CN207143932U - A kind of artificial digging pile concrete support device - Google Patents

A kind of artificial digging pile concrete support device Download PDF

Info

Publication number
CN207143932U
CN207143932U CN201721077990.4U CN201721077990U CN207143932U CN 207143932 U CN207143932 U CN 207143932U CN 201721077990 U CN201721077990 U CN 201721077990U CN 207143932 U CN207143932 U CN 207143932U
Authority
CN
China
Prior art keywords
groove
hole
connection box
template
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721077990.4U
Other languages
Chinese (zh)
Inventor
杨昌盛
刘庆
徐贵
陈贵全
何锋
蔡灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Poly Xinlian Blasting Engineering Group Co Ltd
Original Assignee
Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinlian Blasting Engineering Group Co Ltd filed Critical Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority to CN201721077990.4U priority Critical patent/CN207143932U/en
Application granted granted Critical
Publication of CN207143932U publication Critical patent/CN207143932U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of artificial digging pile concrete support device,Including four templates and hole,Four templates join end to end and are placed in hole,The utility model is by adding transverse support bar,Head rod,Hole,The second connection structure such as box and filling concrete groove,Be powered the second electromagnet,So that the second electromagnet attracts permanent magnet,So that the second connecting rod departs from the first groove,So as to remove the 3rd connection box,Simultaneously,Due to the disengaging of the second connecting rod,Second conducting strip no longer contacts with the first conducting strip,First electromagnet no longer attracts iron,The first screw rod and the second screw rod are screwed out again,Iron departs from the 3rd groove in the presence of the first spring,Template loses support,The template of left and right ends is set to be separated with the template of upper and lower ends,Next section of concrete support can quickly be entered,It is not only convenient and swift,And improve operating efficiency.

Description

A kind of artificial digging pile concrete support device
Technical field
Supporting field is the utility model is related to, specially a kind of artificial digging pile concrete support device.
Background technology
With development of the country to new district, particularly town road and science of bridge building, artificial digging pile is because easy for construction, fast Degree is very fast, does not need the more low advantage of heavy mechanical equipment, cost to be used widely.Due to caisson underground work condition Difference, bad environments, labor intensity are big, and safety and quality are even more important.As the continuous intensification of artificial digging pile, workmen are past Larger security risk is brought toward ignorance retaining wall quality, as mechanization degree is constantly lifted, it is a kind of more convenient to find, more The artificial digging pile concrete support device of safety is particularly important.
Utility model content
The purpose of this utility model is to provide a kind of artificial digging pile concrete support device, to solve above-mentioned background skill The problem of being proposed in art.
A kind of artificial digging pile concrete support device, including four templates and hole, four templates join end to end It is placed in hole, the upper end of the template offers filling concrete groove, and the both ends of the relative template of one pair of which are fixed The first connection box is connected with, the both ends of the relative template of another pair have been fixedly connected with the second connection box, in same template Two first connection boxes connected by transverse support bar, the both ends of the support bar are connected to the first company by the 5th screw rod The upper surface of box is connect, two in same template second connect the relative one end of box and are fixedly connected with the one of head rod End, the other end of the head rod offer the first groove, and the bottom of first groove is connected with by second spring First conducting strip, the both ends of first groove offer the 3rd threaded passage, and the 3rd threaded passage internal thread is connected with 3rd screw rod, in first groove activity be plugged with the second connecting rod, second connecting rod is located at one in the first groove End is fixedly connected with the second conducting strip, and the second connecting rod offers the first tapped through hole matched with the 3rd screw rod, and described the One tapped through hole is connected with the 3rd screw flight, and two the second connecting rod activities are plugged on the both ends of the 3rd connection box, the Two connecting rods connect one section in box positioned at the 3rd and offer the second tapped through hole, and the second tapped through hole internal thread is connected with 4th threaded rod, the both ends of the 3rd connection box offer the 4th threaded passage matched with the 4th threaded rod, and the 4th Threaded passage is threadedly coupled with the 4th threaded rod, and the one end of second connecting rod in the 3rd connection box is fixedly connected with second The side of electromagnet, the opposite sides of two second electromagnet are connected to up and down the two of permanent magnet by the 3rd spring Side, the permanent magnet are fixedly connected with the 3rd intracavity sidewall for being connected box;
The second connection box offers the second groove close to one end of the first connection box, and the first connection box is close to the One end of two connection boxes offers the 3rd groove, and the bottom of second groove connects one end of iron, institute by the first spring The other end activity for stating iron is plugged in the 3rd groove, and be located in the second groove one section of the iron offers the 3rd screw thread Through hole, the both ends of second groove offer the first threaded passage, and the first threaded passage and the 3rd equal spiral shell of tapped through hole Line connects the first screw rod, and be located in the 3rd groove one section of the iron offers the 4th tapped through hole, the 3rd groove Both ends offer the second threaded passage, and the second threaded passage is threadedly coupled the second screw rod with the 4th tapped through hole, described The bottom of 3rd groove is fixedly connected with the first electromagnet.
Preferably, the filling concrete groove is located at the upper center of template.
Preferably, the 3rd connection box is rectangular frame.
Preferably, the filling concrete groove is in ball coronal structure.
Compared with prior art, the beneficial effects of the utility model are:The utility model is by adding transverse support bar, One connecting rod, hole, second connection the structure such as box and filling concrete groove, staff by filling concrete groove to template with Space between hole is irrigated, by connecting external power source, when needing to carry out next section of perfusion, screw out the 3rd screw rod and 4th screw rod, be powered the second electromagnet, so that the second electromagnet attracts permanent magnet, so that the disengaging first of the second connecting rod is recessed In groove, so as to remove the 3rd connection box, simultaneously as the disengaging of the second connecting rod, the second conducting strip and the first conducting strip are no longer Contact, so as to which the first electromagnet be powered off, the first electromagnet no longer attracts iron, then screws out the first screw rod and the second screw rod, iron Bar departs from the 3rd groove in the presence of the first spring, and template loses support, makes the template of left and right ends and the mould of upper and lower ends Plate separates, and can quickly enter next section of concrete support, not only convenient and swift, and improves operating efficiency.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model top view;
Fig. 3 is A portions structure enlargement diagram;
Fig. 4 is B portions structure enlargement diagram.
In figure:Template 1, first connects box 2, transverse support bar 3, head rod 4, hole 5, second and connects box 6, coagulation Soil perfusion groove 7, the first spring 8, iron 9, the first screw rod 10, the first electromagnet 11, the 3rd screw rod 12, second spring 13, first Conducting strip 14, the second conducting strip 15, the second connecting rod 16, the second electromagnet 17, the 3rd spring 18, permanent magnet 19, the 5th screw rod 20th, the 3rd connection box 21.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:
A kind of artificial digging pile concrete support device, including four templates 1 and hole 5, four templates 1 join end to end and put To put in hole 5, the upper end of template 1 offers filling concrete groove 7, and filling concrete groove 7 is located at the upper center of template 1, Filling concrete groove 7 is in ball coronal structure, is easy to pour into concrete, the both ends of the relative template 1 of one pair of which are fixedly connected with There is the first connection box 2, the both ends of the relative template 1 of another pair have been fixedly connected with the second connection box 6, in same template 1 Two first connection boxes 2 connected by transverse support bar 3, the both ends of support bar 3 are connected to first by the 5th screw rod 20 The upper surface of box 2 is connected, two second relative one end of connection box 6 in same template 1 are fixedly connected with the first connection One end of bar 4, the other end of head rod 4 offer the first groove, and the bottom of the first groove is connected by second spring 13 There is the first conducting strip 14, the both ends of the first groove offer the 3rd threaded passage, and the 3rd threaded passage internal thread is connected with the 3rd Screw rod 12, in the first groove activity be plugged with the second connecting rod 16, one end that the second connecting rod 16 is located in the first groove is fixed The second conducting strip 15 is connected with, and the second connecting rod 16 offers the first tapped through hole matched with the 3rd screw rod 12, the first spiral shell Line through hole is threadedly coupled with the 3rd screw rod 12, two activities of the second connecting rod 16 be plugged on the 3rd connection box 21 both ends, the 3rd Connection box 21 is rectangular frame, and the second connecting rod 16 connects one section in box 21 positioned at the 3rd and offers the second tapped through hole, the Two tapped through hole internal threads are connected with the 4th threaded rod, and the both ends of the 3rd connection box 21 offer what is matched with the 4th threaded rod 4th threaded passage, and the 4th threaded passage is threadedly coupled with the 4th threaded rod, the second connecting rod 16 is positioned at the 3rd connection box 21 Interior one end is fixedly connected with the side of the second electromagnet 17, and the opposite side of two the second electromagnet 17 is distinguished by the 3rd spring 18 The both sides up and down of permanent magnet 19 are connected to, permanent magnet 19 is fixedly connected with the 3rd intracavity sidewall for being connected box 21;
Second connection box 6 offers the second groove close to one end of the first connection box 2, and the first connection box 2 connects close to second The one end for connecing box 6 offers the 3rd groove, and the bottom of the second groove connects one end of iron 9 by the first spring 8, iron 9 Other end activity is plugged in the 3rd groove, and be located in the second groove one section of iron 9 offers the 3rd tapped through hole, and second is recessed The both ends of groove offer the first threaded passage, and the first threaded passage and the 3rd tapped through hole are threadedly coupled the first screw rod 10, be located in the 3rd groove one section of iron 9 offers the 4th tapped through hole, and the both ends of the 3rd groove offer the second screw thread Duct, and the second threaded passage is threadedly coupled the second screw rod with the 4th tapped through hole, the bottom of the 3rd groove is fixedly connected with First electromagnet 11.
Operation principle:Staff is irrigated by filling concrete groove 7 to the space between template 1 and hole 5, is led to Connection external power source is crossed, when needing to carry out next section of perfusion, screws out the 3rd screw rod 12 and the 4th screw rod, be powered the second electromagnet 17, so that the second electromagnet 17 attracts permanent magnet 19, so that the second connecting rod 16 departs from the first groove, so as to remove the Three connection boxes 21, simultaneously as the disengaging of the second connecting rod 16, the second conducting strip 15 no longer contacts with the first conducting strip 14, from And power off the first electromagnet 11, the first electromagnet 11 no longer attracts iron 9, then screws out the first screw rod 10 and the second screw rod, iron Bar 9 departs from the 3rd groove in the presence of the first spring 8, and template 1 loses support, makes the template 1 and upper and lower ends of left and right ends Template 1 separate, can quickly enter next section of concrete support, it is not only convenient and swift, and improve operating efficiency.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of artificial digging pile concrete support device, including four templates (1) and hole (5), it is characterised in that:Four institutes To state template (1) and join end to end and be placed in hole (5), the upper end of the template (1) offers filling concrete groove (7), wherein The both ends of a pair of relative templates (1) have been fixedly connected with the first connection box (2), and the both ends of the relative template of another pair (1) are equal The second connection box (6) is fixedly connected with, the two first connection boxes (2) in same template (1) pass through transverse support bar (3) Connection, the both ends of the support bar (3) are connected to the upper surface of the first connection box (2) by the 5th screw rod (20), positioned at same Two second in one template (1) relative one end of connection box (6) are fixedly connected with one end of head rod (4), and described the The other end of one connecting rod (4) offers the first groove, and the bottom of first groove is connected with by second spring (13) One conducting strip (14), the both ends of first groove offer the 3rd threaded passage, the 3rd threaded passage internal thread connection Have the 3rd screw rod (12), in first groove activity be plugged with the second connecting rod (16), second connecting rod (16) is located at One end in first groove is fixedly connected with the second conducting strip (15), and the second connecting rod (16) offers and the 3rd screw rod (12) First tapped through hole of matching, first tapped through hole are threadedly coupled with the 3rd screw rod (12), two second connecting rods (16) activity is plugged on the both ends of the 3rd connection box (21), and the second connecting rod (16) connects one section in box (21) positioned at the 3rd and opened Provided with the second tapped through hole, the second tapped through hole internal thread is connected with the 4th threaded rod, the 3rd connection box (21) Both ends offer the 4th threaded passage matched with the 4th threaded rod, and the 4th threaded passage connects with the 4th threaded rod screw thread Connecing, the one end of second connecting rod (16) in the 3rd connection box (21) is fixedly connected with the side of the second electromagnet (17), The opposite side of two second electromagnet (17) is connected to the both sides up and down of permanent magnet (19) by the 3rd spring (18), The intracavity sidewall that the permanent magnet (19) is connected box (21) with the 3rd is fixedly connected;
The second connection box (6) offers the second groove, the first connection box (2) close to one end of the first connection box (2) The 3rd groove is offered close to one end of the second connection box (6), the bottom of second groove connects iron by the first spring (8) One end of bar (9), the other end activity of the iron (9) are plugged in the 3rd groove, and the iron (9) is located in the second groove One section offer the 3rd tapped through hole, the both ends of second groove offer the first threaded passage, and the first screwed hole Road and the 3rd tapped through hole are threadedly coupled the first screw rod (10), and be located in the 3rd groove one section of the iron (9) offers 4th tapped through hole, the both ends of the 3rd groove offer the second threaded passage, and the second threaded passage and the 4th screw thread Through hole is threadedly coupled the second screw rod, and the bottom of the 3rd groove is fixedly connected with the first electromagnet (11).
A kind of 2. artificial digging pile concrete support device according to claim 1, it is characterised in that:The concrete fills Note groove (7) is located at the upper center of template (1).
A kind of 3. artificial digging pile concrete support device according to claim 1, it is characterised in that:3rd connection Box (21) is rectangular frame.
A kind of 4. artificial digging pile concrete support device according to claim 1, it is characterised in that:The concrete fills It is in ball coronal structure to note groove (7).
CN201721077990.4U 2017-08-27 2017-08-27 A kind of artificial digging pile concrete support device Expired - Fee Related CN207143932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721077990.4U CN207143932U (en) 2017-08-27 2017-08-27 A kind of artificial digging pile concrete support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721077990.4U CN207143932U (en) 2017-08-27 2017-08-27 A kind of artificial digging pile concrete support device

Publications (1)

Publication Number Publication Date
CN207143932U true CN207143932U (en) 2018-03-27

Family

ID=61670068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721077990.4U Expired - Fee Related CN207143932U (en) 2017-08-27 2017-08-27 A kind of artificial digging pile concrete support device

Country Status (1)

Country Link
CN (1) CN207143932U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524140A (en) * 2017-08-27 2017-12-29 贵州新联爆破工程集团有限公司 A kind of artificial digging pile concrete support device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524140A (en) * 2017-08-27 2017-12-29 贵州新联爆破工程集团有限公司 A kind of artificial digging pile concrete support device

Similar Documents

Publication Publication Date Title
CN107524140A (en) A kind of artificial digging pile concrete support device
CN207143932U (en) A kind of artificial digging pile concrete support device
CN207218161U (en) A kind of cable bridge
CN106946141A (en) A kind of sucked type plays hanging box paw
CN201679230U (en) Adjustable iron tower base foundation bolt positioning template
CN206441487U (en) A kind of advertising lamp box for being conveniently replaceable advertisement
CN206639681U (en) A kind of transformer body fastening structure
CN206722448U (en) A kind of novel building ergonomic support device
CN207904967U (en) A kind of underpass side wall pours rack
CN207245185U (en) Steel structure concrete building template
CN206748385U (en) A kind of construction tool rack easy to use
CN205629956U (en) Electric power communication staple bolt processing equipment of acting as go -between
CN206859830U (en) A kind of portable municipal guardrail
CN206564177U (en) Inductor magnetic core
CN206831270U (en) A kind of seamless spliced wall lamp
CN203231053U (en) Supporting plate special for tractor rack
CN207026220U (en) A kind of punch press panel for being easy to open
CN206832854U (en) Insulating bar hanger bracket
CN203773899U (en) Novel road construction warning board
CN206941876U (en) A kind of hoisting prefabricated wall of ACC building blocks assembling
CN203967707U (en) A kind of heavy cable actinobacillus device
CN209327260U (en) A kind of inserted-link type Moisture Meter
CN206670542U (en) A kind of connector pinout flatness detection tool
CN207436001U (en) A kind of hydraulic engineering ecological protection slope protective device
CN206256695U (en) Construction mould placing box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Patentee after: POLY XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd.

Address before: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Patentee before: GUIZHOU XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

CF01 Termination of patent right due to non-payment of annual fee