One kind is used to hang mould lower concrete receipts face instrument Download PDF

Info

Publication number
CN207144502U
CN207144502U CN201720892869.0U CN201720892869U CN207144502U CN 207144502 U CN207144502 U CN 207144502U CN 201720892869 U CN201720892869 U CN 201720892869U CN 207144502 U CN207144502 U CN 207144502U
Authority
CN
China
Prior art keywords
slip
main body
graduated scale
trowel
control panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720892869.0U
Other languages
Chinese (zh)
Inventor
赵春光
王宗源
牛化宪
张东方
秦永江
陈前钟
王良超
潘至栋
徐斌
明宪永
邓秀丽
张凤兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201720892869.0U priority Critical patent/CN207144502U/en
Application granted granted Critical
Publication of CN207144502U publication Critical patent/CN207144502U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

It is used to hang mould lower concrete receipts face instrument the utility model discloses one kind, including trowel main body and slide chi, the upper surface of the trowel main body is installed with two slip round bars, the upper surface opposite side of the trowel main body is fixedly installed graduated scale, the slip chi includes two connecting rods and control panel, the rear end of two connecting rods is fixedly connected with the side of control panel, one end of the sliding shoe is provided through parbuckle screw, and the head end of parbuckle screw is each extended in slip draw-in groove, two slip draw-in grooves are fastened on two and slided on round bar respectively, the control panel is located at the top of graduated scale.This is used to hang mould lower concrete receipts face instrument, with according to field condition by graduated scale and slide chi can arbitrarily adjust to obtain needed for drilling depth size, avoid drilling depth excessive and the Forming Quality of concrete vertical face is damaged, avoid drilling depth is too small to cause that receipts face is not complete, omits simultaneously, improve concrete construction quality well.

Description

One kind is used to hang mould lower concrete receipts face instrument
Technical field
Technical field of building construction tools is the utility model is related to, is specially that one kind is used to hang mould lower concrete receipts face work Tool.
Background technology
In architectural engineering, hoisting die construction is widely distributed in the construction of the positions such as grandstand, stair, basement.It is existing to hang Mould construction technology because hanging the limitation of mould self-technique feature, hang mould bottom can not to concrete-face closure, concrete directly with side The supports such as wood contact, and cause to hang the concrete formation quality problems of mould bottom, such as forming surface is coarse, bubble is difficult to discharge, and is This, it is proposed that a kind of be used to hang mould lower concrete receipts face instrument.
Utility model content
The purpose of this utility model is that providing one kind is used to hang mould lower concrete receipts face instrument, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical scheme:One kind is used to hang mould lower concrete receipts face Instrument, including trowel main body and slide chi, the upper surface side of the trowel main body are fixedly connected with connecting plate, connecting plate it is upper End is connected with trowel handle by fix bar, and the upper surface of the trowel main body is installed with two slip round bars, and slides Round bar is located at the both sides of connecting plate respectively, and the upper surface opposite side of the trowel main body is fixedly installed graduated scale, the slip Chi includes two connecting rods and control panel, and the rear end of two connecting rods is fixedly connected with the side of control panel, two connecting rods Front end on the downside of be welded with sliding shoe, the lower section of sliding shoe offers slip draw-in groove, and one end of the sliding shoe is run through Parbuckle screw is provided with, and the head end of parbuckle screw is each extended in slip draw-in groove, two slip draw-in grooves are fastened on two respectively Slide on round bar, the control panel is located at the top of graduated scale.
Preferably, slip round bar, connecting rod, control panel, sliding shoe and the graduated scale are rigid structure.
Preferably, the graduated scale aligns away from the one end for sliding round bar with one end of trowel main body, and on graduated scale Scale is arranged on upper surface.
Preferably, the rear end of the parbuckle screw has been fixedly connected with round plastic block, and the table of plastic circular unit of plastic Face is provided with anti-slip veins.
Compared with prior art, the utility model has advantages below:
1. for hanging the problem of mould bottom can not receive face, by improving the trowel commonly used in concrete construction, and then solve The concrete formation problem of mould bottom is hung, and receives face without dead angle, improves concrete construction quality well;
2. can according to field condition by graduated scale and slide chi can arbitrarily adjust to obtain needed for drilling depth size, avoid into The excessive Forming Quality to concrete vertical face of chi damages, while avoids drilling depth is too small from causing that receipts face is not complete, omits;
3. it is detachable to slide chi, the concrete residue in easy cleaning trowel main body.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model trowel main body schematic diagram;
Fig. 3 is that the utility model slides chi schematic diagram.
In figure:Trowel main body 1, connecting plate 2, trowel handle 3, slip round bar 4, slip chi 5, connecting rod 6, control panel 7, cunning Motion block 8, slip draw-in groove 9, parbuckle screw 10, graduated scale 11.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:One kind is used to hang mould lower concrete receipts face work Tool, including trowel main body 1 and slide chi 5, the upper surface side of trowel main body 1 are fixedly connected with connecting plate 2, connecting plate 2 it is upper End is connected with trowel handle 3 by fix bar, and the upper surface of trowel main body 1 is installed with two slip round bars 4, sliding rail Distance apart from trowel front end is depending on service condition(That is template maximum gauge and shuttering supporting maximum gauge sum), generally 8-10cm, slides the both sides that round bar 4 is located at connecting plate 2 respectively, and the upper surface opposite side of trowel main body 1 is fixedly installed graduated scale 11, sliding chi 5 includes two connecting rods 6 and control panel 7, and the rear end of two connecting rods 6 is fixedly connected with the one of control panel 7 Side, be welded with sliding shoe 8 on the downside of the front end of two connecting rods 6, slide round bar 4, connecting rod 6, control panel 7, sliding shoe 8 and Graduated scale 11 is rigid structure, and rigid structure is made up of stainless steel, and not only intensity is higher, is hardly damaged, and will not be given birth to Rust, extends service life, the lower section of sliding shoe 8 offers slip draw-in groove 9, and one end of sliding shoe 8 is provided through pine Tight screw 10, and the head end of parbuckle screw 10 is each extended in slip draw-in groove 9, the rear end of parbuckle screw 10 has been fixedly connected with circle Shape unit of plastic, and the surface of plastic circular unit of plastic is provided with anti-slip veins, plays good skidproof effect, parbuckle screw 10 is right Two slip draw-in grooves 9 are fastened on two and slided on round bar 4 respectively, twist round plastic block with hand, you can realize to sliding chi 5 Fixed or dismounting, it is very convenient so that slide chi 5 detachably, the concrete residue in easy cleaning trowel main body 1, control Plate 7 is located at the top of graduated scale 11, and graduated scale 11 aligns away from the one end for sliding round bar 4 with one end of trowel main body 1, graduated scale Scale on 11 is arranged on upper surface, and the scale of the one end of graduated scale 11 is zero starting point.
This trowel calculates the quarter that trowel should be adjusted in use, according to template thickness and the thickness of shuttering supporting (flitch of template thick such as 15mm and 50mm thickness, trowel scale should be adjusted to 65mm to degree), then tighten parbuckle screw 10 and fix, By graduated scale 11 and the drilling depth size that chi 5 controls trowel is slided, avoids drilling depth excessive and the Forming Quality of concrete vertical face is made Into destruction, while avoid drilling depth is too small from causing that receipts face is not complete, omits, control panel 7 is close to face outside shuttering supporting and carried out when receiving face Receipts face.
Specifically used method is as follows:
1st, when concrete reaches the intensity that can receive face, receipts face is carried out to hanging mould bottom;
2nd, according to template thickness and the thickness of shuttering supporting, the scale (template thick such as 15mm that trowel should be adjusted is calculated Thick flitch, trowel scale should be adjusted to 65mm with 50mm), then tighten parbuckle screw and fix;
3rd, using the trowel to concrete-face closure, trowel must carry out receipts face in the same direction, repeat 3 to 4 times, receive face height Highly it is consistent with hanging concrete surface beyond mould, pays attention to checking the elastic state of parbuckle screw 10, avoids the pine of parbuckle screw 10 The dynamic Forming Quality to concrete vertical face damages;
4th, after receipts face is terminated, parbuckle screw 10 is unclamped, chi 5 will be slided and unloaded, trowel is cleared up.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. one kind is used to hang mould lower concrete receipts face instrument, including trowel main body(1)With slip chi(5), it is characterised in that:Institute State trowel main body(1)Upper surface side be fixedly connected with connecting plate(2), connecting plate(2)Upper end be connected with by fix bar Trowel handle(3), the trowel main body(1)Upper surface be installed with two slip round bars(4), and slide round bar(4)Point Wei Yu not connecting plate(2)Both sides, the trowel main body(1)Upper surface opposite side be fixedly installed graduated scale(11), it is described Slide chi(5)Including two connecting rods(6)And control panel(7), two connecting rods(6)Rear end be fixedly connected with control panel (7)Side, two connecting rods(6)Front end on the downside of be welded with sliding shoe(8), sliding shoe(8)Lower section offer cunning Dynamic neck(9), the sliding shoe(8)One end be provided through parbuckle screw(10), and parbuckle screw(10)Head end it is equal Extend to slip draw-in groove(9)It is interior, two slip draw-in grooves(9)Two slip round bars are fastened on respectively(4)On, the control panel(7) Positioned at graduated scale(11)Top.
It is 2. according to claim 1 a kind of for hanging mould lower concrete receipts face instrument, it is characterised in that:It is described to slide circle Bar(4), connecting rod(6), control panel(7), sliding shoe(8)And graduated scale(11)It is rigid structure.
It is 3. according to claim 1 a kind of for hanging mould lower concrete receipts face instrument, it is characterised in that:The graduated scale (11)Away from slip round bar(4)One end and trowel main body(1)One end alignment, and graduated scale(11)On scale be arranged on Surface.
It is 4. according to claim 1 a kind of for hanging mould lower concrete receipts face instrument, it is characterised in that:The elastic spiral shell Silk(10)Rear end be fixedly connected with round plastic block, and the surface of plastic circular unit of plastic is provided with anti-slip veins.
CN201720892869.0U 2017-07-21 2017-07-21 One kind is used to hang mould lower concrete receipts face instrument Active CN207144502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720892869.0U CN207144502U (en) 2017-07-21 2017-07-21 One kind is used to hang mould lower concrete receipts face instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720892869.0U CN207144502U (en) 2017-07-21 2017-07-21 One kind is used to hang mould lower concrete receipts face instrument

Publications (1)

Publication Number Publication Date
CN207144502U true CN207144502U (en) 2018-03-27

Family

ID=61676372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720892869.0U Active CN207144502U (en) 2017-07-21 2017-07-21 One kind is used to hang mould lower concrete receipts face instrument

Country Status (1)

Country Link
CN (1) CN207144502U (en)

Similar Documents

Publication Publication Date Title
CN204057828U (en) Curb machinery hoist tool
CN103967273B (en) Concrete floor slab placement concrete mould plate supporting device
CN104153555B (en) The detachable pre-buried fixing device of overhanging type steel beam containing horizontal fixation kit
CN204781624U (en) Floor elevation and roughness controlling means
CN209460009U (en) A kind of construction material rigidity detection device
CN202430997U (en) Reinforcing device for template of sump or elevator shaft
CN205637528U (en) Scaffold frame that building engineering used
CN209066289U (en) High-speed rail bridge pinner and the anti-beam that shakes off combine adjustable anchor hole positioning tool
CN207144502U (en) One kind is used to hang mould lower concrete receipts face instrument
CN204676608U (en) A kind of template-setup structure reserving ater-casting for basement wall
CN204510816U (en) The stair template of adjustable angle
CN211235310U (en) Evaporate and press aerated concrete block compressive strength testing arrangement
CN108035548A (en) The closed template construction method of cast-in-place concrete stair
CN208430643U (en) A kind of wall hole plugging device
CN204715741U (en) A kind of wall form for building
CN104313984A (en) Kerbstone mechanical-hoisting and seam-spacing method-based construction method, hoisting tool and seam-spacing tool
CN204492183U (en) Adjustable type stairway is marked time support for shuttering
CN203430057U (en) Floor concrete leveling device
CN102561713B (en) Method for controlling building quality of concrete frame structure walls
CN208996448U (en) A kind of building template support construction
CN203879014U (en) Cast-in-situ concrete floor thickness control device
CN201762635U (en) Simply structure chute
CN209868868U (en) Plank nailing device for interior decoration
CN212836701U (en) Concrete floor entrance to a cave shutoff mould lifting tool
CN204510814U (en) Beam for building jacking

Legal Events

Date Code Title Description
GR01 Patent grant