CN207144164U CN201721086802.4U CN201721086802U CN207144164U CN 207144164 U CN207144164 U CN 207144164U CN 201721086802 U CN201721086802 U CN 201721086802U CN 207144164 U CN207144164 U CN 207144164U
Authority
CN
China
Prior art keywords
hoist engine
area
lifting
movable floor
building structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721086802.4U
Other languages
Chinese (zh)
Inventor
邱锦进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721086802.4U priority Critical patent/CN207144164U/en
Application granted granted Critical
Publication of CN207144164U publication Critical patent/CN207144164U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Power-Operated Mechanisms For Wings (AREA)

Abstract

It the utility model is related to building structure technology field, and in particular to a kind of liftable building structure and its control system, the room main body in the utility model are divided into three regions, and it is respectively first area, second area and the 3rd region from top to bottom;The movable floor that can be moved up and down in the second area is additionally provided with the room main body;It is installed with hoist engine in 3rd region, one end of hawser on the hoist engine is mutually fixed with the upper surface of the movable floor;The top of the first area is provided with the first limit switch, and the bottom in the 3rd region is provided with the second limit switch;The utility model drastically increases the space utilization rate in house, effectively alleviates the problem of city housing resources are in short supply.

Description

A kind of liftable building structure and its control system
Technical field
It the utility model is related to building structure technology field, and in particular to a kind of liftable building structure and one kind should Control system for the liftable building structure.
Background technology
With the fast development of social economy, for the resident population in city also in rapid increase, this causes city housing resources Become extremely in short supply;But on the other hand, the utilization rate of urban parts house property is not high now, a few thing place only can be on daytime Use, idle state is would be to evening, and some houses can then be used at night, and idle shape is would be to daytime State;It can be seen that now the house property in city quite a few time in one day be in idle state, the utilization rate of house property is not high.
The content of the invention
To overcome drawbacks described above, the purpose of this utility model is to provide a kind of liftable building structure and one kind Control system applied to the liftable building structure.
The purpose of this utility model is achieved through the following technical solutions:
The utility model is a kind of liftable building structure, and it includes being surrounded by floor, ceiling, column and metope Room main body, in addition to:The room main body is divided into three regions, and it is respectively first area, the secondth area from top to bottom Domain and the 3rd region;The movable floor that can be moved up and down in the second area is additionally provided with the room main body;3rd area It is installed with hoist engine in domain, one end of hawser on the hoist engine is mutually fixed with the upper surface of the movable floor;Institute The top for stating first area is provided with the first limit switch, and the bottom in the 3rd region is provided with the second limit switch.
Further, the support column that can longitudinally overturn is hinged with by rotating shaft on the floor, the quantity of the support column is More than two.
Further, locating piece is provided with the first area, the top of the locating piece and the top of first area are mutually neat Flat, the quantity of the locating piece is four pieces, and it is respectively arranged on four corners on floor.
Further, the quantity of the hoist engine is four, and one end of the hawser of each hoist engine with the movable floor One corner of plate is mutually fixed.
Further, the hoist engine is fixedly installed on the column or metope in the 3rd region by fixture.
Further, the side of the movable floor is provided with roller, and the roller and metope are tangent.
Further, the metope is provided with door, and the door is made up of separate upper door body and lower door body, described It is connected between upper door body and lower door body by locking bolt, the height of the lower door body is consistent with the height of first area.
A kind of control system for being applied to liftable building structure as described above of the utility model, including:
Clock module, the clock module are connected with lifting controller, for providing time letter for the lifting controller Breath;
Lifting controller, the lifting controller are connected with hoist engine, for believing the time transmitted by clock module Breath is judged, if temporal information reaches default first time point, control hoist engine tightens up hawser, enters movable floor Row rises, and after the movable floor reaches the bottom in the 3rd region and touches the second limit switch, hoist engine is stopped;If Temporal information reaches default second time point, then controls hoist engine to loosen hawser, declined movable floor, until this Movable floor is reached at the top of first area and after the first limit switch of shake-up, hoist engine is stopped;
Hoist engine, the hoist engine are installed on the 3rd region, for controlling the jacking condition of movable floor.
Further, the utility model also includes:
Time point setting apparatus, the time point setting apparatus are connected with the lifting controller, for inputting described in setting First time point and the second time point in lifting controller;
Reminiscences is lifted, the lifting reminiscences is connected with the lifting controller, for according to lifting controller Control instruction, send prompt message;
Signal loader is lifted, the lifting signal loader is connected with the lifting controller, for the lifting Controller inputs control signal, and the lifting controller is driven according to the control signal to hoist engine,
Controller is overturn, the upset controller is connected with support column and the lifting controller respectively, for according to liter The control signal of drop controller, control support column is upright or accumbency.
Its movable floor in the utility model can need to be lifted according to the use of different periods, to change its application Environment, it drastically increases the space utilization rate in house, effectively alleviates the problem of city housing resources are in short supply.
Brief description of the drawings
For ease of explanation, the utility model is described in detail by following preferred embodiments and accompanying drawing.
Fig. 1 is the vertical section structure schematic diagram of the utility model building structure in the first state;
Fig. 2 is the vertical section structure schematic diagram of the utility model building structure in the second condition;
Fig. 3 is the circuit theory diagrams of the utility model lift control system.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further described.It should be appreciated that specific embodiment described herein is only explaining this reality With new, it is not used to limit the utility model.
Fig. 1 to Fig. 2 is referred to, a kind of building structure of liftable floor of the utility model, it is included by floor 106, day The room main body that card 107, column and metope 108 are surrounded, in addition to:The room main body is divided into three regions, its from Under to it is upper be respectively first area 101, the region 103 of second area 102 and the 3rd;Being additionally provided with the room main body can be second The movable floor 104 moved up and down in region 102;Hoist engine 105, the elevator are installed with 3rd region 103 One end of hawser 109 on machine 105 and the upper surface of the movable floor 104 are mutually fixed;The top of the first area 101 is set There is the first limit switch, the bottom in the 3rd region is provided with the second limit switch.
Further, the support column 111 that can longitudinally overturn, the support column 111 are hinged with the floor 106 by rotating shaft Quantity be more than two, after movable floor 104 rises in place, support column 111 will be dug, and its top with movable floor 104 bottom abuts against, and it plays support fixation;When movable floor 104 needs to decline, support column 111 will decline simultaneously Lie down in first area 101.
Further, locating piece 110, top and the first area 101 of the locating piece 110 are provided with the first area Top is flush, and the quantity of the locating piece 110 is four pieces, and it is respectively arranged on four corners on floor 106.
Further, the quantity of the hoist engine 105 is four, and one end of the hawser 109 of each hoist engine 105 with One corner of the movable floor is mutually fixed.
Further, the hoist engine 105 is fixedly installed in column or wall in the 3rd region 103 by fixture 120 On face 108;The roller is effectively reduced friction, and placement activity floor 104 damages to the wall of second area 102.
Further, the side of the movable floor 104 is provided with roller, and the roller and metope 108 are tangent.
Further, the metope 108 is provided with door, and the door is made up of separate upper door body and lower door body, It is connected between the upper door body and lower door body by locking bolt, the height of the lower door body is consistent with the height of first area.
Wherein, the height of the first area 101 can be with consistent with the height in the 3rd region 103, can also be according to each Depending on the height of region fitment.
Building structure described in the utility model has two kinds of use states, and the first state is:By under movable floor 104 It is down to the top of first area 101;The bottom surface of movable floor 104 is supported by the top of locating piece 110, and its upper surface is made For the floor in room, the region 103 of second area 102 and the 3rd constitutes the activity space of people;When needing to be converted to second During state, movable floor 104 is raised up to the bottom in the 3rd region 103 by driving hoist engine 105;Now, the bottom of movable floor 104 Ceiling of the face as room, first area 101 and second area 102 constitute the activity space of people.
In the utility model, second area 102 is the public domain under two states, and its state is relatively fixed, and can be incited somebody to action Public water pipe, electric wiring are disposed therein;And first area 101, the 3rd region 103 can be respectively used to deposit family property, set It is standby etc.;When room is in the first state, first area 101 is for depositing the family property under second of state, equipment;Work as room During in second of state, movable floor 104 is raised, and the family property, equipment under the first state follow movable floor 104 to carry out Rise, and deposit in the 3rd region 103;Two kinds of use states can possess independent family property, equipment, and it does not interfere with each other.
Building structure described in the utility model only need to increase the 3rd area in design on the basis of existing room The height in domain 103 can meet the needs of installation activity floor 104 and jacking equipment, and design requirement is not high, but can be greatly Improve the utilization rate in room;The utility model is particularly suitable for such as:Hotel, dormitory, small-sized operating room, small-sized classroom etc. one In the relatively simple environment of a little structures.
It refer to Fig. 3, a kind of drop control system for being applied to liftable building structure as described above of the utility model, bag Include:
Clock module 112, the clock module 112 are connected with lifting controller 113, for for the lifting controller 113 provide temporal information;
Lifting controller 113, the lifting controller 113 are connected with hoist engine 105, for the institute of clock module 112 The temporal information of transmission is judged, if temporal information reaches default first time point, controls the taut wire of hoist engine 105 Rope 109, movable floor 104 is set to be increased, until the bottom in movable the 3rd region of the arrival of floor 104 and shake-up second is spacing After switch 118, hoist engine 105 is stopped;If temporal information reaches default second time point, control hoist engine 105 is put Loose hawser 109, declined movable floor 104, until the movable floor 104 reaches first area top and shake-up first After limit switch 117, hoist engine is stopped;
Hoist engine 105, the hoist engine 105 are installed on the 3rd region 103, for controlling the lifting of movable floor 104 State.
The utility model also includes:
Time point setting apparatus 114, the time point setting apparatus 114 is connected with the lifting controller 113, for inputting Set the first time point in the lifting controller 113 and the second time point;
Reminiscences 115 is lifted, the lifting reminiscences 115 is connected with the lifting controller 113, for according to lifting The control instruction of controller 113, sends prompt message;
Signal loader 116 is lifted, the lifting signal loader 116 is connected with the lifting controller 113, is used for Control signal is inputted to the lifting controller 113, the lifting controller 113 is carried out according to the control signal to hoist engine 105 Driving;
Controller 119 is overturn, the upset controller 119 connects with support column 111 and the lifting controller 113 respectively Connect, for the control signal according to lifting controller 113, control support column 111 is upright or accumbency.
The control process of this control system is described in detail with one embodiment below, it is specially:
Before activation, keeper first to the input service period of lifting controller 113 and stays the period, if working hour is 9: 00-17:00, the period of staying is 18:00- next day 8:00;When then clock module 112 constantly will send for lifting controller 113 Between information, when clock information be 7:When 30, lifting reminiscences 115 will send prompt message " accommodation time at once arrive, please as early as possible from Open ", clock information 8:When 00, lifting reminiscences 115 will send prompt message " preparing lifting, it is noted that safety ";Clock is believed Cease for 8:When 30, then the taut wire rope 109 of hoist engine 105 is controlled, movable floor 104 is increased, until the movable floor After 104 reach the bottom in the 3rd region and touch the second limit switch 118, hoist engine 105 is stopped, and support column 111 rises And prop up the lower surface of movable floor 104 so that movable floor 104 is positioned in the bottom in the 3rd region, first, second region 101st, 102 turn into workplace, and the lower surface of the movable floor 104 is using as the ceiling of the workplace;When clock is believed Cease for 16:When 30, lifting reminiscences 115 will send prompt message " quitting time arrives at once, please leaves as early as possible ", and clock information is 17:When 00, lifting reminiscences 115 will send prompt message " preparing lifting, it is noted that safety ";Clock information is 17:When 30, then Control support column 111 releases the fixation to movable floor 104, and drops in first area 101, and then hoist engine 105 loosens Hawser 109, declined movable floor 104, until the movable floor 104 reaches the top of first area 101 and touches the After one limit switch 117, hoist engine 105 stops operating so that and movable floor 104 is located on locating piece 110, and second, Three regions 102,103 turn into lodging place, and the upper surface of the movable floor 104 is using as the floor in the lodging place.
In the above-described embodiments, the user of workplace and the user in lodging place can be identical people, also may be used Think different people;When user is identical people, user can also utilize and lift signal loader 116 at any time to movable floor The jacking condition of plate 104 is adjusted;The control signal that lifting signal loader 116 is inputted has highest control preferential Level.
As can be seen here, the utility model can significantly reduce the standby time in room, drastically increase making for room With rate.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (9)

1. a kind of liftable building structure, it includes the room main body surrounded by floor, ceiling, column and metope, its It is characterised by, in addition to:The room main body is divided into three regions, and it is respectively first area, second area from top to bottom With the 3rd region;The movable floor that can be moved up and down in the second area is additionally provided with the room main body;3rd region In be installed with hoist engine, one end of hawser on the hoist engine is mutually fixed with the upper surface of the movable floor;It is described The top of first area is provided with the first limit switch, and the bottom in the 3rd region is provided with the second limit switch.
2. liftable building structure according to claim 1, it is characterised in that be hinged with the floor by rotating shaft The support column that can longitudinally overturn, the quantity of the support column is more than two.
3. liftable building structure according to claim 2, it is characterised in that positioning is provided with the first area Block, it is flush at the top of the top and first area of the locating piece, the quantity of the locating piece is four pieces, and it is respectively arranged at On four corners on floor.
4. liftable building structure according to claim 3, it is characterised in that the quantity of the hoist engine is four, And a corner of the one end of the hawser of each hoist engine with the movable floor is mutually fixed.
5. liftable building structure according to claim 4, it is characterised in that the hoist engine is fixed by fixture It is installed on the column or metope in the 3rd region.
6. liftable building structure according to claim 5, it is characterised in that the side of the movable floor is provided with Roller, the roller and metope are tangent.
7. liftable building structure according to claim 6, it is characterised in that the metope is provided with door, described Door is made up of separate upper door body and lower door body, is connected between the upper door body and lower door body by locking bolt, described The height of lower door body is consistent with the height of first area.
A kind of 8. control system for being applied to liftable building structure as claimed in claim 1, it is characterised in that including:
Clock module, the clock module are connected with lifting controller, for providing temporal information for the lifting controller;
Lifting controller, the lifting controller are connected with hoist engine, for entering to the temporal information transmitted by clock module Row judges, if temporal information reaches default first time point, control hoist engine tightens up hawser, carries out movable floor Rise, after the movable floor reaches the bottom in the 3rd region and touches the second limit switch, hoist engine is stopped;If the time Information reaches default second time point, then controls hoist engine to loosen hawser, declined movable floor, until the activity Floor is reached at the top of first area and after the first limit switch of shake-up, hoist engine is stopped;
Hoist engine, the hoist engine are installed on the 3rd region, for controlling the jacking condition of movable floor.
9. control system according to claim 8, it is characterised in that also include:
Time point setting apparatus, the time point setting apparatus are connected with the lifting controller, and the lifting is set for inputting First time point and the second time point in controller;
Reminiscences is lifted, the lifting reminiscences is connected with the lifting controller, for the control according to lifting controller Instruction, sends prompt message;
Signal loader is lifted, the lifting signal loader is connected with the lifting controller, for the elevating control Device inputs control signal, and the lifting controller is driven according to the control signal to hoist engine,
Controller is overturn, the upset controller is connected with support column and the lifting controller respectively, for being controlled according to lifting The control signal of device processed, control support column is upright or accumbency.
CN201721086802.4U 2017-08-28 2017-08-28 A kind of liftable building structure and its control system Expired - Fee Related CN207144164U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721086802.4U CN207144164U (en) 2017-08-28 2017-08-28 A kind of liftable building structure and its control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721086802.4U CN207144164U (en) 2017-08-28 2017-08-28 A kind of liftable building structure and its control system

Publications (1)

Publication Number Publication Date
CN207144164U true CN207144164U (en) 2018-03-27

Family

ID=61669025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721086802.4U Expired - Fee Related CN207144164U (en) 2017-08-28 2017-08-28 A kind of liftable building structure and its control system

Country Status (1)

Country Link
CN (1) CN207144164U (en)

Similar Documents

Publication Publication Date Title
CN106144804A (en) Intelligent elevator reservation queuing system
CN107401221B (en) A kind of building structure and its lift control system of liftable floor
CN103395669A (en) Shock absorption device for elevator
CN207144164U (en) A kind of liftable building structure and its control system
CN103145009A (en) Building talk-back and elevator interaction system
CN207144163U (en) A kind of building structure and its control system of liftable conversion
CN202441045U (en) Rail-type electric attached lifting scaffold
CN202897699U (en) Construction elevator control system with floor calling function
CN105329746A (en) Multifunctional elevator
CN203158949U (en) Building talk-back and elevator interacting system
CN207943725U (en) A kind of lowrise layer packaged type elevator
CN201254418Y (en) Chassis apparatus of construction hoist
CN107337161A (en) Possesses the workbench in more lifting work areas
CN210418844U (en) Outdoor solar elevator
CN220564044U (en) Residential elevator control device
CN206872192U (en) Split type Non-machine room elevator control cabinet
CN204135412U (en) Rope sheave drill jig
CN106051445B (en) A kind of outside Wall Cleaning safety equipment
CN206751210U (en) The multi-thread boom hoisting of shiftable track
CN201321327Y (en) Device for fixing elevator traction machine
CN202729523U (en) Machine-room-less household elevator
CN204689301U (en) The anchor fitting of a kind of upper beam component for elevator and lower beam assembly
CN202575587U (en) Energy-saving controller of elevator
CN213241749U (en) Anti-congestion intelligent traffic guidance display screen
CN203359714U (en) Control panel used for building hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327