207144941 U CN 207144941U
Authority
CN
China
Prior art keywords
cash
baffle plate
center pillar
wire netting
strut rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721077930.2U
Other languages
Chinese (zh)
Inventor
周忠国
殷绍林
刘安福
丁正付
冯宗华
刘建
邓勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Colliery Huaying Hill Coal Industry Ltd Co Clear Water Hole Sichuan Province
Original Assignee
Colliery Huaying Hill Coal Industry Ltd Co Clear Water Hole Sichuan Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Colliery Huaying Hill Coal Industry Ltd Co Clear Water Hole Sichuan Province filed Critical Colliery Huaying Hill Coal Industry Ltd Co Clear Water Hole Sichuan Province
Priority to CN201721077930.2U priority Critical patent/CN207144941U/en
Application granted granted Critical
Publication of CN207144941U publication Critical patent/CN207144941U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of high-dipping fully-mechanized mining working open-off cut to tunnel safely auxiliary facility, mainly baffle plate, fixed strut rail, ladder is drained by center pillar baffle plate, end to stay coal strut rail, gib, anti-push away bottom wire netting, anchor pole, anti-fall guardrail, gear cash wire netting and form, center pillar baffle plate between pedestrian and will be slipped and separated between cash, chute, which rides upon, to slip in cash, and gear cash wire netting is laid on above center pillar baffle plate and obturaged to back.Center pillar baffle interval 4m sets one group, the distance of end and driving face is not more than 20m, and the driving face moraine head first half is ahead of 0.2~0.3m of lower half, and supporting is carried out to bottom plate using anti-bottom wire netting and the anchor pole of pushing away, ladder stays coal strut rail interval 4m to set one group, highly not less than 0.4m.Fixed strut rail interval 20m sets one group of human world of being expert at, highly no more than 0.3m.The utility model is easy to operate, safety, reduces open-off cut tunneling process and wall caving occurs, flies cash, push away the threat such as bottom.

Description

A kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility
Technical field
It the utility model is related to fully-mechanized mining working open-off cut driving technology field, and in particular to a kind of high-dipping working face Face open-off cut tunnels safely auxiliary facility.
Background technology
High-dipping fully-mechanized mining working is because seam inclination is larger, and open-off cut difficulty of construction and security threat are big, using rig Drilling rod is influenceed by gravity, amount of deflection etc. during coal channel under expansion of being constructed from the bottom up in machine lane is brushed, and whole hole is whard to control, error is big, and The successful half-edge coal seam open-off cut of development test at present bores expansion technology and is primarily adapted for use in open-off cut length in below 100m, coal seam Relatively hard condition, mainly still applied from lower to upper using drilling and blasting method for more than length 100m half-edge coal seam open-off cut Work, wall caving is faced in open-off cut tunneling process, flies cash, push away the problems such as bottom, to ensure that high-dipping fully-mechanized mining working open-off cut is pacified Tunnel entirely, it is necessary to constantly improve and the related auxiliary facility of innovation.
The content of the invention
The utility model is to provide a kind of high-dipping working face to solve the technical scheme that above-mentioned technical problem uses Face open-off cut driving auxiliary facility safely, baffle plate, fixed strut rail, ladder are mainly drained by center pillar baffle plate, end and stays coal strut rail, face When supporting, it is anti-push away bottom wire netting, anchor pole, anti-fall guardrail, gear cash wire netting composition, center pillar baffle plate between pedestrian and will slip between cash point Open, chute, which rides upon, to slip in cash, and for the coal of open-off cut driving by chute between slipping cash, gear cash wire netting is laid on center pillar Obturaged above baffle plate to back, gib and supporting is carried out to top plate with the lumps of wood using two hydraulic props.
A kind of above-mentioned high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility, it is characterized in that:Center pillar baffle interval The distance of one group of 4m settings, end and driving face is not more than 20m, and the driving face moraine head first half is ahead of lower half 0.2~0.3m.
A kind of above-mentioned high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility, it is characterized in that:It is anti-to push away bottom wire netting To coal seam, section bottom plate carries out supporting thicker with anchor pole, prevents to push away bottom, bottom plate supporting must be with holding together end drainage baffle plate.
A kind of above-mentioned high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility, it is characterized in that:Ladder stays coal strut rail It is spaced 4m and sets one group, the ladder nearest to gib stays coal strut rail with driving face distance controlling within 2m, height Not less than 0.4m, stay coal strut rail appropriate location to set up terraced step in ladder, facilitate above and below personnel.
A kind of above-mentioned high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility, it is characterized in that:Fixed strut rail interval 20m sets one group of human world of being expert at, and highly no more than 0.3m, sets aperture closing on the downside of center pillar baffle plate, is easy to fix strut rail heap Long-pending coal entrance is slipped between cash.
A kind of above-mentioned high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility, it is characterized in that:Anti-fall guardrail uses Steel-pipe welding forms grid, and pitch of holes be not more than 0.3m, is placed between center pillar baffle plate end slips cash, and side drains baffle plate by end, Opposite side is using iron wire bundled fixed on lane side wire netting, effectively preventing that personnel from falling and bulk bastard coal enters to slip and caused between cash Block.
The beneficial effect of the utility model compared with prior art is:Easy construction, safe operation, realize high-dipping fully mechanized mining Safety driving, reduction open-off cut tunneling process occur wall caving, fly cash, push away the threat such as bottom, make existing working face open-off cut paragraph by paragraph step by step Field operating environment is improved.
Below by drawings and examples, the technical scheme of utility model is described in further detail.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 I-I sectional view.
Label in figure:1- center pillar baffle plates;2- ends drain baffle plate;3- fixes strut rail;4- ladders stay coal strut rail;5- is propped up temporarily Shield;6- is anti-to push away bottom wire netting;7- anchor poles;The anti-fall guardrails of 8-;9- chutes;Between 10-pedestrian;11-slip between cash;12-gear cash metal Net.
Embodiment
The utility model is further described below in conjunction with the accompanying drawings, but the utility model is not therefore limited in institute Among the scope of embodiments stated.
Referring to Fig. 1, Fig. 2, a kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility, mainly by center pillar baffle plate (1), end drainage baffle plate(2), fixed strut rail(3), ladder stay coal strut rail(4), gib(5), anti-push away bottom wire netting(6)、 Anchor pole(7), anti-fall guardrail(8), gear cash wire netting(12)Composition, center pillar baffle plate(1)By between pedestrian(10)And slip between cash(11)Point Open, chute(9)Ride upon and slip between cash(11)Interior, the coal of open-off cut driving passes through chute(9)Into slipping between cash(11), gear cash gold Belong to net(12)It is laid on center pillar baffle plate(1)Obturage to back, gib top(5)Matched somebody with somebody using two hydraulic props The lumps of wood carries out supporting to top plate.
In the present embodiment, the center pillar baffle plate(1)The distance of one group of interval 4m settings, end and driving face is not more than 20m, the driving face moraine head first half are ahead of 0.2~0.3m of lower half.
It is described to prevent pushing away bottom wire netting in the present embodiment(6)And anchor pole(7)To coal seam, section bottom plate carries out supporting thicker, prevents Bottom is only pushed away, bottom plate supporting must be with holding together end drainage baffle plate(2).
In the present embodiment, the ladder stays coal strut rail(4)It is spaced 4m and sets one group, to gib(5)Nearest ladder Stay coal strut rail(4)With driving face distance controlling within 2m, highly not less than 0.4m, coal strut rail is stayed in ladder(4)Suitably Terraced step is set up in position, facilitates above and below personnel.
In the present embodiment, the fixed strut rail(3)It is spaced 20m and one group of human world of being expert at is set(10), highly no more than 0.3m, Closing on center pillar baffle plate(1)Downside sets aperture, is easy to fix strut rail(3)The coal entrance of accumulation is slipped between cash(11).
In the present embodiment, the anti-fall guardrail(8)Grid is formed using steel-pipe welding, pitch of holes is not more than 0.3m, is placed in Center pillar baffle plate(1)End is slipped between cash(11), side is by end drainage baffle plate(2), opposite side is using iron wire bundled fixed in lane side On wire netting, effectively prevent that personnel from falling and bulk bastard coal enters and slipped between cash(11)Result in blockage.
It is described above, only it is the preferred embodiment of utility model, not utility model is imposed any restrictions, it is every according to this Any simple modification, change and the equivalent structure change that utility model technical spirit is made to above example, belong to this In the protection domain of utility model technical scheme.

Claims (5)

1. a kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility, mainly by center pillar baffle plate(1), end drainage gear Plate(2), fixed strut rail(3), ladder stay coal strut rail(4), gib(5), anti-push away bottom wire netting(6), anchor pole(7), anti-fall shield Column(8), gear cash wire netting(12)Composition, center pillar baffle plate(1)By between pedestrian(10)And slip between cash(11)Separate, chute(9)Set up Between cash is slipped(11)Interior, the coal of open-off cut driving passes through chute(9)Into slipping between cash(11), keep off cash wire netting(12)It is laid on Center pillar baffle plate(1)Obturage to back, gib top(5)Top plate is carried out with the lumps of wood using two hydraulic props Supporting.
2. driving auxiliary facility, its feature exist a kind of high-dipping fully-mechanized mining working open-off cut according to claim 1 safely In center pillar baffle plate(1)It is spaced 4m and sets one group, the distance of end and driving face is not more than 20m, on driving face moraine head Half portion is ahead of 0.2~0.3m of lower half.
3. driving auxiliary facility, its feature exist a kind of high-dipping fully-mechanized mining working open-off cut according to claim 1 safely Bottom wire netting is pushed away in anti-(6)And anchor pole(7)To coal seam, section bottom plate carries out supporting thicker, prevents to push away bottom, bottom plate supporting must Must be with holding together end drainage baffle plate(2).
4. driving auxiliary facility, its feature exist a kind of high-dipping fully-mechanized mining working open-off cut according to claim 1 safely In fixed strut rail(3)It is spaced 20m and one group of human world of being expert at is set(10), highly no more than 0.3m, closing on center pillar baffle plate(1)Downside Aperture is set, is easy to fix strut rail(3)The coal entrance of accumulation is slipped between cash(11).
5. driving auxiliary facility, its feature exist a kind of high-dipping fully-mechanized mining working open-off cut according to claim 1 safely In anti-fall guardrail(8)Grid is formed using steel-pipe welding, pitch of holes is not more than 0.3m, is placed in center pillar baffle plate(1)End is slipped between cash (11), side is by end drainage baffle plate(2), opposite side using iron wire bundled fixed on lane side wire netting, effectively prevent personnel Fall and bulk bastard coal enters and slipped between cash(11)Result in blockage.
CN201721077930.2U 2017-08-27 2017-08-27 A kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility Expired - Fee Related CN207144941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721077930.2U CN207144941U (en) 2017-08-27 2017-08-27 A kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721077930.2U CN207144941U (en) 2017-08-27 2017-08-27 A kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility

Publications (1)

Publication Number Publication Date
CN207144941U true CN207144941U (en) 2018-03-27

Family

ID=61670056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721077930.2U Expired - Fee Related CN207144941U (en) 2017-08-27 2017-08-27 A kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility

Country Status (1)

Country Link
CN (1) CN207144941U (en)

Similar Documents

Publication Publication Date Title
CN104453899B (en) Complex condition island working face safety coal extraction method
CN104358572B (en) Non-pillar mining technology by spontaneous caving filling roadway at large inclined angle steeply inclined seam
CN205189893U (en) Be used for a lane coal column to wearing reinforced (rfd) supporting construction
CN108194088A (en) A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion
CN103244122B (en) Trinity coupling support stability control method for gob-side entry-driving coal pillar
CN103195443B (en) Deep mining method capable of optimizing support parameters and preventing roadway delaying water gushing
CN104265295B (en) Medium Thickness And Medium Slope Angle coal seam prosthetic roadside packing and without coal column gob-side entry retaining method
CN108868833A (en) A method of it carries out cutting gob side entry retaining in the relieving roadway of top in U-shaped steel supported laneway
CN108035715B (en) A kind of unregulated fully mechanized coal mining face just adopts stage isometric tune face method
CN102182482A (en) Impact-resistant combined anti-pressure supporting system
CN104989272B (en) Upward inverse well drilling process
CN104234749A (en) Surrounding rock control method for large-section dismantling tunnel of fully-mechanized mining face
CN105649635B (en) A kind of disaster type tunnelling method in goaf
CN108979638B (en) Composite gob-side entry retaining method for wedge-shaped regenerated wall and single-leg shed beam of coal mining roadway
Xu et al. Control of floor heaves with steel pile in gob-side entry retaining
CN109763861A (en) One kind cutting intraocular fault belt treatment of roof collapse method
CN105909284A (en) Sloughing prevention and control method for large mining height coal wall
CN207144941U (en) A kind of high-dipping fully-mechanized mining working open-off cut tunnels safely auxiliary facility
CN207080226U (en) A kind of steeply inclined thin is to the flat ore removal structure of middle strong vein
CN105937400B (en) It is a kind of once to tunnel Liu Sheshuan lanes digging operation production line
CN107859525B (en) A kind of large deformation stope drift active workings replace canopy surrounding rock control method except the lane Mao Kuo
CN105937401B (en) The method for protecting support in Liu Sheshuan lanes is once tunneled in a kind of U-shaped ventilation
CN205532650U (en) Roof support structure and well worker colliery withdrawing working face that has this structure
CN205047239U (en) Top of roadway board control system under mat
CN111236968B (en) Rock burst roadway advanced support anti-impact method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

Termination date: 20190827

CF01 Termination of patent right due to non-payment of annual fee